ML21109A368

From kanterella
Jump to navigation Jump to search
International, Submittal of RAI Clarification Responses on HI-STORM 100 License Renewal
ML21109A368
Person / Time
Site: Holtec
Issue date: 04/19/2021
From: Seawright B
Holtec
To: Kristina Banovac
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21109A367 List:
References
Download: ML21109A368 (2)


Text

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 April 19, 2021 Kristina Banovac. Project Manager Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-1014, Certificate of Compliance (CoC) No. 1014

Subject:

Submittal of RAI Clarification Responses on HI-STORM 100 License Renewal Reference(s): [1] Request for Clarification of Response to Request for Additional Information for the Technical Review of the Application for Renewal of the Certificate of Compliance No. 1014 for the HI-STORM 100 Storage Cask System (CAC/EPID Nos. 001028/L-2020-RNW-0007) (Letter from K. Banovac (NRC) to K.

Manzione (Holtec) dated February 18, 2021)

Dear Ms. Banovac:

In reference [1] NRC staff requested additional clarification to previously submitted RAI responses needed to complete their detailed technical review of the application for renewal of HI-STORM 100 Certificate of Compliance No. 1014. This letter provides the responses to those remaining clarification requests.

Attachments 1 and 2 to this letter contain RAI clarification responses in proprietary and non-proprietary forms. Attachment 3 contains the revised renewal application. Please note that in , additional editorial change is made as part of the clarification responses. This change is made in Appendix A and Appendix D to element 6 of the Overpack and Transfer Cask AMP Tables and consist of replacing part long with part length in the instances to improved reader clarity. To facilitate the review of the RAI responses, this change, along with all changes discussed in the RAI clarification responses, are highlighted in blue in the updated renewal application. Additionally, all highlights from previous submittals were maintained in this submitted renewal application. Attachment 4 contains the shielding analysis performed in support of the response to the clarification request to RAI 3.6.

Document ID 5014922 Page 1 of 2

Holtec Technology Campus, One Holtec Blvd, Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Holtec considers information in Attachments 1 and 4 to be proprietary information; therefore, to this letter is an affidavit prepared in accordance with 10 CFR 2.390 requesting that these attachments be withheld from public disclosure.

If you have any questions, please contact me at 856-797-0900 ext. 3931.

Sincerely, Brian Seawright Licensing Engineer, Holtec International cc: (via email)

Andrea Kock (USNRC)

John McKirgan (USNRC)

Attachments: : Response to Clarification Requests for Requests for Additional Information (Proprietary) : Response to Clarification Requests for Requests for Additional Information (Non-Proprietary) : HI-STORM 100 License Renewal Application Rev 1 (Non-Proprietary) : Shielding Analysis in Support of the HI-STORM 100 License Renewal Application Rev 0 (Proprietary) : Affidavit Pursuant to 10 CFR 2.390 to Withhold Information from Public Disclosure (non-proprietary)