MONTHYEARML0522103682005-08-11011 August 2005 RAI, Relief Request No. 26 on Alloy 600 Nozzle Repair/ Replacement Programs (Tac No. MC6944) Project stage: RAI ML0527201012005-09-30030 September 2005 Second Request for Additional Information Regarding Relief Request No. 26 - Repair of Alloy 600 Small Bore Nozzles Without Flaw Removal Project stage: RAI ML0531401962005-11-22022 November 2005 Relief Request, Reactor Coolant Piping Hot Leg Alloy-600 Small Bore Nozzles Project stage: Other 2005-08-11
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22151A0012022-06-0707 June 2022 Authorization and Safety Evaluation for Relief Request 20, Revision 1 ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML22020A4052022-01-24024 January 2022 Summary of January 14, 2022, Teleconference with Florida Power & Light Co. Regarding Verbal Authorization of Request for Alternative to the Requirements of ASME Code for Examination of Closure Head CEDM Housing 27 Canopy Seal Weld ML22026A1022022-01-13013 January 2022 RAIs for RR 20 - Alternate Examination of Canopy Seal Weld Control Element Drive Mechanism Number 27 Housing ML22011A0852022-01-0707 January 2022 Relief Request Number 10 Acceptance Review ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System L-2020-160, Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years2020-10-30030 October 2020 Extension of St. Lucie Unit 2 RPV Welds from 10 to 20 Years ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds L-2018-188, Inservice Inspection Plan - Fifth Ten-Year Interval Unit 1 Relief Request 62018-09-28028 September 2018 Inservice Inspection Plan - Fifth Ten-Year Interval Unit 1 Relief Request 6 ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) L-2017-183, Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09,2017-10-0606 October 2017 Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09, ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 L-2017-113, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 16, Revision 02017-06-12012 June 2017 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 16, Revision 0 L-2017-112, Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 17, Revision 02017-06-12012 June 2017 Inservice Inspection Plan, Fourth Ten-Year Interval Unit 1 Relief Request No. 17, Revision 0 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML15196A6232015-08-10010 August 2015 Relief Request No. 7 for Use of an Alternative to the Requirements of the ASME Code ML14013A3042014-01-30030 January 2014 Relief Request No. 7 Regarding Alternative Repair for Intake Cooling Piping ML13316A5552013-12-11011 December 2013 Relief Request Number 5 for Examination of Cold Leg Dissimilar Metal Welds ML13308C4262013-11-25025 November 2013 Relief from the Requirements of the American Society of Mechanical Engineers Code Regarding Extension of Pressure Retaining Boundary During System Leakage Test ML12313A4152012-11-0909 November 2012 Relief from the Requirements of the ASME Code ML11143A0772011-07-0101 July 2011 Relief from the Requirements of the ASME Code, Relief Request No. 9 ML11136A1382011-06-23023 June 2011 Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 4 and Third 10-Year Interval Inservice Inspection Program Plan Relief Request No. 11 ML1003212812010-02-0505 February 2010 Third 10-Year Internal Inservice Inspection Program Plan Request for Relief 31, Revision 1 and Request for Relief 32, Revision 1 (Tac No. ME0662) L-2010-001, Inservice Inspection Plan, Fourth Ten-Year Interval Relief Request No. 62010-01-15015 January 2010 Inservice Inspection Plan, Fourth Ten-Year Interval Relief Request No. 6 ML0904103622009-02-12012 February 2009 Relief Request No. 3, Request for Alternative to ASME Code, Section XI Repair Requirements for Refueling Water Tank Bottom, TAC MD9268 ML0828404942008-11-26026 November 2008 SE for the Continued Use of Risk-Informed Inservice Inspection Program ML0824700892008-09-25025 September 2008 Safety Evaluation of Relief Request for St. Lucie Fourth 10-year Pump and Valve Inservice Testing Program ML0805000752008-03-0404 March 2008 Safety Evaluation of Relief Request No. 29, to Use Alternative Plant Conditions on Class 1 Piping and Valves TAC No. MD5145) L-2007-195, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 12007-12-0707 December 2007 Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request 1 L-2007-144, Submittal of Fourth Ten-Year Interval In-Service-Test Program2007-09-11011 September 2007 Submittal of Fourth Ten-Year Interval In-Service-Test Program ML0612900562006-05-26026 May 2006 Relief Request No. 5, Rev. 1 Regarding Repair of Small Bore Piping Nozzles ML0602704862006-02-10010 February 2006 Safety Evaluation for Relief Request No. 28 Steam Generator Manway Studs ML0531401962005-11-22022 November 2005 Relief Request, Reactor Coolant Piping Hot Leg Alloy-600 Small Bore Nozzles ML0507303852005-03-14014 March 2005 Ltr, Correction to SE St. Lucie, Unit 2, Ltr, Correction to SE Methodology and SG Tube Plugging Limit Change for Amendment No. 138 ML0502103922005-01-21021 January 2005 RR #6 & 7, Vessel Head Penetration Weld Repair & Flaw Evaluation (TAC Nos. MC3860, 3861) ML0501002222005-01-19019 January 2005 Ltr, Relief Request No. 8 for Radiographic Inspection of Intake Cooling Water System Piping ML0500700852005-01-10010 January 2005 Relief, Correction to SE for Relaxation Request No. 3 ML0416105142004-06-0808 June 2004 Relief, 1995 Edition Through the 1996 Addenda & Select ASME Code, Section XI, Appendix Viii, Supplement 10 Provisions, Regarding Third 10-Year Inservice Inspection Interval ML0410408512004-04-13013 April 2004 Relief, Inservice Inspection of Reactor Vessel Bottom Area & Piping in Covering Trenches 2022-09-21
[Table view] Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:Safety Evaluation
MONTHYEARML23219A0032023-09-0101 September 2023 SLRA SER Rev 1 ML23200A1462023-07-21021 July 2023 Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 ML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML20023B3782020-02-19019 February 2020 Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19254B5332019-09-30030 September 2019 Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19115A2812019-05-31031 May 2019 Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18256A0982018-10-30030 October 2018 Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16210A3742016-08-30030 August 2016 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2 ML16103A3972016-07-28028 July 2016 Issuance of Amendments Regarding Removal of Technical Specification for Cleaning Fuel Oil Storage Tank Sediment and Relocating Procedures to Licensee Controlled Documents ML16167A4732016-07-0505 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16139A5882016-05-27027 May 2016 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 10, Revision 0 ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) 2023-09-01
[Table view] |
Text
November 22, 2005 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
ST. LUCIE NUCLEAR PLANT, UNIT 1 - SAFETY EVALUATION FOR RELIEF REQUEST NO. 26 REGARDING REACTOR COOLANT PIPING HOT LEG ALLOY-600 SMALL BORE NOZZLES (TAC NO. MC6944)
Dear Mr. Stall:
By a letter dated April 29, 2005, as supplemented by letters dated August 25 and October 13, 2005, Florida Power and Light Company (the licensee) submitted Relief Request No. 26 for St. Lucie Unit 1, requesting relief from the American Society of Mechanical Engineers Code Section XI, Sub-article IWB-3132.3, Acceptance by Replacement. Pursuant to Title 10 of the Code Federal Regulations (10 CFR) Section 50.55a(a)(3)(i), the licensee proposed to use the half-nozzle technique as an alternative to the requirement to remove the remnant nozzle and its attachment weld that contains the flaw.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensees proposed alternative and has concluded that the proposed alternative provides an acceptable level of safety and quality. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the proposed alternative is authorized for the remainder of the third 10-year inservice inspection interval at St. Lucie Unit 1, which began on February 11, 1998, and ends on February 10, 2008.
Further details on the bases for the NRC staffs conclusions are contained in the enclosed safety evaluation. If you have any questions regarding this issue, please feel free to contact Brendan Moroney at (301) 415-3974.
Sincerely,
/RA/
Michael L. Marshall, Jr., Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
Safety Evaluation cc: See next page
ML053140196 NRR-028 OFFICE LPL2-2/PM LPL2-2/LA CPNB/C OGC LPL2-2/C NAME BMoroney BClayton TChan SHamrick MMarshall by memo dated DATE 11/22/05 11/22/05 11/8 /05 11/21/05 11/22/05 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. 26 FLORIDA POWER AND LIGHT COMPANY ST. LUCIE NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-335
1.0 INTRODUCTION
By letter dated April 29, 2005, as supplemented by letters dated August 25 and October 13, 2005, Florida Power & Light Company (the licensee) submitted Relief Request No. 26 (RR-26) for St. Lucie Unit 1, which proposed an alternative repair for 19 of the Alloy 600 small-bore reactor coolant system (RCS) hot leg nozzles, in lieu of the ASME Code Section XI requirement. Specifically, the licensee proposed to use the half-nozzle technique as an alternative to the requirement to remove the remnant nozzle and its attachment weld that contains the flaw.
The basis of the licensees proposed alternative relies mainly on the application of the results of analyses performed in accordance with Westinghouse Topical Report WCAP-15973-P-A, Revision 0, Low-Alloy Steel Component Corrosion Analysis Supporting Small-Diameter Alloy 600/690 Nozzle Repair/Replacement Program (the TR).
2.0 REGULATORY EVALUATION
The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code requires inservice inspection (ISI) of Class 1, Class 2, and Class 3 components to be performed in accordance with Section XI of the ASME Code and applicable edition and addenda, as required by Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Section 50.55a(g),
except where specific written relief has been granted by the U. S. Nuclear Regulatory Commission (NRC) pursuant to 10 CFR 50.55a(g)(6)(i). Additionally, 10 CFR 50.55a(a)(3) states, in part, that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if the licensee demonstrates that: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
ENCLOSURE
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection (ISI) of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI Code of record for the third 10-year ISI interval at St. Lucie Unit 1 is the 1989 Edition. Sub-article IWB-3132.3, Acceptance by Replacement, of ASME Code Section XI, 1989 Edition states, As an alternative to the repair requirement of IWB-3132.2, the component or the portion of the component containing the flaw shall be replaced.
In a safety evaluation (SE) dated January 12, 2005, the staff found that the TR is acceptable for referencing in licensing applications for Combustion Engineering (CE) designed pressurized water reactors (PWRs) to the extent specified and under the limitations delineated in the TR and in the SE. The SE also specified additional conditions that needed to be met in order to assess the applicability of the TR. The licensee addressed the additional conditions in its submittal.
3.0 TECHNICAL EVALUATION
3.1 Licensees Code Relief Request The licensee proposed the use of the half-nozzle technique as an alternative to the Code repair as delineated in IWB-3132.3. The half-nozzle technique will not remove the remnant nozzle and its attachment weld that contain the flaw.
In lieu of removing the remaining portion of the nozzle component and its attachment weld that contain the flaw, the licensee assumed a worst-case flaw in the Alloy 600 base and weld material and used the methodology presented in the TR to support the relief request.
3.2 Components for Which Relief Is Requested RR-26 applies to 19 of the Alloy 600 small-bore RCS hot leg nozzles at St. Lucie Unit 1. The identification number (ID#) of each nozzle was provided in the licensees submittal dated August 25, 2005. During the fall 2005 refueling outage, the licensee has scheduled the replacement of 18 of the Alloy 600 small-bore hot leg nozzles as a preventive measure to mitigate primary water stress corrosion cracking (PWSCC). One nozzle (ID# PDT-1121D) was previously repaired with a half-nozzle replacement during the 2001 refueling outage. In RR-26, the licensee is also requesting staff approval of this previously repaired nozzle as a permanent repair. This repair was approved on a temporary cycle-by-cycle basis in SEs dated May 9, 2003, and May 18, 2004.
3.3 Licensees Basis for Proposed Alternative During fabrication of the RCS piping, Alloy 600 small-bore nozzles were welded to the interior of the RCS hot leg piping, using partial penetration welds. Industry experience has shown that cracks may develop in the nozzle or in the weld metal joining the nozzles to the reactor coolant pipe and lead to leakage of the reactor coolant fluid. The cracks are believed to be caused by PWSCC.
The licensee stated that the exact leak path, through the weld or through the base metal or through both, cannot be determined. The total removal of all Alloy 600 small-bore nozzle and/or Alloy 82/182 weld material would require accessing the internal surface of the reactor coolant piping and grinding out the attachment weld and any remaining nozzle. Such an activity would result in high radiation exposure to the personnel involved. Grinding within the pipe would also expose personnel to other safety hazards. Grinding will also increase the possibility of introducing foreign material that could damage the fuel cladding. The licensee stated that the analysis in the TR has shown that there is no compensating increase in the level of quality or safety as a result of removing the remnant nozzle or the attaching weld metal.
3.4 Licensees Proposed Alternative and Basis The licensee proposed an alternative to the Code requirement as delineated in IWB-3132.3 of ASME Code Section XI. In the application of the alternative repair, the licensee will not remove the remnant nozzle and its attachment weld that contain the flaw. The licensees proposed alternative repair is based on the use of the half-nozzle technique to relocate the attachment weld from the interior surface of the pipe to the exterior surface of the pipe. In the half-nozzle technique, nozzles are cut outboard of the partial penetration weld, approximately mid-wall of the hot leg piping. The cut-out section of the Alloy 600 nozzle is replaced with a short section (half-nozzle) of Alloy 690, which is welded to the exterior surface of the pipe. Alloy 690 material has been shown to be more resistant to PWSCC than Alloy 600 material. The remainder of the Alloy 600 nozzle, including the original fabrication partial penetration weld, remains in place.
The basis of the licensees proposed alternative relies mainly on the application of the analysis results from the TR. The licensee identified the analysis results presented in the TR that showed that (1) the corrosion of the carbon or low alloy steel in the crevices between the nozzles and components does not exceed ASME Code limits, (2) thermal-fatigue crack-growth and crack stability meet the ASME Code acceptance criteria and (3) growth of the existing flaw by stress corrosion into the vessel or piping is improbable. The licensee asserts that results of these analyses are applicable to the replacement of the St. Lucie Unit 1 hot leg small-bore nozzles. The SE also specified additional conditions that needed to be met in order to assess the applicability of the Topical Report. The licensee addressed the additional conditions in their submittal. The staffs evaluation of the licensees evaluation is contained in Section 3.0 of this SE.
Based on the analysis provided in the TR, the licensee has determined that the proposed alternative would not result in a reduction of the level of quality and safety.
3.5 Duration of Proposed Relief Request The subject relief request is requested for the remainder of the current (third) 10-year ISI interval for St. Lucie Unit 1, which began on February 11, 1998, and is scheduled to end on February 10, 2008.
3.6 Staff Evaluation As stated in Section 3.2 above, RR-26 applies to 19 of the Alloy 600 small-bore RCS hot leg nozzles at St. Lucie Unit 1. The NRC staff considers this replacement action by the licensee to be a proactive approach to mitigate PWSCC susceptibility of these Alloy 600 components in the RCS.
The licensee is requesting relief from Sub-article IWB-3132.3 of ASME Section XI, 1989 Edition, which states, As an alternative to the repair requirement of IWB-3132.2, the component or the portion of the component containing the flaw shall be replaced. The licensees proposed alternative repair does not remove the remnant nozzle and its attachment weld that contain the flaw, but rather assumes a worst-case flaw in the Alloy 600 base and weld material and uses the methodology presented in the TR for determining the following:
- 1. The overall general/crevice corrosion rate for the internal surfaces of the low-alloy or carbon steel materials that will now be exposed to the reactor coolant and for calculating the amount of time the ferritic portions of the vessel or piping would be acceptable if corrosive wall thinning occurs.
- 2. The thermal-fatigue crack-growth life of existing flaws in the Alloy 600 nozzles and/or Alloy 82/182 weld material into the ferritic portion of the vessels or piping.
- 3. Acceptable bases and arguments for concluding that unacceptable growth of the existing flaw by stress corrosion into the vessel or piping is improbable.
In its SE approving the TR, the staff found that licensees could use the methods of the TR as a basis for implementing half-nozzle techniques, provided responses to several plant-specific questions were submitted to the NRC for review in the areas of general corrosion assessment, thermal-fatigue crack growth assessment, stress corrosion cracking growth assessment and a few other considerations. The staffs evaluation of the licensees responses to these questions is provided below.
In the area of general corrosion assessment, the staff finds the licensees responses meet the requirements of NRCs final SE for the TR. The minimum acceptable wall thickness due to thinning by corrosion for the ferritic piping that will adjoin to the half-nozzle repair was evaluated in the TR as one of the limiting dimensions for the hot leg pipe half-nozzle repair. The minimum acceptable wall thickness is discussed in terms of the maximum acceptable nozzle bore-hole diameter associated with the replaced hot leg nozzle. The TR reported the maximum acceptable nozzle bore-hole diameter to be 1.27 inches, which is based on a bounding CE-designed PWR. This value is applicable to St. Lucie Unit 1, which is a CE-designed PWR.
The licensee calculated the amount of general corrosion for the first half-nozzle repair that was made in April 2001. The general corrosion was calculated in accordance with the methodology of the TR with plant-specific operating experience from January 1, 1995, to December 31,
2004. The corrosion rate was calculated to be 1.34 mils per year. Using this corrosion rate, the potential corrosion from April 2001 to the end of the renewed operating license period (about 35 years of operation) would result in a material loss of 46.9 mils. Therefore, the nozzle bore-hole diameter will increase from 0.997 inches to 1.09 inches after 35 years of service, which is still less than the limiting nozzle bore-hole diameter of 1.27 inches.
The SE for the TR requires licensees to track the time at cold shutdown to determine whether this time does not exceed the assumptions made in the analysis. The licensee proposed not to track the time at cold shutdown conditions because the relief request applies only to a period of 27 months. This is based on the consideration that even if the Unit 1 plant is in cold shut down condition for all 27 months, the resulting nozzle bore-hole diameter (1.045 inches) will still be less than the limiting bore hole diameter of 1.27 inches. The licensee also stated that it will reassess the plant operating conditions and submit another relief request at the start of the next inspection interval, which begins in February 2008. The staff finds the licensee has provided reasonable justification to support the proposal not to track plant operating conditions during the remainder of the current inspection interval. Therefore, in the area of general corrosion assessment, the licensees proposed alternative is acceptable.
In the area of thermal-fatigue crack growth assessment, the NRC staff finds the licensees responses meet the requirements of the staffs SE for the TR. The licensee has shown that the geometry of the referenced nozzles is bounded by the corresponding nozzle penetration reported in Calculation Report CN-CI-02-71, Revision 01. Therefore, the analysis results of the TR are applicable to St. Lucie Unit 1. The plant-specific pressure and temperature profiles were not required for this relief request since RR-26 applies only to RCS hot leg piping.
Furthermore, the plant-specific Charpy upper shelf energy data was not applicable because the hot leg piping is bounded by the linear fracture mechanics analysis. The licensee stated that the hot leg piping associated with the referenced small bore Alloy 600 nozzles was manufactured by Lukens Steel, using two heats of material (melt number C7293 and slab numbers 65 and 67). The RTNDT for the two heats of material is reported to be plus 30 degrees Fahrenheit (+300 F), which is conservative in comparison to the value of +600 F used in the TR.
Therefore, in the area of thermal-fatigue crack growth assessment, the licensees proposed alternative is acceptable.
In the area of stress corrosion cracking growth assessment, the NRC staff finds the licensees responses meet the requirements of the staffs SE for the TR. The licensee stated that a level of hydrogen overpressure between 25 and 35 pounds per square inch gauge is typically maintained in the RCS and the steady state contaminant concentrations in the reactor coolant are typically maintained at a level below 5 parts per billion for dissolved oxygen, halide ions and sulfate ions. The licensee reviewed the coolant chemistry analysis results for the last two cycles and confirmed that the above contaminant limits have been maintained during steady state operation, and no water chemistry transients were identified. Therefore, in the area of stress corrosion cracking growth assessment, the licensees proposed alternative is acceptable.
In summary, the staffs review of the licensees responses in the areas of general corrosion assessment, thermal-fatigue crack growth assessment and stress corrosion cracking growth assessment, supports the licensees use of the TR as a basis for RR-26. Therefore, staff concludes that the proposed alternative will provide an acceptable level of quality and safety for the remainder of the third 10-year ISI interval at St. Lucie Unit 1.
4.0 CONCLUSION
The staff has reviewed the licensees proposal in RR-26 regarding the use of the half-nozzle technique as an alternative repair for 19 of the Alloy 600 small-bore RCS hot leg nozzles in lieu of the ASME Code Section XI, IWB-3132.3 requirement. Based on its review, the staff finds the proposed alternative will provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the licensees proposed alternative is authorized for the remainder of the third 10-year ISI interval at St. Lucie Unit 1, which began on February 11, 1998, and ends on February 10, 2008.
All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: William Koo Date: November 22, 2005
Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:
Senior Resident Inspector Mr. G. L. Johnston St. Lucie Plant Plant General Manager U.S. Nuclear Regulatory Commission St. Lucie Nuclear Plant P.O. Box 6090 6351 South Ocean Drive Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Craig Fugate, Director Mr. Terry Patterson Division of Emergency Preparedness Licensing Manager Department of Community Affairs St. Lucie Nuclear Plant 2740 Centerview Drive 6351 South Ocean Drive Tallahassee, Florida 32399-2100 Jensen Beach, Florida 34957 M. S. Ross, Managing Attorney Mark Warner, Vice President Florida Power & Light Company Nuclear Operations Support P.O. Box 14000 Florida Power and Light Company Juno Beach, FL 33408-0420 P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company Mr. Rajiv S. Kundalkar 801 Pennsylvania Avenue, NW. Vice President - Nuclear Engineering Suite 220 Florida Power & Light Company Washington, DC 20004 P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Douglas Anderson County Administrator Mr. J. Kammel St. Lucie County Radiological Emergency 2300 Virginia Avenue Planning Administrator Fort Pierce, Florida 34982 Department of Public Safety 6000 Southeast Tower Drive Mr. William A. Passetti, Chief Stuart, Florida 34997 Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. William Jefferson, Jr.
Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, Florida 34957-2000