Survey Unit Release Phase Rev. Supplemental Documentation Record 2, Pt.

00101A 1 2

2, Pt.

00101B 1 2

2, Pt.

00101F 0 2

2, Pt.

00101H 0 2

2, Pt.

00150A/B/C 0 2

2, Pt.

01100/01110 1 1

2, Pt.

01111 1 Revised Release Record 1

Revised Release Record, Penetration Dose 2, Pt.

01112/02112/05120 1 Calculation spreadsheet, Phase 2 Part 1 Final 1

Report, Attachment to ZS-2020-0011 2, Pt.

02100/02110 1 1

2, Pt.

03202 1 1

2, Pt.

05100 1 1

2, Pt.

05119 1 1

2, Pt.

06100 2 Revised Release Record 1

2, Pt.

06105B 0 1

2, Pt.

06107 0 1

2, Pt.

06108 0 1

2, Pt.

06201 2 Revised Release Record 1

2, Pt.

06202 2 Revised Release Record 1

2, Pt.

06209 0 1

2, Pt.

06210 0 1

2, Pt.

06211 0 1

2, Pt.

06212 0 1

2, Pt.

06213/06214 2 Revised Release Record 1

2, Pt.

06215/06216 0 1

2, Pt.

08100 2 Revised Release Record 1

2, Pt.

09100 0 1

10201A 3 0 10201B 3 0 10201C 3 0 Buried Pipe RA Results spreadsheet 10201D 3 0 Buried Pipe RA Results spreadsheet 10202A 3 0 10202B 3 0 10202C 3 0 10202D 3 0 Buried Pipe RA Results spreadsheet Question 1 Response 10203A 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review 10203B 4 1 Buried Pipe RA Results spreadsheet 10203C 4 1 Buried Pipe RA Results spreadsheet 10203D 3 0 Buried Pipe RA Results spreadsheet 10203E 3 0 Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 10203F 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet 10204A 4 1 10204B 4 1 Buried Pipe RA Results spreadsheet 10204C 4 1 Buried Pipe RA Results spreadsheet 10204D 4 1 10205 1 1 10206A 4 1 10206B 4 1 10206C 4 1 10206D 4 1 Buried Pipe RA Results spreadsheet 10206E 4 1 Buried Pipe RA Results spreadsheet Buried Pipe RA Results spreadsheet 10207A 4 1 Ballast RA Attachments 10207B 4 1 Buried Pipe RA Results spreadsheet 10207C 4 1 Buried Pipe RA Results spreadsheet 10207D 4 1 Buried Pipe RA Results spreadsheet 10207E 4 1 Buried Pipe RA Results spreadsheet Buried Pipe RA Results spreadsheet 10208A 4 1 Ballast RA Attachments Buried Pipe RA Results spreadsheet 10208B 4 1 Ballast RA Attachments Buried Pipe RA Results spreadsheet 10208C 4 1 Ballast RA Attachments Buried Pipe RA Results spreadsheet 10208D 4 1 Ballast RA Attachments 10209A 3 0 Buried Pipe RA Results spreadsheet 10209B 3 0 Buried Pipe RA Results spreadsheet 2019-1953 Follow Up to Concrete in 10209C, 10209C 4 1 Attachment to ZS-2020-0011, 2020 Surveillance Surveys 10209D 3 1 10209E 3 0 Buried Pipe RA Results spreadsheet 10210A 3 0 10210B 3 0 10210C 3 0 10211A 3 0 10211B 3 0

10212A 4 1 Drainage Ditch Flood Timeline 10212B 4 1 Drainage Ditch Flood Timeline 10212C 4 1 Drainage Ditch Flood Timeline RAI 5a Response 10212D 4 1 Drainage Ditch Flood Timeline 10213A 4 1 Drainage Ditch Flood Timeline 10213B 4 1 Drainage Ditch Flood Timeline 10213C 4 1 Drainage Ditch Flood Timeline 10214A 4 1 Drainage Ditch Flood Timeline 10214B 4 1 Drainage Ditch Flood Timeline Gamma Spectroscopy Report for L2-10214C-RJGS-10214C 4 1 001-SM Drainage Ditch Flood Timeline 10214D 4 1 Drainage Ditch Flood Timeline 10214E 4 1 Drainage Ditch Flood Timeline 10214F 4 1 Drainage Ditch Flood Timeline 10219A 1 1 10219B 1 1 10220A 4 1 Buried Pipe RA Results spreadsheet 10220B 3 0 Buried Pipe RA Results spreadsheet 10220C 1 1 10220D 3 0 10220E 3 0 10220F 3 0 10220G 3 0 10220H 4 1 RAI 3c Response RAI 3c Response 10220I 4 1 2020 Surveillance Surveys 10220J 3 1 10221A 4 1 Ballast RA Attachments 10221B 3 1 Revised Release Record, Ballast RA Attachments 10221C 4 1 Ballast RA Attachments Buried Pipe RA Results spreadsheet 10221D 4 1 Ballast RA Attachments 10221E 3 0 10221F 3 0 10221G 3 0 10221H 3 0 Buried Pipe RA Results spreadsheet 10222 1 1 10223 1 1 10224 1 1 10301 1 1 12101 3 1 Buried Pipe RA Results spreadsheet 12102 3 0 Buried Pipe RA Results spreadsheet 12103 3 0 Buried Pipe RA Results spreadsheet Question 1 Response 12104 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review Question 1 Response Power Block RA Report Attachments, Power 12105 4 1 Block RA Readiness Review Attachment to ZS-2020-0011, Subsurface Soil FSS Dose spreadsheet Question 1 Response

Power Block RA Report Attachments, Power 12106 4 1 Block RA Readiness Review Attachment to ZS-2020-0011, Subsurface Soil FSS Dose spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12107 4 1 Block RA Readiness Review Attachment to ZS-2020-0011, Subsurface Soil FSS Dose spreadsheet Question 1 Response 12108 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review Question 1 Response, Additional Question 1

Response

Power Block RA Report Attachments, Power Block RA Readiness Review 12109 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review RAI 7d Response, Power Block RA Readiness Review Question 1 Response Power Block RA Report Attachments, Power Block RA Readiness Review 12110 4 1 RAI 7d Response, Power Block RA Readiness Review Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12111 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet 2018 Unit 1 and Unit 2 Containment Exterior URS, Special Surveillances, 2020 Surveillance Surveys, 12112 3 0 Post-CCDD Surveillance Summary spreadsheet 2020 Surveillance Surveys 2018 Unit 1 and Unit 2 Containment Exterior URS, Special Surveillances, 2020 Surveillance Surveys, 12113 3 0 Post-CCDD Surveillance Summary spreadsheet Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12201A 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12201B 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12201C 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet 12201D 4 1 12201E 4 1 Question 1 Response

12202A 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review Question 1 Response 12202B 4 1 Power Block RA Report Attachments, Power Block RA Readiness Review Question 1 Response Power Block RA Report Attachments, Power 12202C 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12202D 4 1 Block RA Readiness Review July 2019 Power Block Remediation Results Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12202E 4 1 Block RA Readiness Review Buried Pipe RA Results spreadsheet Question 1 Response Power Block RA Report Attachments, Power 12202F 4 1 Block RA Readiness Review July 2019 Power Block Remediation Results Buried Pipe RA Results spreadsheet 2018 Unit 1 and Unit 2 Containment Exterior URS, Special Surveillances, 2020 Surveillance Surveys, 12203A 4 1 Post-CCDD Surveillance Summary spreadsheet Buried Pipe RA Results spreadsheet 2018 Unit 1 and Unit 2 Containment Exterior URS, Special Surveillances, 2020 Surveillance Surveys, 12203B 3 0 Post-CCDD Surveillance Summary spreadsheet Buried Pipe RA Results spreadsheet 2018 Unit 1 and Unit 2 Containment Exterior URS, Special Surveillances, 2020 Surveillance Surveys, 12203C 3 0 Post-CCDD Surveillance Summary spreadsheet Buried Pipe RA Results spreadsheet 2018 Unit 1 and Unit 2 Containment Exterior URS, 12203D 3 0 Special Surveillances, 2020 Surveillance Surveys, Post-CCDD Surveillance Summary spreadsheet Buried Pipe RA Results spreadsheet 12204A 3 0 2020 Surveillance Surveys, 2019-1971 Follow Up to Particle in 12204A 12204B 3 1 12204C 3 0 12205A 4 1 12205B 4 1 12205C 4 1 12205D 4 1 12205E 4 1 Final Report Rev. Revision due to RAI Phase 1 Final Report 1

Phase 2, Pt. 1 Final Report 2 Additional Question 4 Phase 2, Pt. 2 Final Report 0 Phase 3 Final Report 0 Phase 4 Final Report 1 ZS-2020-0011 2 Additional Question 4, RAI 7c, RAI 10a, RAI 15d

Reason for Supplement RAI 6c Additional Question 4 Additional Question 3 Additional Question 3 Additional Question 3 Additional Question 3 Additional Question 3

RAI 8a RAI 8a RAI 8a Question 1 Additional Question 8 RAI 8a RAI 8a RAI 8a RAI 8a Question 1 Additional Question 8 RAI 8a RAI 8a RAI 8a RAI 8a RAI 8a RAI 8a Question 3 RAI 8a RAI 8a RAI 8a RAI 8a RAI 8a Question 3 RAI 8a Question 3 RAI 8a Question 3 RAI 8a Question 3 RAI 8a RAI 8a RAI 10a RAI 8a

Question 7 Question 7 Question 7 RAI 5a, RAI 5c Question 7 Question 7 Question 7 Question 7 Question 7 Question 7 Question 6 Question 7 Question 7 Question 7 Question 7 RAI 8a RAI 8a RAI 3c RAI 3c RAI 10a Question 3 Question 3, Additional Question 7 Question 3 RAI 8a Question 3 RAI 8a RAI 8a RAI 8a RAI 8a Question 1 Additional Question 8 Question 1, RAI 7c Additional Question 8 RAI 7c Question 1, RAI 7c, RAI 15d

Additional Question 8 RAI 7c Question 1, RAI 7c Additional Question 8 RAI 7c Question 1 Additional Question 8 Question 1, Additional Question 1 Question 2 Additional Question 8 RAI 7d Question 1 Additional Question 8 RAI 7d RAI 8a Question 1 Additional Question 8 RAI 8a RAI 1a, RAI 1c RAI 10a RAI 1a, RAI 1c RAI 8a Question 1 Additional Question 8 RAI 8a Question 1 Additional Question 8 RAI 8a Question 1 Additional Question 8 RAI 8a Question 1

Additional Question 8 Question 1 Additional Question 8 Question 1 Additional Question 8 RAI 8a Question 1 Additional Question 8 RAI 4a RAI 8a Question 1 Additional Question 8 RAI 8a Question 1 Additional Question 8 RAI 4a RAI 8a RAI 1a, RAI 1c RAI 8a RAI 1a, RAI 1c RAI 8a RAI 1a, RAI 1c RAI 8a RAI 1a, RAI 1c RAI 8a RAI 10a

Summary of Conclusions Provided correction in Attachment 2 of the release record Updated dose calculations for penetrations; site compliance dose component for basements revised to 0.443 BcSOF from 0.444 BcSOF.

Added discussion of false positives for Tc-99 Added discussion of false positives for Tc-99 Added discussion of false positives for Tc-99 Added discussion of false positives for Tc-99 Added discussion of false positives for Tc-99

Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided Radiological Assesment data Provided additional radiological survey data and revised dose to account for a lack of post-remediation data. Dose for survey unit revised to 0.466 mrem/year from 0.382 mrem/year.

Provided Radiological Assesment data

Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Radiological Assesment data Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Gamma Spectroscopy Report for L2-10214C-RJGS-001-SM Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Timeline for survey 10212, 10213, and 10214 Provided Radiological Assesment data Provided Radiological Assesment data Corrected language with regard to inaccessible areas for scanning Corrected language with regard to inaccessible areas for scanning Provided surveillance surveys Provided survey attachments for ballast RA Clarified RA and FSS progression, provided survey attachments for ballast RA Provided survey attachments for ballast RA Provided Radiological Assesment data Provided survey attachments for ballast RA Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided results of dose assessment performed for survey unit 12105K Provided correct date of ORISE confirmatory survey

Provided Radiological Assesment data Provided results of dose assessment performed for survey unit 12106K; max soil dose increased to 1.016 mrem/year.

Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided results of dose assessment performed for survey unit 12107K Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided timeline for progression of surveys Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided surveillance surveys Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey

Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided correct date of ORISE confirmatory survey Provided Radiological Assesment data Provided Radiological Assesment data Provided Radiological Assesment data Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided Radiological Assesment data Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided Radiological Assesment data Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided Radiological Assesment data Provided evidence that CCDD is clean, that I&C was properly maintained, and that surveillance surveys verified no change to FSS radiological conditions Provided Radiological Assesment data Provided surveillance surveys and post-remediation data