BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs
ML21162A332
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle  Constellation icon.png
Issue date: 06/11/2021
From: Tom Loomis
Exelon Generation Co
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
Purnell B
References
Download: ML21162A332 (5)


Text

Exelon BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs June 15, 2021

Exelon Fleet BWR Relief Request for Nozzle Repair

  • The purpose of this pre-emptive relief request is to provide a repair technique for the instrument nozzles in the Exelon BWR fleet for the duration of the operating cycle in which the indication is identified.
  • This pre-emptive relief request would mimic the two previously approved half-nozzle repairs for a 2-inch instrument line nozzle at Limerick Generating Station, Unit 2 and Peach Bottom Atomic Power Station, Unit 2.
  • Three previous NRC Safety Evaluation Reports (SERs) for a nozzle repair:

Quad Cities Nuclear Power Station, Unit 2 dated January 30, 2013 (ML13016A454)

Limerick Generating Station, Unit 2 dated March 5, 2019 (ML19009A002)

Peach Bottom Atomic Power Station, Unit 2 dated April 23, 2021 (ML21110A680) 2

Exelon Fleet BWR Relief Request for Nozzle Repair

  • The previous relief requests and the proposed relief request will address the following elements of the repair evolution:

Examination of the j-groove welds and the RPV low alloy steel interface.

Technical details of the repair with referenced ASME Code Cases.

One-cycle flaw analytical evaluation with referenced ASME Code Cases.

Planned steps of the repair.

Commitments for the final one-cycle flaw analytical evaluation, evaluation of repair, and corrosion evaluation.

  • A similar pre-emptive repair relief request was obtained for Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2 concerning alternative requirements for the repair of reactor Vessel Head Penetrations (VHPs) and J-groove Welds (ML16007A185, dated January 21, 2016).

3

Exelon Fleet BWR Relief Request for Nozzle Repair

  • This relief request does not support a bounding analysis / evaluations for the fleet.
  • Plant specific analyses will be submitted for each plant as was done for the Limerick and Peach Bottom Relief Request.
  • The flaw cannot be removed therefore a relief request would be needed and submitted in accordance with 50.55a(z)(2).
  • This relief request does not change the bases used in approved relief requests from Quad Cities Unit 2, Limerick Unit 2, and Peach Bottom Unit 2.

4

Exelon Fleet BWR Relief Request for Nozzle Repair QUESTIONS?

5