|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23151A7252023-05-31031 May 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23121A0782023-05-0101 May 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23023A2542023-01-23023 January 2023 Site Emergency Plan Implementing Procedure Revision, Includes EPIP-6, Revision 0045, EPIP-7, Revision 0040, & EPIP-12, Revision 0026 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio ML22327A1742022-11-23023 November 2022 Site Emergency Plan Implementing Procedure Revision ML22286A1122022-10-13013 October 2022 Site Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Rev. 63, Emergency Classification Procedure ML22279A9452022-10-0606 October 2022 Site Emergency Plan Implementing Procedure Revision. Includes EPIP-14, Revision 0024, Radiological Control Procedures CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22166A3952022-06-15015 June 2022 Site Emergency Plan Implementing Procedure Revision CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. CNL-22-050, Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-04-18018 April 2022 Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22083A1692022-03-24024 March 2022 Site Emergency Plan Implementing Procedure Revision CNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-03-22022 March 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML22031A2842022-01-31031 January 2022 Site Emergency Plan Implementing Procedure Revision CNL-21-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing2021-12-17017 December 2021 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing CNL-21-088, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 242021-11-12012 November 2021 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 24 CNL-21-087, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions2021-11-0303 November 2021 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions CNL-21-071, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2021-08-13013 August 2021 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML21006A2102021-01-0707 January 2021 Site Emergency Plan Implementing Procedure Revision CNL-20-086, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-10-15015 October 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-080, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-10-0202 October 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML20246G8642020-09-0202 September 2020 Site Emergency Plan Implementing Procedure Revision ML20234A4862020-08-21021 August 2020 Site Emergency Plan Implementing Procedure Revision ML20220A6182020-08-0707 August 2020 Site Emergency Plan Implementing Procedure EPIP-1, Revision 60 CNL-20-062, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-07-29029 July 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-024, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-02-21021 February 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-20-007, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-01-27027 January 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML20015A2702020-01-15015 January 2020 Site Emergency Plan Implementing Procedure Revision CNL-20-001, Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-01-0909 January 2020 Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML19312A0972019-11-0808 November 2019 Site Emergency Plan Implementing Procedure Revision ML19311C5752019-11-0707 November 2019 Site Emergency Plan Implementing Procedure Revision CNL-19-096, Emergency Plan Implementing Procedure Revisions2019-10-22022 October 2019 Emergency Plan Implementing Procedure Revisions CNL-19-090, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2019-09-24024 September 2019 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML19038A1642019-02-0707 February 2019 Site Emergency Plan Implementing Procedure Revision ML18309A0192018-11-0505 November 2018 Site Emergency Plan Implementing Procedure Revision ML18302A0922018-10-29029 October 2018 Submittal of Site Emergency Plan Implementing Procedure Revision ML18253A0362018-09-10010 September 2018 Site Emergency Plan Implementing Procedure Revision 2024-01-17
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
l TENNESSEE VALLEY AUTHORITY Post Office Box 2000, Decatur, Alabama 35609-2000 November 23, 2022 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)
ATIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052
Subject:
Browns Ferry Nuclear Plant - Site Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 1O of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan (REP). The affected document is the BFN Emergency Plan Implementing Procedure (EPIP) named below.
EPIP Revision Title Effective Date EPIP-6 0045 Activation and Operation of the Technical 10/25/2022 Support Center (TSC)
EPIP-7 0040 Activation and Operation of the Operations 10/25/2022 Support Center (OSC)
EPIP-12 0026 Emergency Equipment and Supplies 10/25/2022 Description of Changes and Summary of Analysis Changes requiring a 50.54(q) reduction in effectiveness evaluation:
- 1. EPI P-6 Revision 45 adds necessary instruction to Attachment 19 for the Control Room Communicator related to establishing contact with the OSC and TSC personnel. Planning Standard 50.47(b)(6)- Emergency Communications was impacted by this change.
U.S. Nuclear Regulatory Commission Page2 November 23, 2022
- 2. EPIP-6 Revision 45 adds instruction to Attachment 12 for the TSC Radiation Protection Manager (RPM) to include a review of Dose Assessment Assumptions and other WebEOC boards including BFN Field Data, BFN Radiological Assessment, BFN Isotopic Mix Determination and BFN Release Flowchart. Planning Standard 50.47(b)(9) -Accident Assessment was impacted by this change.
- 3. EPIP-7 Revision 40 adds instruction to the Operational Responsibilities section of Attachment 8 for the OSC RP Briefer to update the OSC when the REP Vans have been dispatched; and adds examples to Attachment 8, OSC RP Briefer Checklist, of teams to be tracked in the OSC during response to an emergency. Planning Standard 50.47(b)(9) -
Accident Assessment was impacted by these changes.
- 4. EPIP-7 Revision 40 and EPIP-12 Revision 26 remove instruction related to the OSC/OSC Staging Area PA system. Planning Standards 50.47(b)(6) - Emergency Communications, and 50.47(b)(8) - Emergency Facility and Equipment, were impacted by this change.
These changes were determined to be changes to the REP that were not editorial or typographical in nature. These changes were also determined to not conform to activities that had prior NRC approval. 10 CFR 50.47(b) Planning Standards were impacted by these changes; therefore, it was concluded that these changes could not be implemented without performing a 50.54(q) reduction in effectiveness evaluation. Upon completion of the Effectiveness Evaluation Form for these changes, it was concluded that the changes continue to comply with the requirements of 50.47(b) and 50 Appendix E, and that the changes do not constitute a reduction in effectiveness. Therefore, these changes were allowed to be implemented without prior NRC approval.
Changes which did not require a 50.54(g) reduction in effectiveness evaluation:
EPIP-6 Revision 45 adds clarifying instruction to the Operational Responsibilities section of Attachment 2, Site Emergency Director Checklist, related to when to invoke 10 CFR 50.54(x) as a means of responding to an emergency. This change was determined to be a change to the REP that was not editorial or typographical in nature. This change was also determined to not conform to activities that had prior NRC approval. No 10 CFR 50.47(b) Planning Standards were impacted by this change; therefore, it was concluded that the change could be implemented without performing a 50.54(q) reduction in effectiveness evaluation, and that the change was allowed to be implemented without prior NRC approval.
U.S. Nuclear Regulatory Commission Page3 November 23, 2022 Additionally, EPIP-7, Revision 40 includes changes which were determined to be editorial or typographical in nature and could therefore be implemented without performing a 50.54(q) reduction in effectiveness evaluation.
There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact B. F. Tidwell at (256) 729-3666.
/TJ,;11 U S° I 11*.-.: ,....,&v\
~ 1,-1.-z-*zvi:1.
Manu Sivaraman Site Vice President cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant