Slides - Constellation - Pre-Application EP 2/23/2023 Meeting SlidesML23052A175 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle |
---|
Issue date: |
02/21/2023 |
---|
From: |
Rhoades D Constellation Energy Generation |
---|
To: |
Scott Wall Plant Licensing Branch III |
---|
Wall, SP |
References |
---|
EPID L-2023-LRM-0009, NEI 99-01, Rev 7 |
Download: ML23052A175 (1) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle |
---|
Category:Slides and Viewgraphs
MONTHYEARML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML24003A1812024-01-0808 January 2024 Handout - Byron-Braidwood Core Monitoring and Support System LAR Pre-Submittal Meeting January 8,2024 ML23345A0362023-12-11011 December 2023 ATWS Uet December 11, 2023 Pre-submittal Meeting Slides ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23272A0622023-09-29029 September 2023 Ultimate Heat Sink Temperature Tech Spec Limit Change ML23262B2602023-09-19019 September 2023 Slides - Constellation - Pre-Application EP 9/25/2023 Meeting Handout ML23251A0782023-09-0606 September 2023 DRE1 Decom Pre-Submittal Slides ML23229A0132023-08-17017 August 2023 Relief Request for Alternative Requirements for Byron Unit 1 Reactor Pressure Vessel Inservice Inspection Intervals NRC Meeting Handout ML23229A1722023-08-17017 August 2023 RR Pen-75 Pre-Submittal NRC Meeting Handout ML23229A4832023-08-17017 August 2023 RR 20-Year ISI Pre-Submittal NRC Meeting Handout ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23170A0082023-06-29029 June 2023 Decommissioning Presentation for NRC Pre-submittal Meeting, June 29, 2023 ML23172A2092023-06-28028 June 2023 LRA - NRC Pre-Submittal Meeting Slides ML23172A2102023-06-28028 June 2023 CPS Lr Pre-Submittal Meeting Presentation ML23173A0472023-06-28028 June 2023 SLRA - NRC Presubmittal Meeting Slides - 6-28-23 ML23173A0462023-06-28028 June 2023 DNPS SLR Pre-submittal Meeting Presentation Rev. 1 ML23145A1322023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0242023-06-27027 June 2023 June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23174A0012023-06-23023 June 2023 Pre-submittal Meeting Slides Regarding Update to the FitzPatrick Fuel Handling Accident Analysis with Impacts to Technical Specifications, June 26, 2023 ML23145A1342023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - Constellation Slides ML23165A0162023-06-14014 June 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting - NRC Slides ML23163A1642023-06-12012 June 2023 2022 Braidwood/Byron End-of-Cycle Meeting Presentation ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23103A4072023-04-13013 April 2023 Presentation Slides for Information Call on 4/13/23 N2E Recirc Discharge Nozzle Weld Repair 2nd Request for Alternative ML23094A1492023-04-11011 April 2023 Licensee Presentation on Whr Exemption Request for Public Meeting on April 11, 2023 ML23080A2972023-03-21021 March 2023 Presentation Slides for Information Call on 3/21/23 N2E Recirc Discharge Nozzle Weld Repair Request for Alternative ML23076A0442023-03-16016 March 2023 Pb U2 Scram Barrier Presentation KT Session ML23055A2712023-03-0202 March 2023 March 2, 2023, Preapplication Meeting to Discuss Planned Amendments to Adopt TSTF-505 and 10 CFR 50.69 (EPID L-2023-LRM-0007) - Slides ML23076A2822023-02-23023 February 2023 Licensee Presentation on Defense-in-Depth Process ML23076A2812023-02-23023 February 2023 Licensee Presentation on Pressure Boundary Process ML23053A1562023-02-23023 February 2023 NRC Presentation Slides for Public Meeting on February 23, 2023 - 10 CFR 50.69 Alternate Processes License Amendment Request Preliminary Partial Denial NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML23006A2572023-01-10010 January 2023 Digital Modernization Project Installation Support License Amendment Request and Exemption Request Presentation - January 10, 2023 (EPID L-2022-LRM-0099) (Slides) ML22347A1532022-12-13013 December 2022 Public Meeting Presentation, December 15, 2022 Di&C License Amendment Request ML22319A0012022-11-14014 November 2022 Constellation Energy Generation, Llc'S Presentation for November 10, 2022 Public Meeting with NRC ML22311A5112022-11-0707 November 2022 Pool Swell License - Amendment Request ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22250A4372022-09-0808 September 2022 NRC Staff'S Presentation for September 8, 2022 Partially Closed Public Meeting with Constellation - Review Planning and Tentative Review Timeline ML22249A0972022-09-0808 September 2022 Constellation'S Open Presentation for September 8, 2022 Partially Closed Public Meeting ML22249A2202022-09-0606 September 2022 Constellation'S Non-Proprietary Presentation for Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting September 8, 2022 ML22222A1122022-08-0404 August 2022 NMP1 Torus Corrosion Presentation for August 2022 Final ML22195A2172022-07-12012 July 2022 D3 Audit Open Items List (Non-Proprietary) (07-12-22)_redacted ML22164A8082022-06-13013 June 2022 Westinghouse, Presentation GLIMM-RPS-PM-L1-000008, Revision 0 ML22159A3332022-06-0909 June 2022 Presentation Slides for Braidwood and Byron 2021 End of Cycle Meeting 2024-01-08
[Table view] |
Text
NEI 99-01 Rev. 7 Implementation:
NRC Pre-submittal Meeting February 23, 2023
Background
- Constellation plants EALs are currently based on NEI 99-01, Revision 6 guidance
- NEI and NRC are working through final development of Revision 7 to the NEI 99-01 guidance
- NRC endorsement of the NEI 99-01, Revision 7 guidance is currently anticipated about June 2023 1
NEI 99-01 Rev. 7 - Development Considerations
- Current EALs for correct level of event classification and necessity were reviewed
- References to permanently shutdown conditions were removed 2
Approximate Timeline and Schedule
- Expect no deviations from the guidance in NEI 99-01 Rev. 7
- Expect fleet drafts and fleet internal reviews to be completed by June of 2023
- Anticipate NRC endorsement about June of 2023
- Will reconcile any differences between NEI 99-01 Rev. 7 draft and what is endorsed by the NRC
- Will coordinate submittal of License Amendment Request with final NRC-endorsement of NEI 99-01, Revision 7, guidance (late July 2023)
- Request 12-month NRC review period (July 2024) with final site implementation occurring by late 1Q25 o Extended implementation period is needed to facilitate and coordinate necessary training with established training cycles for the Operations' personnel and other Emergency Response Organization (ERO) personnel and allows time to complete the training around outage schedules.
- All calculated thresholds have been previously docketed 3