ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)
ML22139A233
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/19/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.6.03.04a, ND-22-0364
Download: ML22139A233 (10)


Text

Jamie M. Coleman 7825 River Road A Southern Nuclear Regu latory Affa irs Director Vogtle 3 & 4 Waynesboro , GA 30830 706-848-6926 tel MAY 1 9 2022 Docket No.: 52-025 ND-22-0364 10 CFR 52 .99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601 l Ladies and Gentlemen:

In accordance with 10 CFR 52 .99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests , Analyses , and Acceptance Criteria (ITAAC) Item 2.6.03.04a (Index Number 601 ). This ITAAC verified that a simulated test signal exists at the Class 1E equipment identified in COL Appendix C Table 2.6.3-1 when the assigned Class 1E division is provided the test signal.

The closure process for this ITAAC is based on the guidance described in NEl-08-01 , "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52" which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments . Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52 .99 .

If there are any questions , please contact Kelli Roberts at 706-848-6991.

Respectfully submitted ,

~ ~\Mft,_µ Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a (Index Number 6011 JMC/MSV/sfr

U.S. Nuclear Regulatory Commission ND-22-0364 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G . Chick Mr. S. Stimac Mr. P. Martino Mr. J.B . Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms . A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE : VND .LI .L06 File AR.01.02 .06 Nuclear Regulatory Commission Ms . M. Bailey Mr. M . King Mr. G . Bowman Ms. A. Veil Mr. C. P. Patel Mr. G . J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G . Armstrong Mr. M . Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms . K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S . Nuclear Regulatory Commission ND-22-0364 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W . Kline , Bechtel Power Corporation Ms. L. Matis , Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey , Georgia Public Service Commission Mr. K. C. Greene , Troutman Sanders Mr. S. Blanton , Balch Bingham

U.S . Nuclear Regulatory Commission ND-22-0364 Enclosure Page 1 of 7 Southern Nuclear Operating Company ND-22-0364 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04a [Index Number 601]

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 2 of 7 ITAAC Statement Design Commitment 4.a) The IDS provides electrical independence between the Class 1E divisions .

Inspections, Tests, Analyses Testing will be performed on the IDS by providing a simulated test signal in each Class 1E division .

Acceptance Criteria A simulated test signal exists at the Class 1E equipment identified in Table 2.6.3-1 when the assigned Class 1E division is provided the test signal.

ITAAC Determination Basis Testing was performed on the Class 1E equipment identified in the VEGP Unit 3 COL Appendix C Table 2.6.3-1 (Attachment A) to demonstrate the Class 1Ede and Uninterruptible Power Supply System (IDS) provides electrical independence between Class 1E divisions. This ITAAC performed testing on the IDS equipment by providing a simulated test signal in each Class 1E division .

SV3-I DS-ITR-800601 (Reference 1) documents completion of testing which ensures IDS provides electrical independence between Class 1E divisions . Testing verified electrical independence of the divisions of Class 1E IDS by energizing a single division and verifying the presence or absence of power at all division components being tested , then the single division is de-energized. This same sequence was repeated until all division components identified in Table 2.6.3-1 as being Class 1E were verified to be energized/de-energized when the appropriate power source is cycled .

The Unit 3 component testing documented in Reference 1 confirms that a simulated test signal exists at the Class 1E equipment identified in Table 2.6.3-1 when the assigned Class 1E division is provided the test signal.

References 1 is available for NRC review, as well as the Unit 3 ITAAC 2.6.03.04a Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion , Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings and associated corrective actions.

This review found no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.6.03 .04a (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 3 of 7 ITAAC Completion Statement Based on the above information , SNC hereby notifies the NRC that ITAAC 2.6.03.04a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed , ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRG inspection)

1. SV3-IDS-ITR-800601 Rev 0, "Unit 3 IDS Class 1E Equipment Signaled from Assigned Division : ITAAC 2.6.03.04a"
2. 2.6.03.04a-U3-CP-Rev0, "ITAAC Completion Package"

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 4 of 7 Attachment A COL Appendix C Table 2.6.3-1 Table 2.6.3-1 Class IE/ Safety-Seismic Qual. for Related Equipment Name Ta2 No. Cat. I Harsh Envir. Display Division A 250 Vdc 24-Hour Battery Bank IDSA-DB-1 Yes Yes/No No Division B 250 Vdc 24-H our Battery Bank I IDSB-DB-1 Yes Yes/No No Division B 250 Vdc 72-Hour Battery Bank 2 IDSB-DB-2 Yes Yes/No No Di vision C 250 Vdc 24-Hour Battery Bank I IDSC-DB-1 Yes Yes/No No Division C 250 Vdc 72-H our Battery Bank 2 IDSC-DB-2 Yes Yes/No 0 Di vision D 250 Vdc 24-H our Battery Bank IDSD-DB-1 Yes Yes/No No Spare 250 Vdc Battery Bank IDSS-DB-1 Yes Yes/No No Division A 24-Hour Battery Charge r I IDSA-D C-1 Yes Yes/No No Di vision B 24-H our Battery Charge r I IDSB-DC-1 Yes Yes/No No Di vision B 72-Hour Battery Charger 2 IDSB-DC-2 Yes Yes/No No Division C 24-H our Battery Charger I IDSC-DC-1 Yes Yes/No No Di vision C 72-Hour Battery Charger 2 IDSC-DC-2 Yes Yes/No No Di vision D 24-Hour Battery Charger I IDSD-D C-1 Yes Yes/No No Spare Battery Charger I IDS S- DC-1 Yes Yes/No No Division A 250 Vdc Distributi on Panel IDSA-DD-1 Yes Yes/No No Di visio n B 250 Vdc Distribution Panel IDSB-DD-1 Yes Yes/No No Division C 250 Vdc Distribution Panel !DSC-DD-I Yes Yes/No No

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 5 of 7 Table 2.6.3-1 I I Class 1 E/ Safety-Seismic Qual. for Related Equipment Name Ta2 No. Cat. I Harsh Envir. Display Division D 250 Vdc Distribution Pane l IDSD-DD-1 Yes Yes/No No Division A 120 Vac Distr ibution Panel 1 IDSA-EA-1 Yes Yes/No No Division A 120 Vac Distribution Pane l 2 IDSA-EA-2 Yes Yes/No No Division B 120 Vac Distribution Pane l I IDSB-EA-1 Yes Yes/No No Divis ion B 120 Vac Distr ibution Panel 2 IDSB-EA-2 Yes Yes/No No Division B 120 Vac Distr ibu tion Panel 3 IDSB-EA-3 Yes Yes/No No Division C 120 Yac Distribution Panel I IDSC-EA-1 Yes Yes/No No Divis ion C 120 Vac Distribution Panel 2 IDSC-EA-2 Yes Yes/No No Division C 120 Vac Distr ibution Panel 3 IDSC-EA-3 Yes Yes/No No Division D 120 Vac Distribut ion Panel I IDSD-EA-1 Yes Yes/No No Division D 120 Yac Distribution Pane l 2 IDSD-EA-2 Yes Yes/No No Divis ion A Fuse Panel 4 IDSA-EA-4 Yes Yes/No No IDSA Battery Monitor Fuse Pane l IDSA-EA-5 Yes Yes/No No Division B Fuse Pane l 4 IDSB-EA-4 Yes Yes/No No Division B Fuse Pane l 5 IDSB-EA-5 Yes Yes/No No Division B Fuse Panel 6 IDSB-EA-6 Yes Yes/No No IDSB Battery Monitor Fuse Panel IDSB-EA-7 Yes Yes/No No IDSB Battery Mo nitor Fuse Panel IDSB-EA-8 Yes Yes/No No Division C Fuse Pane l 4 IDSC-EA-4 Yes Yes/No No Division C Fuse Pane l 5 IDSC-EA-5 Yes Yes/No No Div ision C Fuse Pane l 6 IDSC-EA-6 Yes Yes/No No IDSC Battery Monitor Fuse Pan el IDSC-EA-7 Yes Yes/No No IDSC Battery Mon itor Fuse Pan el IDSC-EA-8 Yes Yes/No No Division D Fuse Panel 4 IDSD-EA-4 Yes Yes/No No IDSD Battery Monitor Fuse Panel IDSD-EA-5 Yes Yes/No No IDSS Battery Monitor Fuse Pane l IDSS-EA-1 Yes Yes/No No

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 6 of 7 Tab le 2.6.3- 1 Class IE/ Safety-Seism ic Qua l. for Re lated Equipment Name Ta2 No. Cat. I Harsh E nvir. D isplay Div ision A Fused Transfer Sw itch Box I IDSA-DF-1 Yes Yes/No No Division B Fused Transfer Switch Box I IDSB-DF-1 Yes Yes/No No Division B Fused Transfer Sw itch Box 2 IDSB-DF-2 Yes Yes/No No Div ision C Fused Transfe r Switch Box I IDSC-DF- 1 Yes Yes/No No Divisio n C Fused Transfer Switch Box 2 IDSC-DF-2 Yes Yes/No No Divis ion D Fused Transfer Switch Box I IDSD-DF-1 Yes Yes/No No Spare Fused Transfer Switch Box I IDSS-DF-1 Yes Yes/No No Div ision A 250 Vdc MCC IDSA-D K-1 Yes Yes/No No

U.S. Nuclear Regulatory Commission ND-22-0364 Enclosure Page 7 of 7 Table 2.6.3-1 Class 1E/ Safety-Seismic Qual. for Related Equipment Name Tae No. Cat. I Harsh Envir. Display Divi sion B 250 Vdc MCC IDSB-DK-1 Yes Yes/No No Divi sion C 250 Vdc MCC IDSC-DK-1 Yes Yes/No No Division D 250 Vdc MCC IDSD-DK-1 Yes Yes/N o No Divi sion A 250 Vdc Sw itchboard I IDSA-DS-1 Yes Yes/N o Yes (Bu s Voltage)

Divi sion B 250 Vdc Switchboard I IDSB-DS-1 Yes Yes/No Yes (B us Voltage)

Division B 250 Vdc Switchboard 2 IDSB-DS-2 Yes Yes/No Yes (Bus Vo ltage)

Divi sion C 250 Vdc Sw itchboard I IDSC-DS-1 Yes Yes/No Yes (Bus Vo ltage)

Divi sion C 2 50 Vdc Switchboard 2 IDSC-DS-2 Yes Yes/No Yes (Bus Vo ltage)

Divi sion D 250 Vdc Switchboard I IDSD-DS-1 Yes Yes/No Yes (Bus Voltage)

Divi sion A Regulatin g Transformer IDSA-DT-1 Yes Yes/No No Division B Regulating Transformer IDSB-DT-1 Yes Yes/No No Divi s ion C Regul atin g Transforme r IDSC-DT-1 Yes Yes/No No Divi sion D Regulating Transformer IDSD-DT-1 Yes Yes/No No Divi sion A 24-Hour Inve rter 1 IDSA-DU-1 Yes Yes/No No Divi sion B 24-Hour Inverter I IDSB-D U-1 Yes Yes/No No Divi sion B 72 -Hour Inverter 2 IDSB-DU-2 Yes Yes/No No Div ision C 24 -Hour ln ve1ier 1 IDSC-DU-1 Yes Yes/No No Divi sion C 72-Hour In verte r 2 IDSC-DU-2 Yes Yes/No No Divi sion D 24- Hour ln ve1ier I IDSD-DU-1 Yes Yes/No No Spare Battery Termination Box IDSS-DF-3 Yes Yes/No No