Callaway Plant Ameren MISSOURI SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
February 21, 2023 ULNRC-06796 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION AND SUPPLEMENT TO LICENSE AMENDMENT REQUEST REGARDING SPENT FUEL STORAGE (LDCN 22-0015) tEPID L-2022-LLA-0132)
References:
1.
Ameren Missouri letter ULNRC-06723, License Amendment Request Regarding Proposed Technical Specification Changes for Spent Fuel Storage (LDCN 22-001 5), dated August 29, 2022 (ADAMS Accession No. ML22242A122) 2.
NRR e-mail capture,
Subject:
Final - Request for Additional Information
Callaway Plant, Unit 1 LAR for proposed changes to TS for SFP EPID:
L-2022-LLA-0132, dated January 24, 2023 (ADAMS Accession No. ML23026A021)
By letter dated August 29, 2022 (Reference 1), Ameren Missouri submitted a license amendment request (LAR) to revise Technical Specification (TS) 3.7.16, Fuel Storage Pool Boron Concentration; TS 3.7.17, Spent Fuel Assembly Storage; Figure 3.7.17-1, Minimum Required Fuel Assembly Bumup as a Function of Initial Enrichment to Permit Storage in Regions 2 and 3 ; and TS 4.3. 1, Criticality. The proposed TS changes are needed to reflect the performance of a new/revised criticality safety analysis (CSA) for fuel assembly storage in the Callaway Energy Center (Callaway) spent fuel pool (SFP) storage racks, based on a methodology compliant with the guidance in Regulatory Guide 1.240, Fresh and Spent Fuel Pool Criticality Analyses, Revision 0. By e-mail to this letter contains sensitive information. Withhold from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosure 8, this letter is uncontrolled.
SENSITIVE iNFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4) 83 15 County Joad 1*59 Steediiiai:i, 1I 65077
.iriereri1vIissoiiri.coni.
ULNRC-06796 February 21, 2023 Page 2 of 5 dated January 24, 2023, (Reference 2) the NRC staffrequested additional information to support completion of the review of the requested license amendment.
The requested information and the response to each item identified in Reference 2 is provided in. In developing the response, the originally proposed TSs and TS Bases have been modified. In addition, vendor-provided analyses have been completed that support the responses given in Enclosure 1. The documents are included in the following enclosures:
. provides the modified marked-up TS pages.
. provides the re-typed, clean T$ pages.
. provides the modified marked-up TS Bases pages (for information only).
. provides the affidavits for withholding proprietary information from public disclosure
. contains the Supplemental Criticality Safety Analysis Report (Non-proprietary version)
. contains the Supplemental Criticality Safety Analysis Report (Proprietary version)
Since Enclosure 8 contains information proprietary to HOLTEC International, it is supported by an affidavit signed by a representative ofthe owner ofthe information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 1 0 CFR 2.390. Accordingly, it is respectfully requested that the proprietary information be withheld from public disclosure in accordance with 1 0 CFR 2.3 90.
In addition, Enclosure 2 provides supplemental information resulting from the identification of an issue during the development ofthe core loading plan for operating cycle 27. This core loading plan requires the use of fuel containing an integral fuel burnable absorber (IFBA) not explicitly bounded by the cases presented in the criticality safety analysis provided in support of the license amendment request provided in Reference 1. This letter conveys the supplemental analyses demonstrating the acceptability ofthe placement and storage ofthe fuel being acquired for operating cycle 27 in the SFP.
Vendor-provided analyses have been included in Enclosure 8 that address the issue described in.
As discussed in the Enclosures, the requested information and associated changes provided in this letter have no adverse impact on the regulatory analysis and conclusion of acceptability described in the LAR provided in Reference 1. In addition, the responses to the requested information and associated changes described in this response do not change the No Significant Hazards Consideration conclusions reached in the LAR provided in Reference 1, nor do they change the conclusion regarding no need for an environmental assessment based on the categorical exclusion provisions of 1 0 CFR 51.22.
In accordance with the Callaway Operating Quality Assurance Manual, the Onsite Review Committee has reviewed and approved the submittal of this supplemental information in support of the license amendment application. to this letter contains sensitive information. Withhold from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosures 8, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNUJER 10 CFR 2.390(a)(4)
ULNRC-06796 February 21, 2023 Page 3 of 5 This letter does not contain new commitments.
If there are any questions, please contact Mr. Tom Elwood at 3 14-225-1905.
I declare under penalty ofperjury that the foregoing is true and correct.
Sincerely, Todd A. Witt Manager, Regulatory Affairs Executed on:
Enclosures:
1 Response to Request for Additional Information 2
Supplement to License Amendment Request 3.
Revised Technical Specifications (Red-Line Version) 4 Revised Technical Specifications (Retyped Version) 5 Revised Technical Specification Bases (For Information Only) 6 Affidavit for Withholding 7
Holtec International Report HI-2230125 (Non-Proprietary Version) 8 Holtec International Report HI-2230125 (Proprietary Version) to this letter contains sensitive information. Withhold from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosures 8, this letter is uncontrolled.
SENSITIVE iNFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)
ULNRC-06796 February 21, 2023 Page 4 of 5 to this letter contains sensitive information. Withhold from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosures 8, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4) cc:
Mr. Robert Lewis Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001
ULNRC-06796 February 21, 2023 Page 5 of 5 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6500 West Freeway, Suite 400 FortWorth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
F. M. Diya K. C. Scott B. L. Cox B. L. Jungmann D. E. Farnsworth T. A. Witt T. B. Elwood M. G. Hoehn D. S. Pallardy B. D. Richardson C. J. Ehmke D. E. Rickard NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittrnan LLP) to this letter contains sensitive information. Withhold from public disclosure under 10 CFR 2.390(a)(4). Upon removal of Enclosures 8, this letter is uncontrolled.
SENSITIVE INFORMATION - WITHHOLD UNDER 10 CFR 2.390(a)(4)