Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24005A1145 January 2024Recommendation for 2023-301 Cr/Sim 3 (Emergency Depress the Reactor Using Main Steam Line Drains)
NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 202114 July 2022Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021
A000412, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2 December 2021National Pollutant Discharge Elimination System (NPDES) Permit Renewal ApplicationUltimate heat sink
License Renewal
Biofouling
Power Uprate
NL-20-1295, 10 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B14 December 202010 CFR 71.95 Report on Non-Compliance Involving Radwaste Cask 3-60B
ML20303A17829 September 2020Submittal of Revision 38 to Updated Final Safety Analysis ReportQualified Offsite Circuit
License Renewal
Fuel cladding
Offsite Circuit
NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 130 September 2019Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Dissimilar Metal Weld
NL-18-0863, CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 Examinations21 June 2018CFR 50.55a Request for Alternative HNP-ISI-ALT-05-04 Implementation of BWRVIP Documents in Lieu of Certain 8-N-1 and 8-N-2 ExaminationsAging Management
EVT-1
NL-18-0506, Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test16 April 2018Failure to Observe the Certificate of Compliance Condition of the 8-120B Cask Pre-Shipment Leak Test
NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure6 April 2018Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher PressureThrough-Wall Leak
NL-18-0282, Enclosure 1: NFPA 805 LAR Transition Report for Edwin I. Hatch4 April 2018Enclosure 1: NFPA 805 LAR Transition Report for Edwin I. Hatch
NL-17-1916, Pressure and Temperature Limits Report27 November 2017Pressure and Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
ML18012A05831 October 2017NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.Earthquake
NL-18-0026, NEDO-33884, Revision 0, Gnf Fecrai Atf Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.31 October 2017NEDO-33884, Revision 0, Gnf Fecrai Atf Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.Earthquake
NL-18-0026, NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.31 October 2017NEDO-33884, Revision 0, Gnf Fecrai ATF Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.Earthquake
NL-18-0026, NEDO-33883, Revision 0, Gnf Armor Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.30 September 2017NEDO-33883, Revision 0, Gnf Armor Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1.Fuel cladding
NL-17-1255, Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope High Frequency Confirmation Evaluation22 August 2017Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope High Frequency Confirmation EvaluationMission time
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Large early release frequency
Earthquake
NL-17-0955, Alternatives HNP-ISI-ALT-05-05 and HNP-ISI-ALT-05-065 June 2017Alternatives HNP-ISI-ALT-05-05 and HNP-ISI-ALT-05-06Hydrostatic
VT-2
Finite Element Analysis
Pressure and Temperature Limits Report
ML17069A24013 April 2017Mitigating Strategies Assessment (CAC Nos. MF7932 and MF7933) - RedactedUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
ML16356A01716 December 2016Information Report for Lead Use AssembliesShutdown Margin
Anticipated operational occurrence
Channel-control blade interference
Flow Induced Vibration
NL-16-2466, Fukushima Near-Term Task Force Recommendation 2.1 Expedited Seismic Evaluation Process Report Completion15 December 2016Fukushima Near-Term Task Force Recommendation 2.1 Expedited Seismic Evaluation Process Report CompletionHigh Radiation Area
Ultimate heat sink
Probabilistic Risk Assessment
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
Power-Operated Valves
Power Operated Valves
NL-16-1136, Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope Low Frequency Evaluation10 August 2016Fukushima Near-Term Task Force Recommendation 2.1 Seismic Limited-Scope Low Frequency EvaluationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
NL-16-0463, Submittal of 10 CFR 50.46 ECCS Evaluation Model, Annual Report for 2015 and Significant Change/Error Report1 April 2016Submittal of 10 CFR 50.46 ECCS Evaluation Model, Annual Report for 2015 and Significant Change/Error Report
NL-15-2010, E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B2 November 2015E.I. Hatch - Submits 10 CFR 71.95 Report on Non-Conformance Involving Radwaste Cask 8-120B
NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B21 August 2015Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B
ML15097A42427 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 of the NTTF ReviewSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML15106A31017 April 2015April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing AnalysisHigh Radiation Area
Minimum staff
ML14335A13725 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents)Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Containment Hardened Vent
Earthquake
Scaffolding
NL-14-1989, Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.130 December 2014Expedited Seismic Evaluation Process Report - Fukushima Near-Term Task Force Recommendation 2.1High Radiation Area
Ultimate heat sink
Probabilistic Risk Assessment
Emergency Lighting
Locked High Radiation Area
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Earthquake
Power-Operated Valves
Power Operated Valves
NL-14-1876, Proposed Lnservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Conceptual Design Information Package24 November 2014Proposed Lnservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0, Conceptual Design Information PackageDissimilar Metal Weld
NL-14-1245, 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample22 August 201410 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample
ML14223A79431 July 2014Enclosure 2 - Non-Proprietary Gnf Report GNF-001N6296-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Hatch 2 Cycle 24Anticipated operational occurrence
Minimum Critical Power Ratio
ML14155A40530 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0234-35)Unanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14155A3616 June 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
NL-14-0343, Seismic Hazard and Screening Report for CEUS Sites31 March 2014Seismic Hazard and Screening Report for CEUS SitesProbabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
NL-14-0326, Units 1 and 2, Recommendation 2.1 Flood Hazard Reevaluation Report, Requested by NRC Letter Dated March 12, 20126 March 2014Units 1 and 2, Recommendation 2.1 Flood Hazard Reevaluation Report, Requested by NRC Letter Dated March 12, 2012Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Earthquake
ML13364A20227 February 2014Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Design basis earthquake
Containment Hardened Vent
Frazil ice
B.5.b Mitigating Strategies
Earthquake
ML14045A14712 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2, TAC Nos.: MF0712 and MF0713Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Design basis earthquake
Containment Hardened Vent
Frazil ice
B.5.b Mitigating Strategies
Earthquake
Hardened vent
GOTHIC
NL-13-1898, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B30 August 201310 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120BEnforcement Discretion
ML13193A3667 August 2013Request for Concurrence on the Effects of the Edwin I. Hatch Nuclear Plant, Units 1 and 2 on the Federally-Listed Endangered Species Altamaha SpinymusselUltimate heat sink
License Renewal
Biofouling
Power Uprate
NL-13-0172, Southern Nuclear Operating Company'S Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051)27 February 2013Southern Nuclear Operating Company'S Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (EA-12-051)FLEX
Spent Fuel Pool Instrumentation
NL-13-0214, Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events..27 February 2013Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events..High winds
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Containment Hardened Vent
Frazil ice
ML13115A47331 January 2013GNF-0000-0079-7396NP, Rev. 6, Technical Basis Supporting GNF-Ziron Lead Test Assembly Introduction Into the Hatch Nuclear Plant, March 2008
NL-13-0402, GNF-0000-0079-7396NP, Rev. 6, Technical Basis Supporting GNF-Ziron Lead Test Assembly Introduction Into the Hatch Nuclear Plant, March 200831 January 2013GNF-0000-0079-7396NP, Rev. 6, Technical Basis Supporting GNF-Ziron Lead Test Assembly Introduction Into the Hatch Nuclear Plant, March 2008
ML12355A63326 November 2012SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 3 of 11
ML12355A63126 November 2012SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12355A05926 November 2012SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 11 of 11Safe Shutdown
Scaffolding
ML12355A05626 November 2012SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 8 of 11Scaffolding
ML12355A05526 November 2012SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 7 of 11
ML12355A05426 November 2012SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 6 of 11