ND-22-0364, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)
| ML22139A233 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/19/2022 |
| From: | Coleman J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ITAAC 2.6.03.04a, ND-22-0364 | |
| Download: ML22139A233 (10) | |
Text
A Southern Nuclear MAY 1 9 2022 Docket No.:
52-025 Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 7825 River Road Waynesboro, GA 30830 706-848-6926 tel ND-22-0364 10 CFR 52.99(c)(1)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601 l Ladies and Gentlemen:
In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)
Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.03.04a (Index Number 601 ). This IT AAC verified that a simulated test signal exists at the Class 1 E equipment identified in COL Appendix C Table 2.6.3-1 when the assigned Class 1 E division is provided the test signal.
The closure process for this ITAAC is based on the guidance described in NEl-08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52" which is endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.
If there are any questions, please contact Kelli Roberts at 706-848-6991.
Respectfully submitted,
~
~\\Mft,_µ Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
JMC/MSV/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a (Index Number 6011
U.S. Nuclear Regulatory Commission ND-22-0364 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall
U.S. Nuclear Regulatory Commission ND-22-0364 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 1 of 7 Southern Nuclear Operating Company ND-22-0364 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a [Index Number 601]
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 2 of 7 ITAAC Statement Design Commitment 4.a) The IDS provides electrical independence between the Class 1 E divisions.
Inspections, Tests, Analyses Testing will be performed on the IDS by providing a simulated test signal in each Class 1 E division.
Acceptance Criteria A simulated test signal exists at the Class 1 E equipment identified in Table 2.6.3-1 when the assigned Class 1 E division is provided the test signal.
ITAAC Determination Basis Testing was performed on the Class 1 E equipment identified in the VEGP Unit 3 COL Appendix C Table 2.6.3-1 (Attachment A) to demonstrate the Class 1 Ede and Uninterruptible Power Supply System (IDS) provides electrical independence between Class 1 E divisions. This ITAAC performed testing on the IDS equipment by providing a simulated test signal in each Class 1 E division.
SV3-I DS-ITR-800601 (Reference 1) documents completion of testing which ensures IDS provides electrical independence between Class 1 E divisions. Testing verified electrical independence of the divisions of Class 1 E IDS by energizing a single division and verifying the presence or absence of power at all division components being tested, then the single division is de-energized. This same sequence was repeated until all division components identified in Table 2.6.3-1 as being Class 1 E were verified to be energized/de-energized when the appropriate power source is cycled.
The Unit 3 component testing documented in Reference 1 confirms that a simulated test signal exists at the Class 1 E equipment identified in Table 2. 6. 3-1 when the assigned Class 1 E division is provided the test signal.
References 1 is available for NRC review, as well as the Unit 3 ITAAC 2.6.03.04a Completion Package (Reference 2).
ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings and associated corrective actions.
This review found no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.6.03.04a (Reference 2) and is available for NRC review.
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 3 of 7 ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.03.04a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.
Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
References (available for NRG inspection)
- 1. SV3-IDS-ITR-800601 Rev 0, "Unit 3 IDS Class 1 E Equipment Signaled from Assigned Division: ITAAC 2.6.03.04a"
- 2. 2.6.03.04a-U3-CP-Rev0, "ITAAC Completion Package"
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 4 of 7 Attachment A COL Appendix C Table 2.6.3-1 Table 2.6.3-1 Seismic Equipment Name Ta2 No.
Cat. I Division A 250 Vdc 24-Hour Battery Bank IDSA-DB-1 Yes Division B 250 Vdc 24-Hour Battery Bank I IDSB-DB-1 Yes Division B 250 Vdc 72-Hour Battery Bank 2 IDSB-DB-2 Yes Division C 250 Vdc 24-Hour Battery Bank I IDSC-DB-1 Yes Division C 250 Vdc 72-Hour Battery Bank 2 IDSC-DB-2 Yes Division D 250 Vdc 24-Hour Battery Bank IDSD-DB-1 Yes Spare 250 Vdc Battery Bank IDSS-DB-1 Yes Division A 24-Hour Battery Charger I IDSA-DC-1 Yes Division B 24-Hour Battery Charger I IDSB-DC-1 Yes Division B 72-Hour Battery Charger 2 IDSB-DC-2 Yes Division C 24-Hour Battery Charger I IDSC-DC-1 Yes Division C 72-Hour Battery Charger 2 IDSC-DC-2 Yes Division D 24-Hour Battery Charger I IDSD-DC-1 Yes Spare Battery Charger I IDSS-DC-1 Yes Division A 250 Vdc Distribution Panel IDSA-DD-1 Yes Division B 250 Vdc Distribution Panel IDSB-DD-1 Yes Division C 250 Vdc Distribution Panel
!DSC-DD-I Yes Class IE/
Safety-Qual. for Related Harsh Envir.
Display Yes/No No Yes/No No Yes/No No Yes/No No Yes/No 0
Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No Yes/No No
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 5 of 7 I
Equipment Name Division D 250 Vdc Distribution Panel Division A 120 Vac Distribution Panel 1 Division A 120 Vac Distribution Pane l 2 Division B 120 Vac Distribution Panel I Division B 120 Vac Distribution Panel 2 Division B 120 Vac Distribution Panel 3 Division C 120 Yac Distribution Panel I Divis ion C 120 Vac Distribution Panel 2 Division C 120 Vac Distribution Panel 3 Division D 120 Vac Distribution Panel I Division D 120 Yac Distribution Panel 2 Division A Fuse Panel 4 IDSA Battery Monitor Fuse Panel Division B Fuse Panel 4 Division B Fuse Panel 5 Division B Fuse Panel 6 IDSB Battery Monitor Fuse Panel IDSB Battery Monitor Fuse Panel Division C Fuse Panel 4 Division C Fuse Panel 5 Division C Fuse Panel 6 IDSC Battery Monitor Fuse Panel IDSC Battery Mon itor Fuse Panel Division D Fuse Panel 4 IDSD Battery Monitor Fuse Panel IDSS Battery Monitor Fuse Panel Table 2.6.3-1 Ta2 No.
IDSD-DD-1 IDSA-EA-1 IDSA-EA-2 IDSB-EA-1 IDSB-EA-2 IDSB-EA-3 IDSC-EA-1 IDSC-EA-2 IDSC-EA-3 IDSD-EA-1 IDSD-EA-2 IDSA-EA-4 IDSA-EA-5 IDSB-EA-4 IDSB-EA-5 IDSB-EA-6 IDSB-EA-7 IDSB-EA-8 IDSC-EA-4 IDSC-EA-5 IDSC-EA-6 IDSC-EA-7 IDSC-EA-8 IDSD-EA-4 IDSD-EA-5 IDSS-EA-1 I
Class 1 E/
Safety-Seismic Qual. for Related Cat. I Harsh Envir.
Display Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 6 of 7 Equipment Name Division A Fused Transfer Switch Box I Division B Fused Transfer Switch Box I Division B Fused Transfer Switch Box 2 Division C Fused Transfer Switch Box I Division C Fused Transfer Switch Box 2 Division D Fused Transfer Switch Box I Spare Fused Transfer Switch Box I Division A 250 Vdc MCC Table 2.6.3-1 Ta2 No.
IDSA-DF-1 IDSB-DF-1 IDSB-DF-2 IDSC-DF-1 IDSC-DF-2 IDSD-DF-1 IDSS-DF-1 IDSA-DK-1 Class IE/
Safety-Seism ic Qua l. for Related Cat. I Harsh Envir.
Display Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No
U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 7 of 7 Equipment Name Division B 250 Vdc MCC Division C 250 Vdc MCC Division D 250 Vdc MCC Division A 250 Vdc Switchboard I Division B 250 Vdc Switchboard I Division B 250 Vdc Switchboard 2 Division C 250 Vdc Switchboard I Division C 250 Vdc Switchboard 2 Division D 250 Vdc Switchboard I Division A Regulating Transformer Division B Regulating Transformer Division C Regulating Transformer Division D Regulating Transformer Division A 24-Hour Inverter 1 Division B 24-Hour Inverter I Division B 72-Hour Inverter 2 Division C 24-Hour lnve1ier 1 Division C 72-Hour Inverter 2 Division D 24-Hour lnve1ier I Spare Battery Termination Box Table 2.6.3-1 Tae No.
IDSB-DK-1 IDSC-DK-1 IDSD-DK-1 IDSA-DS-1 IDSB-DS-1 IDSB-DS-2 IDSC-DS-1 IDSC-DS-2 IDSD-DS-1 IDSA-DT-1 IDSB-DT-1 IDSC-DT-1 IDSD-DT-1 IDSA-DU-1 IDSB-DU-1 IDSB-DU-2 IDSC-DU-1 IDSC-DU-2 IDSD-DU-1 IDSS-DF-3 Class 1 E/
Safety-Seismic Qual. for Related Cat. I Harsh Envir.
Display Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No Yes (Bus Voltage)
Yes Yes/No Yes (Bus Voltage)
Yes Yes/No Yes (Bus Voltage)
Yes Yes/No Yes (Bus Voltage)
Yes Yes/No Yes (Bus Voltage)
Yes Yes/No Yes (Bus Voltage)
Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No Yes Yes/No No