Letter Sequence Supplement |
---|
|
|
MONTHYEARML22171A0132022-06-20020 June 2022 Units, Units 1 and 2 - Proposed License Amendment Request Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications Project stage: Request ML22172A1342022-06-20020 June 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability Project stage: Request ML22202A0472022-07-25025 July 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Technical Specification Change Auxiliary Feedwater Allowed Outage Time Project stage: Acceptance Review ML22220A2162022-08-0808 August 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability Supplemental Information Project stage: Supplement ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR Project stage: Approval ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information Project stage: Response to RAI ML23030B8472023-03-10010 March 2023 Issuance of Amendment Nos. 309 and 309, License Amendment Request Regarding a 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Project stage: Approval 2022-07-25
[Table View] |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information2023-05-0808 May 2023 Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information ML23096A1972023-04-0606 April 2023 License Amendment Request - Application of Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure - Response to Request for Additional Information ML23096A2982023-04-0606 April 2023 Units 1 and 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion ML23089A3542023-03-30030 March 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times ML23044A0392023-02-11011 February 2023 Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles Response to Request for Additional Information ML23025A1252023-01-25025 January 2023 Response to Request for Additional Information License Amendment Request, NRC Approval of Methodology Change and Reclassification of the Turbine Building as a Tornado Resistant Structure ML22343A0002022-12-0909 December 2022 Response to Request for RAI on ASME Operation & Maintenance Code Inservice Testing Program - Request for Approval of Alternative Request V-01 Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing ML22342A4242022-12-0707 December 2022 Response to 3/12/2012 Request for Information Enclosure 2, Recommendation 2.0, Flooding Focused Evaluation Integrated Assessment Submittal Revised Commitment Completion Date ML22312A4432022-11-0707 November 2022 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to RAI ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information ML22220A2162022-08-0808 August 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater (AFW) Cross-Connect Capability Supplemental Information ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit ML21259A0852021-09-15015 September 2021 North Ann, and Surry, Units 1 and 2, Millstone, Units 2 and 3, Request for Approval of Appendix E of Fleet Report DOM-NAF-2-A Qualification of the Framatome BWU-I CHF Correlation in the Vipre-D Computer Code Response to Request for Addition ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis ML21133A2852021-05-13013 May 2021 Stations, Units 1 & 2 and Millstone Power Station, Units 2 and 3 - Request for Approval of Appendix E Fleet Report DOM-NAF-2-A Qualification of the Framatome Bwui CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21098A2612021-04-0808 April 2021 Subsequent License Renewal Application, Response to Request for Additional Information Re Environmental Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification ML21056A5412021-02-25025 February 2021 NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Final Supplemental Response ML21042B9262021-02-11011 February 2021 ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative Requests S1-I5-ISl-05 and S2-I5-ISl-06 - Response to Request for Additional Information ML22040A1012021-02-0909 February 2021 Response to Request for Additional Information 2021 Steam Generator Inservice Report ML20296A7272020-10-22022 October 2020 Stations Units 1 & 2 - Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break LOCA Supplement to the Response to Request for Additional Information ML20247J6352020-09-0303 September 2020 Virginia Electric & Power Co - Subsequent License Renewal Application (SLRA) Environmental Review, Response to Request for Additional Information Concerning Aquatic Resources ML20181A4222020-06-29029 June 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Response to Request for Additional Information ML20181A3082020-06-23023 June 2020 Response to Request for Additional Information on 2019 Steam Generator Inservice Inspection Report ML20269A4072020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 2 of 3 ML20269A4062020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 3 of 3 ML20269A4082020-06-0202 June 2020 Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 1 of 3 ML20149K6942020-05-28028 May 2020 Response to Request for Additional Information, to Proposed License Amendment Requests Addition of Analytical Methodology to the Core Operating Limits Report for a Small Break Loss of Coolant Accident ML20034F0532020-01-31031 January 2020 Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information ML19350A0042019-12-12012 December 2019 License Amendment Request Addition of 24-Hour Completion Time for an Inoperable Reactor Trip Breaker Response to NRC Request for Additional Information ML19283B6222019-10-10010 October 2019 Subsequent License Renewal Application Safety Review - Documentation of Draft Third Round Requests for Additional Information ML19291B0342019-10-0101 October 2019 Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding Focused Evaluation/Integrated Assessment Submittal ML19269B7342019-09-19019 September 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Sets 3 and 4 Revised SLRA Mark-Ups ML19267A0422019-09-16016 September 2019 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information Set 2 ML19253B3302019-09-0303 September 2019 Response to Requests for Additional Information - Sets 3 and 4 - Subsequent License Renewal Application ML19249B7672019-08-29029 August 2019 Enclosure 1 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Response to EAL Scheme Change RAIs ML19204A3572019-07-17017 July 2019 Subsequent License Renewal Application Response to Request for Additional Information - Set 2 ML19198A0592019-07-11011 July 2019 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML19183A3862019-06-27027 June 2019 Subsequent License Renewal Application - Response to Requests for Additional Information - Set 1 ML19148A4212019-05-10010 May 2019 All Enclosures with Coversheets ML18304A3302018-10-25025 October 2018 Proposed License Amendment Request TSTF-490 & Update of Alternative Source Term Analyses Response to Request for Additional Information & Revised Proposed Technical Specifications ML18302A1212018-10-18018 October 2018 Response to Request for Additional Information, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules ML18303A2882018-10-18018 October 2018 Response to Request for Additional Information Regarding Relief Request S2-I5-LMT-P01 Examination Category R-A, Preservice Weld Examinations 2024-05-07
[Table view] |
Text
V I RGINIA ELECTRIC AND POWER COMPANY RICHMOND, V IRGINIA 23261 August 8, 2022 10 CFR 50.90 U.S. Nuclear Regulatory Commission Serial No.: 22-081A Attention: Document Control Desk NRA/GDM: RO Washington, D.C. 20555 Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37 VI RG INIA ELECTRIC AND POWER COMPAN Y SURRY POWER STATION UNITS 1 AN D 2 LICENSE AMENDMENT REQUEST 10-DAY ALLOWED OUTAGE TI ME FOR OPPOSITE UNIT AUXILIARY FEEDWATER (AFW) CROSS-CONN ECT CAPABILITY SUPPLEMENTAL INFORMATION By letter dated June 20, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22172A134), Virginia Electric and Power Company (Dominion Energy Virginia) requested an amendment to Facility Subsequent Renewed Operating License Numbers DPR-32 and DPR-37 in the form of a change to the Technical Specifications (TS) for Surry Power Station (SPS) Units 1 and 2. The proposed change revises SPS TS 3.6.1.2 to include a 10-day Allowed Outage Time (AOT) for opposite unit Auxiliary Feedwater (AFW) cross-connect capability specific to when maintenance that would result in the inoperability of all three of the opposite unit's Auxiliary Feedwater (AFW) pumps is being performed. By letter dated July 25, 2022 (ADAMS Accession No. ML22202A047), the Nuclear Regulatory Commission (NRC) informed Dominion Energy Virginia that additional information was required before the NRC would accept the license amendment request (LAR) for formal review. A conference call was held on July 25, 2022, to clarify the supplemental information the NRC needed to complete their acceptance review. The NRC provided Dominion Energy Virginia an opportunity to supplement the proposed LAR by submitting the requested supplemental information within thirteen working days, i.e., by August 11, 2022.
Dominion Energy Virginia's response to the NRC request for supplemental information is provided in the attachment. The information provided does not affect the conclusions of the no significant hazards consideration determination or the environmental assessment included in the June 20, 2022 LAR. Dominion Energy Virginia's request for NRC review and approval of the proposed LAR by April 30, 2023, with a 30-day implementation period is unchanged.
Serial No. 22-081A Docket Nos. 50-280/281 Supplemental Information Page 2 of 3 If you have any further questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Respectfully, r
James E. Holloway Vice President - Nuclear Engineering and Fleet Support Commitments contained in this letter: None
Attachment:
Response to NRC Request for Supplemental Information COMMONWEAL TH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. James E. Holloway, who is Vice President -
Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 8.µ, day of ~ - 2022.
MyCommissionExpires: ~ 31, z..od GARY DON MILLER Notary Public Commonwealth of Virginia
. Reg. # 7629412 My Commission Expires August 31, 2~
Serial No. 22-081A Docket Nos. 50-280/281 Supplemental Information Page 3 of 3 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 Mr. L. John Klos NRG Project Manager - Surry U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. G. Edward Miller NRG Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector Surry Power Station State Health Commissioner Virginia Department of Health James Madison Building - 7th floor 109 Governor Street Suite 730 Richmond, VA 23219
Serial No. 22-081A Docket Nos. 50-280/281 Attachment RESPONSE TO NRC REQUEST FOR SUPPLEMENTAL INFORMATION PROPOSED LICENSE AMENDMENT REQUEST 10-DAY ALLOWED OUTAGE TIME FOR OPPOSITE UNIT AUXILIARY FEEDWATER CROSS-CONNECT CAPABILITY Virginia Electric and Power Company (Dominion Energy Virginia)
Surry Power Station Units 1 and 2
Serial No. 22-081A Docket Nos. 50-280/281 Attachment RESPONSE TO NRC REQUEST FOR SUPPLEMENTAL INFORMATION SURRY POWER STATION UNITS 1 AND 2
Background
By letter dated June 20, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22172A134), Dominion Energy Virginia requested an amendment to Facility Subsequent Renewed Operating License Numbers DPR-32 and DPR-37 in the form of a change to the Technical Specifications (TS) for Surry Power Station (SPS) Units 1 and 2. The proposed change revises SPS TS 3.6.1.2 to include a 10-day Allowed Outage Time (AOT) for opposite unit Auxiliary Feedwater (AFW) cross-connect capability specific to when maintenance that would result in the inoperability of all three of the opposite unit's Auxiliary Feedwater (AFW) pumps is being performed. By letter dated July 25, 2022 (ADAMS Accession No. ML22202A047), the Nuclear Regulatory Commission (NRC) informed Dominion Energy Virginia that additional information was required before the NRC would accept the license amendment request (LAR) for formal review. A conference call was held on July 25, 2022, to clarify the supplemental information the NRC needed to complete their acceptance review. The NRC provided Dominion Energy Virginia an opportunity to supplement the proposed LAR by submitting the requested supplemental information within thirteen working days, i.e., by August 11, 2022.
Dominion Energy Virginia's response to the NRC request for supplemental information is provided below.
NRCComment The licensee stated that the proposed change is based on a risk evaluation performed in accordance with Regulatory Guides (RG) 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," (ML17317A256) and RG 1. 177, An Approach for Plant-Specific, Risk-Informed Decision-making: Technical Specifications," (ML20164A034). To support the acceptance review, the NRG staff requests that Dominion Energy Virginia supplement the application to address the below:
A. Per RG 1. 174 and RG 1. 177, describe how the proposed licensing action meets the following principles of risk-informed decision making: (NOTE: Principle 4 is discussed in the LAR).
- 1) Principle 1: The proposed licensing basis change meets the current regulations unless it is explicitly related to a requested exemption (i.e., under 10 CFR 50.12, "Specific Exemptions'?-
Page 1 of 4
Serial No. 22-081A Docket Nos. 50-280/281 Attachment The proposed licensing basis change meets current regulations and is being requested pursuant to 10 CFR 50.90 requirements. Upon adoption of this change, it will be acceptable to remove the AFW cross-connect from service for 10 days for the specific purpose of performing maintenance that would render the opposite unit's three AFW pumps inoperable. Therefore, unavailability of the AFW cross-connect will be limited to the 10-day duration and for this specific purpose. No exemptions are being requested .
- 2) Principle 2: The proposed licensing basis change is consistent with the defense-in-depth philosophy.
The proposed change is consistent with the defense-in-depth philosophy. The SPS AFW system is a diverse system that has two independent trains of motor-driven pumps and a third train with a steam driven pump. In most scenarios, the likelihood of losing all three trains of one unit's AFW system is very low. The SPS AFW cross-connect provides defense-in-depth during a loss of a unit's AFW and provides decay heat removal during a fire or high energy line break in the main steam valve house where the AFW pumps are located because those scenarios can impact all three AFW pumps for one unit. Under the proposed change, a Beyond Design Basis (BDB)/FLEX pump capable of providing AFW flow to the affected unit will be pre-staged for use if needed whenever the 10-day AOT is entered. Since the diesel-driven BOB/FLEX pump can provide AFW flow for decay heat removal in all of the scenarios where the AFW cross-connect would normally be used, the normal level of defense-in-depth is preserved for all relevant accident scenarios.
- 3) Principle 3: The proposed licensing basis change maintains sufficient safety margins.
The proposed change maintains sufficient safety margins for accident mitigation. An extended period without the AFW cross-connect available requires an alternate method to provide decay heat removal for the scenarios that depend upon the cross-connect.
As noted in the response provided for Principle 2, the staging of a BOB/FLEX pump that can provide AFW flow to the unit that would normally use the AFW cross-connect will ensure safe shutdown capability is maintained during the extended AOT. The availability and pre-staging of the BOB/FLEX pump whenever the 10-day AOT is entered, in addition to the other required compensatory actions specified in the LAR, will maintain appropriate safety margins at all times.
- 4) Principle 5: The impact of the proposed licensing basis change should be monitored using performance measurement strategies.
The impact of the proposed change will be monitored to ensure high levels of performance are maintained. The proposed AOT will limit individual instances of AFW cross-connect unavailability to 10 days when performing maintenance that would render the opposite unit's three AFW pumps inoperable and was determined to be reasonable and safe with the identified compensatory measures in place to mitigate risk. The Page 2 of 4
Serial No. 22-081A Docket Nos. 50-280/281 Attachment Maintenance Rule, implemented in accordance with 10 CFR 50.65, will ensure that maintenance appropriately balances reliability and availability of the systems, structures and components (SSCs) related to the AFW cross-connect by tracking unavailability hours or by trending integrated risk. These actions, in conjunction with the corrective action program, will ensure any adverse trends in AFW availability or equipment reliability performance are promptly and effectively addressed.
B) Per RG 1. 174 and RG 1. 177, identify and discuss the key assumptions and key sources of uncertainty related to the proposed change in the LAR for the internal events PRA and fire and seismic evaluations.
The dominant risk scenario related to the unavailability of the AFW cross-connect is a high energy line break or fire sequences that impact all three of one unit's AFW pumps.
In these scenarios, the plant typically relies on either the AFW cross-connect or primary system feed and bleed to provide decay heat removal. The staged BDB/FLEX pump to be used in place of the AFW cross-connect during the proposed AFW cross-connect 1O-day AOT provides a method for decay heat removal before having to initiate feed and bleed. Key assumptions or sources of uncertainty that would be critical to this analysis would be those that have a significant impact on the inputs or modeling of these scenarios.
Key assumptions and sources of uncertainty were reviewed in preparation of the risk assessment to support the LAR. Dominion Energy Virginia documents assumptions and sources of uncertainty for the probabilistic risk assessment (PRA) in the SPS PRA notebook, SU-NOTEBK-PRA-SPS-QU.4, Revision 2. Sources of uncertainty were determined to be appropriately addressed for this application. For example, Electric Power Research Institute (EPRI) Technical Report (TR)-1016737, 'Treatment of Parameter and Modeling Uncertainty for Probabilistic Risk Assessments," identifies an industry generic source of uncertainty related to how many power-operated relief valves (PORVs) are required for feed and bleed cooling. This potential source of uncertainty is relevant to this application because the reliability of the feed and bleed function is important to dominant risk scenarios. However, Dominion Energy Virginia has performed thermohydraulic analysis using the Modular Accident Analysis Program (MAAP) to provide the basis for how many PORVs are modeled as required in different scenarios, so this is not considered a key source of uncertainty for this application.
Plant specific assumptions and sources of uncertainty were also reviewed. For example, since incorporating BOB/FLEX components into PRA, reliability of this equipment has been considered a source of uncertainty since there was limited reliability data for portable equipment. This equipment was not modeled in the internal events analysis, but it was credited in the fire risk assessment. Pressurized Water Reactor Owners Group (PWROG) report PWROG-18043-P, "FLEX Equipment Data Collection and Analysis," documents industry reliability data and analysis for portable equipment. It was observed that portable equipment is generally reliable, and that Page 3 of 4
Serial No. 22-081A Docket Nos. 50-280/281 Attachment observed failure rates are higher than installed equipment but lower than the typical estimation of BOB/FLEX Human Error Probabilities (HEPs). Estimation of HEPs is also considered a potential source of uncertainty because of the technically complex nature of what is being assessed. This issue is addressed by using industry consensus methods and taking steps such as pre-staging equipment to improve the likelihood of successful operator action in the time required. Overall, the combined reliability and HEP value of 0.1 for the use of the pre-staged BOB/FLEX pump in the fire risk assessment is considered sufficiently conservative to address these considerations, and because the analysis is acceptable with this conservatism, this is not considered a key source of uncertainty for the LAR.
In a typical Extended Loss of AC Power (ELAP) event, there is some uncertainty related to the timing of deploying equipment. This is because there may be a delay in declaring an ELAP, some types of events may need debris to be cleared, and equipment must be transported from the BOB storage dome and staged before it can be used. Since the strategy to use the BOB/FLEX pump is preplanned and one pump is pre-staged, these typical sources of uncertainty do not apply to this application. Additionally, since the dominant risk scenarios involve a fire or high energy line break, the path would be clear to deploy a second pump if there were a reliability issue with the pre-staged pump.
There is some uncertainty in the assumption that seismic failures for components mounted in the same direction would be fully correlated. If failure of all AFW pumps were not fully correlated, then the likelihood of losing the entire AFW system during a seismic event would be low due to the robust design of the system and the diversity of the three AFW trains on each unit as described above. This consideration, combined with the low frequency of seismic events significant enough to damage equipment, means the seismic risk impact of the 10-day AOT would be very low even if it was assumed that AFW pump failures were not correlated. Consequently, this assumption is not considered a key source of uncertainty for this application.
In conclusion, there are no key model assumptions or sources of uncertainty that needed to be addressed further with sensitivity studies to confirm the results and conclusions of the risk assessment performed to support the LAR.
Page 4 of 4