ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 7 Status: YM N[] U[

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P70-AOO2B Equip. Class, Equipment Description, Emergency N2 Bottle Location: Bldg. REACTOR Floor El. 130 Room, Area RL-R9 Manufacturer, Model, Etc. (optional but recommended)

Instructions, for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting: other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is.theanchorage free of bent, broken, missing or loose hardware? YEI NO U" N/AU1
3. Is the anchorage free of corrosion that is more than mild surface YI Nil UI- N/AU oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI ULI N/AU'
5. Is the anchorage configuration consistent with plant documentation? YO NE Ur- N/AU (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

DrawingH-43368 Rev. 0

6. Based on the above anchorage evaluations, is the anchorage free of YZ NI UE3 potentially adverse seismic conditions?

'Enter the equipment class name from Appendix B: Classes of Equipment.

Page 382 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: YM Nn] Uri Seismic Walkdown Checklist (SWC)

Equipment-ID No. 1P70-A.f2B eEquip. Class' 0 Equipment Description EmercencV N2 Bottle Interaction.Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NI] UtI] N/AL]

.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE- N/AE-and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines, have adequate: flexibility to. avoid damage? YN NEI UWE NIAEl
10. Based on the above seismic interaction evaluations, is equipment free YN NEI UE1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UL]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

There are several housekeeping issues with Emergency N2 Bottle Rack 1P70-AOO2B. There does not appearto be an NPL tag affixed toi the rack to aidin identifying the item (CR 516094); there is a rolled up sheet ofpaper with a metal tool of some sort (it appearsto be a wrench) in the top left tube steel horizontalmember; there is a bottle cap sitting between two of the bottles at-the base of the rack; andthere is a bottle cap sitting in the back of the rack near the diagonalsupport. In addition, there is a section of chain at the back of the rack at the same location as the bottle cap. All of these items are small and4relativelylight. Duringa seismic eyent, it.is likely: that the items will move from their existing locations,but do not have thepotential to strike anything other than the bottle racksupports due to the location of the rack and its distancefrom any safety relatedSSCs. Therefore, it isjudged to have: no potentiallyadverse seismic condition.

Evaluated by: John McFarland Date: 09/12/2012 Jeff Horton 09/12/2012.

Page 383 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: Y] Nil] U[]

Seismic Walkdown Checklist ($WC).

Equipment ID No. 1P70-A002B Equip. Class, 0 Equipment Description Emergency N2 Bottle Photographs Tag missing, so no picture available.

Figure 1 - Equipment 1D No (1P70-AO02B)

Page 384 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 7 Figure 2 - Equipment Elevation (1P70-AO02B)

Page 385 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Figure 3 -Tool and Paper in Top Tube Steel Horizontal (IP70-AO02B)

Page 386 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

_Sheet 6 of 7 Figure 4 - Bottle Cap near Rack Base (IP70-AO02B)

Page 387 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 7 of 7 Figure 5 - Bottle Cap between Bottles (1P70-AO02B)

Page 388 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 9 Status: Yfl N23 UL]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-FOO9B Equip. Class' Equipment Description AIR-ACTUATED DAMPER B0033B IN Location: Bldg. :CONTROL Floor El. 180 Root Manufacturer, Model, Etc. (optional but recommended)

.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic%Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklistfor documenting othercomments.

Anchorage

1. Is the anchorage configuration Verification required (i.e., is the item one YE NO of the 50% of SWEL items requiring such verification)?

This component is a inline airoperated HVAC Damperthat is insulated.

These components are manufacturersupplied components which come designed for seismic conditions describedby the plant seismic response.

2. Is the anchorage free of bent, broken, missing or loose~hardware? YLI NEI UE" N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YE- NEI UE NIAZ oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE- NEI UEI N/AO Inline air operated HVAC dampernot anchored in concrete.
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AO (Note: This question only applies if the. item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UEi potentially adverse seismic conditions?

I Enter the equipment class name from Appendix B: Classes.of Equipment,.

Page 389 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 9 Status: YE] NE U-]

Seismic Walkdown :Checklist (SWC)

Equipment ID No; 1Z41-F009B Equip. Class- 0 7 Equipment Description AIR-ACTUATED DAMPER B003B IN Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YI NEI U0- N/A[l
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI Ur- N/AEl and masonry block walls not likely to collapse onto the equipment?

Scafolding above component is tied down andjudged seismically adequate by the SWE's

9. Do-attached lines have adequateflexibility to avoid damage? Y1Z NEI U0- N/A[E]
10. Based on the above seismic interaction evaluations, is equipment free YN NE] UE-of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found~no other seismic conditions that could YE] NE UE]

adversely affect the safety functions of the equipment?

Because the duct is insulatedat the damperflange connection the flange connection bolts could not be checked for broken, missing or loose hardware.All visible surfaces were inspected and no potential adverse conditions were found. Disassembly of the insulationwould be requiredto inspect the flange connection bolts, which are not consideredto be anchoragefor the component.

In addition, The seismic support of the Air Line identified as an iPEEE vulnerability describedin DCR 93-055 has apparently not been completed because the Air pipe is not adequately supported for seismic loads. The end of the hardpipe needs to be attached to an existing Unistrut with a P2558 or equivalent2 bolt pipe clamp (See Figures4, 5 and 6 for details). CR 525292 has been written to addressthis condition.

Page 390 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 9 Status: Y[] NO U-Seismic Walkdown Checklist (SWC)

Equipment ID No, iZ41-FO09B Equip. C Equipment Description AIR-ACTUATED DAMPER, Comments (Additional pages may be added as necessar' None

-I Evaluated by: John McFarland Date: 09/26/2012 Jeff Horton 09/26/2012 Page 391 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 9 Status: YE[ NM Uj]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Z41-FOO9B Equip. Class, 0.7 Equipment Description AIR-ACTUA TED DAMPER B003B IN Photographs Figure 1 - Equipment ID No (I Z4 I-F009B)

Page 392 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 9 Figure 2 Component Picture Page 393 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of g Figure 3 Scaffolding Above Component.

Page 394 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 9 Figure 4 Missing Support on Air Line Hard Pipe to Valve IZ41-FO09B Page 395 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 8 of g Figure 5 Air Line Pipe to Valve IZ41-F009B at Floor Level showing Pipe Supports Page 396 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 9 of 9 Figure 6 Air Line to Valve I Z41 -F009B at Floor Level showing additional Pipe Supports Page 397 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 5 Status: Y[ N-] U[-

Seismic Walkdown Checklist (SWC)

Equipment'ID No. 1E21-COO1A Equip. Classi 5 Equipment Description Core Spray Pump 1A Location: Bldg. REACTOR Floor El. 87 Room, Area SEDiagonal Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This. checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the. results ofjudgments. and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoratge

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YI9 NO UO N/AE-
3. Is the anchorage free of corrosion that Ms more than mild surface YlZ NO UD N/AC oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0 NO UC N/A]
5. Is the anchorage configuration consistent with plant documentation? YZ NE UO N/AC (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Dwgs. H-15138 Rev. 6 and H-5019 Rev, 7

6. Based on the above anchorage evaluations, is the anchorage free of YN NEI UOI-potentially adverse seismic conditions?

Enter the equipment.ciass name from Appendix B: Classes of Equipment.

Page 398 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2.of 5 Status: YZ NI] UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1E21-COOIA Equip. Class, Equipment Description Core Sprav Pump 1A Interaction Effects

7. Are soft.targets free from impact by nearby equipmentor structures? YZ NO! UO N/AD
8. Areoverhead equipment, distribution systems, ceiling tiles and lighting, YO NE UEJ N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YO NEI U] N/AQ There is aflexible conduit section between the top of the pump and a rigidconduit section above the pump that isfairly tight. It isjudged that theflex conduit can deflect 1" without putting significantstress on the conduit. SWE'sjudge that the pump will move less than.0.5" during a seismic event.due to the elevation.and rigidity of the equipment CalculationSCNH-91-069 Rev. Ofor the adjacentRH7R pump of the same type gives a maximum pwnp deflection of less than 0.2" at thetop of the pump, Therefore, it isjudged that the line has adequateflexibilityfor the pump seismic deflections.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UO of potentially adverse seismic interaction effebts?

Other Adverse Conditions

11. Have you looked for and. found no other seismic conditions that could Y0 NO UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Since the component extends between two gratingpladforms,Area Walk-bys were performedfor both EL. 87'-0" and EL. 95'-0".

Evaluated by: John McFarland Jeff Horton iey z 09/0612012 Page 399 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YE N[] Uf-Seismic Walkdown Checklist (SWC)

Equipment ID No. IE21-COOIA Equip. Class, 5 Equipment Description Core Swray Pump 1A Photographs Figure I - Equipment ID No (I E21 -COO IA)

Page 400 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (1 E21 -COO IA)

Page 401 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 - Attached Flex Conduit (1E2 I-COO 1A)

Page 402 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet I Of 7 Status: YE] NO U[-

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1HI 1-P652 Equip. Class' 20 EquipmentlDescription Elec. Aux. PWR Control Console Location: Bldg. CONTROL Floor El. 164 Room, Area Unit 1 Control Room Manufacturer,, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the:

SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklistfor documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e.,. is the item one YZ NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y0 NI] UE] N/AL)
3. Is the anchorage free of corrosion that is more than mild surface YZ NEI UtI N/AL) oxidation?
4. Is the anchorage, free of visible cracks in the concrete near the anchors? YZ NEI U"] N/AEl
5. Is the anchorage configuration consistent with plant documentation? YE NEI ULI N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The as-found anchorageconfigurationis consistent with SEWS package (Dated: 10/23/1988). All anchors were determined to be installedand free.of adverse seismic conditions..

Enter the equipment class name from Appendix B: Classes of Equipment, Page 403 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 7 Status: Y[1 NO U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1Hi 1-P652 Equip. Class' 20 Equipment Description Elec. AUX. PWR Control Console

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI Ur-potentially adverse, seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YEI NO UE1 N/All Long florescent light bulbs inside the panel have no covers or restraints., The florescent light bulbs may become loose during a seismic event and impact wires and components inside the cabinet.

According to the SEWS package, this panel contains essential relays that could be potentially impacted. CR # 520462 was initiatedto evaluate and resolve this condition.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI U-l N/A[I and masonry block walls not likely to collapse onto the equipment?

A ladder was used and permission obtained to remove the ceiling panels near 1-H11-P652. The frames for the ceiling tiles arejudged to be adequate to prevent the tiles from falling during a seismic event.

The overhead equipment, distributionsystems, and lighting were installedwith rigid restraintsor rod hung with multiple tie wires to limit horizontalmovement. The tie wires are also consistent with the IPEEE outlierresolution to prevent the light fixtures from falling (DCR 90-010).

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UEl N/AU Page 404 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 7 Status: YE] NZ U--]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1HII-P652 Equip. Class, Equipment Description Elec. Aux. PWR Control Console

10. Based on the above seismic interaction evaluations, is equipment free YM NEI U-of potentially adverse seismic interaction effects?

There were no bolts at rearvertical side connection of Panel 1-HI 1-P652 to Panel 1-HI11-P651. Five bolts were intalled in the middle verticalsupport member. Also, the bottom bolt on the rearvertical side connection of Panel 1-Hl I-P652 to Panel 1-HI 1-P600 does not have full thread engagement. Only approximately 2 threads are engaged in the nut'(See Picture #3). All otherbolts were properly installed. The details of these connections areý not specified in the availabledesign documents. Perreview of the SEWS package,,the panel weight is conservatively approximated to be 8300/bs. The maximum horizontal accelerationof the panels 0.75g. The evaluation included in the SEWS package concluded that the floor anchors have sufficient capacity to resist the maximum horizontalacceleration. Therefore, the bolts which connect the panels are required to only restrainthe cabinets so that there is no differentialmovement and consequent banging of the panels.

Both. sides of Panel 1-HI I-P652 are also attached to the adjacent panels at the lower front sides with two 518" diameterbolts. The loading of the sides of the panels are distributeddue to the attached terminal strips, electricalcomponents and wires. There are no significantconcentratedloads at the rear edge of the panels.

Therefore, consideringthe maximum capacity of the existing bolts (518" diameter), the loads associatedwith differential movement of the cabinets arejudged to be adequately restrained. The rear vertical connection of Panel 1-H1 I-P652 to Panel 1-HI 1-P652 does not need to be enhanced and the bolt with less than optimal thread engagement does not need to be replaced.

Other Adverse Conditions

11. Haveyou looked for and found no other seismic conditions that could YN NEI UI-adversely affect the safety functions of the equipment?

Components inside the panel were inspected visually in accordance with the directionprovided in the FAQ related to opening panels.

Comments (Additional pages may be added as necessary)

None Page 405 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 Of 7 Status: YE[] N[M U-]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1HII-P652 Equip. Classl 20 Equipment Description Elec. Aux. PWR Control Console Evaluated by: Date: 09119/2012 09/19/2012 Page 406 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 7 Status: YO] NO UM]

Seismic Walkdown Checklist (SWC)

Equipment ID No. tHI,-P652 Equip. Class' 20 Equipment Description Elec. Aux. PWR Control Console Photographs 1: Equipment MPL# 1H11-P652 (

Page 407 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 7 2: Equipment MPL# 1H11-P652 (back)

Page 408 of 436 I

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 7 of 7 3: Lack of Thread Engagement Page 409 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet iof 6 Status: Y[Z NEI U-Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R42-S028 Equip. Class:

Equipment Description 125V BATTERY CHARGER IC Location: Bldg. CONTROL Floor El. 130 Rooi Manufacturer, Model, Etc. (optional but recommended),

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other cornments, Anchorasze

1. Is the anchorage configuration verification required (i.e., is the item one Y0 NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UI N/Al
3. Is the anchorage free of corrosion that is more than mild surface YZ NO U0I N/Ar oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YI NilO UE N/All Small amount of surface roughnesson the concrete that has no effect on the anchorembedment. Therefore, the SWE's have determined that this has no effect on the seismic capacity of the anchorage.
5. Is the anchorage configuration consistent with plant documentation? YZ NO U0 N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Calculation SCNH-91-026 Rev. 2

6. Based on the above anchorage evaluations, is the anchorage free of YZ NE U0 potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 410 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 6 Status- YM NO [- ]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R42-S028, Equip. Class' 16 Equipment Description 125V BATTERY CHARGER IC interaction, ffects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI Ur'D N/Ar
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YER NO ULIEN/AD and masonry block walls not likely to collapse onto the equipment?

The seismic capacityof the concrete block walls C130-009A, C130-.

010B, CI30-011A and C130-012B were verified using Drawing H-40383, Rev. 2 and Hatch Unit 2 UFSAR Table 3.8-20.

9. Do attached lines have adequate flexibility to avoid damage? YO ND U. NMAD
10. Based on the above seismic interaction evaluations,,is equipment free YN NEI U-of potentially adverse seismic interactioneffects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NO U-adversely affect the'safety functions of the equipment?

Components inside the battery chargerwere inspected visually in.

accordancewith the directionprovided in the FAQ relatedto opening panels per Work QrderSNC436314. There is one empty hole at the top of the battery chargerfor an additionalgroundingline that is not being utilized, so no bolt is missing from the hole. Therefore, this is not a potentially adverse seismic condition, and no otherpotentially adverse seismic conditions were identified.

Comments (Additional pages maybe added as necessary)

None.

Evaluated by: John McFarland ,, , , Date: 09/2512012 Jeff Horton 09/2512012 Page 411 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 6 Status: YZ NE] UM]

Seismic Walkdown Checklist (SWC)

Equipment ID No. IR42-S028 Equip. Class, Equipment Description 125V BATTERY CHARGER IC Photographs Figure 1 Equipment ID 1R42-S028 Page 412 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 6 Figure 2 Component Picture Page 413 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 6 Figure 3 Concrete Surface Roughness under Charger Page 414 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 6 of 6 Figure 4 Empty Grounding Line Socket Page 415 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0

ýSheet 1 of 5 Status: Y[ NR] U-Seismic Walkdown Checklist (SWC)

Equipment lID No. 1R42-S057 Equip. Class' 16 Equipment Description BATTERY CHARGER lAB Location: Bldg. CONTROL Floor El. 130 Rooi Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofj udgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YF- NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEl UE0 N/A[l
3. Is the anchorage free of corrosion that is more than mild surface YO NEl UI- N/All oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? Y[ NEl U[- N/AEl
5. Is the anchorage configuration consistent with plant documentation? YEI NEI UEI N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN NEI U-]

potentially adverse seismic conditions?

IEnter the equipment class name from Appendix B: Classes of Equipment.

Page 416 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YZ NI-- U-Seismic Walkdown Checklist (SWC)

Equipment DD No. IR42-S057 Equip. Class, 16 Equipment Description BATTERY CHARGER 1AB Enteraction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[3 NE] UE] N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NO] UE N/AO and masonry block walls not likely to collapse onto the equipment?

The seismic capacity of the concrete block wall C130-050A. which the Battery Chargeris anchoredand the closest remainingconcrete block wall: C130-047F were verified using Drawing H-40383, Rev. 2 and Hatch Unit 2 UFSAR Table 3.8-20.

9. Do attached lines have adequate flexibility to avoid damage? YZ NO UE NIAO The conduit interconnectingthe chargersshown in Figure3 is not a seismic concern because the chargersare anchoredto the same wall so there will be no seismic differential.movements between the two Battery Chargers.
10. Based on the above seismic interaction evaluations, is equipment free YO NE] UE]

of potentially adverse seismic interaction effects?

Other Adverse Conditions 1.1. Have you looked for and found no other seismic conditions that could YZ NE] UE-adversely-affect the safety functions of the equipment?

Components inside the battery chargerwere inspected visually in accordancewith the direction provided in the FAQ related toý opening panels per Work OrderSNC436314. No potentially adverse seismic conditionswere identified..

Comments (Additional pages may be added as necessary)

None Evaluated by: John McFarland dq Date: 09/25/2012 Jeff Horton,,~~ 09/25/2012 Page 417 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: YN Nn UE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1R42-S057 Equip. Class, 16 Equipment Description BATTERY CHARGER lAB Photographs Figure I Equipment ID: 1R42-S057 Page 418 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 Component Picture Page 419 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 5 of 5 Figure 3 Conduit Tied between Battery Chargers on the same wall Page 420 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheetil1 of 5 Status: Y[ NE] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P52-AOOI Equip. Class' Equipment Description ESS Air ACC Location: Bldg. REACTOR Floor El. 130 Room, Area. Torus Room Bay 3 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is providedat the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YO NE] Ur] N/AZ The equipment is an inline component, so there is no anchorage.
3. Is the anchorage free of corrosion that is more than mild surface Y0 NE] UE] N/A[Q oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YZ NEI Ur- N/ArZ
5. Is the anchorage configuration consistent with plant documentation? YE] NC] Ui] N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the: anchorage free of YO NEI UE-potentiallyadverse seismic conditions?

'Enter the equipment class name from AppendixB: Classes of Equipment.

Page 421 of 436

ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 2 of 5 Status: YZ N[-] UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P52-AOOI - Equip. Class, Equipment Description ESS Air ACC Interaction Efffects

7. Are .soft.targets free from impact by nearby equipment or structures? Y! NE] U-1 N/AE]

8.. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ N[l] Ur N/A[']

and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage? Y0 NEI UE1 N/AE" 10., Based on the above seismic interaction evaluations, is equipment free Y NErI UE]

of potentially adverse seismic interaction effects?

OtherAdverse Conditions

11. Have you looked for and found no other seismic conditions that could Y0 NO' UEI adversely affect the safety functions of the equipment?

There isafallprotection strap left on theESSAirACC (CR 519465).

The strap is wedged between the component andthe supportsteel and is not attachedto any otherfall protectionequipment. It appearsthat the strap could not be removedfrom the support andwas.abandoned The strap is very light and is not near any sensitive parts of the component, so it isjudged that the strap does not have the ability to create a*potentiallyadverse seismic condition.

Comments (Additional pages may be added as necessary)

There does not appearto be an MPL tag affixed to the ESS AirACC 1P52-AO01 to aid in identifying the item (CR 519468).,

Evaluated by: John McFarland Date: 09/17/2012 Jeff Horton 09/17/2012 Page 422 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 5 Status: Y]. NEI] U-Seismic Walkdown Checklist (SWC)

Equipment ID No. IP52-AO01 Equip. Class1 I Equipment Description ESS Air ACC Photographs There is no MPLnumber, so this picture is not available..

Figure 1 -Equipment ID No (IP52-AOO1)

Page 423 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCHO82-RPT-01, VERSION 1.0 Sheet 4 of 5 Figure 2 - Equipment Elevation (I P52-AOO 1)

Page 424 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-gl,, A V V6ft 1.0 Figure 3 - Abar'doflc Fall Pctr-t~ifl) Strap (1P52-AO0l)

Page 425 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 4 Status: YZ N']. uE]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F548 Equip. Class, Equipment Description TORX CA V/FUEL PL GT SEAL Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on. the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage L, Is the anchorage configuration verification required (i.e,, is the item one YE] NO of the 50% of SWEL items requiring such verification)?

This is an in-line component and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE] NEI UE] N/AO
3. Is the anchorage free of corrosion that is more than mild surface YE] NEI UE] N/AN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YEI NEI UE] N/AO
5. Is the anchorage configuration consistent with plant documentation? YE] NE] UE] N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YO NO- UE potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B3:Classes of Equipment.

Page 426 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM NE] UF]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F548 Equip. Class' 0 Equipment Description TORX CA V/FUEL PL GT SEAL Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UEI1 N/Arl
8. Are overhead equipment, distribution sYstems, ceiling tiles and lighting, YJR NEI ULI N/AEl and masonry block walls not likely to collapse onto the equipment?

9, Do attached lines have adequate flexibility to avoid damage? YN NO U-' N/AE-1.0. Based on the above seismic interaction evaluations, is equipment free YZ NE U0I of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Some parts of the line is wrappedin duct tape. This is judged not to be a seismic concern. Area walk by was performed within the package for 1P51-F555.

Evaluated by: KURSA T KINALI A, Date: 9/18/2012 WESLEY WILLAMS 9/18/2012 Page 427 of 436

,ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YN N[E] U-]

Seismic Walkdown Checklist (SWC)

Equipment IDNo. 1P51F548 - Equip. Class1 0 Equipment Description TQRX CAVIUEL PLGT SEAL.

Photographs Page 428 of 436

0 , ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 429 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 1 of 3 Status: YN NE] U[]

Seismic Walkdown Checklist (SWC)

EquipmentID No. 1P51F555 Equip. Class Equipment Description GATE SEAL 1' 150# BALL VLV Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraae

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NO of the 50% of SWEL items requiring such verification)?

This is an in-line equipment and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? YUI NEI UI-' N/AZ
3. Is the anchorage free of corrosion that is more than mild surface YEll NO] UE- NIAN oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] NIAN
5. Is the anchorage configuration consistent with plant. documentation? YD1 NEI UE] N/AI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage. free of YO NEI UE1 potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Page 430 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 3 Status: Y* N[:] U-]

Seismic Walkdown Checklist (SWC)

Equipment ID E No. P51F555 Equip. Class Equipment Description GATE SEAL 1' 1604 BALL VLV Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEl U-] N/A["I
8. Are overhead equipment, distribution systems, ceilingtiles and lighting, YZ NEI UL N/A0 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility tb avoid damage? YN NI U-- N/AU
10. Based on the above seismic interaction evaluations, is equipment free Y0 NEI UEU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YlZ N-], UU adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within: the package for 1P51-F555.

Evaluated by: KURSAT KINALI ,42"0 Date: 9/18/2012 WESLEY WILLIAMS/ I/ 9/18/2012 Page 431 of 436

  • 'ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 3 Status: YN NEI U"]

Seismic Waikdown Checklist (SWC)

Equipment ID: No. 1P51F555 - Equip. Class, Equipment Description GATE SEAL 1' 150# BALL VLV Photographs Page 432 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet i of 4 Status: YN Nn UW[

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F558 Equip. ClassO 0 Equipment Description GATE SEAL I'150# BALL VLV Location: Bldg. REACTOR Floor El. 228 Room, Area Refueling Floor Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be'used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE] NN of the 50% of SWEL items requiring such verification)?

This is an in-line component and has no anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? YEI NEI UE] N/At
3. Is the anchorage free of corrosion that is more than mild surface YE] NE] UE] N/A21 oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NE] UE] N/AN
5. Is the anchorage configuration consistent with plant documentation? YEI] NEI UE] N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.):

6.. Based on the above anchorage evaluations, is the anchorage free of Y] NEI UEI potentially adverse seismic conditions?

'Enter the equipmentclass name from Appendix B: Classes of Equipment.

Page 433 of 436

ATTACHMENT 3:. SEISMIC WALKIDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 2 of 4 Status: YM Nr- U--

Seismic, W~alkdown Checklist (SWC)

Equipment ID No. 1P51F558 Equip. Class, Equipment Description GATE SEAL 1'150# BALL VLV Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y1Z NO- UL1 N/AE]
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NEI U-1 N/AE3 and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YV NEI Ur] N/AE]
10. Based on the above seismic interaction evaluationsi is equipment free YE NE-I UI-1 of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NEI U-1 adversely affectthe safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk by was performed within the package for 1P5I-F555.

Evaluated by: KURSA T KINALI 2

LL Date: 9118/2012 WESLEY WILLIAMS 9/18/2012 Page 434 of 436

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 3 of 4 Status: YI N[] U[]

Seismic Walkdown Checklist (SWC)

Equipment ID No. 1P51F558 Equip. Class' 0 Equipment Description GATE SEAL 1' 150# BALL VLV Photographs Page 435 of 436

0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCH082-RPT-01, VERSION 1.0 Sheet 4 of 4 Page 436 of 436