ITAAC Closure Notification on Completion of ITAAC 2.3.19.02a (Index Number 486)
ML22133A237
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/13/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.3.19.02a, ND-22-0291
Download: ML22133A237 (7)


Text

.. Southern Nuclear May 13, 2022 Docket No.:

52-025 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Jamie M. Coleman Regulatory Affairs Director Vogtle 3 &4 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 7825 River Road Waynesboro, GA 30830 706-848-6926 tel ND-22-0291 10 CFR 52.99(c)(1)

ITAAC Closure Notification on Completion of ITAAC 2.3.19.02a [Index Number 486)

Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.19.02a [Index Number 486). This ITAAC confirms that the as-built Communication System (EFS) has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system, and that voice transmission and reception using the telephone/page equipment from the MCR can be accomplished. The IT AAC also confirms that the as-built EFS has sound-powered equipment connected as a system and that voice transmission and reception using the sound-powered equipment can be accomplished. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

'tfANJ\\M \\Jl~~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

JMC/RLB/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of IT AAC 2.3.19.02a [Index Number 486]

U.S. Nuclear Regulatory Commission ND-22-0291 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms.K.McCurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0291 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S. L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-22-0291 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-22-0291 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.3.19.02a [Index Number 486]

U.S. Nuclear Regulatory Commission ND-22-0291 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 1.a) The EFS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system.

1.b) The EFS has sound-powered equipment connected as a system.

2.a) The EFS telephone/page system provides intraplant, station-to-station communications and area broadcasting between the MCR and the locations listed in Table 2.3.19-1.

2.b) EFS provides sound-powered communications between the MCR, the RSW, the Division A, B, C, D de equipment rooms (Rooms 12201/12203/12205/12207), the Division A, B, C, D l&C rooms (Rooms12301/12302/12304/12305), and the diesel generator building (Rooms 60310/60320) without external power.

Inspections/Tests/Analyses Inspection of the as-built system will be performed.

Inspection of the as-built system will be performed.

An inspection and test will be performed on the telephone/page communication equipment.

An inspection and test will be performed of the sound-powered communication equipment.

Acceptance Criteria The as-built EFS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system.

The as-built EFS has sound-powered equipment connected as a system.

Telephone/page equipment is installed and voice transmission and reception from the MCR are accomplished.

Sound-powered equipment is installed and voice transmission and reception are accomplished.

ITAAC Determination Basis This ITAAC was performed to verify, by inspection and testing, that the Communication System (EFS) is installed with handsets, amplifiers, loudspeakers, siren tone generators, and sound-powered equipment that is operating properly.

ITAAC 2.3.19.02a was completed as a combination of:

  • Field inspections of the Plant Paging System (PPS)
  • Field inspections of the Sound Powered Phones (SPP)
  • Testing of the PPS with voice transmission and reception from the Main Control Room (MCR) and other required locations throughout the plant
  • Testing of the SPP with transmission and reception between the MCR, Remote Shutdown Workstation (RSW) and other required locations throughout the plant

U.S. Nuclear Regulatory Commission ND-22-0291 Enclosure Page 3 of 4 The inspections placed operators in the field at predetermined locations where PPS and SPP components are installed and verified that the necessary equipment is available. The MCR personnel initiated a communication test and each operator in the field verified the transmission from the MCR was received. The response back from the operator in the field to the MCR verified the reception by the MCR was received. The PPS equipment that must be verified is listed in Combined License (COL) Appendix C Table 2.3.19-1 (see Attachment A). The SSP equipment that must be verified is listed in COL Appendix C ITAAC No. 2.3.19.02a Item 2.b)

(see Attachment 8).

Additional tests verified that personnel in the field could hear a plant page, fire alarm, and warble alarm from the PPS with a response to the MCR from other locations verifying the PPS was operating properly for these functions.

Inspections and testing were performed as described in ITAAC Technical Report SV3-EFS-ITR-800486 (Reference 1 ). The results of the inspections and testing are also summarized in Reference 1.

The completed Unit 3 inspection and testing results summarized in Reference 1 confirmed the as-built EFS has handsets, amplifiers, loudspeakers, and siren tone generators connected as a telephone/page system, the as-built EFS has sound-powered equipment connected as a system, telephone/page equipment is installed and voice transmission and reception from the MCR are accomplished, and sound-powered equipment is installed and voice transmission and reception are accomplished.

Reference 1 is available for NRC inspection as part of the Unit 3 ITAAC 2.3.19.02a Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.19.02a (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.19.02a was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this IT AAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-EFS-ITR-800486, Unit 3 Sound Powered and Telephone/Page Communication System Inspection and Testing: ITAAC 2.3.19.02a, Revision 0
2. 2.3.19.02a-U3-CP-Rev 0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-22-0291 Enclosure Page 4 of 4 Attachment A

  • Excerpt from COL Appendix C Table 2.3.19-1
  • Telephone/Page System Eauipment
  • Location Fuel Handlinq Area 12562 Division A, B, C, D de Equipment Rooms 12201 /12203/12205/12207 Division A, B, C, D l&C Rooms 12301 /12302/12304/12305 Maintenance Floor StaQinq Area 12351 Containment Maintenance Floor 11300 Containment Operatinq Deck 11500 Attachment B Sound-Powered Phone Svstem Eauioment Location Main Control Room 12401 Remote Shutdown Workstation 12303 Division A, B, C, D de Equipment Rooms 12201 /12203/12205/12207 Division A, B, C, D l&C Rooms 12301/12302/12304/12305 Diesel Generator BuildinQ 60310/60320