ML21067A181

From kanterella
Jump to navigation Jump to search
Special Surveillances, FSS Area Access Request, Authorization and Sign-In Sheet
ML21067A181
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/10/2021
From:
ZionSolutions
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21067A225 List:
References
ZS-2021-0001
Download: ML21067A181 (21)


Text

{{#Wiki_filter:Attachment 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET ZS-LT-300-001-003 Revision 6 Infonnation Use REQUEST FOR ACCESS: Survey Area No.: 12000 Survey Unit No.: 12112A Survey Unit Type: OpenLand[gj Structure D System D Work Group

Contact:

Final Status Survey (FSS), supervisor Radio RP-3. Description of Planned Activities: This is the 1st Bi-annual surveillance survey for this survey unit. Duration: Start 7/30/19 Stop 7/30/19 Access Controls Required:

1. All personnel will brief and sign in/out on this FSS Attachment 2.
2. All personnel and equipment will be surveyed into the area by the FSS technician.
3. There will be one scheduled biased surface soil sample taken in this survey unit.
4. When job is completed, the survey unit postings will be verified s * ~facto 0

Survey Name Reason for Entry Date Time Time Unit# (Pnnt/Sign) In Out 12112A Karen Nicholson/ l<v..-tL ~'V,ch./k_,". FSS technician 7-30-19 /'-/'.OS I s:cl Jn

r
:

15.oo 1s*.J5" / i.,hv1-e, S--pro~ T 7.3,./C, Page I of 3 FSS l&C Surveillance Summary AREA SURVEILLANCE: Survey Area No.: Survey Unit No.:

== Description:== Performing 1st Bi-Annual surveillance survey. Survey Unit Type: Structure 0 ZS-LT-300-001-003 Revision 6 Information Use 12112A SystemO Classification: Open Land 18] Class3 0 Class2 0 Class 1 ~ Reason for Surveillance: Semi-Annual 18] Special D Surveillance Due Date: 7-17-19 Reason: Bi-annual Surveillance survey. (Survey Date surveillance performed: 7-30-19 performed after due date because the storage and removal of the CCDD pile in survey area 12205). SURVEILLANCE ACTIVITIES: I) Review ZS-LT-300-001-003 Attachment 2, PSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit-------*------------------------------------------------*----------------------------****----- IZ!

2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.---------------- ~

SURVEILLANCE COMMENTS AND OBSERVATIONS: This survey unit was accessible after the removal of the CCDD pile. The FSS technician contacted the MBI foreman (N. Friant) for support, entered the survey unit to perform the walk down and select the sample locations. The MBI laborer support will join the FSS technician when they become available_ 14:55 The FSS technician received MBI laborer support (Tim C) and setup at the first biased surface soil sample location. 15:00 Collected biased surface soil sample #Ll 12112AVJGS001SS.

== Description:== light/medium brown sand, and gravel. Location was taken on the footprint of a small piece of metal that was removed from survey unit. The metal was surveyed, result, indistinguishable from background. 15:10 Collected biased surface soil sample #Lll2112AVJGS002SS.

== Description:== light/medium brown sand, and gravel. Location selected at tire marks and water mark area. 15:25 Completed surveillance survey. The group signed out of the survey unit. The collected samples were brought to the sample prep trailer for processing. Notes: The sample locations were GPS'd, and the corrected coordinate with the location will be shown on the attached map. There were some small pieces of plastic and metal, water bottles, and some old flags surveyed and removed from the survey unit. The postings were satisfactory. The postings are represented on the adjacent FSS survey units. A Model 3 #283273 with a 44-9/PR355602, cal due 1-24-20 was used for all the surveying. All survey results were indistin 'shable from back ound. Back ound 30-50 c m. - Surveillance Satisfactory 0 -Surveillance Un-Satisfactory Karen N1cholson/ ~ /\\, { t 9-26-19 15:30 fil1-4> ~ \\ te _ LC* \\.._.. (Print Name/Signature) C/LT Technician (Date) (Time)

0.... .... ;z 0 In co

ti 343740 343800

.. '..-~;*.: i:. ,~;,1(' --*--*. ----...... ~.. *- ----------- ------ -~~~

  • ,'*:/*

-~,,. -- "*--.~~- N r" ,~ 30 Feet A ZI~ 0 10Me1ers . :_'?\\\\~?;1 ;::--:'.. Legend

  • :07; :.:*,.

Final Status Survey Surveillance 12112 D

.--\\ **; *.-"

NAD83 IL State Plane East 1201 (Meters) Survey Unit (SU) 12112

  • * ~- *

.,,*.i-2017 Aerials - ~ake CountyG/S DepL __ _

?\\/~-

.. ~~ 0 Biased Surface samples Date performed: 07/30/2019 -~_~-.-_{~_-._' _ D_r_aw_in_g_: ___ F_s_s_1_2_1_1_2_s_U_R_V_0_7_30_1_9 _ ___, FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET ZS-LT-300-001-003 Revision 6 Information Use REQUEST FOR ACCESS: Survey Area No.: 12000 Survey Unit No.: 12113A Survey Unit Type: Open Land IZ! Structure D System D Work Group

Contact:

The Final Status Survey (FSS) supervisor, Radio RP-3. Description of Planned Activities: The FSS technician and MBI laborer support are performing the 1st Bi-annual surveillance in this survey unit 12113A. Duration: Start 9-6-19 Stop 9-6-19 Access Controls Required:

1. All personnel will brief and sign in/out on this FSS Attachment 2.
2. All personnel and equipment will be surveyed into the area by the FSS technician.
3. There will be a minimum of one scheduled biased surface soil sample taken in this survey unit.
4. When job is completed, the survey unit postings will be verified satisfactory.

Approved: Ji BfJtu4,;__. Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out 12113A Karen Nicholson!f °"'-...,_JV l *~ FSS technician 9-6-19 /3'..30 J<t. 1/5 l L. 1\\.9 12113A Rudy Diaz/ -~ ~ MBI laborer support 9-6-19 ,~- 3 0 / Y. l/5 12113A Tony Ortega/ ~,(/~- MBI laborer support 9-6-19 13 :3o }l-J. 'if" /'


*- ---. --~--- ----

-.............. ~----........ A /V *-------------......__*-..,, '***~ -............ ~........... FSS l&C Surveillance Summary AREA SURVEILLANCE: Survey Area No.: 12000 Survey Unit No.:

== Description:== Performing 1st Bi-Annual surveillance survey. Survey Unit Type: Structure 0 ZS-LT-300-001-003 Revision 6 Information Use 12113A System 0 Classification: Open Land~ Class 3 0 Class 2 0 Class 1 ~ Reason for Surveillance: Semi-Annual~ Special 0 Surveillance Due Date: 7-16-19 Reason: Bi-annual Surveillance survey. (Survey Date surveillance performed: 9-6-19 performed after due date because the storage and removal of the CCDD pile in the adjacent survey area 12205). SURVEILLANCE ACTIVITIES: l) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit--**********--**-**********-**-********-*-**********--*************--*-********--************* ~

2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.**************** [gj SURVEILLANCE COMMENTS AND OBSERVATIONS:

This survey unit was part of the traverse path to remove the CCDD pile. The CCDD is now removed, and the surveillance survey is being performed. The FSS technician will perform the planned surveillance survey (walk down and sample), but will also include a gamma walk over survey on the traverse path. 13:30 The FSS technician and the MBI laborer support (RD, TO) contacted the MBI foreman (N. Friant), and signed into the survey unit. All personnel and sampling equipment was_~~eyed in. .._-,--::-::-=-~::-:----,::-:--,-,--,----,.....,...-,---.,,..,...-- 13 :40 Scan Area backgrounds: 2936, 2833, 2905, 2122, and 2094 cpm, AVG 2578 cpm, MDCR 543 cpm, and ASP 3121 cpm. 14:14 Collected biased surface soil sample #Ll 12113AVJGS001SS.

== Description:== medium brown sand, and gravel. Location selected at a dried flooded area. 14:22 Collected biased surface soil sample #Ll 12113AVJGS002SS.

== Description:== medium brown sand, and gravel. Location selected at tire marks flooded area. 14:45 Completed surveillance survey. The group signed out of the survey unit. The collected samples were brought to the sample prep trailer for processing. Notes: The sample locations and the scan area was GPS 'd, and the corrected coordinate with the location will be shown on the attached map. The meter used for the scan area was a Model 2350-1/ #304708 with a 44-10 probe #PR321892 (with 3" collimator), cal due 9-4-20. The scan results were no detectable above background/no alarms. The 2350-1 meter passed pre and post source check. There were some small pieces of plastic and metal that was surveyed and removed from the survey unit. The postings were satisfactory. The postings are represented on the adjacent FSS survey units. A Model 3 #284300 with a 44-9/PR308400, cal due 1-24-20 was used for all the surve

  • ng. All survey results were indistin ishable from background. Back ound 30-50 c m.

~- Surveillance Satisfactory 0- Surveillance Un-Satisfactory (Print Name/S' a re) C/LT (Date) (Time) /1) - Pt,-/ (Date) (Time)

0.....

g 0

tO CD v CD 343710 I f ' ' I 1 i ! *~ I I i._:, / /

  • L 112113AVJ0s0<>1ss*
~641693.13....

343 723.61 '~.. l I j Legend I I / I I ~ D Survey Unit (SU) 12113 0 Biased Surface Samples '. *** --1 Scan Area 343740 N A 125 2li Fee!

  • .5 0Me1em Final Status Survey Surveillance 12113 NAD83 IL State Plane East 1201 (Meters) 2017 Aerials - Lake County GIS Dept Date performed:

09/06/2019 Drawing: FSS12113 SURV FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 6 Information Use Survey Area No.: 12000 Survey Unit No.: 12203A Survey Unit Type: Open Land ~ Structure D System D Work Group

Contact:

Final Status Survey (FSS) contact Radio RP-3. Description of Planned Activities: FSS technician and MBI laborer support are performing the I st Bi-annual Surveillance survey for this survey unit. This survey is also a response to CR#ES-ZION-CR-2019-0066. Duration: Start ------- 6-18-19 Stop 6-18-19 Access.Controls Required:

1.

FSS technician will brief/sign on the Attachment 2 from this procedure ZS-LT-300-001-003.

2.

The personnel that enter the survey unit will perform a hand and foot frisk, and survey any equipment going for surveying.

3.

There will be one biased surface soil sample collected, and a scan survey performed on the snow/dirt pile placed at the west boundary.

4.

Posting will be verified when job is complete. Survey Name Reason for Entry Date Time Time Unit# (Pnnt/Sign) In Out 12203A Karen Nicholson/ Cv1'\\1, \\\\j I J\\,--. FSS technician 6-18-19 i :J " M' f/S 12203A Rudy Diaz/ MBI laborer support 6-18-19 5( : ] i) 1r>:v~ I ~~t-'~f'\\ kITT\\tv l I t.,h ~ ls-... 1,, +SS ~ hl)l(l,V... it ~ */ 9 J '3: ) ~) 1Lj' ~ r I / y-.,1?,iI.. I a...~,., r-'1r S'-'<"r--.iR-+- "-J g-J ~ rr *,r /l ~~s


*-* 1"1 IJ..t /.._J>.Jrf-<

l~~C3ft ':,.-.....,-(0.'L-;- 6*1? iCJ' ,3~.3£" ,1~:cl...\\ n1 ~,,:: l " /b b,r4,'.,-

  • i/o 5-,,,:JF'" (- -J--

fu-/8' I? /S-.' (JU If-: 3 !i / )l iJ_,;J.: / r,_,b,Y -{- 1;).l~ *3 y S'-f'I""',-r ~,(&-17 1{:uo /5* 3 5" f *c lb-/~-,9 kl} re,-, )./1 e,'1~L\\*,,." "'-~' "I fd-cH 1/1

  • kl'"' IC I fl-ll0 15- 00 ts;~

~~¥-- Ii+ -s-

AREA SURVEILLANCE: Survey Area No.: 12000 FSS I&C Surveillance Summary Survey Unit No.: ZS-LT-300-001-003 Revision 6 Information Use 12203A

== Description:== Final Status Survey (FSS) 1st Bi-Annual Surveillance Survey. Survey Unit Type: Classification: OpenLand[gl Class 3 D Reason for Surveillance: Semi-Annual [8'.I Structure D System D Class 2 D Class 1 [8'.I Special~ Surveillance Due Date: 7/10/2019 Reason: 1st Bi-annual Surveillance survey, Date surveillance was performed: 6/18/2019 and response to CR#ES-ZION-CR-2019-0066 SURVEILLANCE ACTIVITIES:, *.

1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-ln Sheet for authorized entries into the FSS Survey Unit------*---*-----*--*-*----*--------------*----*******-------** [gJ
2) Perform a walk down of the FSS Survey Unit and identify decolillllissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.*--*-------- [gJ SUR\\'EILLANCE COJ\\-IMEN'f~ AND OBSER\\*ATIONS:

8:25 The FSS technician (KN) and MBI laborer support (Rudy D, and Alex V) contacted MBI (N. Friant), signed into and surveyed into the survey unit This survey is the 1st Bi-annual surveillance and a special survey on a pile of dirt staged at the FSS boundary (See attach sheet for special survey instructions for the dirt ile. 08:30 Performed the scan survey on the pile and IO meters square on the perimeter at the track marks. Backgrounds; 3392, 3827, 3559, 3306, and 3481 cpm, average 3513 cpm, MDCR 634 cpm, and ASP 4147 cpm. There were no alarms for all scan results (3" collimator used). There are eight biased surface soil samples collected for the dirt pile area. 09:48 Collected biased surface soil sample #Ll 12203AVJGS001 SS.

== Description:== dark/medium brown sand, and gravel. 10: 10 Collected biased surface soil sample #Ll 12203AVJGS002SS.

== Description:== medium brown sand, gray clay, and gravel. 10:35 Collected biased surface soil sample #Ll 12203AVJGS003S S.

== Description:== medium brown sand, gray clay, and gravel. 13:00 Collected biased surface soil sample #Ll 12203AVJGS004SS.

== Description:== medium brown sand, gray clay, and gravel. 13: 11 Collected biased surface soil sample #LI 12203AVJGS005SS.

== Description:== medium brown sand, gray clay, and gravel. 13: 1 7 Collected biased surface soil sample #L 112203A VJGS006S S.

== Description:== medium brown sand, gray clay, and gravel. 13:26 Collected biased surface soil sample #LI 12203AVJGS007SS.

== Description:== medium brown sand, and gravel. 13:42 Collected biased surface soil sample #LI 12203AVJGS008SS.

== Description:== medium brown sand, and gravel. Completed the special survey for the CR, brought all the samples to sample prep trailer for processing, and then came back to finish the walk down for the surveillance. FSS I&C Surveillance Summary Continuation from page 1. ZS-L T-300-001-003 Re\\ision 6 Information Use 15:00 The FSS technician and the MBI laborer support sign and surveyed back into the survey unit for the walk down. 15:30 Completed survey, there were no anomalies. The flags from FSS survey were removed, an FSS posting was added to the south west entry rope. There was a portion of the survey unit on the west side was not accessible because it was flooded. The west side of this survey unit does abut up to the Power Block survey units 1211 lA, and 12202F that bas had remediation performed recently. The group signed out of the survey unit. Note: The meters used for the survey was a Model 2350-1, 304712 using a 44-10/PR372143, cal due 12-18-19 passed pre and post source check. The Model 3 #284230 with 44-9/361458, cal due 10-18-19. Background 30-50 cpm. The sample locations were GPS'd and the corrected coordinates are shown on attached map. I IZJ-Surveillance Satisfactory I D-Surveillance Un-Satisfactory Karen Nicholson/ J<

-0 ~ -s: + V') Details for the SU 12203A surveillance: Scans and samples along the perimeter of the dirt pile and on the dirt pile (6 samples) 2 random scan and sample areas within areas of obvious heavy machinery landscaping east of dirt pile location (~10 square meters of scan and :; samples along the treadways) Examples below: Perimeter scans & samples and on the dirt pile Heavy Machinery Treadways East of Dirt Pile ~ \\'\\~\\ \\ '\\ )_ \\~

co 0 C") co co 0 co

i 343640 L 112203AVJGS007SS 641626.96 343641.55 L 112203AVJGS005SS 641625.63 343642.53 L112203AVJGS004SS 641623.04 343641.98 t

L 1122D3AV JGS006SS 641622.40 343640.57 Legend D Survey Unit (SU) 12203A 0 Biased Surface Samples L 112203AVJGS003SS 641628.53 343643.44 343650 L112203AVJGS001SS 641626.90 343645.03 L112203AVJG008SS ,~641624.30 343643.70 ~ L112203AVJGS002SS 641621.76 343643.44 ~ ZlONSoLl!llONS 0 10 Feet 1.25 2.5Metere Final Status Survey Surveillance SU12203A ES-ZION-CR-2019-0066 NAD83 JL State Plane East 1201 (Meters) 2017 Aerials - Lake County GJS Dept. Date performed: 06/18/2019 Drawing: FSS SURV12203A 061819 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 6 Information Use Survey Area No.: _12_0_0_0 _______ _ Survey Unit No.: 12203B Survey Unit Type: Open Land IZI Structure D System D Work Group

Contact:

Final Status Survey (FSS), supervisor Radio RP-3. Description of Planned Activities: This is the 1st Bi-annual surveillance survey for this survey unit. Duration: Start 8/1/19 Stop 8/1/19 Access Controls Required:

1. All personnel will brief and sign in/out on this FSS Attachment 2.
2. All personnel and equipment will be surveyed into the area by the FSS technician.
3. There will be a minimum of one scheduled biased surface soil sample taken in this survey unit.
4. When job is completed, the survey unit postings will be verified sat* act~

.. t\\Jw~ Survey Unit# Name (Pnnt/S1gn) Reason for Entry Date Time Time In Out 12203B FSS technician 8-1-19 v;*. / 5 JO: 'J-5 \\-<l\\'l,"l.'. ta*. "-I a. litb-...~S..., (t:t- <l - ~ I 'f /3 : ~ '""'-~~ ~- )- 19' )J:YJ. ~-O~*C 'S,~, 1 /?.. ~ .,) -, PS I )(-/-1'1 \\J:_lf ~ /'1 -~7 /RAw-c,.~5'; -:r-Page/ of Y FSS I&C Surveillance Summary AREA SURVEILLANCE: Survey Area No.: 12000 Survey Unit No.:

== Description:== Performing 1st Bi-Annual surveillance survey. Survey Unit Type: Structure D ZS-L T-300-001-003 Revision6 Information Use 12203B System Classification: Open Land !ZI Class3 D Class2 D Class 1 !ZI Reason for Surveillance: Semi-Annual !ZI Special D Surveillance Due Date: 7-10-19 Reason: Bi-annual Surveillance survey. (Survey Date surveillance performed: 8-1-19 performed after due date because the storage and removal of the CCDD pile in the adjacent survey area 12205). SURVEILLANCE ACTIVITIES: I) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit--------*********************************************************--------*----*---*----*----*- ~

2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.--************** ~

SURVEILLANCE COMMENTS AND OBSERVATIONS: This survey unit was part of the traverse path to remove the CCDD pile. The CCDD is now removed, and the surveillance survey is being performed. The FSS technician will perform the planned surveillance survey (walk down and sample), but will also include a gamma walk over survey on the traverse path. The laborer support will be available after lunch, so the FSS technician will be going in and perform the walk down and complete the gamma walk over survey. Informed the MBI foreman (N.Friant). 08: 15 The FSS technician signed in and surveyed all the sampling equipment into the survey unit. The FSS technician established the scan area and started with verifying the backgrounds. The west side has a higher background due the media having more clay surface, so there will be two set of backgrounds making two scan areas, #1 and #2. Scan Area #I backgrounds: 2103, 2117, 2208, 2284, and 2116 cpm, AVG 2166 cpm, MDCR 497 cpm, and ASP 2663 cpm. Scan Area #2backgrounds: 3003, 3526, 3590, 3572, and 3413 cpm, AVG 3421 cpm, MDCR 625 cpm, and ASP 4046 cpm. Completed the gamma walk over scan, lunch. 12:30 MBI laborer support (RD, AV) joined the FSS technician to complete this survey. The group signed/surveyed into the surve unit. 13:00 Collected biased surface soil sample #LI l2203BVJGS001SS.

== Description:== medium brown sand, and gravel. Location selected in scan area # 1. 13: 11 Collected biased surface soil sample #Ll 12203BVJGS002SS.

== Description:== medium brown sand, clay, and gravel. Location selected in scan area #2. 13:28 Collected biased surface soil sample #Ll 12203BVJGS003SS.

== Description:== light brown sand, and gravel. Location selected in the road that is the main entry for the survey unit. 13:38 Completed surveillance in this survey unit. The group signed out of the survey unit. The collected samples were brought to the sample prep trailer for processing. FSS l&C Surveillance Summary ZS-LT-300-001-003 Revision 6 Information Use Continuation for survey unit 12203B 1st surveillance survey. Notes: The sample locations and the scan area was OPS' d, and the corrected coordinate with the location will be shown on the attached map. The meter used for the scan area was a Model 2350-1/ #266656 with a 44-10 probe #PR311750 (with 3" collimator), cal due 7-24-20. All scan results were; no detectable above background/no alarms. The 2350-1 meter passed pre and post source check. There were some small pieces of plastic/metal, and old flags/rope that was surveyed and removed from the survey unit. The postings were satisfactory. The postings are represented on the adjacent connecting FSS survey units. A Model 3 #283228 with a 44-9/PR355606, cal due 1-12-20 was used for all the surveying. All survey results were indistinguishable from background. Background 30-50 cpm. I !8J-Surveillance Satisfactory I 0- Surveillance Un-Satisfactory Karen Nicholso 9-4-19 16:00 (Time)

0 I,() c.o .... i 0 N (0 ~ 343680 L 112203BVJGS002SS 641649.87

J.-~'--~

343685.82 Legend D Survey Unit (SU) 12203B (1,989 m2) ~ Biased Surface Samples Refusal 343710 _j;_...... _

I, -\\*'.

20

  • o Feet 10Meters Final Status Survey Surveillance 122038 NAD83 IL State Plane East 1201 (Meters) 2017 Aerials - Lake County GIS Dept.

Date performed: 08/01/2019 Drawing; FSS SURV122038 080119 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 6 Information Use Survey Area No.: 12000 Survey Unit No.: 12203C Survey Unit Type: Open Land [8J Structure D System D Work Group

Contact:

Final Status Survey (FSS), supervisor Radio RP-3. Description of Planned Activities: This is the I st Bi-annual surveillance survey for this survey unit. Duration: Start 8/1/19 Stop 8/1/19 Access Controls Required:

1. All personnel will brief and sign in/out on this FSS Attachment 2.
2. All personnel and equipment will be surveyed into the area by the FSS technician.
3. There will be a minimum of one scheduled biased surface soil sample taken in this survey unit.
4. When job is completed, the survey unit postings will be verified saf ctory.

/ ~ Approt:' "I. \\ )vJ ~ Survey Name Time Time Unit# (Print/Sign) In Out 12203C Karen Nicholson/ KU\\t FSS technician 8-1-19

n. 3Ss ) 1./: I 5

}d, d O 3 C. \\'Y\\~-r: ~-!-J ~ J'3.35r J'1:J5 / (k;i,.,~,:.e,- S.. \\,f'f' iH2J-11-1P, r ~.~r-er Svpqc.-t ~-)-j ~

13. 3~ J LJ: IS ZS-L T-300-001-003 Revision 6 Information Use FSS I&C Surveillance Summary AREA SURVEILLANCE:

Survey Area No.: 12000 Survey Unit No.: 12203C

== Description:== Performing 1st Bi-Annual surveillance survey. Survey Unit Type: Structure D Classification: OpenLand!ZI Class 3 D Class2 D Class 1 ~ Reason for Surveillance: Semi-Annual IZI Special D System Surveillance Due Date: 7-10-19 Reason: Bi-annual Surveillance survey. (Survey Date surveillance performed: 8-1-19 performed after due date because the storage and removal of the CCDD pile in the adjacent survey area 12205). SURVEILLANCE ACTIVITIES:

1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit*--*-----------------------------------------------------------------------------------------* IZ!
2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit--------*------- IZ!

SURVEILLANCE COMMENTS AND OBSERVATIONS: The CCDD is now removed, and the surveillance survey is being performed. The FSS technician and the MBI laborer (RD, AV) support walked down the survey unit and selected sample location. Informed the MBI foreman (N.Friant). 13:38 The FSS technician signed the group in, and surveyed all the sampling equipment into the survey unit. 13:52 Collected biased surface soil sample #Ll 12203CVJGS001SS.

== Description:== medium brown sand, and gravel. Location selected at a dried, low water area. 14:15 Completed surveillance in this survey unit. The group signed out of the survey unit. The collected sample was brought to the sample prep trailer for processing. Notes: The sample location was GPS'd, and the corrected coordinate with the location will be shown on the attached map. There were some small pieces of metal, and old flags that were surveyed and removed from the survey unit. The postings were satisfactory. The postings are represented on the adjacent FSS survey units. A Model 3 #283228 with a 44-9/PR355606, cal due 1-12-20 was used for all the surveying. All survey results were indistinguishable from background. Back ound 30-50 cpm. IZ!- Surveillance Satisfactory D-Surveillance Un-Satisfactory 15:30 (Time) /( 'Z-V (Time) (Time)

343680 343710 343740 0 N co,.. ;z '*7 ~---~-:~~:* ~ .. :~~- ~---, ;-----..c~*

r~ ~-*

~ . ---~-__

-~---~~---

-==--~----; .\\

  • --------~------.,__.,;::.. __

Legend N A 40 Ftet Final Status Survey Surveillance 12203C NAD83 IL State Plane East 1201 {Meters) 2017 Aerials - Lake County G/S Dept D Survey Unit (SU) 12203C [,. 0 Biased Surface Sample Date performed: 08/01/2019 Drawing: FSS SURV 080119 ~~--'- - ~i-..:.- ~ i ----~'-- ------- ---- j FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 6 Information Use Survey Area No.: 12000 Survey Unit No.: 12203D Survey Unit Type: Open Land IZI Structure D System D Work Group

Contact:

Final Status Survey (FSS), supervisor Radio RP-3. Description of Planned Activities: This is the 1st Bi-annual surveillance survey for this survey unit. Duration: Start 8/1/19 Stop 8/1/19 Access Controls Required:

1. All personnel will brief and sign in/out on this FSS Attachment 2.
2. All personnel and equipment will be surveyed into the area by the FSS technician.
3. There will be a minimum of one scheduled biased surface soil sample taken in this survey unit.
4. When job is completed, the survey unit postings will be verified a isfa~

Survey Unit# 12203D

  • -~---

Name (Print/Sign) / ~"JJvvtA----- Approvf!ci by: __ at _ ___,, __________ _ Time Time In Out FSS technician 8-1-19 i V'.15- /y;y5 h18.r J.. ~o,--~r-S-0pflv,t- ~ !**19 /v. I c; ;\\,:-y5 mB ~ L,v-6 o,-"'1-5 VfFO, f ~ -J-l (.1 /lf./ 5 ilf: ys Page / of 3 FSS l&C Surveillance Summary AREA SURVEILLANCE: Survey Area No.: 12000 Survey Unit No.:

== Description:== Performing 1st Bi-Annual surveillance survey. Survey Unit Type: Structure D ZS-LT-300-001-003 Revision 6 Information Use 12203D System O Classification: Open Land IZI Class 3 D Class 2 D Class 1 IZI Reason for Surveillance: Semi-Annual IZI Special D Surveillance Due Date: 7-10-19 Reason: Bi-annual Surveillance survey. (Survey Date surveillance performed: 8-1-19 performed after due date because the storage and removal of the CCDD pile in the adjacent survey area 12205). SURVEILLANCE ACTIVITIES:

1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit**************-**-**-***-**---****-****--*--*--*****----*-**-*---* --*--*---------*---------** 1::8'.1
2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.-*---*-**------*

1::8'.1 SURVEILLANCE COMMENTS AND OBSERVATIONS: The CCDD is now removed, and the surveillance survey is being performed. The FSS technician and the MBI laborer (RD, AV) support walked down the survey unit and selected sample location. Informed the MBI foreman (N.Friant). 14: 15 The FSS technician signed the group in, and surveyed all the sampling equipment into the survey unit. 14:33 Collected biased surface soil sample #Ll 12203DVJGS001SS.

== Description:== medium brown sand, and gravel. Location selected at dried, low point in soil. 14:45 Completed surveillance in this survey unit. The group signed out of the survey unit. The collected sample was brought to the sample prep trailer for processing. Notes: The sample location was GPS'd, and the corrected coordinate with the location will be shown on the attached map. There were some small pieces of metal, water bottle, plastic at fence line, and old flags that were surveyed and removed from the survey unit. The postings were satisfactory. The postings are represented on the adjacent FSS survey units. A Model 3 #283228 with a 44-9/PR355606, cal due 1-12-20 was used for all the surveying. All survey results were indistinguishable from background. Back ound 30-50 cpm. aren 1c o so :

  • Ch.C,11\\ /Lil cl~:).(.

9-4-19 15:45 (Print Name/Signature) C/L (1rj_ tu~ (Date) (Time) -i-,q P43 (Print Name/Signature) Radio J).'v,Jcu ~Dv-J I (Print Name/Signature) C/LT Manag /Date) (Time) II '26 JC/ 0'?38' (Date) (Time)

343710 343740 0 ~ ~ 0 I() <.D ~ 0 fR ~ Legend D Survey Unit (SU} 12203D 0 Biased Surface Sample 343770 Final Status Survey Surveillance 12203D NADB3 IL State Plane East 1201 (Meters) 2017 Aerials

  • Lake COi.iniy GIS Dept.

Date performed: 08/05/2019 Drawing: FSS SURV12203D 081519}}