ML22179A263

From kanterella
Jump to navigation Jump to search
2018 PI Ile Administered RO and SRO Admin JPMs
ML22179A263
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/20/2018
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Baker R
Shared Package
ML17165A318 List:
References
Download: ML22179A263 (81)


Text

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 11 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OUT OF SERVICE JPM NUMBER: ADMIN-19 REV. 4 RELATED PRA INFORMATION: NONE TASK NUMBERS / SS 341 ATI 00 00 026 / EVALUATE OPERATING CONDITIONS WHEN TASK TITLE(S): SECURITY ANALYSIS IS OOS K/A NUMBERS: 2.1.25 (3.9/4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both units are at 100% power.
  • The System Operator in the Transmission System Operation center has informed you that BOTH the Security Power System Analysis and the MISO RTCA programs are OOS.
  • The plant is in its NORMAL at power 4.16 KV line-up.

INITIATING CUES:

  • Evaluate the current system operating conditions for BUS 25 ONLY per C20.3 AOP 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 JPM PERFORMANCE INFORMATION Required Materials: Consumable copies of the following:

  • C20.3
  • C20.3 AOP1 General

References:

C20.3, ELECTRICAL POWER SYSTEM SECURITY ANALYSIS C20.3 AOP1, EVALUATING SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OUT OF SERVICE Task Standards: Examinee determines that the Bus 25 grid source (2R) setpoint is 97.2% (335.3 kV), plots the line and operating points on Figure 5, and determines that Bus 25 grid source (2R) is operating in the acceptable region.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: C20.3 AOP1, step 2.4.1:

Critical N Log the Security Analysis Program and the MISO RTCA Program OOS in the Operations Log.

Standard: Examinee determines a log entry will be made concerning SAP and MISO RTCAP being OOS.

Evaluator Cue: Inform the examinee that the Lead Reactor Operator will make the appropriate log entries.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 Performance Step: C20.3 AOP1, step 2.4.2:

Critical N If any 345 kV transmission line is OOS, then contact Electrical Engineering for assistance in evaluating grid operating conditions.

Standard: Examinee determines by using ERCS ES-1 that no 345 kV lines are OOS.

Evaluator Cue: If asked about current grid line up, then provide examinee with picture of ERCS ES-1 and EA25.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C20.3 AOP1, step 2.4.3:

Critical N Evaluate the 345 kV and 161 kV grid operating conditions using Section 3.0, Table 1, and Figure 1 through Figure 6. Document results on Appendix B.

Standard: Examinee goes to appropriate sections for Bus 25 - Section 3.0, Table 1, and Figure 5.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 Performance Step: C20.3 AOP1, step 3.2.2:

Critical Y Generate the correct 161 kV and 345 kV figure by evaluating plant 4.16KV bus line-up with Table 1.

Standard: Examinee evaluates grid operating conditions for Bus 25 source (2R) using Table 1 and Figure 5 as follows:

  • (Critical) Table 1 XFMR 2R - Case Study 2R-5 (21, 22, 23, 24, 25, 27) -

97.2%, 335.3 kV.

  • (Critical) Plot horizontal line from 335.3 kV and vertical line from 0 MVARs.
  • (Non-Critical) Plot a sloped line from plotted point using sloped grid lines as a reference. (Completion of this bullet is not necessary to successfully complete this step.)

Evaluator Cues:

  • If not already done, provide examinee with picture of ERCS ES-1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C20.3 AOP1, step 3.2.3:

Critical N Using ERCS ES1 display read bus voltages and adjusted MVARs directly from display.

Standard: Examinee reads voltages and MVARs from ES1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 Performance Step: C20.3 AOP1, step 3.2.4:

Critical Y Plot the points on the curve and evaluate for ACCEPTABLE or UNACCEPTABLE operating region.

Standard: Examinee determines that Bus 25 is operating in the ACCEPTABLE region.

Evaluator Note: Bus 26 is operating in the UNACCEPTABLE region. If the examinee incorrectly believes that 8H12 is closed and 8H10 is open, then the examinee will not arrive at the correct evaluation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined that the Bus 25 grid source (2R) setpoint is 97.2% (335.3 kV), plotted the line and operating points on Figure 5, and determined that Bus 25 grid source (2R) is operating in the acceptable region, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 11 ADMIN-19, EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS, REV 4 ATTACHMENT 2 JPM Number: ADMIN-19 JPM

Title:

EVALUATE SYSTEM OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OUT OF SERVICE Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 11 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Both units are at 100% power.
  • The System Operator in the Transmission System Operation center has informed you that BOTH the Security Power System Analysis and the MISO RTCA programs are OOS.
  • The plant is in its NORMAL at power 4.16 KV line-up.

INITIATING CUES:

  • Evaluate the current system operating conditions for BUS 25 ONLY per C20.3 AOP 1.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 10 of 11 ATTACHMENT 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 11 of 11 ATTACHMENT 4 cont.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 9 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: AUTHORIZATION OF WASTE GAS RELEASE JPM NUMBER: ADMIN-22 REV. 3 RELATED PRA NONE INFORMATION:

TASK NUMBERS /

TASK TITLE(S): SS 341.049.03.03 / APPROVE RADIOACTIVE GAS RELEASES K/A NUMBERS: 2.3.6 (3.8/4.3)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 9 ADMIN-22, AUTHORIZATION OF WASTE GAS RELEASE, REV. 3 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Shift Supervisor.
  • A Waste Gas Release is planned for your shift from 128 Low Level Gas Decay Tank.
  • Unit 1 and Unit 2 are at 100% power.
  • There is no precipitation occurring.
  • The Gas Decay Tank Gaseous Effluent Release Permit has been completed and approved.

INITIATING CUES:

  • C21.3-10.8, Releasing Radioactive Gas from 128 Low Level Gas Decay Tank, has been completed through step 7.10.
  • Determine if a gaseous release can be approved per C21.3-10.8, step 7.11.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 9 ADMIN-22, AUTHORIZATION OF WASTE GAS RELEASE, REV. 3 JPM PERFORMANCE INFORMATION Required Materials:

  • Consumable copy of C21.3-10.8, Releasing Radioactive Gas from 128 Low Level Gas Decay Tank
  • Attachment 4, Gas Decay Tank Gaseous Effluent Release Permit, with dates and times filled in.
  • Attachment 5, ERCS Server Group OPWIND General

References:

Gas Decay Tank Gaseous Effluent Release Permit C21.3-10.8, Releasing Radioactive Gas from 128 Low Level Gas Decay Tank Task Standards: Determine release cannot be approved due to unfavorable wind conditions.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: C21.3-10.8, step 7.11.1:

Critical N Verify Chemistry Manager or designee has approved the release on the Gas Decay Tank Gaseous Effluent Release Permit.

Standard: Examinee verifies Chemistry Manager has approved the release on the GDTGER Permit.

Evaluator Cue: Give examinee Attachment 4, Gas Decay Tank Gaseous Effluent Release Permit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 9 ADMIN-22, AUTHORIZATION OF WASTE GAS RELEASE, REV. 3 Performance Step: C21.3-10.8, step 7.11.2:

Critical Y Check wind conditions as specified in the Limitations section are satisfied (from ERCS server group OPWIND):

  • 10-meter average wind speed _______________ mph
  • 10-meter average wind direction _____________ ° Standard: Examinee locates wind speed and direction from OPWIND ERCS Group Attachment 5.

Evaluator Cue: Give examinee Attachment 5, ERCS Server Group OPWIND.

10-meter avg wind speed = 6 mph 10-meter avg wind direction= 22° Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: C21.3-10.8, step 7.11.3:

Critical Y Release Approval: _______________

Shift Supervisor Date: __________ Time: ____________

Standard: Examinee determines the release cannot be approved due to unfavorable wind conditions.

Evaluator Note: This critical step is considered met if the examinee notes unfavorable wind conditions during review of step 7.11.3 or Precaution & Limitation 3.2.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined the release cannot be approved due to unfavorable wind conditions, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 9 ADMIN-22, AUTHORIZATION OF WASTE GAS RELEASE, REV. 3 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 9 ADMIN-22, AUTHORIZATION OF WASTE GAS RELEASE, REV. 3 ATTACHMENT 2 JPM Number:

JPM

Title:

Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Shift Supervisor.
  • A Waste Gas Release is planned for your shift from 128 Low Level Gas Decay Tank.
  • Unit 1 and Unit 2 are at 100% power.
  • There is no precipitation occurring.
  • The Gas Decay Tank Gaseous Effluent Release Permit has been completed and approved.

INITIATING CUES:

  • C21.3-10.8, Releasing Radioactive Gas from 128 Low Level Gas Decay Tank, has been completed through step 7.10.
  • Determine if a gaseous release can be approved per C21.3-10.8, step 7.11.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 9 ATTACHMENT 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 9 ATTACHMENT 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS JPM NUMBER: ADMIN-29 REV. 6 RELATED PRA INFORMATION: NONE TASK NUMBERS /

TASK TITLE(S): CRO 002 ATI 00 00 011, RESPONSE TO SG TUBE LEAK K/A NUMBERS: 2.4.11 (4.0/4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 15 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • ERCS is unavailable.
  • 1C4 AOP2 has been implemented in response to indications of SG Tube Leakage.
  • Table 1 is being performed for periodic data entry.
  • Air Ejector flow is currently reading 3.1 CFM.

INITIATING CUES:

  • Update Table 1 of 1C4 AOP2 for the 1045 entry based on current 1R-15 count rates.
  • Determine the current Action Level per step 2.4.9 of 1C4 AOP2.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 JPM PERFORMANCE INFORMATION Required Materials: Copy of 1C4 AOP2 Table 1 filled out from 1000 to 1045 per Att. 2 KEY (blue ink only) or copy of Attachment 5 and Attachment 6, 1C4 AOP2 SG Tube Leak step 2.4.9.

General

References:

1C4 AOP2, STEAM GENERATOR TUBE LEAK Task Standards: Examinee determines Steam Generator Tube Leak Action Level 3 is met.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C4 AOP2, Table 1, step B.1:

Critical N IF ERCS is out of service OR completing the table for periodic data entry, THEN perform the following:

1. Enter the current date and time in the date/Time column, the current 1R-15 counts in column A, and the air ejector flow in Column H.

Standard: Examinee records 3600 in Column A for 1R-15 Counts and 3.1 in Column H for air ejector flow.

Evaluator Note: Current date and time is already entered on Table 1.

Evaluator Cue: Provide examinee with Attachment 5, Table 1 of 1C4 AOP2 and Attachment 6, step 2.4.9 of 1C4 AOP2.

If examinee requests Chemist to perform another leak rate determination based on sample, then inform examinee that sample results will take 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to complete.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 Performance Step: 1C4 AOP2 Table 1 Step B.2 Critical Y Determine the current leak rate by dividing the 1R-15 counts (Column A) by the most recent conversion factor (Column C) and enter in Column F.

(Column A ÷ Column C = Column F).

Standard: Examinee records 116 in Column F for 1R-15 Leak rate.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C4 AOP2, Table 1, step B.3:

Critical N Determine the rate of change (ROC) by dividing the change in leak rate (change in Column F) by the change in time (change in Date/Time column in hours) for the most recent entries and enter in Column G.

( Column F ÷ Hours = Column G).

Standard: Examinee records a number between 119 and 120 in column G for 1R-15 Leak rate ROC.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 Performance Step: 1C4 AOP2 Step 2.4.9 Critical Y Determine the appropriate procedure section:

Standard: Examinee determines Action Level 3 is met.

Evaluator Note: Step 2.4.9 of 1C4 AOP2 is a continuous action step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Examinee determines Steam Generator Tube Leak Action Level 3 is met.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 ATTACHMENT 2 KEY Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 10 ADMIN-29, DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS, REV. 6 ATTACHMENT 3 JPM Number: ADMIN-29 JPM

Title:

DETERMINE SG LEAKAGE CORRELATION TO R-15 COUNTS Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 10 ATTACHMENT 4 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • ERCS is unavailable.
  • 1C4 AOP2 has been implemented in response to indications of SG Tube Leakage.
  • Table 1 is being performed for periodic data entry.
  • Air Ejector flow is currently reading 3.1 CFM.

INITIATING CUES:

  • Update Table 1 of 1C4 AOP2 for the 1045 entry based on current 1R-15 count rates.
  • Determine the current Action Level per step 2.4.9 of 1C4 AOP2.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 10 of 10 ATTACHMENT 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 8 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: RCS / STEAM GENERATOR TEMPERATURE VERIFICATION JPM NUMBER: ADMIN-48 REV. 5 RELATED PRA INFORMATION: NONE TASK NUMBERS /

TASK TITLE(S): CRO 002 011 01 000 / HEATUP THE REACTOR COOLANT SYSTEM K/A NUMBERS: 2.1.20 (4.6/4.6)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 8 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is in MODE 6.
  • An Out Plant Operator reports SG Skin Temperatures are as follows:
  • 12413, 11 SG SKIN TI = 141°F
  • 12414, 12 SG SKIN TI = 147°F INITIATING CUES:
  • The SS directs you to complete step 5.6.3 of 1C1.2-M5, UNIT 1 STARTUP TO MODE 5, and determine whether or not an RCP can be started.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 JPM PERFORMANCE INFORMATION Required Materials: Consumable copy of 1C1.2-M5, step 5.6.3 (pages 31-32).

General

References:

1C1.2-M5, UNIT 1 STARTUP TO MODE 5, REV 12 Task Standards: Examinee determines the SG to RCS T is 22°F and the limiting SG to RCS T of 15°F has been exceeded.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C1.2-M5, step 5.6.3:

Critical N Verify the secondary water temperature of each SG is less than 15°F warmer than the RCS cold leg temperatures before starting an RCP as follows:

A. Record SG skin temperatures at the SG skin pyrometer locations:

  • 12413, 11 SG SKIN TI
  • 12414, 12 SG SKIN TI Standard: Examinee records 11 and 12 SG Skin Temperatures.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 Performance Step: 1C1.2-M5, step 5.6.3:

Critical Y Verify the secondary water temperature of each SG is less than 15°F warmer than the RCS cold leg temperatures before starting a RCP as follows:

B. Record RCS cold leg temperatures:

  • 1T0406A, RCS A TCOLD 450B
  • 1T0426A, RCS B TCOLD 451B Standard: Examinee obtains and records RCS A and B cold leg temperatures.

Evaluator Cue: When examinee has demonstrated the ability to locate RCS cold leg temps, then provide the examinee with the following:

  • 1T0406A, RCS A TCOLD 450B = 125°F
  • 1T0426A, RCS B TCOLD 451B = 127°F Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C1.2-M5, step 5.6.3.C:

Critical Y Determine the limiting SG to RCS temperature difference by subtracting the lowest RCS cold leg temperature from the highest SG skin temperature:

__________°F - __________°F = _______°F Highest SG Lowest RCS T Skin T cold leg T Standard: Examinee determines the SG to RCS temperature difference is 22°F.

Evaluator Note: Calculation: 147°F - 125°F = 22°F Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 Performance Step: 1C1.2-M5, step 5.6.3.D:

Critical Y Verify the limiting SG to RCS temperature difference is less than 15°F.

Standard: Examinee determines the limiting SG to RCS T is GREATER than 15°F and step D is NOT met.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee determines the SG to RCS T is 22°F and the limiting T of 15°F has been exceeded, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 8 ADMIN-48, RCS / STEAM GENERATOR TEMPERATURE VERIFICATION, REV 5 ATTACHMENT 2 JPM Number: ADMIN-48 JPM

Title:

STEAM GENERATOR TEMPERATURE VERIFICATION Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 8 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 is in MODE 6.
  • An Out Plant Operator reports SG Skin Temperatures are as follows:
  • 12413, 11 SG SKIN TI = 141°F
  • 12414, 12 SG SKIN TI = 147°F INITIATING CUES:
  • The SS directs you to complete step 5.6.3 of 1C1.2-M5, UNIT 1 STARTUP TO MODE 5, and determine whether or not an RCP can be started.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME JPM NUMBER: ADMIN-78 REV. 2 RELATED PRA INFORMATION: NONE TASK NUMBERS /

TASK TITLE(S): CRO 048 012 01 04 000 / ADJUST TURBINE LOAD RATES K/A NUMBERS: 2.1.25 (3.9/4.2)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 13 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A plant startup is in progress.
  • Preparations are in progress to roll the turbine off the turning gear IAW 1C1.2-M1, Unit 1 Startup to Mode 1.

INITIATING CUES:

  • The Shift Supervisor directs you to determine the following IAW 1C1.2-M1, section 5.3.35, step A:
  • Turbine acceleration rate
  • Maximum recommended loading rate Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 JPM PERFORMANCE INFORMATION Required Materials: Calculator Attachment 4, DEHC screen showing ERCS points 14019, 14020 and 14088.

Consumable copy of 1C1.2-M1 and Fig. C1-2A.

General

References:

1C1.2-M1, Unit 1 Startup to Mode 1, Figure C1-2A, Recommended Startup and Loading Times Task Standards: Examinee determines the correct turbine acceleration times and maximum recommended loading rate calculated per 1C1.2-M1 Att. 1.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: 1C1.2-M1, section 5.3.35:

Critical N Determine the turbine acceleration rate as follows:

A. Using Turbine Temperatures screen, determine the following:

1. LP 1ST Stage metal temperatures:

14019 _______°F for LP1 14020 _______°F for LP2

2. HP impulse chamber metal temperature:

14088 _______°F for Imp Chamber Standard: Examinee determines 14019 is 55.4°F, 14020 is 56.5°F and 14088 is 190.4 °F.

Evaluator Cue Provide Attachment 4 when examinee asks for DEHC temperature points.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 Performance Step: 1C1.2-M1, section 5.3.35:

Critical N B. Complete Attachment 1, Turbine Loading Calculation.

Standard: Examinee transitions to 1C1.2-M1 Attachment 1.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C1.2-M1, Attachment 1, step 1:

Critical N

1. Record HP Turbine First Stage Metal Temperature from 1C1.2-M1 Step 5.3.35.A.2 HP Turbine First Stage Metal Temperature _________°F Standard: Examinee records temperature for 14088 Imp Chamber as 190.4°F.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C1.2-M1, Attachment 1, step 2:

Critical Y

2. Determine the time to accelerate to synch from Figure C1-2A:

Time = ____________ minutes Standard: Examinee determines the time to be 11.25-13.75 minutes (11 min 15 sec - 13 min 45 sec).

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 Performance Step: 1C1.2-M1, Attachment 1, step 3:

Critical Y

3. Calculate the maximum recommended acceleration rate:

1800 rpm/ ________ minutes = ________ rpm/min Standard: Examinee calculates an acceleration rate of 130-160 rpm/min.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C1.2-M1, Attachment 1, step 4:

Critical Y

4. Determine the recommended time to hold at approximately 15%

reactor power from figure C1-2A:

Hold for __________ minutes Standard: Examinee determines a time of 27-33 minutes.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 1C1.2-M1, Attachment 1, step 5:

Critical Y

5. Determine the time to raise load to 100% from Figure C1-2A:

Load increase in __________ minutes Standard: Examinee determines a time of 85-95 minutes.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 Performance Step: 1C1.2-M1, Attachment 1, step 6:

Critical Y

6. Determine the maximum recommended loading rate:

85%/ _______ minutes = __________ %/min Standard: Examinee determines a load rate of 0.85 to 1.0 %/minute.

Evaluator Note: Examinee may choose DEHC load rates of 0.25%, 0.5% or 1% as the max loading rate since those are the three options that dont exceed the calculated limit, depending on how the final calculation ends up.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the examinee determines the correct turbine acceleration times and maximum recommended loading rate calculated per 1C1.2-M1 Att. 1, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 10 ADMIN-78, DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME, REV. 2 ATTACHMENT 2 JPM Number: ADMIN-78 JPM

Title:

DETERMINE RECOMMENDED TURBINE STARTUP AND LOAD TIME Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 10 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • A plant startup is in progress.
  • Preparations are in progress to roll the turbine off the turning gear IAW 1C1.2-M1, Unit 1 Startup to Mode 1.

INITIATING CUES:

  • The Shift Supervisor directs you to determine the following IAW 1C1.2-M1, section 5.3.35, step A:
  • Turbine acceleration rate
  • Maximum recommended loading rate Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 10 of 10 ATTACHMENT 4 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 7 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: ASSESS SHIFT STAFFING LEVELS JPM NUMBER: ADMIN-88 REV. 1 RELATED PRA INFORMATION: NONE TASK NUMBERS / SS 343 ATI 00 00 009 / ENSURE SHIFT MANNING FOR ALL EVOLUTIONS TASK TITLE(S): INCLUDING FFD K/A NUMBERS: 2.1.5 (2.9*/3.9)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 9 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 7 ADMIN-88, ASSESS SHIFT STAFFING LEVELS, REV. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 2 Shift Supervisor.
  • Unit 1 and 2 are both at 100% power.
  • It is Saturday at 1730.
  • Currently on site, there are
  • 2 Shift Supervisors.
  • 4 Licensed Reactor Operators
  • 7 Non-licensed Operators
  • 1 Shift Technical Advisor
  • 1 Shift Manager
  • 1 Shift Chemist
  • 4 Radiation Protection Specialists
  • The Shift Technical Advisor (STA) receives a phone call from his relief calling in sick. A call out is made and a relief will not be available until 2100.
  • The STA requests permission to leave at 1800 due to family dinner plans.

INITIATING CUES:

  • Determine the following using SWI O-2, Shift Organization, Operation & Turnover:
  • Can the STA immediately leave the site?
  • If so, what actions must be taken?
  • Report decisions to evaluator.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 7 ADMIN-88, ASSESS SHIFT STAFFING LEVELS, REV. 1 JPM PERFORMANCE INFORMATION Required Materials: SWI O-2, SHIFT ORGANIZATION, OPERATION & TURNOVER General

References:

SWI O-2, SHIFT ORGANIZATION, OPERATION & TURNOVER Task Standards: Examinee determines that the STA cannot be released for convenience and must keep the duty until a qualified relief arrives.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: SWI O Table 1, Minimum Shift Staffing:

Critical N Standard: Examinee determines minimum shift staffing is currently met.

Evaluator Note: Steps may be performed in any sequence.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 7 ADMIN-88, ASSESS SHIFT STAFFING LEVELS, REV. 1 Performance Step: SWI O Table 1, Minimum Shift Staffing:

Critical Y Note 1.

Shift crew composition may be one less than the minimum requirements for a period of time not to exceed two hours in order to accommodate an unexpected absence of one duty shift crew member provided immediate action is taken to restore the shift crew composition to within the minimum requirements specified. This SHALL NOT be used for convenience.

Standard: Examinee determines the STA is requesting to leave for convenience.

Evaluator Note: Steps may be performed in any sequence.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Table 1 Minimum Shift Staffing:

Critical Y If a persons relief calls in sick, they are to keep the duty until a qualified relief arrives.

Standard: Examinee determines the STA is not allowed to leave until a qualified relief arrives.

Evaluator Note: Steps may be performed in any sequence.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee determines the STA cannot be released for convenience and must keep the duty until a qualified relief arrives, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 7 ADMIN-88, ASSESS SHIFT STAFFING LEVELS, REV. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 7 ADMIN-88, ASSESS SHIFT STAFFING LEVELS, REV. 1 ATTACHMENT 2 JPM Number: ADMIN-88 JPM

Title:

ASSESS SHIFT STAFFING LEVELS Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 7 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 2 Shift Supervisor.
  • Unit 1 and 2 are both at 100% power.
  • It is Saturday at 1730.
  • Currently on site, there are
  • 2 Shift Supervisors.
  • 4 Licensed Reactor Operators
  • 7 Non-licensed Operators
  • 1 Shift Technical Advisor
  • 1 Shift Manager
  • 1 Shift Chemist
  • 4 Radiation Protection Specialists
  • The Shift Technical Advisor (STA) receives a phone call from his relief calling in sick. A call out is made and a relief will not be available until 2100.
  • The STA requests permission to leave at 1800 due to family dinner plans.

INITIATING CUES:

  • Determine the following using SWI O-2, Shift Organization, Operation & Turnover:
  • Can the STA immediately leave the site?
  • If so, what actions must be taken?
  • Report decisions to evaluator.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 9 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS)

JPM NUMBER: ADMIN-96 REV. 2 RELATED PRA NONE INFORMATION:

TASK NUMBERS / SS 342 ATI 00 00 030 / PERFORM SHUTDOWN SAFETY ASSESSMENT TASK TITLE(S):

K/A NUMBERS: 2.2.18 (2.6/3.9)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional site-specific signatures may be added as desired.

Developed by: Justin Hasner Developer Date Validated by: Fredrick Collins Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Due to a change in equipment status, PINGP 1102, UNIT 1 SHUTDOWN SAFETY ASSESSMENT, is being performed for Decay Heat Removal (RCS) only.
  • PINGP 1102, pages 1-3 are provided.
  • RCS Time to boil is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
  • RWST is available as a make up source to support pool boil-off
  • Equipment status has been completed and verified accurate.

INITIATING CUES:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 JPM PERFORMANCE INFORMATION Required Materials: Consumable copy of PINGP 1102 and 5AWI 15.6.1 General

References:

5AWI 15.6.1, SHUTDOWN SAFETY ASSESSMENT PINGP 1102, UNIT 1 SHUTDOWN SAFETY ASSESSMENT Task Standards: Examinee determines Decay Heat Removal (RCS) is a YELLOW condition.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step:

Critical Y Standard: Examinee allocates ZERO points for 11 RHR Available Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 Performance Step:

Critical Y Standard: Examinee allocates ZERO points for 12 RHR Available Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:

Critical Y Standard: Examinee allocates ZERO points for Refueling Pool Core Cooling Available Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 Performance Step:

Critical Y Standard: Examinee allocates ONE point for 11 S.G. Available Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 Performance Step:

Critical Y Standard: Examinee allocates ONE point for 12 S.G. Available Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step:

Critical Y Standard: Examinee allocates TWO points for Decay Heat Removal RCS and determines DHR RCS is YELLOW Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined Decay Heat Removal RCS is a Yellow condition, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation sign and date this form.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 9 ADMIN-96, PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS), REV 2 ATTACHMENT 2 JPM Number: ADMIN - 96 JPM

Title:

PERFORM SHUTDOWN SAFETY ASSESSMENT FOR DECAY HEAT REMOVAL (RCS)

Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 9 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Due to a change in equipment status, PINGP 1102, UNIT 1 SHUTDOWN SAFETY ASSESSMENT, is being performed for Decay Heat Removal (RCS) only.
  • PINGP 1102, pages 1-3 are provided.
  • RCS Time to boil is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
  • RWST is available as a make up source to support pool boil-off
  • Equipment status has been completed and verified accurate.

INITIATING CUES:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 7 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: PERFORM RCS LEAKAGE INVESTIGATION (PRT)

JPM NUMBER: ADMIN-100 REV. 1 RELATED PRA LOCA TOTAL - 14.3%

INFORMATION:

TASK NUMBERS / CRO 002 999 00 00 000 / OPERATE THE REACTOR COOLANT SYSTEM TASK TITLE(S): CRO 002 ATI 00 00 017 / PERFORM RCS LEAKAGE INVESTIGATION K/A NUMBERS: 2.2.12 (3.7/4.1)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 7 Minutes Time Critical: NO Alternate Path: NO TASK APPLICABILITY: SRO: X RO: X NLO Additional site-specific signatures may be added as desired.

Developed by: Justin Hasner Developer Date Validated by: Zach Elbert Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 7 ADMIN-100, PERFORM RCS LEAKAGE INVESTIGATION (PRT), REV. 1 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Steps 7.2.1 through 7.2.3 of SP1001AAA are complete.
  • Step 7.2.3 of SP1001AAA was completed at 1051.
  • PRT level, as read on 1L1-442, at the time step 7.2.3 was completed was 70%.

INITIATING CUES:

  • The Shift Supervisor directs you to complete step 7.2.4 of SP1001AAA, Reactor Coolant System Leakage Investigation.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 7 ADMIN-100, PERFORM RCS LEAKAGE INVESTIGATION (PRT), REV. 1 JPM PERFORMANCE INFORMATION Required Materials: Consumable copy of pages 7 and 8 of SP1001AAA, Reactor Coolant System Leakage Investigation, with the following data entered:

  • Step 7.2.1 marked NA.
  • Step 7.2.2 marked with the following data:

o PRT level is 68%.

o PRT Gallons are 4300.

o Time is 0831.

  • Step 7.2.3 marked complete with the bullet next to 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> period circle/slashed.

Calculator Unit 1 Tank Book - 11 & 21 PRT Level/Volume Graph General

References:

SP1001AAA Unit 1 Tank Book Task Standards: Examinee determines that leakage into PRT is ~ 0.7 gpm.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: SP1001AAA, Step 7.2.4, Bullet 1:

Critical Y Final RCDT level using ERCS point 1L0485A, PRZR RELIEF TK L, or 1LI-442, PRT Level:

Standard: Examinee enters 70% for final PRT level, 4400 gallons for final PRT level, and 100 gallons for Gallons Changed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 7 ADMIN-100, PERFORM RCS LEAKAGE INVESTIGATION (PRT), REV. 1 Performance Step: SP1001AAA, Step 7.2.4, Bullet 2:

Critical Y Time final PRT level reading recorded:

Standard: Examinee enters 1051 for time final PRT level was recorded, 140 min for duration of the test, and calculates the rate of change to be ~0.7 gpm.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined that leakage into the RCDT is ~0.7 gpm, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 7 ADMIN-100, PERFORM RCS LEAKAGE INVESTIGATION (PRT), REV. 1 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 7 ADMIN-100, PERFORM RCS LEAKAGE INVESTIGATION (PRT), REV. 1 ATTACHMENT 2 JPM Number: ADMIN-100 JPM

Title:

PERFORM RCS LEAKAGE INVESTIGATION (PRT)

Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 7 ATTACHMENT 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Steps 7.2.1 through 7.2.3 of SP1001AAA are complete.
  • Step 7.2.3 of SP1001AAA was completed at 1051.
  • PRT level, as read on 1L1-442, at the time step 7.2.3 was completed was 70%.

INITIATING CUES:

  • The Shift Supervisor directs you to complete step 7.2.4 of SP1001AAA, Reactor Coolant System Leakage Investigation.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE: PRAIRIE ISLAND JPM TITLE: DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION JPM NUMBER: ADMIN-106 REV. 0 RELATED PRA INFORMATION: NONE TASK NUMBERS / SS 344 023 03 03 000 / DIRECT EMERGENCY RESPONSE FOR THE TASK TITLE(S): EMERGENCY DIRECTOR K/A NUMBERS: 2.4.40 (2.7/4.5)

APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical: YES Alternate Path: NO TASK APPLICABILITY: SRO: X RO: NLO Additional site-specific signatures may be added as desired.

Developed by: Fredrick Collins Developer Date Validated by: Justin Hasner Validator Date (See JPM Validation Checklist, Attachment 1)

Approved by: Shawn Sarrasin Training Supervisor Date Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 2 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 JPM BRIEFING/TURNOVER You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • You are the Unit 1 Shift Supervisor.
  • Unit 1 has experienced a Large Break Loss of Coolant Accident.
  • A SITE AREA EMERGENCY based on EAL FS1 has been declared due to Loss of RCS Barrier and Potential Loss of Containment Barrier.
  • The Shift Manager completed filling out the PINGP 577 for initial notification for FS1 5 minutes ago.

INITIATING CUES:

  • Wind Speed - 11.0 MPH
  • Wind Direction - 255°
  • Stability Class - A
  • The Shift Manager has tasked you with performing the independent verification of his completed PINGP 577.

o Review the completed PINGP 577.

o Determine if is suitable for delivery to the SEC and return the form to the Shift Manager.

THIS JPM IS TIME CRITICAL Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 3 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 JPM PERFORMANCE INFORMATION Required Materials: Consumable copies of Attachments 5 & 6, PINGP 577 & 1576 - Student Consumable copies of PINGP 577 pages 2-12 PINGP 1576 General

References:

F3-2, Classification of Emergencies PINGP 577, Rev. 60 PINGP 1576, Rev. 10 Task Standards: Determine errors exist in Blocks 4 (GE circled vice SAE), Block 5 (time/date/EAL# not filled in), and Block 8 (incorrect downwind sectors circled) of PINGP 577 and return the form to the Shift Manager for correction.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e., the examinee looks or asks for the indication).

IMPORTANT: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM, per FP-T-SAT-73, Licensed Operator Requalification Program Examinations.

Performance Step: Review completed PINGP 577.

Critical Y Standard: Examinee reviews PINGP 577 and determines the following errors exist:

  • Block 4: The incorrect declaration is circled.
  • Block 5: Time/Date/EAL# are not filled in
  • Block 8: The incorrect downwind sectors are circled.

Evaluator Note: Errors are noted in RED on KEY with correct information with exception of time and date as the actual time/date are inconsequential.

Evaluator Cues: Provide examinee with Attachments 5 & 6, PINGP 577 & PINGP 1576.

If examinee asks for time/date, inform examinee that they can use the current time/date.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 4 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 Performance Step: Determine if PINGP 577 is suitable for delivery to SEC and return the form to Critical Y the Shift Manager.

Standard: Examinee determines that the PINGP 577 CANNOT be delivered to the SEC as is without fixing the errors.

Evaluator Note: The examinee marking the errors on the form or informing the evaluator of the errors is sufficient to complete this step.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee has determined errors exist in Blocks 4 (GE circled vice SAE),

Block 5 (time/date/EAL# not filled in), and Block 8 (incorrect downwind sectors circled) of PINGP 577 and returned the form to the Shift Manager for correction, then this JPM is complete.

Stop Time:

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 5 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the cover page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Do the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. If the task is NOT time critical, has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required? Not applicable to Non-Licensed Operators
9. Is the K/A appropriate to the task and to the licensee level if required? Not applicable to Non-Licensed Operators
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified?
12. Are all references identified, current, and accurate?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All applicable questions must be answered YES or the JPM is not valid for use. If all applicable questions are answered YES then the JPM is considered valid and can be performed as written.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 6 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 ATTACHMENT 2 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 7 of 10 ADMIN-106, DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION, REV. 0 ATTACHMENT 3 JPM Number: ADMIN-106 JPM

Title:

DETERMINE PINGP 577 ERRORS ON INITIAL CLASSIFICATION Examinee & ID: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Make written comments for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 8 of 10 ATTACHMENT 4 TURNOVER SHEET INITIAL CONDITIONS:

  • You are the Unit 1 Shift Supervisor.
  • Unit 1 has experienced a Large Break Loss of Coolant Accident.
  • A SITE AREA EMERGENCY based on EAL FS1 has been declared due to Loss of RCS Barrier and Potential Loss of Containment Barrier.
  • The Shift Manager completed filling out the PINGP 577 for initial notification for FS1 5 minutes ago.

INITIATING CUES:

  • Wind Speed - 11.0 MPH
  • Wind Direction - 255°
  • Stability Class - A
  • The Shift Manager has tasked you with performing the independent verification of his completed PINGP 577.

o Review the completed PINGP 577.

o Determine if is suitable for delivery to the SEC and return the form to the Shift Manager.

THIS JPM IS TIME CRITICAL Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 9 of 10 ATTACHMENT 5 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.

QF-1075-01 Rev. 6 (FP-T-SAT-75) Page 10 of 10 ATTACHMENT 6 Retention: Life of Plant Retain in: Training Record Form retained in accordance with record retention schedule identified in FP-G-RM-01.