Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A17 August 2023Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A
ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)21 June 2023Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)Exemption Request
Fuel cladding
ML23156A6375 June 2023Response to Request for Additional Information Regarding License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesBoric Acid
Coatings
Incorporated by reference
Aging Management
Moisture barrier
ML23129A7979 May 2023Response to Audit QuestionsShutdown Margin
License Renewal
Exemption Request
Fuel cladding
Flow Induced Vibration
Affidavit
ML23088A13229 March 2023Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection
ML23052A04421 February 2023Enclosure 2 - Supplement to License Amendment Request
ML23052A04221 February 2023Response to Request for Additional Information and Supplement to License Amendment Request Regarding Spent Fuel Storage (LDCN 22-0015)
ML23052A04321 February 2023Enclosure 1 - Response to Request for Additional Information
ML22342B2668 December 2022Enclosure - Ameren Missouri Response to NRC RAIs
ML22335A49916 November 2022Enclosure 1: Responses to Requested InformationAnticipated operational occurrence
Exemption Request
ML22244A1691 September 2022Updated Response to RAT HFE-lHigh winds
ML22194A80313 July 2022Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals
ML22194A80213 July 2022Enclosure 1: Ameren Missouri Response to NRC Requests for Additional Information
ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications5 July 2022Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical SpecificationsExemption Request
ML22186A1055 July 2022Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical SpecificationsStroke time
Finite Element Analysis
ML22146A33926 May 2022Enclosure 1: Ameren Missouri Response to NRC RAIs
ML22068A0298 March 2022Response to Audit Question/Item 23 in NRC Letter Dated September 14, 2021
ML21286A68213 October 2021Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsHot Short
High winds
Probabilistic Risk Assessment
Thermoset
Large early release frequency
Earthquake
ULNRC-06629, Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs7 January 2021Response to Request for Additional Information Pertaining to Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty ProgramsFitness for Duty
Exemption Request
COVID-19
ULNRC-06602, Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 -2 September 2020Response to Request for Addition Information Pertaining to Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and TS 5.3.1.2 -Safe Shutdown
ML20238C10725 August 2020Response to Request for Additional Information (Redacted)
ULNRC-06591, Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.110 July 2020Supplemental Information for Response to March, 2012 Information Request, Seismic Probabilistic Risk Assessment for Recommendation 2.1Hot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Multiple Spurious Operation
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Power Operated Valves
GOTHIC
ML19325D67321 November 2019Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 50.54(F) Letter with Regard to NTTF 2.1 Seismic - Supplemental InformationProbabilistic Risk Assessment
Job Performance Measure
Earthquake
ML19051A13720 February 2019Attachment 1: Response to Request for Additional Information
ULNRC-06482, Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.8 February 2019Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System.
ML19039A3548 February 2019RAI Questions and ResponsesSafe Shutdown
Shutdown Margin
Ultimate heat sink
Mission time
Anticipated operational occurrence
ML19025A07125 January 2019Response to Request for Additional Information Pertaining to Relief Request 14R-05 for Relief from Requirements of ASME Code Case N-770-2 Regarding Inspection Intervals for Reactor Vessel Nozzle Dissimilar Metal WeldsIncorporated by reference
Dissimilar Metal Weld
ULNRC-06479, Attachment a - Mitsubishi Responses to NRC Wjp RAIs25 January 2019Attachment a - Mitsubishi Responses to NRC Wjp RAIsDissimilar Metal Weld
ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information31 May 2018Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental InformationAging Management
ULNRC-06410, Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)5 February 2018Callaway Plant, Unit 1 - Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (Ldcn 16-0001)
ML18036A6765 February 2018Enclosure 6: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 21)Stroke time
ML18036A6745 February 2018Enclosure 5: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 20)Ultimate heat sink
Anchor Darling
ML18036A6735 February 2018Enclosure 4: Response to Request for Additional Information (RAI) 1.d (MOV Performance Indicator Report for Cycle 19)Packing leak
Stroke time
ML18036A6725 February 2018Enclosure 3: Response to Request for Additional Information (RAI) 1.cStroke time
ULNRC-06410, Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)5 February 2018Response to Request for Additional Information Concerning Proposed Revision of FSAR-Described Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection (LDCN 16-0001)
ML18036A6695 February 2018Enclosure 1: Responses to Requests for Additional InformationStroke time
ML18036A6715 February 2018Enclosure 2: Response to Request for Additional Information (RAI) Item 1.a
ULNRC-06381, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident3 October 2017Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML17138A21318 May 2017Response to Request for Additional Information Concerning Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011)Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
ULNRC-06357, Response to Request for Additional Information, 2016 Steam Generator Tube Inspections23 March 2017Response to Request for Additional Information, 2016 Steam Generator Tube Inspections
ULNRC-06321, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-087 July 2016Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection Request for Relief No. I3R-08
ULNRC-06275, Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-00212 January 2016Response to Request for Additional Information (RA) Related to Operating Quality Assurance Manual (Oqam), Revision 31, Oqam Change Notice 15-002Commercial Grade Dedication
ULNRC-06266, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-1124 November 2015Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-11Non-Destructive Examination
ULNRC-06238, Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 631 August 2015Response to Supplemental Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6Safe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ULNRC-06230, Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 616 July 2015Response to Request for Additional Information (RAI) Related to License Amendment Request for Emergency Action Level (EAL) Upgrade Adopting NRC-Endorsed NEI 99-01, Revision 6Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
ULNRC-06233, Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone Call13 July 2015Submittal of Requested Information on FSAR Section 3.1.2., Per July 9, 2015 Telephone CallEarthquake
ULNRC-06227, Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 66 July 2015Response to Request for Additional Information Related to License Amendment Request for Emergency Action Level Upgrade Adopting NRC-Endorsed NEI 99-01, Rev 6High winds
Shutdown Margin
Internal Flooding
FLEX
Earthquake
Pressure Boundary Leakage