Letter Sequence Other |
---|
EPID:L-2022-LLA-0150, International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System (Approved, Closed) EPID:L-2022-LLE-0030, International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
Other: ML22287A139, ML22287A141, ML22287A143, ML22287A146, ML22334A262, ML22334A263, ML22335A499, ML22335A501, ML22343A261, ML23068A377, ML23129A797, ML23206A199, ULNRC-06783, Enclosure 2: Affidavit for Withholding, ULNRC-06808, Affidavit
|
MONTHYEARML22050A0012022-02-18018 February 2022 International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22130A7052022-05-10010 May 2022 International - Resubmittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0582022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0592022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22235A1152022-08-25025 August 2022 Enc - 9375 RAI 2022 Project stage: RAI ML22235A1132022-08-25025 August 2022 RAIs for the Model No. HI-STAR Atb 1T Package Project stage: Request ML22235A1142022-08-25025 August 2022 Letter - Request for Additional Information for the Review of the Atb 1T Package - 2022 Project stage: RAI ULNRC-06768, Attachment 4 to Enclosure 1: Framatome Affidavits for Withholding from Public Disclosure2022-10-0707 October 2022 Attachment 4 to Enclosure 1: Framatome Affidavits for Withholding from Public Disclosure Project stage: Request ML22285A1152022-10-0707 October 2022, 12 October 2022 Application for Technical Specification Change and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 Project stage: Request ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ML22287A1412022-10-14014 October 2022 Attachment 2 - HI-STAR Atb 1T Amendment Request 1 RAI Responses Project stage: Other ML22287A1462022-10-14014 October 2022 Affidavit of Kimberly Manzione Project stage: Other ML22287A1382022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Request ML22287A1432022-10-14014 October 2022 Attachment 4 - Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Other ML22287A1392022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Other ML22305A6042022-11-0101 November 2022 International - Supplemental Information for Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Supplement ML22335A4992022-11-16016 November 2022 Enclosure 1: Responses to Requested Information Project stage: Other ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis Project stage: Other ML22335A4972022-11-16016 November 2022, 1 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ULNRC-06783, Enclosure 2: Affidavit for Withholding2022-11-16016 November 2022 Enclosure 2: Affidavit for Withholding Project stage: Other ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 Project stage: Acceptance Review ML22335A4982022-12-0101 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ML22343A2612022-12-0909 December 2022 International - Submittal of Final SAR for HI-STAR ATB-1T Amendment 1 Project stage: Other ML22334A2632022-12-13013 December 2022 Enclosure 1 - Certificate of Compliance Rev. No. 1 Project stage: Other ML22334A2642022-12-13013 December 2022 Enclosure 2 - Safety Evaluation Report Project stage: Approval ML22334A2612022-12-13013 December 2022 Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Request ML22334A2622022-12-13013 December 2022 Cover letter- Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Other ML22348A1162022-12-21021 December 2022 Acceptance of Requested Licensing Actions Application for License Amendment & Regulatory Exemptions for TS Change & Exemption Request Regarding Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150 & EPID L-2022-LLE-0030) Project stage: Acceptance Review ML23068A3772023-03-20020 March 2023 Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request and Exemption for Fuel Transition to Framatome Gaia Fuel (EPID L-2022-LLA-0150 and EPID L-2022-LLE-0030) - Nonproprietary Project stage: Other ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ULNRC-06808, Affidavit2023-04-27027 April 2023 Affidavit Project stage: Other ML23129A7932023-04-27027 April 2023, 9 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Request ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Supplement ML23129A7972023-05-0909 May 2023 Response to Audit Questions Project stage: Other ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) Project stage: Request ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ULNRC-06829, Affidavit2023-08-0303 August 2023 Affidavit Project stage: Request ML23215A1962023-08-0303 August 2023, 31 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 Project stage: Request ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) Project stage: Other ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) Project stage: Approval ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) Project stage: Approval ML23234A1532023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Exemption) Project stage: Approval ML23234A1592023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material Project stage: Request ML23234A1542023-10-11011 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (FRN) Project stage: Approval 2022-08-25
[Table View] |
|
---|
Category:Response to Request for Additional Information (RAI)
MONTHYEARULNRC-06907, Attachment: Supplementation Information and Response to Request for Confirmation of Information (RCI) for Resolution of Callaway Plant License Renewal Commitments 34 and 352024-12-0505 December 2024 Attachment: Supplementation Information and Response to Request for Confirmation of Information (RCI) for Resolution of Callaway Plant License Renewal Commitments 34 and 35 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ML23156A6372023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23129A7972023-05-0909 May 2023 Response to Audit Questions ML23088A1322023-03-29029 March 2023 Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ML23052A0442023-02-21021 February 2023 Enclosure 2 - Supplement to License Amendment Request ML23052A0422023-02-21021 February 2023 Response to Request for Additional Information and Supplement to License Amendment Request Regarding Spent Fuel Storage (LDCN 22-0015) ML23052A0432023-02-21021 February 2023 Enclosure 1 - Response to Request for Additional Information ML22342B2662022-12-0808 December 2022 Enclosure - Ameren Missouri Response to NRC RAIs ML22335A4992022-11-16016 November 2022 Enclosure 1: Responses to Requested Information ML22244A1692022-09-0101 September 2022 Updated Response to RAT HFE-l ML22194A8022022-07-13013 July 2022 Enclosure 1: Ameren Missouri Response to NRC Requests for Additional Information ULNRC-06755, Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals2022-07-13013 July 2022 Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML22186A1052022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ML22146A3392022-05-26026 May 2022 Enclosure 1: Ameren Missouri Response to NRC RAIs ML22068A0292022-03-0808 March 2022 Response to Audit Question/Item 23 in NRC Letter Dated September 14, 2021 ML21286A6822021-10-13013 October 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ULNRC-06629, Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2021-01-0707 January 2021 Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs ULNRC-06602, Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 -2020-09-0202 September 2020 Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 - ML20238C1072020-08-25025 August 2020 Response to Request for Additional Information (Redacted) ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.12020-07-10010 July 2020 Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1 ML19325D6732019-11-21021 November 2019 Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 50.54(F) Letter with Regard to NTTF 2.1 Seismic - Supplemental Information ML19051A1372019-02-20020 February 2019 Attachment 1: Response to Request for Additional Information ULNRC-06482, Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.2019-02-0808 February 2019 Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. ML19039A3542019-02-0808 February 2019 RAI Questions and Responses ML19025A0712019-01-25025 January 2019 Response to Request for Additional Information Pertaining to Relief Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal Welds ULNRC-06479, Attachment a - Mitsubishi Responses to NRC Wjp RAIs2019-01-25025 January 2019 Attachment a - Mitsubishi Responses to NRC Wjp RAIs ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information ULNRC-06410, Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)2018-02-0505 February 2018 Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001) ML18036A6762018-02-0505 February 2018 Enclosure 6: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 21) ML18036A6742018-02-0505 February 2018 Enclosure 5: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 20) ML18036A6732018-02-0505 February 2018 Enclosure 4: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 19) ML18036A6722018-02-0505 February 2018 Enclosure 3: Response to Request for Additional Information (RAI) 1.c ML18036A6712018-02-0505 February 2018 Enclosure 2: Response to Request for Additional Information (RAI) Item 1.a ULNRC-06410, Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)2018-02-0505 February 2018 Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001) ML18036A6692018-02-0505 February 2018 Enclosure 1: Responses to Requests for Additional Information ULNRC-06381, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2017-10-0303 October 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML17138A2132017-05-18018 May 2017 Response to Request for Additional Information Concerning Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011) ULNRC-06357, Response to Request for Additional Information, 2016 Steam Generator Tube Inspections2017-03-23023 March 2017 Response to Request for Additional Information, 2016 Steam Generator Tube Inspections ULNRC-06321, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-082016-07-0707 July 2016 Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08 ULNRC-06275, Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-0022016-01-12012 January 2016 Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002 ULNRC-06266, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-112015-11-24024 November 2015 Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-11 ULNRC-06238, Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 62015-08-31031 August 2015 Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6 ML15197A2512015-07-16016 July 2015 Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6 ULNRC-06230, Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 62015-07-16016 July 2015 Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6 ULNRC-06233, Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone Call2015-07-13013 July 2015 Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone Call ULNRC-06227, Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 62015-07-0606 July 2015 Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 6 2024-12-05
[Table view] |
Text
Enclosure 1 to ULNRC-06783 Page 1 of 4 ENCLOSURE 1 RESPONSE TO REQUESTED INFORMATION
References:
- 1.
Ameren Missouri letter ULNRC-06768, "Application for Technical Specification Change and Exemption Request Regarding Use of Framatome GAIA Fuel (LDCN 22-0002)," dated October 12, 2022. (ADAMS Accession No. ML22285A115)
- 2.
NRC e-mail capture,
Subject:
"Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Plant, Unit 1 - LAR for proposed changes to TS and Exemption Request Regarding use of Framatome GAIA Fuel - EPID L-2022-LLA-0150 & L-2022-LLE-0030," dated November 17, 2022. (ADAMS Accession No. ML22322A006)
By e-mail dated November 17, 2022, (Reference 2) the NRC staff requested supplemental information needed to support acceptance of the Reference 1 license amendment request (LAR). The requested information is needed to support the NRC staff's independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements for the protection of public health and safety and the environment. This information is being provided to enable the NRC staff to begin its detailed technical review.
In order to make the application described in Reference 1 complete, the NRC staff requested that Ameren Missouri supplement the application to address the following individual information requests (in bold text). Ameren Missouri's response immediately follows each request.
- 1.
Regarding control rod ejection accident analysis, Enclosure 1, pdf page 12 states: The results of the analysis are available for NRC review (Reference 45). The Reference 45 in Enclosure 1 is ANP-4012P, "Callaway Rod Ejection Accident Analysis," dated July 2022. Please submit ANP-4012P as a supplement to the license amendment request (LAR) or make it readily available on an electronic portal.
Ameren Missouri Response:
A proprietary version of ANP-4012P, "Callaway Rod Ejection Accident Analysis,"
Revision 1 dated November 2022 is contained in Enclosure 4 of this letter. Revision 1 was created to allow identification of proprietary content consistent with the requirements of 10 CFR 2.390 in support of submittal to the NRC. No technical changes were to ULNRC-06783 Page 2 of 4 associated with this revision. Enclosure 3 contains the non-proprietary version of this document.
- 2.
It is not clear in the LAR whether the locations of the 8 GAIA fuel assemblies in the Cycle 27 core are in limiting or non-limiting locations. In Enclosure 1, pdf page 4/24, the second paragraph states:
Note that the technical reports were written to support a full transition to Framatome GAIA fuel including intermediate batch load quantities of fuel. Operation with eight assemblies starting in operating cycle 27 is bounded by the evaluations performed although not explicitly stated in all locations. A separate license amendment request will be required at a later date, to address the potential transition to Framatome GAIA fuel.
The demonstration analysis presented in the attachments to Enclosure 1 are all based on Framatome methodologies.
Please clarify if the italicized sentence in the above statement implies that the 8 GAIA assemblies in Cycle 27 core are in limiting positions, such that the demonstration analysis presented in the attachments to Enclosure 1 is bounding for these assembly locations. [Note that italicized text was substituted for highlighted text.]
Ameren Missouri Response:
Regarding operating cycle 27, the final core design has not yet been established, and it cannot be stated with certainty whether any of the GAIA fuel assemblies will be located in limiting locations. The purpose of the LAR submitted in Reference 1 is to allow unrestricted use of GAIA assemblies regardless of the ultimate final location of the assemblies.
The italicized sentence (and quoted paragraph) was an attempt to explain that the four supporting summary reports1 provided as attachments to Enclosure 1 of the LAR were originally written to support the complete transition to GAIA fuel. The reports discuss batch loading in which a mix of Framatome GAIA and Westinghouse fuel would be present up to (and concluding with) complete transition to GAIA fuel. The summary reports addressed the interim cycle (i.e., operating cycle 27) intended to include eight GAIA assemblies, but they did not always explicitly call this out.
The analyses provided in the four supporting summary reports1 that were provided as attachments to Enclosure 1 were developed using Framatome analysis methods with representative Callaway core design data, operating parameters and operating limits. As 1 Specifically, the four supporting summary documents referenced here are Attachments 9 through 12 of of Reference 1: 1) ANP-3943P, Revision 1, "Callaway Small Break LOCA Analysis with GAIA Fuel Design," dated October 2022; 2) ANP-3944P, Revision 1, "Callaway Realistic Large Break LOCA Analysis with GAIA Fuel Design," dated October 2022; 3) ANP-3947P, Revision 3, "Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel," dated October 2022; and 4)
ANP-3969P, Revision 2, "Callaway Non-LOCA Summary Report," dated October 2022.
to ULNRC-06783 Page 3 of 4 discussed in Section 3 of Attachment 9 to Enclosure 1 (i.e., ANP-3947P), Framatome computer models were benchmarked against the existing Westinghouse core design operating characteristics to ensure the neutronics models met the uncertainty verification criteria established in their respective topical reports. As stated in Table 3-1 of, the existing Westinghouse-established Technical Specification (TS) power distribution Core Operating Limits Report (COLR) limits were used as inputs in these analyses. These analyses demonstrate the specified acceptable fuel design limits are satisfied for normal and anticipated operational occurrences when operating in compliance with the current Westinghouse-established COLR limits. Similarly, the transient and accident analysis summary reports provided in Attachments 10 through 12 of Enclosure 1 demonstrate that the GAIA fuel assemblies meet regulatory acceptance criteria when the transients and accidents initiate within the existing TS power distribution COLR limits.
The response to Question 3 elaborates on the core design process and the treatment of the GAIA assemblies.
- 3.
In response to question 2, in case the GAIA assemblies are in limiting locations, please clarify what Technical Specifications (TS) would be applicable during Cycle 27 operation. The LAR does not include the Framatome fuel TS 3.2 Power Distribution Limits and Framatome methodologies in TS 5.6.5, Core Operating Limit Report.
Ameren Missouri Response:
The TS requirements that will be applicable during operating cycle 27 are those currently contained in the TSs, specifically, in Section 3.2, "Power Distribution Limits," which are TS 3.2.1, "Heat Flux Hot Channel Factor (FQ(Z))"; TS 3.2.2, "Nuclear Enthalpy Rise Hot Channel Factor (FNH)"; TS 3.2.3, "Axial Flux Difference (AFD) (Relaxed Axial Offset Control (RAOC) Methodology)"; and TS 3.2.4, "Quadrant Power Tilt Ratio (QPTR)."
These power distribution limit (PDL) TSs will continue to cite the limits given in the COLR. The COLR limits will continue to be those developed by Westinghouse using the methods identified in TS 5.6.5.b. Framatome's methods will not be used to define any COLR limit. Limiting fuel assemblies, regardless of the manufacturer, will be required to meet the COLR limits established using the Westinghouse methods.
The LAR does not propose any changes to the Section 3.2 PDL TSs, nor does it propose to change the description of the COLR methods (e.g., TS 5.6.5.b list of methodologies).
Any change to these sections will be addressed by a future LAR addressing transition to Framatome GAIA fuel. The Framatome methods will be listed in the Final Safety Analysis Report along with descriptions of the analysis results based on those analysis methods.
The reload analysis process involves Westinghouse's proprietary method and is described in WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," which is an NRC-approved method listed as item b.1 in TS 5.6.5, "Core Operating Limits Report (COLR)." The method described in the WCAP involves the solicitation and aggregation to ULNRC-06783 Page 4 of 4 of pertinent data and potential plant changes using the Reload Safety and Licensing Checklist (RS&LC), confirmatory analyses, assessment against design and licensing standards, and generation of the Reload Safety Analysis Checklist (RSAC). This process has been used numerous times over the life of Callaway.
Ameren Missouri, with Framatome's permission, has provided pertinent GAIA fuel assembly design data to Westinghouse for its use in constructing a core model containing GAIA fuel. The ability of Westinghouse to provide core reload power distribution predictions to support confirmation of Framatome GAIA fuel safety analysis fuel design limits by Framatome has been previously demonstrated when the first four GAIA lead fuel assemblies were placed in the core during operating cycle 25. The power distribution predictions were also used to confirm that the lead fuel assemblies in cycle 25 met the criteria for non-limiting locations. Given the application of this process for the four GAIA lead fuel assemblies, Ameren Missouri has confidence in its application to the four additional GAIA assemblies to be loaded in operating cycle 27.
Ameren Missouri is using the Westinghouse-developed core design, its supporting analyses and the RSAC to determine the acceptability of the core design for use in the subsequent operating cycle. The Westinghouse TS COLR power distribution limits used in these analyses were also used by Framatome to perform bounding safety analysis that support the use of GAIA fuel in unrestricted locations. Independent of the Westinghouse activities, Framatome, as part of their standard reload design process, will develop a cycle-specific core model using their approved methods and independently ensure that the cycle-specific predicted power distributions meet the Westinghouse-established COLR limits. Ameren Missouri could not accept a core design in which the TS limits were not satisfied by both fuel vendors.
Lastly, the ability to operate within the TS power distribution limits relies on the ability to predict and monitor core power peaking effectively, specifically FH and FQ. The ability to effectively monitor core power distribution given the presence of GAIA fuel assemblies has already been demonstrated in operating cycle 25. Further, the limits established in TS 3.2.1 and TS 3.2.2 require the ability to predict power peaking consistently, and the design similarities of the fuel assemblies do not adversely impact that ability. As Framatome concluded in Section 4 of Attachment 9 to Enclosure 1, the existing Westinghouse-established limits of TS 3.2.1 and TS 3.2.2 remain applicable to GAIA fuel with use of the Westinghouse fuel vendor's power distribution control methodology. The ability to accurately predict power distributions in GAIA fuel is not dependent on whether the acceptance criteria is the non-limiting peaking factor limits for lead fuel assemblies or the TS COLR limits for unrestricted use.