ML24036A078

From kanterella
Jump to navigation Jump to search
American Centrifuge Operating, LLC, Notification of Changed Pages of the (U) Integrated Safety Analysis Summary
ML24036A078
Person / Time
Site: 07007003
Issue date: 01/24/2024
From: Karen Fitch
American Centrifuge Operating
To: Laura Dudes, John Lubinski
Document Control Desk, Office of Nuclear Material Safety and Safeguards, NRC/RGN-II
References
ACO 24-0004
Download: ML24036A078 (1)


Text

January 24, 2024 ACO 24-0004

ATTN: Document Control Desk John W. Lubinski, Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Laura Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II

. Marquis One Tower 234 Peachtree Center Ave. NE, Suite 1200 Atlanta, GA 30303-1200

American Centrifuge Lead Cascade Facility Docket Number 70- 7003; License Number SNM-7003

Notification of Changed Pages of the (U) Integrated Safety Analysis Summary for the American Centrifuge Lead Cascade Facility

Dear John Lubinski and Laura Dudes:

Pursuant to 10 Code of Federal Regulations (CFR) 70.72(d)(3), American Centrifuge Operating, LLC hereby notifies the U.S. Nuclear Regulatory Commission that no changes occurred during calendar year 2023 that impacted the previously provided changed pages for (U) Integrated Safety Analysis Summary for the American Centrifuge Lead Cascade Facility (Reference 1 ).

Additionally, in accordance with 10 CFR 70.5( a)( 4 )(b ), previous reporting of this information failed to properly address this Submittal of Changed Pages of the (U) Integrated Safety Analysis Summary for the American Centrifuge Lead Cascade Facility to the Region II Regional Administrator, which has been corrected with this submittal.

If you have any questions regarding this matter, please contact me at (740) 897-3859.

Sincerely,

/~;°,JiU

Kelly L. Fitch Regulatory Manager -~(Yl5520

((&-ND 2..

American Centrifuge Operating, LLC NrYISJ 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661 fL~ ~-2;.

John Lubinski and Laura Dudes January 24, 2024 ACO 24-0004, Page 2

Reference:

1. Letter ACO 23-0007 from K.L. Fitch to J.W. Lubinski (NRC) regarding Submittal of Changed Pages of the (U) Integrated Safety Analysis Summary for the American Centrifuge Lead Cascade Facility, dated January 25, 2023

cc:

C. Blanton, DOE Idaho Y. Paraz, NRC HQ A. Ford,'DOE Idaho J. Hutson, Contractor J. Lingard, DOE Idaho L. Pitts, NRC Region II M. Reim, DOE-NE J. Tobin, NRC HQ D. Woodyatt, NRC HQ