|
---|
Category:Letter
MONTHYEARML24036A2762024-02-0606 February 2024 American Centrifuge Operating - Headquarters - Information Security Inspection Report 07007004/2024401 - (Public) ML24018A1472024-01-19019 January 2024 Request for Additional Information Regarding Physical Security of High-Assay Low-Enriched Uranium at the American Centrifuge Plant ML24024A0352024-01-17017 January 2024 American Centrifuge Plant - Transmittal of Updated Owners, Officers, Directors, and Executive Personnel Listing ML23324A0402023-11-20020 November 2023 American Centrifuge Operation - Oak Ridge - Information Security Inspection Report 07007004/2023403 - (Public) ML23318A1012023-11-0909 November 2023 American Centrifuge Plant - Request for Extension of Interim Authority to Operate ML23313A1032023-11-0202 November 2023 Annual Review of Operations Security Plan for the American Centrifuge Program ML23311A3132023-11-0202 November 2023 American Centrifuge Lead Cascade Facility; Docket Number 70-7003; License Number SNM-7003 ML23296A0402023-10-19019 October 2023 American Centrifuge Operating, LLC, Amendment Request for Information System Security Plans ML23261A5872023-09-21021 September 2023 American Centrifuge Operating, LLC - American Centrifuge Plant Docket No. 70-7004 Cat II Authorization ML23263B0672023-09-21021 September 2023 Confirmatory Order Modifying License - American Centrifuge Operating - Oak Ridge ML23257A0372023-09-15015 September 2023 American Centrifuge Operating, LLC - Inspection Schedule for Calendar Year 2024 ML23248A5442023-09-0707 September 2023 American Centrifuge Plant High Assay Low Enriched Uranium Demonstration Operational Readiness Review Report 07007004/2023407 ML23180A1402023-08-15015 August 2023 Approval of American Centrifuge Operatings License Amendment Request to Revise Its Information System Security Plan (Enterprise Project Identifier L-2022-SPR-0009) ML23220A1922023-08-0808 August 2023 American Centrifuge Plant - Information Security Inspection Report 07007004/023404 (Cover Letter) ML23137A1332023-07-0303 July 2023 Nispom Amd Cvr Ltr ML23137A133 Pkg A129 07/03/2023 Public ML23187A1432023-06-29029 June 2023 Supplement to License Amendment Request for American Centrifuge Operating, Llc'S License Application for the American Centrifuge Plant ML23171A9372023-06-13013 June 2023 American Centrifuge Operating, LLC, Transmittal of Risk Assessment ML23163A1682023-06-12012 June 2023 American Centrifuge Operating, LLC - ACP - Docket No. 70-7004, Authorization to Introduce Uranium Hexafluoride Into the High-Assay Low-Enriched Uranium Demonstration Cascade Module ML23146A1102023-06-0808 June 2023 Centrus/Aco HALEU Production Phase 2 RAI - Forwarding E-Mail ML23152A2762023-06-0505 June 2023 ACP High Assay Low Enriched Uranium, Demonstration Physical Security Operational Readiness Review (Orr) Report 07007004/2023406 ML23163A0542023-05-30030 May 2023 American Centrifuge Operating, LLC, Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant ML23139A1532023-05-15015 May 2023 American Centrifuge Plant, Request for Approval: Tempest Companies for Use ML23128A3572023-05-0909 May 2023 American Centrifuge Plant - Material Control and Accounting Program Inspection Report 07007004/2023405 - Cover Letter ML23128A3502023-05-0909 May 2023 American Centrifuge Plant Integrated Inspection Report 07007004 2023007 ML23086A0882023-04-13013 April 2023 Centrus Phase II Acceptance License Amendment L-2023-LLA-0024 ML23108A0622023-04-13013 April 2023 American Centrifuge Operating, LLC, Supplement to Request for Approval: Proposed Change to Security Program ML23108A0582023-04-11011 April 2023 American Centrifuge Operating, LLC, Request for Extension of Interim Authority to Operate ML23108A1022023-04-0606 April 2023 American Centrifuge Plant Submittal of Amendment Request for American Centrifuge Operating, Llc'S Information Security Plan ML23083B9622023-03-30030 March 2023 HALEU Phase 1+ Extension Amd 20 Cvr Ltr ML23083B962 Pkg A961 03/30/2023 ML23074A2222023-03-30030 March 2023 American Centrifuge Operating - Oak Ridge Special Inspection Report 07007004 2023401 and Apparent Violations ML23088A0522023-03-28028 March 2023 Confirmation of the Implementation of Category III Special Nuclear Material Requirements for American Centrifuge Operating, Llc'S American Centrifuge Plant - HALEU Program ML23088A0512023-03-28028 March 2023 Supplement to License Amendment Request for American Centrifuge Operating, Llc'S License Application for the American Centrifuge Plant ML23086B9692023-03-23023 March 2023 American Centrifuge Plant - Declaration of Readiness for Operational Readiness and Management Measures Review for American Centrifuge Operating, LLC - HALEU Demonstration ML23069A0982023-03-20020 March 2023 NRC Confirmation Aco License Authorizes Possession and Use of a Small Quantity of UF6 for Mass Spectrometer Testing ML23047A0462023-02-13013 February 2023 License Amendment Request for American Centrifuge Operating, Llc'S License Application for the American Centrifuge Plant - American Centrifuge Plant; Docket Number 70-7004; License Number SNM-2011 ML23047A0472023-02-10010 February 2023 Submission of Gap Analysis for Proposed Changes to American Centrifuge Operating, Llc'S Security Plans (EPID: L-2022-SPR-000S) ML23047A0602023-02-0909 February 2023 Request for Clarification of American Centrifuge Operating, LLC Materials License Condition ML23037A8912023-02-0606 February 2023 American Centrifuge Operating - Headquarters - Information Security Inspection Report 07007004/2023402 ML23038A0932023-01-30030 January 2023 American Centrifuge Operating, LLC, Submittal of Gap Analysis for Proposed Changes to Security Plans ML23030A8042023-01-25025 January 2023 American Centrifuge Operating, LLC, Submittal of Changed Pages of the Integrated Safety Analysis Summary ML23027A0112023-01-24024 January 2023 American Centrifuge Operating, LLC, Request for Extension of Interim Authority to Operate for the Distributed Control System and Process Telecommunication System ML23027A0152023-01-18018 January 2023 American Centrifuge Operating, LLC, Supplement for Unclassified Foreign Visit/Assignment Security Plan ML23010A1512023-01-13013 January 2023 Letter - Acceptance for Review Centrus/Aco Request to Extend HALEU Authorization to Dec 31, 2023 2024-02-06
[Table view] Category:Report
MONTHYEARML23163A0542023-05-30030 May 2023 American Centrifuge Operating, LLC, Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant ML21347A9292021-10-26026 October 2021 American Centrifuge Operating, LLC, Comments on Draft NUREG-2159, Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance ML21123A3062021-05-0303 May 2021 HALEU FAQs for Website ML20255A1352020-09-0303 September 2020 Description of Change and Justification for the Supplemental Proposed Changes 2023-05-30
[Table view] Category:Miscellaneous
MONTHYEARML23163A0542023-05-30030 May 2023 American Centrifuge Operating, LLC, Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant ML21347A9292021-10-26026 October 2021 American Centrifuge Operating, LLC, Comments on Draft NUREG-2159, Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance ML21123A3062021-05-0303 May 2021 HALEU FAQs for Website ML20255A1352020-09-0303 September 2020 Description of Change and Justification for the Supplemental Proposed Changes 2023-05-30
[Table view] |
Text
- J,.*
May 30, 2023 ACO 23-0049 ATTN: Document Control Desk John W. Lubinski, Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 American Centrifuge Lead Cascade Facility and American Centrifuge Plant Docket Numbers 70-7003 and 70-7004; License Numbers SNM-7003 and SNM-2011 Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant
Dear John Lubinski:
In accordance with Section 1.2 of the Fundamental Nuclear Material Control Plan (FNMCP) for the American Centrifuge Lead Cascade Facility (LCF), Section 1.3 of the FNMCPs for the American Centrifuge Plant (ACP), and 10 Code of Federal Regulations (CPR) 70.32(c)(2)(ii), American Centrifuge Operating, LLC (ACO) hereby submits to the U.S. Nuclear Regulatory Commission (NRC) a description of change as Enclosure 1 of this letter, which applies to the following documents:
- NR~2605-0003, Fundamental Nuclear Material Control Plan for the American Centrifuge Lead Cascade Facility
- NR-3605-0005, Fundamental Nuclear Material Control Plan for the American Centrifuge Plant
- NR-3605-0005A, (U) Program for Precluding and Detecting Unauthorized Production/
Enrichment Activities
- NR-3605-0005B, Addendum I of the Fundamental Nuclear Material Control Plan for the American Centrifuge Plant - HALEU Demonstration
- NR-3605-0005C, (U) Program for Precluding and Detecting Unauthorized Production/
Enrichment and Diversion Activities for the HJ!-LEU Demonstration The changes noted in Enclosure 1 have been reviewed in accordance with 10 CPR 70.32 and have been determined not to decrease the effectiveness of the FNMCP.
American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661
John W. Lubinski
- May 30, 2023 ACO 23-0049, Page 2 If you have any questions regarding this matter, please contact me at (740) 897--3859.
Sincerely,
~/J;ld Kelly L. Fitch Regulatory Manager
Enclosure:
As stated cc (without enclosure, unless otherwise noted):
S. Ani, NRC HQ Y. Faraz, NRC HQ (Enclosure)
A. Ford, DOE Idaho S. Harlow, DOE-NE J. Hutson, Contractor J. Lingard, DOE Idaho L. Pitts, NRC Region II (Enclosure)
J. Tobin, NRC HQ (Enclosure)
T. Vukovinsk:y, NRC Region II
Enclosure 1 to ACO 23-0049 Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant Information contained within DOES NOT CONTAIN Export Controlled Information Reviewer: #171, ACO Date: 05/23/2023
Enclosure 1 to ACO 23-0049 Description of Change for the Fundamental Nuclear Material Control Plans for the American Centrifuge Lead Cascade Facility and American Centrifuge Plant Documents ISA Modified Summary Approval Change Due to Update FCE/PCE Rev. Description/Reason for the Change Date to Change Required Numbers SSC? ?
FCE23-0008 0
Title:
Organizational Changes to Support Ongoing Operations 3/20/2023 No LA-2605-0001 Table of Yes PCE23-0018 0 Contents, Sections 2.1.1, ..
Description of Change: Changes are being made to the American Centrifuge 2.1.2, 2.1.2.1, 2.1.2.1.1, Operating, LLC organization structure to support ongoing operations. The following 2.1.2.2, 2.1.2.2.1, 2.1.2.2.2, organization changes are being made to the License Application and Supporting 2.1.2.3, 2.1.2.3.1, 2.1.2.3.2, Documents for the American Centrifuge Lead Cascade Facility (Lead Cascade) and 2.1.2.3.3, 2.1.2.3.4, 2.1.2.3.5, American Centrifuge Plant (ACP). 2.1.2.3 .5.1, 2.1.2.4.2, 2.1.5,
.. New position added for the Director, Regulatory Affairs.
Figure 2.1-1, Sections 3.1.2, 5.2.1, 5.2.2, 5.4.2, 6.0, Creation of the Nuclear Safety Manager position which will now report to the new 11.1.1.2, and 11.2.1 Director, Regulatory Affairs. NR-2605-0003 Sections 3.1
. The Regulatory Manager will now report to the new Director, Regulatory Affairs and 3.3
. vice the Enrichment Operations Plant Manager.
The NMC&A Manager will now report to the new Director, Regulatory Affairs LA-3605-0001 TOC, Sections 1.4.1 2.1, 2.1.2, 2.1.2.1,
. vice the Regulatory Manager.
The Maintenance Manager position has been re-established and will report to the 2.1.2.1.1, 2.1.2.2, 2.1.2.2.1, 2.1.2.2.2, 2.1.2.3, 2.1.2.3.1,
. Enrichment Operations Plant Manager.
The Cascade/Recycle and Assembly Operations Shift Supervisors will now report 2.1.2.3.2, 2.1.2.3.3, 2.1.2.3.4, 2.1.2.3.5, 2.1.2.3.5.1,
. to the Cascade Process Area Manager vice the Operations Manager.
The Maintenance Work Center Supervisor will now report to the Maintenance 2.1.2.4.2, 2.1.5, Figure 2.1-1, Sections 3.1.2, 5.2.1, 5.2.2,
. Manager vice the Operations Manager.
Change the title of the Radiation Protection Manager/Supervisor to Radiation 5.4.2, 6.0, 11.1.1.2.2, 11.1.1.2.5, 11.1. 1.2:6, Protection Manager.
. Corrected title for NR-3605-0005A, (U) Program for Precluding and Detecting 11.1.1.2. 7, 11.1.1.2.8 and 11.2.1 Unauthorized Production/Enrichment Activities LA-3605-0003 Sections 4.1.1, 4.1.2 and 4.1.4 Reason for the Change: Organization structure changes were needed for both the NR-3605-0003 Section 1.2 Lead Cascade and ACP. Expanding the management team oversight allows for and Figure 1.1-1 continued operations in a manner that protects the health and safety of workers and the NR-3605-0005 Sections 3.1, public; protects the environment; provides for the common defense and security; and is 3.2.1 and Figure 3-1 in qompliance with applicable local, state, and federal laws and regulations. NR-3605-0005B Figure 3-1 NR-3605-0005A Section 11.3 NR-3605-0005C Sections 11.3 and 11.3.1