Letter Sequence Meeting |
---|
|
|
MONTHYEARML23349A2082023-12-15015 December 2023 TRISO-X, LLC, Response to Request for Additional Information Set 6 (Structural, Material Control and Accounting, and Fire Safety) for the TRISO-X License Application Project stage: Response to RAI ML24020A0102024-01-20020 January 2024 Project Update Letter Regarding the TRISO-X License Application Project stage: Other ML24060A2392024-02-29029 February 2024 TRISO-X, LLC, Submittal of Supplemental Information for the Electrical/I&C Review of IROFS for the TRISO-X License Application Project stage: Supplement ML24030A8472024-03-0101 March 2024 Summary of Meeting on January 24, 2024, with TRISO-X LLC Project stage: Request ML24066A1812024-03-25025 March 2024 Summary of the Meeting on January 25, 2024, with TRISO-X LLC, to Align a Supplement for Management Measures Review Project stage: Request ML24085A7642024-04-0202 April 2024 Summary of Meeting on March 18, 2024, with TRISO-X LLC, to Align on Draft Set 8 Requests for Additional Information Regarding the Integrated Safety Analysis Project stage: Draft Approval ML24085A7632024-04-0202 April 2024 Enclosure - Participant List for Meeting on March 18, 2024 with TRISO-X LLC Project stage: Meeting ML24085A7622024-04-0202 April 2024 Summary of Meeting on March 18, 2024, with TRISO-X LLC, to Align on Draft Set 8 Requests for Additional Information Regarding the Integrated Safety Analysis Project stage: Request ML24071A1572024-04-0808 April 2024 Enclosure 1 - Participants List for Meetings Held 02-21-24 and 02-22-24 with TRISO-X for Supplement Regarding RAIs on ISA Summary Project stage: RAI ML24071A1562024-04-0808 April 2024 Memorandum - Summary of Meetings on Held on 2-21-24 and 2-22-24 with TRISO-X for Supplements Regarding RAIs on the ISA Summary Project stage: RAI ML24102A1822024-04-24024 April 2024 Enclosure 1 - Participant List for Meeting on April 9, 2024 with TRISO-X LLC Project stage: Meeting ML24102A1812024-04-24024 April 2024 Cover Letter - Summary of Meeting on April 9, 2024, with TRISO-X LLC, to Discuss Supplement Responses to Structural Programmatic Requests for Additional Information Project stage: RAI ML24165A1362024-06-17017 June 2024 6-17-24 Slides Meeting to Discuss an Overview of the TRISO-X License Application Review Status Project stage: Meeting ML24183A2022024-07-31031 July 2024 Memo - Summary of Meeting on June 6, 2024, with TRISO-X, LLC, to Align on the Supplement Responses to Integrated Safety Analysis Requests for Additional Information Project stage: RAI ML24183A2032024-07-31031 July 2024 Enclosure 1 - Participant List for Meeting on June 6, 2024, with TRISO-X, LLC Project stage: Meeting ML24178A4042024-08-0101 August 2024 Enclosure 1 - Participant List for the May 24, 2024 Meeting Regarding the TRISO-X, LLC Supplements for the Integrated Safety Analysis Summary Requests for Additional Information for the License Application Project stage: RAI ML24178A4022024-08-0101 August 2024 Memo - Summary of Meeting on May 24, 2024, with TRISO-X LLC, to Align on the Supplemental Responses to the Integrated Safety Analysis Requests for Additional Information Project stage: RAI ML24206A0452024-08-26026 August 2024 Memo - Summary of Meeting on June 17, 2024, with TRISO-X, Llc. to Discuss the Status of the License Application Review Project stage: Meeting ML24198A2352024-08-26026 August 2024 Memorandum - Summary of Meeting Held on June 17 2024 with TRISO-X to Align on NRC Supplement Responses to Management Measures Requests for Additional Information Project stage: RAI ML24206A0462024-08-26026 August 2024 Enclosure - Participant List for Meeting on June 17, 2024 with TRISO-X, LLC Project stage: Meeting ML24198A2342024-08-26026 August 2024 Enclosure - Participant List for June 17, 2024 Meeting with TRISO-X Project stage: Meeting ML24206A0772024-09-0505 September 2024 Memorandum - Summary of Meeting Held on June 27, 2024 with TRISO-X LAR Structural Meeting Project stage: Meeting ML24228A1262024-09-0505 September 2024 Enclosure 1 - Participant List for Summary of Meeting Held July 17, 2024, with TRISO-X, LLC, to Align on the Supplement Responses to Management Measures and Quality Assurance Requests for Additional Information Project stage: RAI ML24228A1282024-09-0505 September 2024 Memo - Summary of Meeting on July 17, 2024, with TRISO-X to Align on the Supplemental Responses to the Management Measures and Quality Assurance Requests for Additional Information Project stage: RAI ML24255A3232024-10-0808 October 2024 Enclosure 1 - Participant List for Meeting on August 27, 2024 with TRISO-X LLC Structural Meeting Project stage: Meeting ML24255A3212024-10-0808 October 2024 Memo - Summary of Meeting on August 27, 2024 with TRISO-X to Discuss Draft Supplement Responses to Structural Programmatic Requests for Additional Information Project stage: Draft RAI ML24254A4102024-10-0808 October 2024 Enclosure - Participant List for Meeting on August 28, 2024 with TRISO-X, LLC (Public) Project stage: Meeting ML24254A4092024-10-0808 October 2024 Memo - Summary of Meeting on August 28, 2024, with TRISO-X, LLC to Align on the Supplement Responses to the Management Measures and Quality Assurance Requests for Additional Information (Public) Project stage: RAI 2024-04-02
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24254A4092024-10-0808 October 2024 Memo - Summary of Meeting on August 28, 2024, with TRISO-X, LLC to Align on the Supplement Responses to the Management Measures and Quality Assurance Requests for Additional Information (Public) ML24228A1282024-09-0505 September 2024 Memo - Summary of Meeting on July 17, 2024, with TRISO-X to Align on the Supplemental Responses to the Management Measures and Quality Assurance Requests for Additional Information ML24198A2352024-08-26026 August 2024 Memorandum - Summary of Meeting Held on June 17 2024 with TRISO-X to Align on NRC Supplement Responses to Management Measures Requests for Additional Information ML24206A0452024-08-26026 August 2024 Memo - Summary of Meeting on June 17, 2024, with TRISO-X, Llc. to Discuss the Status of the License Application Review ML24178A4022024-08-0101 August 2024 Memo - Summary of Meeting on May 24, 2024, with TRISO-X LLC, to Align on the Supplemental Responses to the Integrated Safety Analysis Requests for Additional Information ML24085A7642024-04-0202 April 2024 Summary of Meeting on March 18, 2024, with TRISO-X LLC, to Align on Draft Set 8 Requests for Additional Information Regarding the Integrated Safety Analysis ML24085A7632024-04-0202 April 2024 Enclosure - Participant List for Meeting on March 18, 2024 with TRISO-X LLC ML24066A1832024-03-25025 March 2024 Enclosure 1 - Participants List Management Measures for Meeting on January 25, 2024 with TRISO-X Regarding Supplement Responses Management Measures ML24066A1842024-03-25025 March 2024 Memorandum - Summary of Meeting on January 25, 2024 with TRISO-X to Align on NRC Supplement Responses Management Measures ML24002A8252024-03-13013 March 2024 December 18, 2023, Summary of Meeting on TRISO-X, LLC, to Align on the Need to Supplement the Responses to the Requests for Additional Information Regarding Management Measures ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection ML24030A8512024-03-0101 March 2024 Summary of Meeting on with TRISO-X to Align on NRC Supplement to Responses to Structural Requests for Additional Information ML23332A0752024-02-23023 February 2024 Memorandum - Summary of Six Meetings Between December 11, 2023 and January 23, 2024 with TRISO-X, LLC, to Align on a Supplement for the Responses to the Requests for Additional Information Regarding the Integrated Safety Analysis ML24024A1632024-01-25025 January 2024 January 17, 2024, Summary of Meeting with Triso-X, LLC, to Align on the Triso-X Draft Environmental Impact Analysis Requests for Additional Information Part 2-2 ML23362A0662024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis ML23312A2482023-11-0808 November 2023 7-5-23 Email Summary of Meeting to Discuss Draft ISA RAIs for Alignment ML23212B0422023-07-31031 July 2023 Email - Summary of Call with TRISO-X to Discuss Draft Requests for Information on Chapters 1 (Administrative), Chapter 2, and Emergency Plan ML23117A1122023-05-22022 May 2023 Memo Summary of TRISO-X Closed Call on ISA Methodology and Natural Phenomena Hazards ML23062A5052023-03-0303 March 2023 TRISO-X Fuel Fabrication Facility Scoping Meetings and Audit Summary - January 2023 ML24053A0292023-02-17017 February 2023 Email - Summary of February 17, 2023 Call with TRISO-X to Discuss the Draft RAI Set 1 for Management Measures, Human Factors, and Structural for the License Application ML19283B2042019-10-10010 October 2019 Meeting Summary with X-Energy to Provide Pre-Application Information Re Integrated Safety Analysis Methods for the TRISO-X Fuel Fabrication Facility License Application ML19011A1942019-01-17017 January 2019 Meeting Summary: Meeting with X-Energy to Provide Pre-Application Information Related to Criticality Safety Regarding the Triso-X Fuel Fabrication Facility License Application 2024-09-05
[Table view] Category:Memoranda
MONTHYEARML24254A4092024-10-0808 October 2024 Memo - Summary of Meeting on August 28, 2024, with TRISO-X, LLC to Align on the Supplement Responses to the Management Measures and Quality Assurance Requests for Additional Information (Public) ML24255A3212024-10-0808 October 2024 Memo - Summary of Meeting on August 27, 2024 with TRISO-X to Discuss Draft Supplement Responses to Structural Programmatic Requests for Additional Information ML24206A0772024-09-0505 September 2024 Memorandum - Summary of Meeting Held on June 27, 2024 with TRISO-X LAR Structural Meeting ML24228A1282024-09-0505 September 2024 Memo - Summary of Meeting on July 17, 2024, with TRISO-X to Align on the Supplemental Responses to the Management Measures and Quality Assurance Requests for Additional Information ML24198A2352024-08-26026 August 2024 Memorandum - Summary of Meeting Held on June 17 2024 with TRISO-X to Align on NRC Supplement Responses to Management Measures Requests for Additional Information ML24206A0452024-08-26026 August 2024 Memo - Summary of Meeting on June 17, 2024, with TRISO-X, Llc. to Discuss the Status of the License Application Review ML24178A4022024-08-0101 August 2024 Memo - Summary of Meeting on May 24, 2024, with TRISO-X LLC, to Align on the Supplemental Responses to the Integrated Safety Analysis Requests for Additional Information ML24183A2022024-07-31031 July 2024 Memo - Summary of Meeting on June 6, 2024, with TRISO-X, LLC, to Align on the Supplement Responses to Integrated Safety Analysis Requests for Additional Information ML24102A1812024-04-24024 April 2024 Cover Letter - Summary of Meeting on April 9, 2024, with TRISO-X LLC, to Discuss Supplement Responses to Structural Programmatic Requests for Additional Information ML24071A1562024-04-0808 April 2024 Memorandum - Summary of Meetings on Held on 2-21-24 and 2-22-24 with TRISO-X for Supplements Regarding RAIs on the ISA Summary ML24085A7642024-04-0202 April 2024 Summary of Meeting on March 18, 2024, with TRISO-X LLC, to Align on Draft Set 8 Requests for Additional Information Regarding the Integrated Safety Analysis ML24066A1842024-03-25025 March 2024 Memorandum - Summary of Meeting on January 25, 2024 with TRISO-X to Align on NRC Supplement Responses Management Measures ML24002A8252024-03-13013 March 2024 December 18, 2023, Summary of Meeting on TRISO-X, LLC, to Align on the Need to Supplement the Responses to the Requests for Additional Information Regarding Management Measures ML24057A3632024-03-11011 March 2024 Memorandum - Summary of Meeting 2-12-24 with TRISO-X to Discuss Draft RAIs on Environmental Protection ML24030A8512024-03-0101 March 2024 Summary of Meeting on with TRISO-X to Align on NRC Supplement to Responses to Structural Requests for Additional Information ML23332A0752024-02-23023 February 2024 Memorandum - Summary of Six Meetings Between December 11, 2023 and January 23, 2024 with TRISO-X, LLC, to Align on a Supplement for the Responses to the Requests for Additional Information Regarding the Integrated Safety Analysis ML24024A1632024-01-25025 January 2024 January 17, 2024, Summary of Meeting with Triso-X, LLC, to Align on the Triso-X Draft Environmental Impact Analysis Requests for Additional Information Part 2-2 ML23362A0662024-01-16016 January 2024 12-19-23 Summary of Meeting with Triso-X, LLC, to Align on Triso-X Draft Environmental Safety Request for Additional Information ML24010A1672024-01-10010 January 2024 Environmental Impact Statement Scoping Process, Summary Report for the TRISO-X, LLC, Public Scoping Period January – February 2023 ML24010A1662024-01-0808 January 2024 Scoping Summary Report Related to the Environmental Scoping Process for the Triso-X Special Nuclear Material License Application ML23355A2452024-01-0505 January 2024 TRISO-X Fuel Facility Resident Inspector Decision ML23353A1832023-12-27027 December 2023 Summary of Meeting on December 4, 2023, with TRISO-X LLC, to Align on TRISO-X Draft Responses to the Requests for Additional Information for the Chemical Safety Analysis ML23117A1122023-05-22022 May 2023 Memo Summary of TRISO-X Closed Call on ISA Methodology and Natural Phenomena Hazards ML23044A2522023-02-22022 February 2023 Memo and Enclosure 1 - 011023 Summary of TRISO-X Call on Observations and Fuel Fabrication ML19283B2042019-10-10010 October 2019 Meeting Summary with X-Energy to Provide Pre-Application Information Re Integrated Safety Analysis Methods for the TRISO-X Fuel Fabrication Facility License Application ML19011A1942019-01-17017 January 2019 Meeting Summary: Meeting with X-Energy to Provide Pre-Application Information Related to Criticality Safety Regarding the Triso-X Fuel Fabrication Facility License Application 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 MEMORANDUM TO: Samantha Lav, Chief Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Matt Bartlett, Sr. Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
SUMMARY
OF PUBLIC MEETING ON JUNE 17, 2024, WITH TRISO-X, LLC., TO DISCUSS THE STATUS OF THE LICENSE APPLICATION REVIEW (ENTERPRISE PROJECT IDENTIFIER L-2022-PMP-0005)
The U.S. Nuclear Regulatory Commission (NRC) staff conducted an open Microsoft Teams meeting with TRISO-X, LLC. (TRISO-X) on June 17, 2024, from 1:00PM until 1:30PM. The purpose of the meeting was to discuss the status of the review for the new TRISO-X Title 10 of the Code of Federal Regulations Part 70 fuel fabrication facility license application (LA). In addition, the NRC staff discussed the NRCs project dashboard for the TRISO-X license application review ( https://www.nrc.gov/info-finder/fc/triso-x.html). This included an overview of the project, several Gantt Charts of the schedule, and a list of the High Impact Technical Items (HITIs).
The dashboards contain several tabs that provide different representations of the progress of the license review. When TRISO-X supplements its LA with the revised LA at the end of 2024, the NRC staff will review the new materials and determine if some items currently marked complete should change to pending.
The sixth tab of the dashboard provides information on the four high impact technical items (HITIs). The HITIs include 20 methodology requests for information that need resolution for the integrated safety analysis (ISA) summary, structural design, and management measures and quality assurance (MM/QA); and the electrical/ I&C portions of the LA. There are 10 ISA summary methodology RAIs, four structural methodology RAIs, and five MM/QA methodology RAIs. The electrical/I&C LA materials were submitted on February 29, 2024 (ML24060A239).
The HITIs are updated routinely, and some of the RAIs have been resolved since the HITIs were initially created.
CONTACT: Matt Bartlett, NMSS/DFM 301-415-7154August 26, 2024 Signed by Bartlett, Matthew on 08/26/24
S. Lav 2
The NRC staff discussed the status of work on the HITIs as follows:
- 11 RAIs are moving toward resolution based on discussions and are awaiting written responses;
- 4 RAIs remain unresolved, including the following:
- ISA Summary RAI - 5, Definitions of unlikely and highly unlikely,
- Structural RAI 2-2, (Building) Risk Category,
- MM/QA RAI 1, Construction Qualifications and;
- MM/QA RAI 2, Quality Standards for IROFS,
- The detailed electrical/I&C review is in progress.
Slides presented during the meeting were attached to the public meeting notice dated June 17, 2024 (ML24165A136). A list of participants is provided as an Enclosure.
Docket No. 07007027
Enclosures:
- 1. Participant List (public)
cc: J. Wheeler, TRISO-X B. Cunningham, TRISO-X trisox@listmgr.nrc.gov
ML24206A044(pkg), ML24206A045(memo),
ML24206A046(encl)
OFFICE NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NAME SPoy JRudd SPoy DATE 7/24/2024 7/25/2024 7/31/2024 OFFICE NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/DFM/FFLB NAME MBartlett JGoodridge SLav DATE 7/31/2024 8/1/2024 8/23/2024 OFFICE NMSS/DFM/FFLB NAME MBartlett DATE 8/26/2024