Letter Sequence Request |
---|
EPID:L-2020-SLE-0000, Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement
Results
Other: ML20246G698, ML20258A284, ML20269A465, ML20274A111, ML20274A198, ML20307A177, ML20322A052, ML20337A022, ML20351A388, ML21025A340, ML21181A186, ML23062A466, ML24206A043
|
MONTHYEARML20246G6982020-08-24024 August 2020 Appendix E: Applicant'S Environmental Report Subsequent Operating License Renewal Stage North Anna Power Station Units 1 and 2 Project stage: Other ML20269A4652020-10-0606 October 2020 SLRA - Portal Letter Project stage: Other ML20258A2842020-10-13013 October 2020 SLRA - Acceptance and Opportunity for Hearing Letter Project stage: Other ML20274A1112020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Letter to Applicant Project stage: Other ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice Project stage: Other PMNS20201188, Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application2020-10-28028 October 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20307A1772020-11-0404 November 2020 NRC Presentation North Anna Power Station, Units 1 and 2 Subsequent License Renewal Review Project stage: Other ML20317A2062020-11-12012 November 2020 Environmental Scoping Meeting Related to the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML20324A6792020-11-13013 November 2020 Comment (1) of Kevin Quigley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6802020-11-13013 November 2020 Comment (2) from Luther Jones on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6812020-11-13013 November 2020 Comment (3) from Frederick Gerloff on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6822020-11-13013 November 2020 Comment (4) from Keith Scott on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6832020-11-13013 November 2020 Comment (5) from Joseph Sucha on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6852020-11-14014 November 2020 Comment (6) from Thomas Owens on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20324A6862020-11-14014 November 2020 Comment (7) from Nancy Ashberry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0512020-11-14014 November 2020 Comment (8) of Lisa Hicks-Thomas on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0532020-11-15015 November 2020 Comment (9) of Martin Blough on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0582020-11-16016 November 2020 Comment (12) from Melissa Haley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0572020-11-16016 November 2020 Comment (11) of Lauren Lopez on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0542020-11-16016 November 2020 Comment (10) of Michael Hamby on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20329A4392020-11-17017 November 2020 Pamunkey Consultation Request_North Anna Power Station_17NOV20 Project stage: Request ML20325A0602020-11-17017 November 2020 Comment (13) of Terry Clouthier on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1242020-11-18018 November 2020 Comment (42) of Edmond Longest on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1032020-11-18018 November 2020 Comment (29) of Steven Eisenrauch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1202020-11-18018 November 2020 Comment (41) of Robert Fleshman on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1182020-11-18018 November 2020 Comment (40) of Donald Sharp on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0612020-11-18018 November 2020 Comment (14) of Kevin Cordray on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0622020-11-18018 November 2020 Comment (15) from Jason Evans on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0632020-11-18018 November 2020 Comment (16) of Tracy Gill on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0652020-11-18018 November 2020 Comment (17) of Tommy Flynn on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0662020-11-18018 November 2020 Comment (18) from Jim Norvelle on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0682020-11-18018 November 2020 Comment (19) of Ronald Buchanan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0712020-11-18018 November 2020 Comment (20) of Harold Vaughan on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0722020-11-18018 November 2020 Comment (21) of Mel Holley on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0732020-11-18018 November 2020 Comment (22) of Sarah Marshall on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0742020-11-18018 November 2020 Comment (23) of Andrew Moncol on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0752020-11-18018 November 2020 Comment (24) of Richard Zuercher on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A0922020-11-18018 November 2020 Comment (25) of J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0942020-11-18018 November 2020 Comment (26) from J. Crouch on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A0972020-11-18018 November 2020 Comment (27) from Jenna Brown on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1012020-11-18018 November 2020 Comment (28) from Ralph Joyce on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1042020-11-18018 November 2020 Comment (30) of David Strole on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1052020-11-18018 November 2020 Comment (31) from Carl Eng on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1072020-11-18018 November 2020 Comment (32) of Angela Baker on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1092020-11-18018 November 2020 Comment (33) of Adam Perry on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1102020-11-18018 November 2020 Comment (34) of Terrance Perrone on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1112020-11-18018 November 2020 Comment (35) of Greg Boutchyard on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1122020-11-18018 November 2020 Comment (36) from Robert George on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request ML20325A1132020-11-18018 November 2020 Comment (37) of Shawn Williams on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2 Project stage: Request ML20325A1152020-11-18018 November 2020 Comment (38) of Eric Hendrixson on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Virginia Electric and Power Company; North Anna Power Station, Unit Nos. 1 and 2 Project stage: Request 2020-11-14
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24215A2662024-09-0404 September 2024 SLR - FRN for SLR ML24208A0202024-07-26026 July 2024 Final Environmental Impact Statement - Notice of Availability Federal Register Notice ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24086A4312024-04-0505 April 2024 Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: April 16, 2024 ML24067A0372024-03-20020 March 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - February 2024 ML22294A1892022-11-0808 November 2022 Federal Register Notice - Notice of Intent to Prepare EIS and to Conduct EIS Scoping for North Anna Power Station ML21222A1632021-08-19019 August 2021 Subsequent License Renewal Draft SEIS NOA FRN ML21153A2112021-07-0707 July 2021 Individual Notice of Consideration of Issuance of Amendment(S) to (Renewed) Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing (EPID L-2021-LLA-0082) LTR ML21153A2122021-07-0707 July 2021 Individual Notice of Consideration of Issuance of Amendment(S) to (Renewed) Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing (EPID L-2021-LLA-0082)FRN ML20274A1982020-10-19019 October 2020 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0000) - Federal Register Notice ML20252A0042020-09-23023 September 2020 Request for Relief Request Fifth 10-Year Interval ML20224A1052020-09-17017 September 2020 SLRA - Receipt and Availability Letter ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML19169A2612019-07-31031 July 2019 Federal Register Notice: Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc. and Dominion Nuclear Connecticut, Inc. North Anna ISFSI: Environmental Assessment and Finding of No Significant Impact; Issuance ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML18036B1302018-02-12012 February 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: March 6, 20 ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) ML17312A6062018-01-29029 January 2018 Federal Register Notice for the Final Environmental Assessment for the North Anna ISFSI License Renewal ML17236A2102017-09-13013 September 2017 Enclosufederal Register Notice-Notice of Issuance of Amendment Request to Materials License No. SNM-2507 NRC-2015-0237, Enclosufederal Register Notice-Notice of Issuance of Amendment Request to Materials License No. SNM-25072017-09-13013 September 2017 Enclosufederal Register Notice-Notice of Issuance of Amendment Request to Materials License No. SNM-2507 ML17198A3292017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement Letter, Paul Gunter, Beyond Nuclear, Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Jap ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 NRC-2012-0258, Unit 2 - Federal Register Notice Director'S Decision 15-092015-10-30030 October 2015 Unit 2 - Federal Register Notice Director'S Decision 15-09 ML15293A4542015-10-30030 October 2015 Revised Director'S Decision Letter (G20110757) ML15293A4892015-10-30030 October 2015 Unit 2 - Federal Register Notice Director'S Decision 15-09 ML15176A6282015-08-21021 August 2015 G20110757 - Petition Federal Register Notice (Enclosure 2) ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 ML14311A6242015-04-17017 April 2015 G20110757 - North Anna Proposed Director'S Decision ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20142014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 ML14247A1542014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 NRC-2014-0193, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 20142014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14233A2082014-08-22022 August 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 2, 2014 ML14114A6592014-05-0909 May 2014 Withdrawal of an Amendment Request ML14122A3042014-05-0909 May 2014 Federal Register Notice: North Anna Power Station, Unit 2 - Withdrawal of an Amendment Request NRC-2014-0121, Federal Register Notice: North Anna Power Station, Unit 2 - Withdrawal of an Amendment Request2014-05-0909 May 2014 Federal Register Notice: North Anna Power Station, Unit 2 - Withdrawal of an Amendment Request ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML13205A2192013-07-24024 July 2013 Environmental Assessment and Finding of No Significant Impact ML13205A2232013-07-24024 July 2013 FRN - Environmental Assessment and Finding of No Significant Impact NRC-2013-0172, Units 1 and 2 - FRN - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME9753, ME9754, ME9755, and ME9756)2013-07-24024 July 2013 Units 1 and 2 - FRN - Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME9753, ME9754, ME9755, and ME9756) ML12262A1602012-10-19019 October 2012 G20110757/EDATS:OEDO-2011-0701 - Federal Register Notice - Issuance of Partial Director'S Decision ML12277A3662012-10-10010 October 2012 Withdrawal of Amendment ML12277A3732012-10-10010 October 2012 Federal Register Notice - Withdrawal of Amendment NRC-2012-0241, Units 1 and 2 - Federal Register Notice - Withdrawal of Amendment (TAC Nos. ME7814, ME7815, ME7816, and ME7817)2012-10-10010 October 2012 Units 1 and 2 - Federal Register Notice - Withdrawal of Amendment (TAC Nos. ME7814, ME7815, ME7816, and ME7817) ML12094A2512012-04-27027 April 2012 G20110668/ EDATS: OEDO-2011-0622 - Federal Register Notice - Final Director'S Decision Under 10 CFR 2.206 Re North Anna Power Station, Unit Nos. 1 and 2 NRC-2012-0084, Enclosufederal Register Notice (Notice of Availability of Exemption for Virginia Electric and Power Company, North Anna Power Station Independent Spent Fuel Storage Installation)2012-04-12012 April 2012 Enclosufederal Register Notice (Notice of Availability of Exemption for Virginia Electric and Power Company, North Anna Power Station Independent Spent Fuel Storage Installation) ML12104A1282012-04-12012 April 2012 Enclosufederal Register Notice (Notice of Availability of Exemption for Virginia Electric and Power Company, North Anna Power Station Independent Spent Fuel Storage Installation) 2024-09-04
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-338 and 50-339; NRC-2020-0201]
Virginia Electric and Power Company;
North Anna Power Station, Unit Nos. 1 and 2;
Final Site-Specific Environmental Impact Statement
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice; issuance.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) has published a final site-
specific environmental impact statement (E IS), issued as NUREG-1437, Supplement 7a,
Second Renewal, Site-Specific Environmental Impact Statement for License Renewal of
Nuclear Plants Regarding Subsequent License Renewal for North Anna Power Station
Units 1 and 2, Final Report. This EIS evaluates, on a site-specific basis, the
environmental impacts of subsequent license renewal of Facility Operating License
Nos. NPF-4 and NPF-7 for an additional 20 years of operation for North Anna Power
Station (NAPS), Unit Nos. 1 and 2, respectively. NAPS is located in Louisa County,
Virginia. Alternatives to the proposed action of subsequent license renewal for NAPS
include the no-action alternative and reasonable replacement power alternatives.
DATES: NUREG-1437, Supplement 7a, Second Renewal is available as of
July 22, 2024.
ADDRESSES: Please refer to Docket ID NRC-2020-0201 when contacting the NRC
about the availability of information regar ding this document. You may obtain publicly
available information related to this document using any of the following methods:
search for Docket ID NRC-2020-0201. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email:
Stacy.Schumann@nrc.gov. For technical questions contact the individual listed in the
For Further Information Contact section of this document.
- NRCs Agencywide Documents Access and Management System
(ADAMS): You may access publicly available documents online in the ADAMS Public
Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select Begin Web-based ADAMS Search. For problems with ADAMS, please
contact the NRCs Public Document Room (P DR) reference staff at 1-800-397-4209, at
301-415-4737, or by email to PDR.Resource@nrc.gov. NUREG-1437, Supplement 7a,
Second Renewal is available in AD AMS under Accession No. ML24204A104.
- NRCs PDR: The PDR, where you may examine and order copies of publicly
available documents, is open by appointment. To make an appointment to visit the PDR,
please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-
4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Federal holidays.
- Public Library: A copy of the final EIS will be available for public inspection
at the Louisa County Library, 881 Davis Highway, Mineral, VA 23117. The NRC staff
encourages those addressees with mailing addresses listed in Chapter 7 of the final EIS,
to visit the NRCs NUREG-Series Publication website (https://www.nrc.gov/reading-
rm/doc-collections/nuregs/staff.html) or the NAPS project website
(https://www.nrc.gov/reactors/operating/licens ing/renewal/applications/north-anna-1 subsequent.html) to download an electronic copy. You may also obtain an electronic
copy by contacting Tam Tran via email at Tam.Tran@nrc.gov.
2 FOR FURTHER INFORMATION CONTACT: Tam Tran, Office of Nuclear Material
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001; telephone: 301-415-3617; email: Tam.Tran@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Background
In accordance with section 51.118 of title 10 of the Code of Federal Regulations
(10 CFR), Final environmental impact statementnotice of availability, the NRC is
making available for public inspection NUREG-1437, Supplement 7a, Second Renewal,
regarding the subsequent license renewal of Virginia Electric and Power Companys
(Dominion), renewed Facility Operating License Nos. NPF-4 and NPF-7 for an additional
20 years of operation for NAPS. A notice of availability of the site-specific draft EIS
(DEIS) (NUREG-1437, Supplement 7a, Second Renewal) was published in the Federal
Register on January 8, 2024, (89 FR 960) by the NRC, and on January 5, 2024 (89 FR
781) as amended January 19, 2024 (89 FR 3653), by the Environmental Protection
Agency. The public comment period on the site-specific DEIS (NUREG-1437,
Supplement 7a, Second Renewal) ended on February 22, 2024, and the comments
received on the site-specific DEIS are addressed in the final EIS (NUREG-1437,
Supplement 7a, Second Renewal).
II. Discussion
The site-specific draft EIS (NUREG-1437, Supplement 7a, Second Renewal)
superseded a draft Supplemental EIS (SEIS) (NUREG-1437, Supplement 7, Second
Renewal), that the NRC had issued for public comment on August 25, 2021
(86 FR 47525). The site-specific final EIS addresses the comments received on both the
site-specific draft EIS (NUREG-1437, Supplement 7a, Second Renewal) and the
previous draft SEIS (NUREG-1437, Supplement 7, Second Renewal). As discussed in
3 Chapter 4 of the final EIS (NUREG-1437, Supplement 7a, Second Renewal), the NRC
staff has determined that the adverse env ironmental impacts of subsequent license
renewal for NAPS for an additional 20 years beyond the expiration dates of the initial
renewed licenses are not so great that preserving the option of subsequent license
renewal for energy-planning decisionm akers would be unreasonable. This
recommendation is based on: (1) informati on provided in the environmental report, as
supplemented, and other documents submitted by Dominion; (2) consultation with
Federal, State, Tribal, and local government al agencies; (3) the NRC staffs independent
environmental review; and (4) consideration of public comments received during the
scoping process, on the site-specific DEIS (NUREG-1437, Supplement 7a, Second
Renewal), and on the previous draft SEIS (NUREG-1437, Supplement 7, Second
Renewal).
Dated: July 26, 2024.
For the Nuclear Regulatory Commission.
/RA/
John M. Moses, Deputy Director, Division of Rulemaking, Environmental, and Financial Support, Office of Nuclear Material Safety, and Safeguards.
4