ND-22-0364, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)

From kanterella
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)
ML22139A233
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/19/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.6.03.04a, ND-22-0364
Download: ML22139A233 (10)


Text

Jamie M. Coleman 7825 River Road Regu latory Affairs Director Waynesboro, GA 30830 A Southern Nuclear Vogtle 3 & 4 706-848-6926 tel MAY 1 9 2022

Docket No.: 52-025

ND-22-0364 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601 l

Ladies and Gentlemen:

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.03.04a (Index Number 601 ). This IT AAC verified that a simulated test signal exists at the Class 1 E equipment identified in COL Appendix C Table 2.6.3-1 when the assigned Class 1 E division is provided the test signal.

The closure process for this ITAAC is based on the guidance described in NEl-08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52" which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

~ ~\\Mft,_µ Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure : Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a (Index Number 6011

JMC/MSV/sfr U.S. Nuclear Regulatory Commission ND-22-0364 Page 2 of 3

To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Le ighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND. LI.L06 File AR.01.02.06

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall U.S. Nuclear Regulatory Commission ND-22-0364 Page 3 of 3

Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson

Dalton Ut ilities Mr. T. Bundros

Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack

Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. G reene, Troutman Sanders Mr. S. Blanton, Balch Bingham U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 1 of 7

Southern Nuclear Operating Company ND-22-0364 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a [Index Number 601]

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 2 of 7

ITAAC Statement

Design Commitment

4.a) The IDS provides electrical independence between the Class 1 E divisions.

Inspections, Tests, Analyses

Testing will be performed on the IDS by providing a simulated test signal in each Class 1 E division.

Acceptance Criteria

A simulated test signal exists at the Class 1 E equipment identified in Table 2.6.3-1 when the assigned Class 1 E division is provided the test signal.

ITAAC Determination Basis

Testing was performed on the Class 1 E equipment identified in the VEGP Unit 3 COL Appendix C Table 2.6.3-1 (Attachment A) to demonstrate the Class 1 Ede and Uninterruptible Power Supply System (IDS) provides electrical independence between Class 1 E divisions. This ITAAC performed testing on the IDS equipment by providing a simulated test signal in each Class 1 E division.

SV3-I DS-ITR-800601 (Reference 1) documents completion of testing which ensures IDS provides electrical independence between Class 1 E divisions. Testing verified electrical independence of the divisions of Class 1 E IDS by energizing a single division and verifying the presence or absence of power at all division components being tested, then the single division is de-energized. This same sequence was repeated until all division components identified in Table 2.6.3-1 as being Class 1 E were verified to be energized/de-energized when the appropriate power source is cycled.

The Unit 3 component testing documented in Reference 1 confirms that a simulated test signal exists at the Class 1 E equipment identified in Table 2. 6. 3-1 when the assigned Class 1 E division is provided the test signal.

References 1 is available for NRC review, as well as the Unit 3 ITAAC 2.6.03.04a Completion Package (Reference 2).

ITAAC Finding Review

In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.6.03.04a (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 3 of 7

ITAAC Completion Statement

Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.03.04a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRG inspection)

1. SV3-IDS-ITR-800601 Rev 0, " Unit 3 IDS Class 1 E Equipment Signaled from Assigned Division: ITAAC 2.6.03.04a "

2. 2.6.03.04a-U3-CP-Rev0, "ITAAC Completion Package "

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 4 of 7

Attachment A COL Appendix C Table 2.6.3-1

Table 2.6.3-1

Cla ss IE / Safety-Seismic Qual. for Related Equipment Name Ta2 No. Cat. I Harsh Envir. Displa y Divi s ion A 250 Vdc 24-H o ur Battery Bank IDSA-DB-1 Yes Yes/No No Divi s ion B 250 Vdc 24 -H our Battery Bank I IDSB-DB-1 Yes Yes/No No Divi s ion B 250 Vdc 72-Hour Battery Bank 2 IDSB-DB-2 Yes Yes/No No

Di v is ion C 250 Vdc 24-Ho ur Battery Bank I ID SC-DB-1 Yes Yes/No No

Division C 250 Vdc 72 -H our Battery Bank 2 ID SC-DB -2 Yes Yes/No 0

Di v is io n D 250 Vdc 24 -H o ur Battery Bank ID SD -DB-1 Yes Yes/No No Spare 250 Vdc Battery Bank IDSS-DB-1 Yes Yes/No No

Divi s ion A 24-Hour Battery Charge r I IDSA-D C-1 Yes Yes/No No

Di v is ion B 24 -H o ur Battery C ha rge r I ID SB -D C-1 Yes Yes/No No

Di v is ion B 72 - Hour Battery C harge r 2 IDSB-D C-2 Yes Yes/No No

Division C 24 -H o ur Battery C harger I ID SC -D C-1 Yes Yes/No No Di visio n C 72-Ho ur Battery C harge r 2 IDSC-DC-2 Yes Yes/No No

Di v is io n D 24 -Hour Battery C harger I ID S D-D C-1 Yes Yes/No No

Spare Battery C harge r I IDS S-DC-1 Yes Yes/No No

Divi s ion A 250 Vdc Di stributi on Panel ID SA -DD-1 Yes Yes/No No

Di v isio n B 250 Vdc Distribution Panel IDSB-DD-1 Yes Yes/No No Division C 250 Vdc Distribution Panel !D SC-DD -I Ye s Yes/No No U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 5 of 7

I Table 2.6.3-1 I

Class 1 E/ Safety -

Seismic Qual. for Related Equipment Name Ta2 No. Cat. I Harsh Envir. Display Division D 250 Vdc Distribution Pane l IDSD-DD-1 Yes Yes/No No Divi s ion A 120 Vac D istr ibu tion Panel 1 IDSA-EA-1 Yes Yes/No No

Division A 120 Vac Distribution Pane l 2 IDSA-EA-2 Yes Yes/No No

D ivision B 120 Vac Distribution Pane l I IDSB-EA-1 Yes Yes/No No

Divis ion B 120 Vac Distr ibution Pa ne l 2 IDSB-EA-2 Yes Yes/No No Division B 120 Vac Distr ibu tion Panel 3 IDSB-EA-3 Yes Yes/No No

Divi s ion C 120 Yac Distribution Panel I ID SC -EA-1 Yes Yes/No No

Divis ion C 120 Vac Distrib ut ion Pa nel 2 IDSC-EA-2 Yes Yes/No No

Division C 120 Vac Distr ibu t ion Pa ne l 3 IDSC-EA-3 Yes Yes/No No Divi s ion D 120 Vac Distribut ion Panel I IDSD-EA-1 Yes Yes/No No

Division D 120 Yac Distribution Pane l 2 ID SD-EA-2 Yes Yes/No No

Divis ion A Fuse Pa nel 4 IDSA-EA-4 Yes Yes/No No

IDSA Battery Monitor Fuse Pane l IDSA-EA-5 Yes Yes/No No

Division B Fuse Pane l 4 ID SB - EA -4 Yes Yes/No No Division B Fu se Pane l 5 IDSB-EA-5 Yes Yes/No No

Division B Fuse Panel 6 IDSB-EA-6 Yes Yes/No No

IDSB Battery Monitor Fuse Panel IDSB-EA-7 Yes Yes/No No

IDSB Battery Mo ni tor Fuse Panel ID SB-EA-8 Yes Yes/No No D iv ision C Fuse Pane l 4 IDSC-EA-4 Yes Yes/No No

Divi sion C F use Pane l 5 IDS C-EA -5 Yes Yes/No No

Div is ion C Fu se Pane l 6 IDSC-EA-6 Yes Yes/No No IDSC Battery Monitor Fuse Pan e l IDSC-EA-7 Yes Yes/No No

IDSC Battery Mon itor Fuse Pan e l IDSC-EA-8 Yes Yes/No No Division D Fuse Panel 4 IDSD - EA -4 Yes Yes/No No

IDSD Battery Monitor Fuse Panel IDSD-EA-5 Yes Yes/No No

IDSS Battery Monitor Fuse Pane l IDSS-EA-1 Yes Yes/No No U.S. Nuclea r Regulatory Commission ND-22 - 036 4 Enclosure Page 6 of 7

Tab le 2.6.3 - 1

C lass IE/ Safety -

Seism ic Qua l. for Re late d Equipment Name Ta2 No. Cat. I Harsh E n v ir. D is pl ay Div ision A Fused Tra nsfer Sw itc h Box I IDSA-DF-1 Yes Yes/No No Division B Fused Transfe r Switc h Box I IDSB-DF -1 Yes Yes/No No D iv ision B Fu sed Tra nsfer Sw itch Box 2 IDSB -DF -2 Yes Yes/No No

Div ision C Fused Tra nsfe r Switc h Box I IDSC-DF-1 Yes Yes/No No

D ivisio n C Fused Tra nsfer Switc h Box 2 IDSC-DF -2 Yes Yes/No No

D ivis io n D Fu sed Transfer Switch Box I IDSD-DF -1 Yes Yes/No No Spa re Fused Tra nsfer Switc h Box I IDSS-DF -1 Yes Yes/No No

Div is ion A 250 Vdc MCC IDSA-D K-1 Yes Yes/No No U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 7 of 7

Table 2.6.3-1

Class 1 E / Safety-Seismic Qual. for Related Equipment Name Tae No. Cat. I Harsh Envir. Display

Divi s ion B 250 Vdc MCC IDSB-DK-1 Ye s Ye s/No No

Divi s ion C 250 Vdc MCC IDSC-DK-1 Yes Yes/No No

Division D 250 Vdc MCC IDSD -DK -1 Yes Yes/No No

Divi s ion A 250 Vd c Sw itchboard I IDSA-DS-1 Yes Yes/No Ye s (Bu s Volta ge)

Divi s ion B 250 Vdc S witchboard I IDSB-DS-1 Yes Yes/No Yes (B u s Volta ge)

Division B 250 Vdc Sw itchb oard 2 IDSB-DS-2 Yes Yes/No Ye s (B u s Vo lt age)

Divi s ion C 250 Vdc Sw it c hb oard I IDSC-DS-1 Yes Ye s/No Yes (Bus Vo ltage)

Divi s io n C 2 50 Vdc S witchboard 2 IDSC-DS-2 Yes Yes/No Yes (Bus Vo ltage)

Divi s ion D 250 Vdc Switchboard I IDSD-DS-1 Yes Yes/No Yes (Bus Volt age)

Divi s ion A Reg ulatin g Transforme r IDSA-DT-1 Yes Yes/No No

Divi s io n B Reg ulatin g Transfo rm er IDSB-DT-1 Yes Yes/No No

Divi s ion C Reg ul a tin g Transforme r IDSC-DT-1 Ye s Yes/No No

Divi sio n D Regulating Transformer IDSD-DT-1 Yes Ye s/No No

Divi sio n A 24 -Hou r In ve rter 1 IDSA-DU-1 Yes Yes/No No

Divi s io n B 24-H o ur Inverter I IDSB-D U-1 Ye s Yes/No No

Divi s ion B 72 -H o ur In verter 2 IDSB-DU-2 Yes Yes/No No

Di v is ion C 24 -H our ln ve 1i e r 1 IDSC-DU-1 Ye s Yes/No No

Divi s io n C 72 -Hour In verte r 2 IDSC-DU-2 Yes Yes/No No

Divi s ion D 24-Hour ln ve 1ier I IDSD-DU-1 Yes Yes/No No

Spare Battery Termination Bo x IDSS-DF-3 Ye s Yes/No No