ML20234A486

From kanterella
Jump to navigation Jump to search
Site Emergency Plan Implementing Procedure Revision
ML20234A486
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/21/2020
From: Bono S
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML20234A486 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 August 21, 2020 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052

Subject:

Browns Ferry Nuclear Plant - Site Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan. The affected documents are the BFN Emergency Plan Implementing Procedures (EPIPs) named below.

EPIP Revision Title Effective Date EPIP-5 0056 General Emergency 7/22/2020 EPIP-10 0039 Medical Emergency Procedure 7/22/2020 Description of Changes and Summary of Analysis EPIP-5 Revision 56 and EPIP-10 Revision 39 propose updating the contact information for the Limestone County Emergency Management Agency (EMA) after-hours number and the air ambulance service provider. These changes were screened collectively because the justification for making them was the same. This activity was determined to be a change to the radiological emergency plan that was not editorial or typographical in nature. This change was also determined to not conform to an activity that has prior approval. Planning Standard 50.47(b)(12) - Medical and Public Health Support, was determined to be impacted by this change; therefore, it was concluded that this activity could not be implemented without performing a 50.54(q) reduction in effectiveness evaluation. Upon completion of the Effectiveness Evaluation Form it was concluded that the activity continues to comply with the requirements of 50.47(b) and

U.S. Nuclear Regulatory Commission Page 2 August 21, 2020 50 Appendix E, and the activity does not constitute a reduction in effectiveness. Therefore, the activity was allowed to be implemented without prior approval.

There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact B. F. Tidwell at (256) 729-3666.

Respectfully, S. M.. Bo S. M Bono B no Site Vice President Pre re s siid deen ntt cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant