Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22151A0012022-06-0707 June 2022 Authorization and Safety Evaluation for Relief Request 20, Revision 1 ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML22020A4052022-01-24024 January 2022 Summary of January 14, 2022, Teleconference with Florida Power & Light Co. Regarding Verbal Authorization of Request for Alternative to the Requirements of ASME Code for Examination of Closure Head CEDM Housing 27 Canopy Seal Weld ML22026A1022022-01-13013 January 2022 RAIs for RR 20 - Alternate Examination of Canopy Seal Weld Control Element Drive Mechanism Number 27 Housing ML22011A0852022-01-0707 January 2022 Relief Request Number 10 Acceptance Review ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System L-2020-160, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2020-10-30030 October 2020 Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds L-2018-188, Inservice Inspection Plan - Fifth Ten-Year Interval Unit 1 Relief Request 62018-09-28028 September 2018 Inservice Inspection Plan - Fifth Ten-Year Interval Unit 1 Relief Request 6 ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) L-2017-183, Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09,2017-10-0606 October 2017 Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09, ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 L-2017-113, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 16, Revision 02017-06-12012 June 2017 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 16, Revision 0 L-2017-112, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 17, Revision 02017-06-12012 June 2017 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 17, Revision 0 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML15196A6232015-08-10010 August 2015 Relief Request No. 7 for Use of an Alternative to the Requirements of the ASME Code ML14013A3042014-01-30030 January 2014 Relief Request No. 7 Regarding Alternative Repair for Intake Cooling Piping ML13316A5552013-12-11011 December 2013 Relief Request Number 5 for Examination of Cold Leg Dissimilar Metal Welds ML13308C4262013-11-25025 November 2013 Relief from the Requirements of the American Society of Mechanical Engineers Code Regarding Extension of Pressure Retaining Boundary During System Leakage Test ML12313A4152012-11-0909 November 2012 Relief from the Requirements of the ASME Code ML11143A0772011-07-0101 July 2011 Relief from the Requirements of the ASME Code, Relief Request No. 9 ML11136A1382011-06-23023 June 2011 Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 4 and Third 10-Year Interval Inservice Inspection Program Plan Relief Request No. 11 ML1003212812010-02-0505 February 2010 Third 10-Year Internal Inservice Inspection Program Plan Request for Relief 31, Revision 1 and Request for Relief 32, Revision 1 (Tac No. ME0662) L-2010-001, Inservice Inspection Plan, Fourth Ten-Year Interval Relief Request No. 62010-01-15015 January 2010 Inservice Inspection Plan, Fourth Ten-Year Interval Relief Request No. 6 ML0904103622009-02-12012 February 2009 Relief Request No. 3, Request for Alternative to ASME Code, Section XI Repair Requirements for Refueling Water Tank Bottom, TAC MD9268 ML0828404942008-11-26026 November 2008 SE for the Continued Use of Risk-Informed Inservice Inspection Program ML0824700892008-09-25025 September 2008 Safety Evaluation of Relief Request for St. Lucie Fourth 10-year Pump and Valve Inservice Testing Program ML0805000752008-03-0404 March 2008 Safety Evaluation of Relief Request No. 29, to Use Alternative Plant Conditions on Class 1 Piping and Valves TAC No. MD5145) L-2007-195, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 12007-12-0707 December 2007 Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 1 L-2007-144, Submittal of Fourth Ten-Year Interval In-Service-Test Program2007-09-11011 September 2007 Submittal of Fourth Ten-Year Interval In-Service-Test Program ML0612900562006-05-26026 May 2006 Relief Request No. 5, Rev. 1 Regarding Repair of Small Bore Piping Nozzles ML0602704862006-02-10010 February 2006 Safety Evaluation for Relief Request No. 28 Steam Generator Manway Studs ML0531401962005-11-22022 November 2005 Relief Request, Reactor Coolant Piping Hot Leg Alloy-600 Small Bore Nozzles ML0507303852005-03-14014 March 2005 Ltr, Correction to SE St. Lucie, Unit 2, Ltr, Correction to SE Methodology and SG Tube Plugging Limit Change for Amendment No. 138 ML0502103922005-01-21021 January 2005 RR #6 & 7, Vessel Head Penetration Weld Repair & Flaw Evaluation (TAC Nos. MC3860, 3861) ML0501002222005-01-19019 January 2005 Ltr, Relief Request No. 8 for Radiographic Inspection of Intake Cooling Water System Piping ML0500700852005-01-10010 January 2005 Relief, Correction to SE for Relaxation Request No. 3 ML0416105142004-06-0808 June 2004 Relief, 1995 Edition Through the 1996 Addenda & Select ASME Code, Section XI, Appendix Viii, Supplement 10 Provisions, Regarding Third 10-Year Inservice Inspection Interval ML0410408512004-04-13013 April 2004 Relief, Inservice Inspection of Reactor Vessel Bottom Area & Piping in Covering Trenches 2022-09-21
[Table view] Category:E-Mail
MONTHYEARML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A0242023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) Psl Olive Ridley Capture 1323 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22348A1002022-12-14014 December 2022 NRR E-mail Capture - (External_Sender) November 2022 FPL Marine Turtle Removal Monthly Report ML22325A0682022-11-18018 November 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA RAI Set 4 ML22319A0762022-11-15015 November 2022 NRR E-mail Capture - (External_Sender) October 2022 FPL Marine Turtle Removal Monthly Report ML22285A2222022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) September 2022 FPL Marine Turtle Removal Monthly Report ML22270A1492022-09-26026 September 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 2 - Class 1 Fatigue ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report ML22234A1552022-08-22022 August 2022 NRR E-mail Capture - (External_Sender) July 2022 FPL Marine Turtle Removal Monthly Report ML22227A0522022-08-15015 August 2022 NMFS to NRC, Transmittal of Final Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request ML22194A0482022-07-12012 July 2022 NRR E-mail Capture - (External_Sender) June 2022 FPL Marine Turtle Removal Monthly Report ML22193A0862022-07-11011 July 2022 Email - St. Lucie SLRA - Request for Additional Information Set 3 ML22165A2992022-06-14014 June 2022 NRR E-mail Capture - (External_Sender) May 2022 FPL Marine Turtle Removal Monthly Report ML22147A0862022-05-26026 May 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA - RCI Set 1 2023-09-11
[Table view] |
Text
From: Jordan, Natreon To: Godes, Wyatt Cc: Falkiewicz, Timothy
Subject:
St Lucie, Unit 2 - Relief Request Number 10 Acceptance Review (L-2021-LLR-0089)
Date: Friday, January 07, 2022 1:47:00 PM Mr. Godes, By submittal dated December 17, 2021, (Agencywide Documents and Access Management System (ADAMS) Accession No. ML21351A134), Florida Power & Light (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, for the St. Lucie Plant Unit 2 facility. In accordance with Title 10, Code of Federal Regulations, 10 CFR 50.55a, "Codes and standards," paragraph (z)(2), the licensee submitted a request for Nuclear Regulatory Commission (NRC) review and approval of Relief Request Number 10, Revision 0. The proposed relief request is related to the alternate examinations of pressure retaining welds in control rod housings.
The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed the proposed relief request and concluded that the submittal provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment.
Instances may arise in which issues that impact the NRC staffs ability to complete the detailed technical review are identified. Given the lesser scope and depth of the acceptance review, as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review.
If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is January 7, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC
advisory committees or hearing-related activities.
If you have any questions, please contact me.
- Nate Natreon (Nate) Jordan Nuclear Engineer (Project Manager)
Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8B1A Washington, DC 20555 301-415-7410 natreon.jordan@nrc.gov