ML21067A212
Text
{{#Wiki_filter:Attachment 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: 12000 Survey Unit No.: _12..:..:1:....::c1=2A:.::.,_ ______ _ Survey Unit Type: Open Land !ZI Structure D System D Work Group
Contact:
Final Status Survey (PSS) supervisor, Radio DD-1. Description of Planned Activities: The FSS technician performing the 2nd Bi-annual surveillance survey for this survey unit. Duration: Start ------- 2-11-2020 Stop 2-11-2020 Access Controls Required:
- 1. All personnel will brief and sign in/out on this FSS Attachment 2.
- 2. All personnel and equipment will be surveyed into the area by the FSS technician.
- 3. When job is completed, the survey unit postings will be verified satisfactory.
Survey Name Reason for Date Unit# (Print/Sign) Entry 12112A Karen Nicholson/ t( C N J,~ Technician 2-11-2020 "~""- \\ \\ -, performing survey ~ t---.. ~-- ~----..................___ ~_(\\------- /1/ I'-.,~ Time In /3; { D r--------...... Time Out 1'3 *.~ O FSS I&C Surveillance Summary AREA SURVEILLANCE: Survey Area No.: 12000 Survey Unit No.:
== Description:== Performing the 2nd Bi-annual surveillance survey. Survey Unit Type: Classification: OpenLand[8] Class 3 D Reason for Surveillance: Semi-Annual [8] Structure D Class20 12112A ZS-LT-300-001-003 Revision 7 Information Use SystemO Class 1 [8] Special D Surveillance Due Date: 1-17-2020 Reason: Surveillance survey. Date surveillance performed: 2-11-2020 SURVEILLANCE ACTIVITIES:
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit.
1:8'.1
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit
[8] SURVEILLANCE COMMENTS AND OBSERVATIONS: 13: 10 The FSS technician surveyed into the survey unit. The surveillance will consists of a visual walk down. The survey unit has some snow coverage and the ground is frozen. This survey unit consists of sand, clay, and gravel. This survey unit was recently surveyed by ORISE (scanned) and the clay at the east fence which is a subsurface sample location was identified. This location has already been identified during FSS survey and is satisfactory. There were two plastic water bottles removed from the fence area that were blown in. No anomalies. 13:20 The FSS technician completed the survey. The technician perfonned a hand and foot frisk entering and exiting the survey unit. Results: indistinguishable from background using a Model 3, #284338 with 44-9/PR361684, cal due 6-25-20. Background 40-60 cpm. The FSS postings are represented on the furthest outer connecting FSS survey unit, except the east RRA fence is the boundary. The contact information was updated at the southwest access to "contact FSS supervisor on Radio DD-1 ". I {gj-Surveillance Satisfactory I 0- Surveillance Un-Satisfactory Karen Nicholson/ Ko. '-t '- t'V, ttv-J:t.., (Print Name/Signature) C/LT Technician (Date) (Time) <._ :.)* I' J.:'- z,,;_ z..:, (Date) (Time) ///..!:J (Time} FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: /,9./Co Survey Unit No.: Survey Unit Type: Open Land~ Structure D Work Group
Contact:
ZS-L T-300-001-003 Revision 7 Information Use System D Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. ,4ND 5p&c1.11l. Si/Vt1e1Uavic.e 90rvey Duration: Start &;;*-( dO dD Stop 6,,,/-!}.o!}o Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: (JiJu f3h{}jll,i(u..., d Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out 19-t I 1 Peret? S!le,V/M /~~~ 5vvv-e, I/ o,1c~ 6-1-:Jo /9 :)..O /:J-L/-!7 ~//-Z,, A6AP1,o ~kiJO/~~ 5£Aflr/,; 1 u... A,t-fce ~ -(-2-1) I '2--""vt> /7---45 I u page 1 of 2 FSS I&C Surveillance Summary ZS-LT-300-001-003 Revision 7 Information Use ADA SlJRVEJiLLANCE: Survey Area No.: {a /CO Survey Unit No.: _/._~_/ (_SI _____ _
== Description:== ~~,th~ ::5()yvetf k-v,_ep{p,t,J ~~1cd)c; S }1eGt?~r-Yj Survey Unit Type: Classification: Reason for Surveillance: Open Land [:gj Class 3 D Semi-Annual~ Surveillance Due Date: DSf.3a;J.c Structure D System D Class 2 D Class 1 *@ Special~ Reason: m ott11-ro 1<1 rvf;, ltJ'~;[L ~"b"MN!rl- -ft vftW-""2N -D4s; SURVEitLANCE ACTIVITIES:
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
S.URVEILLANCE COMMENTS AND OBSERVATIONS: ~ tG--rTt-lb,5 (}J&R_?;;, Vc514Rf,D Sti[i "/tC(or< ' Se::1M& Rt()tb trr-r~ 9.1rw;,{ UN,-~ frltb ~PN&' poJII1\\}0 ~
- e trr A-Qj Aec--1v'tf 5LJ<VGy' urvrr~ Ifti+-, R&pg&->~ 1 ALL -r~
5UV VG .-->v/J. ltex:W; B~-~ OUN. R.3117sfo C.f>D - i 0-;).t-dl> ; ~350 5/tJ ;;)..Sf-1718" P/?3b33// Cl)IJ 0;-19**.10 - Surveillance SatisfactorY, D-Surveillanc~ Un-Satisfactory e--f"Gi6\\ 5/E-,t/lWI ~~<P41A~ a.o /615 G/t-Prro 6 ~A-po ..,.,..:,,~,<""= fR-I - Z,,O / & { '5 (Date) (Time) (Print Name/Signature) Radiological Engineer (Date) (Time) (Print Name/Signature) C/L T Manager (Date) (Time) page 2 of 2 GL WOOD / RF YETTER / SIGN SIGN FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-L T-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: 10208B/C - 10221 A - 102200 - 10214A-10220C - 10301 Survey Unit Type: Open Land IZJ Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 / 0700 Stop 09-25-2020 I 1800 Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-L T-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) /7--t/Z-- A. i3 eu.. M')O /AL;~~ (. / 1a11r;.. P. 5/t&Vt~ /~~ 12111... O* 13 Ct'.t.£5 I O V L ;2 ~ GL Digitally signed by GL Wood DN: cn=Gl Wood, o=ZSRP, ou.aZSRP LRE, email=glwood-ext@energysolutioos.com, W d c=US Q Q Dat~ 2020.08.21 14c49c34 Approved by: _____ 00_* ___ Reason for Entry Date Time In 51/lM i£, (...'-'4,( ee-9-2-c;-;u., /q/0 l-f 11 I I
- (*) - This access will suffice for all activities in l 0200, 12100 and l 0300 survey units for the work activities specified on this attachment.
Time Out I 4 "1,,-"5 t, n FSS l&C Surveillance Summary
- ' AREA SURVEILLANCE:
Survey Area No.:
== Description:== Survey Unit Type: Classification: Reason for Surveillance: Open Land~ Class 3 D Semi-Annual ~ Surveillance Due Date: Survey Unit No.: ,S /,II fl-V'!#I t.-1-A,Jc.<f Structure D Class2 D Reason: 1--------------------l 1 Sill'P.ILL.ANCE ACTIVITIES: ZS-LT-300-001-003 Revision 7 Information Use System D Class 1 ~ Special 0
- 1) Review ZS-LT-300-001-003 Attachment 2, PSS Area Access Request, Authorization and Sign.-
In Sheet for authorized entries into the FSS Survey Unit -----***----------------------------------------------------------- I.&!
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent sun'ey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.----------------****-*--**---*-*-*-****--**--------------------------------------------**---------------------------------------------------- rgi Sl.JRVEILLA,NCE COMMENTS ;\\.t~IJ OBSERVATIONS:
f~-n"6-s ~<2/!L.Je~h~fJ 5~~fµ.roiz..y:' t-lofeo -Oi~f"vqZ--R:>A-tJC£s 6'J,Js,-s1~r-fr w1n-t l4\\-3 5/J.i: ~"2s4-2-?D, evo~ c;-2-J-Z-I. yi,{-?-35D-1/44-10 ~/,.I: '?,oc..J-1cn, l!-3'J-l'°AZ-t,~~-= C/-11-~I -:z-3S"D-f 44-tu 5f~~?---{.ewv5, f'{<..3D<"if03c Ci>i>=I0-7t-"%-?-o o5',J:30<-/11-v1//l-3n.t434iJ=-q,,1-'l--l D-Surveillance Un-Satisfactory (Print Name/Signa ) (Date) (Time) (Print Name'Signature) Radiological Engineer (Date) (Time) (Print Name.'Signature) C/LT Manager (Date) (Time) Page 21 of 22 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: /:>-too Survey Unit No.: Survey Unit Type: Open Land~ Structure D Work Group
Contact:
ZS-LT-300-001-003 Revision 7 Information Use ,,_ II 3 System D Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. Duration: Start ~,,,,-Zl:v 202£> Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out (). IIJ AGkfl'f"O 'BP.4-CiM)O IM .,F, ~ (AMI~ I U,W M ~ h 11 /l,C10 D8": 2--0 tD:3b
- _r i~ll 3 PY~ 5'fj-<4\\/1~/ t:,tJV $~
- surve, l/anc-e 02/:;-::2:>J,~ /()3-0 PAGE 1 of 2
AREA SURVEILLANCE: FSS I&C Surveillance Summary ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: /2: J QO Survey Unit No.: --~'2.~I ~' J~--- --
== Description:== <;an1 PrrfNUltL ~c.,wetl [co1e:e 1/fJVD ~p'&::J.,¥,-s tr<; /116<' &;_g,5',4,ey) Survey Unit Type: Classification: Reason for Surveillance: Open Land~ Class 3 D Semi-Annual I)'.'] Surveillance Due Date: o ti{' /-'>o 1r? SURVEILLANCE ACTIVITIES: Structure D System D Class 2 D Class 1..Ila Special D Reason: fVA l) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit ~
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
SURVEILLANCE COMMENTS AND OBSERVATIONS: ~l--::le:D S ~ ftf U/iil1~ A1<1,; o~. s ftl<,£ ff rVlr<;. TU 9-)( 14-iLTfff-p;.s {lr\\lC1S tr CL~ CoRRC-ct-GD. o-"?5D 7iN
- '3/11 >0 CD. l 0-:2~-~ j,])39) 3 'A.I 30 7/ g, PR 3C3~ // Cl)/). 9-19-?o-4.
D-Surveillance Un-Satisfactory ~---a- >2(!} ,ov ' ~ f312.M s-7-'G 0vt> I,s:o b (Date) (Time) (Print Name/Signature) Radiological Eng ineer (Date) (Time) (Print Name/Signature) C/LT Manager (Date) (Time) PAGE 2 of 2 GL Wood / RF Yetter / FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: l 0208B/C - l 0221 A - l 02200 - 10214A - 10220C - 10301 Survey Unit Type: Open Land~ Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 I 0700 Stop 09-25-2020 I 1 soo Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-L T-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) l-z-117;, A, 812..4 att-Do / ~/~1-0 l /'all? p, SAE1¥1M I ~j~ -. ~. 12113 D-/!,l~tJ I ~-fl--. GL Digitally signed by GL Wood ON: cn=GL Wood, o;ZSRP, ouz ZSRP LRE, email;glwood-ext@lene~llll:ions.com, W d (;US QQ Date:2020.08.2114:49:34 Approved by: _____ -04_w ___ Reason for Entry Date Time In ':) Utz-[/ c; I t--t.--14 11.(u, q. 2-q-2,o l3c./s 'n t,-,
- I 11
- (*) - This access will suffice for all activities in 10200, 12100 and 10300 survey units for the work activities specified on this attachment.
Time Out It/ 10 I I Page 1 of 2 FSS l&C Surveillance Summary i AREA SURVEILLANCE: Survey Area No.:
== Description:== Survey Unit Type: Classification: Reason for Surveillance: 1 ~too 0penLandO Class 3 D Semi-Annual f5r" Survey Unit No.: 7VYV-; I ltu1q, Structure D Class 2 D Surveillance Due Date: OCJ-1D~D Reason: 1------------J.-----------l ZS-LT-300-001-003 Revision 7 Information Use I~ 113 System D Class t.~ Special D !,ii-:*.. :!,*;..-:./~a,;,t;:..;;... b;,".~.- ~>-.f~'Z<:~'/-:.. 1.,:*_t *;C:.c:ili-:;_*:_*_..., ..,.:.*,t ':,.,[" *~ 1 strttuittJ~g ~li;TMnEs: l:.: __ )~-;~_.:. ~*<;,,*:::t::.*.,.:_ ':::L.::t.L ~ __
- _*
- -:.-::*=:.=*-
=---
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit---------------*-*-*-*---**********----************---*-***----- --- 12(
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Uni1.---*****--**-*-****************************************************************************************************************************** ~
i S~3/E{IJL~CE COMMENTS Ai~D OBSERYAtidN~~: "posii~~s~*~G v~&ir> srrit£fk,1b12.y*,, Nr:i(iri:>'bt51<JR.Mt(t65 Cl)NSIS-(~f LAJtfi+ HfVA~ 5 G* ltftM ft('/0 Q,~Dltv<4 A-c-fiVi ~. SCANtrt:O ~, e D{.$(vl?B<m /Jr{<.GA9,. R. llJ GlCAf. {))tJC> ION5 !Jo-(C,D LO 13/4 ~ >I Wt(H ~> R~ !>. --~--4-------------------------------- ). i.3/7 C/)l)/0,d.fy~~ ~ I sfactory (Print NamelS{griature) C/LT Teclutician (Date) (Time) (Print Name'Signature) Radiological Engineer (Date) (Time) (Print Name'Signature) C/LT Manager (Date) (Time) Page 21 of 22 Page 2 of 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: Survey Unit No.: Survey Unit Type: Open Land [g] Structure D Work Group
Contact:
ZS-LT-300-001 -003 Revision 7 Information Use 1,;;1 OJ,4-System D Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. Duration: Start 5/-J- &. /i o -ro Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: ddf ~ Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out /).-:J ()?,4 A &A-PI ro 'B tZA6A-i)o / }1&-'7fd,:, 5 waJ ff 1 u.,.J,-,,J (,,~ '7/u(i,o~ O<t: µ) (o : 30 /9_9.0~A PC~~ S/t&vi;1 / ~~ 5vn1ir/lllfvu; lf--u *:76?2.o 03:)e> L03-0 page 1 of 2 FSS I&C Surveillance Summary AREA SURVEILLANCE: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: J ~,l. o o Survey Unit No.: J,-.;t OJ A
== Description:== 5GIY7i lttVN'Ll/rL SVW"&lll11-rVc~ (twD spm& 11$ /V£CZ:~y) Survey Unit Type: Classification: Open Land Qg_ Class 3 D Reason for Surveillance: Semi-Annual SURVEILLANCE ACTIVITIES: Structure D System D Class 2 D Class 1 ~ S ecial D
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
~ SURVEILLANCE COMMENTS AND OBSERVATIONS: t4C,6~ UN l-f~ /tf>.o;;v; c/3${;) '3/tJ 3Cl/-7/S P/?36;33// Cl)/), 9-19~6~0
- sfactor D-Surveillance Un-Satisfactory (Date)
(Time) (Print Name/Signature) Radiological Engineer (Date) (Time) (Print Name/Signature) C/L T Manager (Date) (Time) page 2 of 2 GL WOOD / RF YETTER / FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: 10208B/C - 10221A-10220G-10214A - 10220C - 10301 Survey Unit Type: Open Land ~ Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 / 0700 Stop 09-25-2020 I 1800 Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any eq\\)ipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) /-Z-~:!J A A-. gµq/ri)D I~~ IA~~!+- .p_ 5¥11/,1/ Ii!£~3/4_* GL Digitally signed by GL Wood DN: cn=GL Wood, o=ZSRP, ou=ZSRP LRE, email=glwood-ext@energysolutions.com, W d c=US QQ Date:2020.08.2114:49:34 Approved by: _____ -04_* 00_* ___ Reason for Entry Date Time In ~ fALJI ~, L-l-tffl a q/~/U> ()g,-50 V1 Lt '1
- (*) - This access will suffice for all activities in 10200, 12100 and 10300 survey units for the work activities specified on this attachment.
Time Out oqoS: tr Page 1 of 2 FSS l&C Surveillance Summary ILLANCE: Survey Area No.: __,_/a_t(X)____ __ Survey Unit No.:
== Description:== Survey Unit Type: Classification: Open Land~ Class 3 0 Reason for Surveillance: Semi-Annual~ SvrVe; //a nc.e Structure 0 Class2 0 Surveillance Due Date: OCJ,aO~Q Reason: ~------------------l ZS-LT-300-001-003 Revision 7 Information Use System D Class 1 0 S ecial D
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit-***************-*-*--***--*--*-----------------------------***-***** 00'"
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.***************-*******-*******-************************-***-************************************************-**-----*--------------------*-* 12('
~vi:~ v:~:n~ 10R, N~:J3~ D,_.;~MYCGs w 3ocr):)fk.fJ~3a189;J. CJJP 9-t1-a1' a'3SV*-i/44£o ~l/:69 /1(9C&J?J7 c()f} 10,ag--au 3o *11. />R 37;).1'1~ con 9~r1---a1.. IYJ?J
- w ;;).~';).30 c...r;n 9---a1--a 1 0- Surveillance Un-Satisfactory
....-a.o IS r-,0-~ /507> (Date) (Time) (Print Name'Signature) Radiological Engineer (Date) (Time) (Print Name.'Signature) C/LT Manager (Date) (Time) Page 21 of22 Page 2 of 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: Survey Unit No.: Survey Unit Type: Open Land [2J Structure 0 Work Group
Contact:
ZS-LT-300-001-003 Revision 7 Information Use 122 oJ a System 0 Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. Duration: Start >,,.. 2,b-2tJJ2.e) Stop ~-'26-2.DZe; Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: d'1J ~Vi/.-- Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out l.1~o.3 0 k,Mli-11> OIM-6M>o / A,a""o ? 1/4/lJ ~ I 1.-1.-J,,N l£ 5' /;,.f/7o"J1 0</f'. 2-0 fO: 3 D /~e>??/3 PYr~ 5frrdl1~ I ~ffiµ~ SvvV-G I I MtJt:& ~-.2{;,2o2 0~ /O1/4 page 1 of 2
AREA SURVEILLANCE: FSS I&C Surveillance Summary ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: J:J. ~oo Survey Unit No.: /-;l).o}. 8
== Description:== >c:fl1 ( *-ltfl!NrJkl suvv&1ll~ &<<o <J:,pGCtitls,4-5 N&C?b~!) Survey Unit Type: Classification: Reason for Surveillance: Open Land~ Class 3 D Semi-Annual 1lJ / Surveillance Due Date: l'J~ /:,_o:io SURVEILLANCE ACTIVITIES: Structure D System D Class 2 D Class 1 0(1 Special D Reason: !Vil--
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
521' SURVEILLANCE COMMENTS AND OBSERVATIONS: fbgTT w&tS VU< l ew >Mi g, fAeI DP-1/ ~o m-z; &>f& g M ~ .9.Jrvtf1/4 UN tt-S 11/<G- &,oN&. TI~ ~ '.5 /Wz'G frt
- ~
gUYVG UNl-(S n+. & ~ LL,~ ~g t--trt_._:RI pcsn N Cd~ v&fZf"n r;{> J ArJV Of> CJQ.-q:?Ar,P' g \\;(j() (JO I CO(.{ f? z;e--r &I) N13: ~S5'859 c..of). ?f,-:iotxb > N13~ ~<;;t;.,:;)?JO C()rJ. 7 -fo-:;qoao 0- Surveillance Un-Satisfactory ~ s.--2.b-26'::2.f> I s;;en; 5 -z...u -u-zv $"'0 'l) (Date) (Time) (Print Name/Signature) Radiological Engineer (Date) (Time) (Print Name/Signature) C/L T Manager (Date) (Time) page 2 of 2 GL WOOD / RF YETTER / SIGN FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: 102088/C - 10221 A - 102200 - 10214A - 10220C - 10301 Survey Unit Type: Open Land C8:] Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 I 0700 Stop 09-25-2020 I 1800 Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-L T-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) 12--~32 A. J3fJI-CtA-vv /~ ',,I~ /~13 / u~ f'- 5~,rY\\ ~ GL Digitally signed by GL Wood DN: cn:Gl Wood, o=ZSRP, ou==ZSRP LRE, email=glwood-ext@energysolutions.com, W d c=US QQ Date:2020.os.2114:49:34 Approved by: _____ -04_* 00_* ___ Reason for Entry Date Time In S uWt£ I I-LA,./Ce tJ-3~*2-0 oqo-:; n )?
- (*) - This access will suffice for all activities in 10200, 12100 and 10300 survey units for the work activities specified on this attachment.
Time Out oq,s-V Page 1 of 2 FSS I&C Surveillance Summary )11-LANCE: Survey Area No.: /a/OD
== Description:== Survey Unit Type: Classification: OpenLandl:8] Class 3 D Reason for Surveillance: Semi-Annual ~ Surveillance Due Date: ,,. 9oao Survey Unit No.: 5U(Vei l{C1/4'\\cp Structure 0 Class 2 D Reason: ZS-LT-300-001-003 Revision 7 Information Use System D Class 1~ s ecial D
- 1) Review ZS-LT-300-001-003 Attachment 2, PSS Area Access Request, Authorization and Sign.-
In Sheet for authorized entries into the FSS Survey Unit-******************************************************************** g'
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit******************* ************************************************************************************************************************** ~
[,SURVEILLANCE COMMENTSANDOBSERVATIONS~ ....,.. ;.RG-Va,A..,..:... *.*: *. ",,;_rviii'D 6 / RB/tf'{~ C.OrvSiS. - Ml- &?r()to LOQcM., * ~*s;r~ wr-(H ';1057J-f.tft! o ,~ l?f}:l C{)[) 9-n 1: ;).'3/4i{)-i/44to 'J..b667J fl<. 3080 37 Cl)I) /0--9gr~o d< r /¥1.37dlll.{? Cl)p 7 ~ ~/V ~3"1/~ '30 C-()/) ,f)J,.3, / - Surveillance Un-Satisfactory (_., ~ -90..-.* i;;w ,4..BM6A-t>v I ~(ff-.q, (Print Namc"Signaturc) C/LT Technic q -"3D-2-0 /,S-06 (Date) (Time) {Print Name.'Signature) Radiological Engineer (Date) (Time) (Print Name.'Signature) C/LT Manager (Date) (Time) Page 21 of 22 Page 2 of 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: Survey Unit No.: Survey Unit Type: Open Land~ Structure 0 Work Group
Contact:
ZS-LT-300-001-003 Revision 7 Information Use System D Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. Duration: Start ~,,... -zb-*202.e> Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: d.t~ &L"'1k Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out /~~t>3 (.,, /4GAf'11'!) f>/Llc,6µ>> I ~4'410 5 wz.~, ~,.._(C,t!' ~1"),{.,,1~ ()<{~ 2,-c> to: 30 /?-9.0'??C p~G()._ S/TE#t~11/~~ SUYve, llC<n c.e ~-;-},£:> --2o~ ~ ~ IO?-O page 1 of 2
AREA SURVEILLANCE: FSS I&C Surveillance Summary ZS-L T-300-001-003 Revision 7 Information Use Survey Area No.: J :,.;J()o Survey Unit No.: J:l'i!O 3 C-c
== Description:== ~ 1----ANNU,¥ '3U vt1o1 I !1tNl:f; (,4ND ?f&:(rrl$ ft> N~SA-(3/) Survey Unit Type: Classification: Reason for Surveillance: Open Land~ Class 3 0 Semi-Annual 1Xl Surveillance Due Date: t!J<;' /2..0:J.O SURVEILLANCE ACTIVITIES: Structure 0 System D Class 2 D Class I ~ Special D Reason: Nf}-- I) Review ZS-L T-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
- ************************************************************************************************************************** ~
SURVEILLANCE COMMENTS AND OBSERVATIONS: 1 ~ S l'bRI &O SM5 -- OR. Sbm~ ~ /r-(11~ 5ur(r Ur../1-(£. ~A-Rb ~a~. tdB pcsYi tJCtt s MG frir ADJA-CG 9Jvvq VtJIT~,~ f<rq)~fv( ALL -n-te- ~ ftf.?~- POS11N&1S V&rZl(-{c--01 MY 01sc1<~pA-tJcc~ Ff>VND I c.o Rf-Zr.er-so 0- Surveillance Un-Satisfactory (Date) (Time) (Print Name/Signature) Radiological Engineer (Date) (Time) (Print Name/Signature) C/L T Manager (Date) (Time) page 2 of 2 GL Wood / RF Yetter / FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-L T-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: I 0208B/C - 10221 A - I 0220G - 10214A-10220C - 10301 Survey Unit Type: Open Land~ Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 / 0700 Stop 09-25-2020 I 1 soo Access Controls Required:
- 1. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) /J--UJ3> C. A, gµcjA1)1> I~~ t 9.-aoS1c f~ ~,v;ri-1 /~~ GL Digitally signed by Gl Wood ON: cn=Gl Wood, o=ZSRP, ou=ZSRP LRE, email=glwood* ext@energysolutioos.com, W d c:::US 00 Oatec2020.08.2114,49'34 Approved by: _____ -04_* 00_* ___ Reason for Entry Date Time In 'Gvvt4!IU.A/.IC<; 9-30-').o oq,~ 11 ~, tt
- (*) - This access will suffice for all activities in 10200, 12100 and I 0300 survey units for the work activities specified on this attachment.
Time Out Otj:3D H Page 1 of 2 FSS l&C Surveillance Summary ZS-LT-300-001-003 . Revision 7 Information Use Survey Area No.: L:JI(;() Survey Unit No.: /;'J:J.03C
== Description:== ~ VYVei I la. l-1 c.e Survey Unit Open Land~ Structure D System D Type: Classification: Class 3 D Class20 Class 1 ~ Reason for Surveillance: Semi-Annual ~ Special 0 Surveillance Due Date: OCJ,;)o~O Reason: ~ l :-:~ I\\ ~: ~ t t I r I'*; d I ) -~ .. ~ 1.... ~
- i
.. n, ":...._ ~-.. ~- -.-,
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign.-
In Sheet for authorized entries into the FSS Survey Unit******************************************************************** r:g*
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit**********-******************************************************************************************************************************** ~
-;)./, ~3?0-; /0,,;).8..Jxo ~a1 ~ fi,12, s/111 ;\\ '?JV ~~o ct)O -a 1~ I 0- Surveillance Un-Satisfactory 3Q.--JO 1~0'7 CJ - ?x>-2--0 I 5o'o (Date) (Time) (Prill Namc'Sipatle) Radiological Engineer (Date) (Time) (Prim Name.'Sigmturc) C/LT Manager (Date) (Time) Page21 of22 Page 2 of 2 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No.: / 1. 'J. 00 Survey Unit No.: Survey Unit Type: Open Land~ Structure D Work Group
Contact:
ZS-LT-300-001-003 Revision 7 Information Use System D Description of Planned Activities: FSS technician performing Semi-annual Surveillance survey for this survey unit. Duration: Start {:; ---'2,b-2£> ZD Stop s--26-2-DZB Access Controls Required:
- l. FSS technician will brief/sign on the Attachment 2 this procedure ZS-LT-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Approved by: {i3/4 ~k Survey Name Reason for Entry Date Time Time Unit# (Print/Sign) In Out I )'-tJ'\\" J.~~p;-ro 131U01tvO /?{6.-,; '- 5.tt!W ~ I lWn-lt., s/u;/UJU W !2--D /0: 3D /-)9, D3Y'; PG'f~ ~NI~ //Ji;f?-j-_ 5u vv*o-tl I/fr/ c-r:- !;:-2b -"2cr2. 08o<Q) lo~ page 1 of 2
AREA SURVEILLANCE: FSS l&C Surveillance Summary ZS-L T-300-001-003 Revision 7 Information Use SurveyAreaNo.: J;).;)..Oc) SurveyUnitNo.: /2.ito3 D
== Description:== .5-&m', fW;t/Vfrl 5vY\\/r;-tl/1rr1a;;{;+-rvo ~1Ali1. As NGCG-S:-?ffgy) Survey Unit Type: Classification: Reason for Surveillance: OpenLandg.. Class 3 D Semi-Annual i'xl' Surveillance Due Date: t'JS /,._, o ?,., SURVEILLANCE ACTIVITIES: Structure D System D Class 2 D Class I~ Special D Reason: 1\\/,4-
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.
SURVEILLANCE COMMENTS AND OBSERVATIONS: Vb!<.t~U) S,rriSfttC,'(oR ~ fr11 G:/CtVG. ,....,.,c-...,,,,tJlAS PrR:G frf AO Ae@rr S 11-tfrf R S M~. rosn N &s VG-Rc8 ~, A-NY D1 sCR~@ANCf ~ r;o o(IJ fJ, CIJAA een;.f). ~3$0 SIN ~(?bfh PR3lt75b coo, fo-;;.g-,':).o'J.-0 ~ ~?:>>D '/\\J~Ol/71</si >/t3b39// CUJ. Cj-/9..;)o~o 0- Surveillance Un-Satisfactory 6.),.0 ~ ->-<; UU> /S-t,>D (Date) (Time) (Print Name/Signature) Radiological Engineer (Date) (Time) (Print Name/Signature) C/L T Manager (Date) (Time) page 2 of 2 GL WOOD / RF YETTER / FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: Survey Area No,: l "-P(J o Survey Unit No.: Survey Unit Type: Open Land [Rl Work Group
Contact:
~ck l"1 "e IIM Description of Planned Activities: 5v~v ~~1,1..~,.,e£. Duration: Start f h / ~* Access Controls Required: H"" + {,,., F-'4s-k_ Survey Name Unit# (Print/Sign) Structure 0 Reason for Entry tl.>-o JO /YJlf~fr C,,,~&h,11,t,Ae ~ a IS11.-t "'1-Sll,~&L I ZS-L T-300-001-003 Revision 6 Information Use System 0 Date Time Time In Out , /7 hJ, ~755 ofjo ?~~f'i-3 \\,.., ~ ~lhll\\ ~ ~brl{Ge.) ~ 1 +35
AREA SURVEILLANCE: FSS l&C Surveillance Summary ZS-LT-300-001-003 Revision 6 Information Use Survey Area No.: 12000 Survey Unit No.: 12203D
== Description:== Survey Unit Type: Classification: Under Service Building and South East Yard Open LandX Class 3 D Structure D Class 2 D Reason for Surveillance: Semi-Annual D System D Class I X Special X Surveillance Due Date: A/ll>- Reason: Soil Erosion SURVEILLANCE ACTIVITIES:
- 1) Review ZS-LT-300-001-003 Attachment 2, FSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit----*---------------------------------------------------------------
X
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.--------------------------* * ----*------------------------------------------------* ----------------------------------------* -------------
X SURVEILLANCE COMMENTS AND OBSERVATIONS: Gamma scan area in and around erosion area including concrete and wood. No alarms detected. Samples Ll-12203 D-VJGS-002-SS and L 1-12203 D-V JGS-003-SS taken inside of erosion area. Samples L 1-12203 D-VJ GS-004-SS and Ll-12203D-VJGS-005-SS taken on perimeter of erosion area. See addendum I map X-Surveillance Satisfactory I D-Surveillance Un-Satisfactory (Date} (Time) (Date) (Time) ,_,,.*-Zt;:, (Print Na Si ture) C/LT Manager (Date) 1'c- 'h, W v~-r1t o vJ\\ vt1'.. (Time)
0 II) co ~ 0 0) It') +35
Analysis Report for 08-Jan-20-10002 L 1-12203D-VJGS-003$S Nuclide Id Energy Name Confidence (keV) Bi-214 1.00 806.18 934.06 1120.29 1155.21 1238.12 1280.98 1377. 67 1385.31 1401.52 1407.99 1509.21 1661.27 1729.59 1764.49 1847.43 2118. 51 Pb-214 . 00 241. 99 295.22 351.93 785.96 Ac-228 0.99 129.07 209.25 270.24 328. 00 338.32 409.46 463.00 794. 95 911. 20 964.77 968.97 1588.20
- = Energy line found in the spectrum.
- = Manually added nuclide. ? = Manually edited nuclide. @ = Energy line not used for Weighted Mean Activity Energy Tolerance : 1.000 keV Nuclide confidence index threshold = 0.30 Errors quoted at 1.000sigma 1/8/2020 4:24:38PM Page 3 of7 Yield(3/4) Activity Activity (pCilgrams) Uncertainty
- 1. 26 3.11 14.92 1.63 5.83
- 1. 43 3.99 0.79
- 1. 33 2.39 2.13 1.05 2.88 15.30 2. 03 1.16 7.25 18.42 3.50E-01 6.04E-02 35.60 2.92E-01 4.13E-02 1.06 2.42 3.89 3.46 2.95 11.27 2.88E-01
- 9. llE-02
- 1. 92 4.40 4.25 25.80 2.45E-01 4.59E-02 4.99.
15.80 3.22 INTERFERENCE CORRECTED REPORT
Analysis Report for 08-Jan-20-10002 X ? = X = L 1-12203D-VJGS-003SS Nuclide Nuclide Name Id Confidence An Pk 0.976 K-40 0.979 Tl-208
- 0. 991 Bi-211 0.895 Pb-212
- 1. 000 Bi-214
- 1. 000 Pb-214
- 1. 000 Ac-228 0.999 nuclide is part of an undetermined solution nuclide rejected by the interference analysis 1/8/2020 Wt mean Activity (pCl/grams)
- 4. llE-02 5.74E+OO l.13E-01 2.45E-01 2.25E-01
- 3. llE-01 2.54E-01
@ = nuclide contains energy lines not used in Weighted Mean Activity Errors quoted at 1.000sigma 4:24:38PM Page 4 of7 Wt mean Comments Activity Uncertainty l.17E-02 4.66E-01 1. 91E-02 3.66E-02 3.73E-02 3.41E-02 4.lOE-02
1/8/2020 4:24:38PM Analysis Report for 08-Jan-20-10002 + + L 1-12203D-VJGS-003S$ Peak Locate Performed on Peak Locate From Channel Peak Locate To Channel Peak No. Energy (keV) All peaks were identified. M = First peak in a multiplet region m = Other peak in a multiplet region F = Fitted singlet Errors quoted at 1.000sigma UNIDENTIFIED PEAKS
- 1/8/2020 4:24:29PM
- 120
- 8192 Peak CPS(0/4)
Peak Size (CPS) Uncertainty Peak Type NUCLIDE MDA REPORT Nuclide Library Used
- C:\\Canberra\\Apex\\Root\\Default\\Library\\ZION LIB-BNL.NLB Nuclide Energy Yield(%)
Activity NuclideMDA LineMDA Name (keV) (pCUgrams) (pCilgrams) (pCi/grams) An Pk 511. 00 100.00
- 4. llE-02 3.35E-02 3.35E-02 BE-7 477. 60 10.44 1.61E-01 4.04E-01 4.04E-01 K-40 1460.82 10.66 5.74E+OO 5.33E-01 5.33E-01 Mn-54 834.85 99.98
-6.97E-03 4.33E-02 4.33E-02 Co-60 1173.23 99.85 -3. 65E-02
- 5. 30E-02
- 5. 30E-02 1332.49 99.98 3. 46E- 02 6.0lE-02 Nb-94 702.65 99.81
-1. 16E-03
- 4. 3 5E-02
- 4. 52E- 02 871.09 99.89
- 1.52E- 02 4.35E-02 Ag-108m
- 79. 13 6.60
- 1. 51E+00 4.7 9E-02 2. 16E+OO 433. 94 90.50 9.0 3E-03 4.79E-02 614.28 89.80
-4.58E-03 6.45E-02 722. 94 90.80 3.32E-02 5.50E-02 Sb-125 17 6.31 6.84 -2.84E-01
- 1. 2 9E-01 5.35E-01 380. 45
- 1. 52
-1.15E-01 2.76E+OO 427.87 29.60 -4.58E-02 1.29E-01 463.36 10.49 - ?..09E-03 4.03E-01 600.60
- 17. 65
-2.69E-01 2.44E-01 606. 71 4.98 2.88E+OO l. 61E+OO 635. 95
- 11. 22
- 8.22E-02 3.59E-01 Page5 of7 Tolerance Nuclide r>./~ \\ ~ ~35
1/8/2020 4:24:38PM Page6 of7 Analysis Report for 08-Jan-20-10002 L 1-12203D-VJGS-003S8 Nuclide Energy Yield{%) Activity Nuc/JdeMDA LineMDA Name (keV) (pCUgrams) {pCl/grams) (pCl/grams) Sb-125 671. 44
- 1. 79 -l.89E-01
- 1. 29E-01 2.34E+OO Ba-133 79.61 2.65
-4.30E-01 8.20E-02 5.06E+OO
- 81. 00 32.90
-1. 42E-Ol 3.55E-Ol 276.40 7.16 2.17E-01 5.03E-Ol 302. 85 18.34 4. 45E-02 2.15E-01 356.01 62.05 -l.13E-Ol 8. 20E-02 383.85 8.94 -4.80E-01 4.19E-Ol Cs-134 475.36
- 1. 48 8.88E-01 5. 66E-02 2.86E+OO 563.25 8.34 6.87E-04 5.0lE-01 569.33 15.37 4.20E-02 2.77E-Ol 604. 72 97.62
-5. 72E-02 7. 61E-02 795. 86 85.46 1. 67E-02 5.66E-02 801. 95 8.69 -8.56E-02 4.84E-01 1038.61 0.99 -4.62E-01 5.06E+OO 1167. 97
- 1. 79 2. 52E+OO 3.37E+OO 1365.19 3.02
-6.00E-02
- 1. 56E+OO Cs-137 661. 66
- 85. 10 5.47E-02 5.88E-02 5. 88E-02 Eu-152 121. 78
- 28. 67
-2.71E-02 l.28E-Ol l. 64E-01 244.70 7.61 l.93E-01 6.12E-01 295.94 0. 45 6.85E+OO l.03E+Ol 344. 28 26.60 -1. 16E-02
- 1. 28E-Ol 367. 7 9 0. 86
-9.92E-01 4.41E+OO 411.12 2.24 6.09E-01 l. 77E+OO 443.96 2.83 8.05E-01 l.54E+OO 488.68
- 0. 42 1.21E+00 9.60E+OO 563.99 0.49 5.82E+OO 8. 94E+OO 586.26 0. 46
-1.13E+OO 1.59E+Ol 678. 62
- 0. 47 7. 57E+OO 9. 06E+OO 688. 67
- 0. 86
-2.97E+OO 5. 26E+OO 719.35
- 0. 28 9. 59E+OO l. 43E+Ol 778.90 12.96 1.0lE-01 3.67E- 01 810.45 0.32
-4.26E+OO l. 26E+Ol 867.37 4.26 -5.33E-01 l. 04E+OO 919. 33
- 0. 43 4.32E+OO
- 1. 32E+Ol 964. 08
- 14. 65 2.99E-01 4. 76E-01 1085. 87 10.24
-8.78E-02 5.03E-Ol 1089.74
- 1. 73
-1. 09E+OO 3. lOE+OO 1112. 07 13.69 -2.18E-Ol 3.97E-Ol 1212.95 1.43 -1. 96E+OO 4. 68E+OO 1249.94 0.19 -2. 43E+Ol 2.79E+Ol 1299.14
- 1. 63
-1. 68E+OO 2. 79E+OO 1408. 01
- 21. 07 9. 36E- 02 1.92E- 01 1457. 64
- 0. 50 1.10E+02 4.00E+Ol 1528. 10 0.28 1.33E-01 1.45E+Ol Eu-154 123. 07 40.40
- 1. 38E-02 1.19E-01 1. 19E- 01 247.93 6.89
-8.48E-02 5.85E- 01 591. 76 4.95 8.02E-02 8. 13E- 01 692.42
- 1. 78 l. 73E+OO 2. 73E+OO 723. 30 20.06 8.32E-02 2.46E-Ol 756.80 4.52
- 6.77E- 01 9.50E-01 873. 18 12.08 - 7. 40E-03 3.76E-01 "0.1~ \\'7~3S
1/8/2020 4:24:38PM Page 7 of? Analysis Report for 08-Jan-20-10002 L 1-12203D-VJGS-003$S Nuclide Energy Yield(%) Activity NuclldeMDA LineMDA Name (keV) (pCl/grams) (pCUgrams) (pCl/grams) Eu-154 996.29 10.48 5.42E-01 l.19E-01 5.36E-01 1004.76 18.01 8.64E-02 2.94E-01 1274.43 34.80 -1.82E-01
- 1. 53E-01 1596.48 1.80
-2. 49E-01 2.73E+OO Eu-155 45.30
- 1. 31
- 1. l 6E+OO 2. 69E-01 3.16E+Ol 60.01 l._22 1. 07E+Ol 3.12E+Ol 86.55 30.70
-7. 07E-03 2.76E-01 105. 31 21.10 -5. 69E-02 2.69E-01 Ra-226 186.21 3.64 6.97E-01
- 1. 23E+OO
- 1. 23E+OO Pa-231 27.36 10.30 3. 70E+OO
- 1. SOE+OO 3.57E+OO 283.69
- 1. 70
-1.22E+OO 2.0lE+OO 300.07 2.47 8. 41E-Ol
- 1. 50E+00 302.65 2.20 1.33E+OO 1. 81E+OO 330.06
- 1. 40 2.55E+OO 3.14E+OO U-235 143.76 10. 96 l.74E-01 7. 67E-02 4.36E-01 163.33 5. 0-8 9.31E-02 8.06E-01 185. 71 57.20 7.96E-03 7.67E-02 202.11 1.08 7.29E-01 3.93E+OO 205.31 5.01
-3.97E-01 7.90E-Ol Am-241 59.54 35.90 4.BOE-01 1.12E+OO 1.12E+OO + = Nuclide identified during the nuclide identification
- Energy line found in the spectrum
= MDA value not calculated @ = Half-life too short to be able to perform the decay correction ? = CAUTION: MDA value is inconsistent with Currie MDA at 95% confidence level
60 55 50 45 40 35 V) .µ C: =-8 30 25 20 15 10 5 z t ~ 9 ~ ~ ';-' ~. V I I I I' I of I 'I II I I I I 0 1 1000 ...0 1- ~ w ROI Type: 1 V'\\ 2000 C> ~ 2 i::i I ~ 3000 0000082378.CNF II I I I I I I 4000 channel I u i 5000 live Time :900.000 sec Real Time :901.410 sec Start: 1: -0.0(kev) Stop : 8192:2047.4(keV) Acq. start :wed Jan 08 16:09:24 2020 Si! 1111 VI\\ a in wmum,u YI II ]11\\lj(]V~1 lrnl/JfAIJ UYYIIII I 6000 7000 wt )6/j' lll!I IIY\\llfll 8000
1/8/2020 4:24:59PM Analysls Report for 08-Jan-20-10003 L 1-12203D-VJGS-004SS GAMMA SPECTRUM ANALYSIS Sample Identification Sample Description Sample Type Unit Sample Point Sample Size Facility Sample Taken On Acquisition Started Procedure Operator Detector Name Geometry Live Time Real Time Dead Time Peak Locate Threshold Peak Locate Range (in channels) Peak Area Range (in channels) Identification Energy Tolerance Energy Calibration Used Done On Efficiency Calibration Used Done On Efficiency Calibration Description Sample Number Fill Height Certificate Name Certificate Date Peak Analysis Performed on
- 08-Jan-20-10003
- L 1-12203D-VJGS-004$S
- Soil
- 1. 731 E-+03 grams
- Default
- 117/2020 8:20:00AM
- 1/8/2020 4:09:30PM
- 130G_SOIL_1
- Administrator
- P11314
- 130G_SOIL_ 1
- 900.0 seconds
- 900.3 seconds
- 0.03 %
- 3.00
- 120 - 8192
- 120- 8192
- 1.000 keV
- 11/4/2019
- 1/8/2020
- 82379
- 1731.44 gram
- Eu 155-Na22
- 12/22/2008 12:00:00PM PEAK ANALYSIS REPORT 1/8/2020 4:24:S0PM Peak Analysis From Channel Peak Analysis To Channel
- 120
- 8192 Page l of7
Analysis Report for 08-Jan-20-10003 L 1-12203D-VJGS-004SS Peak Energy ROI No. (keV) start 1 238.64 948 - 2 338.30 1347 - 3 351.88 1399 - 4 583.19 2324 - 5 608.92 2426 - 6 1459.86 5826 - M = First peak in a multiplet region m = Other peak in a multiplet region F = Fitted singlet Errors quoted at 1.000sigma ROI end 959 1360 1413 2335 2442 5848 Peak Centroid 954.13 1352. 28 1406.52 2330.87 2433. 72 5837.37 No background subtract performed on this spectrum. 1/8/2020 4:24:59PM Page 2 of7 Net Peak Net Area Continuum FWHM Area Uncertainty Counts (keV)
- 1. 51E+02 16.78 5.15E+Ol 0.84 4.08E+Ol 8.99 1.42E+Ol
- 1.14 1.09E+02 13.36 2.43E+Ol 1.01 4.32E+Ol
- 8. 52 1.18E+Ol 1.44 8.02E+Ol 10.70
- 1. 08E+01 1.20 3.68E+02
- 19. 76 5.75E+OO
- 1. 79 NUCLIDE /DENT/FICA TION REPORT Nuclide Library Used
- C:\\Canberra\\Apex\\Root\\Default\\Library\\ZION UB-BNL.NLB IDENTIFIED NUCLIDES Nuclide Id Energy Yield(%)
Activity Activity Name Confidence (keV) (pCilgrams) Uncertainty K-40 0.86 1460.82 10.66
- 7. 99E+OO 5.52E-01 Tl-208
- 1. 00 583.19 85.00 6.34E-02
- 1. 31E-02 Bi-211 0.90 351.07 13.02 7. 31E-01 1.07E-01 Pb-212 1.00 115.18 0.60 238. 63 43.60 2.36E-01 3.23E-02 300.0 9 3.30 Bi-214
- 0. 99 609.32 45.49 2.26E-01
- 3. 31E-02 768. 36 4. 89 806.18 1.26 934. 06 3. 11
- ~~
d-1 IY\\- 3S 1120.29 14.92
Analysis Report for 08-Jan-20-10003 L 1-12203O-VJGS-004SS Nuclide Id Energy Name Confidence (keV) Bi-214 0.99 1155.21 1238.12 1280.98 1377.67 1385.31 1401.52 1407.99 1509.21 1661.27 1729.59 1764.49 1847.43 2118.51 Pb-214 0.51 241. 99 295.22 351. 93 785.96 Ac-228 0.57 129.07 209.25 270.24 328.00 338.32 409.46 463.00 794.95 911.20 964.77 968.97 1588.20
- = Energy line found in the spectrum.
- = Manually added nuclide.
? = Manually edited nuclide. @ = Energy line not used for Weighted Mean Activity Energy Tolerance : 1.000 keV Nuclide confidence index threshold = 0.30 Errors quoted at 1.000sigma 1/8/2020 4:24:59PM Page3 of7 Yield(%) Activity Activity (pCilgrams) Uncertainty 1.63 5.83
- 1. 43 3.99 0.79
- 1. 33 2.39 2. 13 1.05 2.88 15.30 2.03 1.16 7.25 18.42 35.60 2. 68E-01 3.92E-02 1.06 2.42 3.89 3.46 2.95 11.27 3. 08E-01 7.24E-02
- 1. 92 4.40 4.25 25.80 4.99 15.80 3.22 INTERFERENCE CORRECTED REPORT
1/8/2020 4:24:59PM Page4 of7 Analysis Report for 08-Jan-20-10003 L 1-12203D-VJGS-004$S Nuclide Nuclide Wt mean Wt mean Comments Name Id Activity Activity Confidence (pCilgrams) Uncertainty K-40 0.862 7.99E+OO 5.52E-01 Tl-208
- 1. 000 6.34E-02
- 1. 31E-02
? Bi-211 0.901 7.31E-01 l.07E-01 Pb-212
- 1. 000 2.36E-01 3.23E-02 Bi-214 0.990 2.26E-01 3.31E-02
? Pb-214 0.512 2.68E-01 3.92E-02 Ac-228 0.574 3.08E-01 7.24E-02 ? nuclide is part of an undetermined solution X = nuclide rejected by the interference analysis @ = nuclide contains energy lines not used in Weighted Mean Activity Errors quoted at 1.000sigma
1/8/2020 4:24:59PM Analysis Report for 08-Jan-20-10003 + L 1-12203D-V JGS-0045S Peak Locate Performed on Peak Locate From Channel Peak Locate To Channel Peak No. Energy (keV) All peaks were identified. M = First peak in a multiplet region m = Other peak in a multiplet region F = Fitted singlet Errors quoted at 1.000sigma UNIDENTIFIED PEAKS
- 1/8/2020 4:24:S0PM
- 120
- 8192 Peak CPS {°/a)
Peak Size (CPS) Uncertainty Peak Type NUCLIDE MDA REPORT Nuclide Library Used
- C:\\Canberra\\Apex\\Root\\Default\\Library\\ZION LIB-BNL. NLB Nuclide Energy Yield{3/4)
Activity NuclideMDA LineMDA Name (keV) (pCi/grams) (pCl/grams) (pCilgrams) An Pk 511.00 100.00 1.24E-02 5.04E-02 5.04E-02 BE-7 477.60
- 10. 44 1.74E-01 4.24E-01
- 4. 2 4E-01 K-40 1460. 82 10. 66 7. 99E+00
- 4. l0E.-01 4.l0E-01 Mn-54 834. 85 99. 98 l. 36E-02 4.64E-02 4.64E-02 Co-60 1173.23 99.85
-7. 27E-03 4.64E-02 6.46E-02 1332. 49 99.98 -2.27E-02 4.64E-02 Nb-94 702.65 99.81 -3.36E-02 4. 65E- 02 4.65E-02 871.09 99.89 -4.80E- 03 4.69E-02 Ag-108m 79.13 6.60 6.17E-01 4.35E-02
- 1. 20E+00 433.94
- 90. 5 0
-8.07E-04 4.35E-02 614.28 89.80 8.62E- 03 5.39E-02 722.94 90.80 -9. 26E-03 5.39E-02 Sb-125 176.31 6.84 7.39E-02
- 1. 12E-01 4.76E-01 380.45
- 1. 52 3. llE-02 2.39E+00 42 7.87 29.60
-6.04E-02 l.12E-01 463.36 10.49 2.16E-01 4.00E-01 600.60 17. 65 -1.40E- 01 2.13E-01 606.71 4.98
- 1. 82E+00 1.37E+00 635. 95
- 11. 22
-3. 32E-02 3.38E- 01 Page 5 of7 Tolerance Nuclide ~~ ~'{....\\-65
1/8/2020 4:24:59PM Page 6 of7 Analysis Report for 08-Jan-20-10003 L 1-12203D-VJGS-004SS Nuclide Energy Yield(%) Activity NuclideMDA LineMDA Name (keV) (pCilgrams) (pCilgrams) (pCi/grams) Sb-125 671. 44
- 1. 79
~1.23E+OO 1.12E-01 2.30E+OO Ba-133 79.61 2.65 -1. 78E-01 7.07E-02 2.86E+OO
- 81. 00 32.90
-3. 90E-01 l. 91E-01 276.40 7.16 8. 69E-02 4. 69E-01 302.85 18.34 9.89E-02 2. 03E-01 356.01 62. 05 -2.31E-02
- 7. 07E-02 383.85 8.94
-2.22E-01 3. 91E-01 Cs-134 475.36
- 1. 48 2.12E+OO 4. 47E-02 3. 16E+00 563.25 8.34
-5.81E-01 5.38E-01 569.33 15.37 -6. llE-02 2.56E-01 604. 72 97.62 -l.56E-02 6.37E-02 795.86 85.46 8.99E-04 4.47E-02 801.95 8.69
- l. 90E-01 4.86E-01 1038.61 0.99 9.29E-02 4.81E+OO 1167. 97
- 1. 79
-8.21E-01 3.68E+OO 1365.19 3.02 -1. 33E+00 l.26E+OO Cs-137 661.66 85. 10 3. 13E-02 5.54E-02 5.54E-02 Eu-152 121. 78 28. 67 7.51E-02
- 1. 08E-01
- 1. 27E-01 244.70 7.61
-2.27E-01 5.22E-01 295.94 0.45 -2.84E+OO 9.23E+OO 344.28
- 26. 60
-1. 74E-01
- 1. 08E-01 367.79 0.86 3.29E-01 4.lOE+OO 411.12 2.24
-7. 72E-01 1.53E+OO 443.96 2.83 -1.38E-01 1.33E+00 488.68 0.42 -1.96E+OO 7.18E+00 563.99 0.49 -5.19E+OO 8.96E+OO 586.26 0.46 -1.53E+Ol
- 1. 21E+Ol 678.62 0.47
-1.40E+OO 8.53E+OO 688.67 0.86 -2.23E+OO 4.44E+OO 719. 35 0.28 -8.67E+OO
- 1. 52E+Ol 778. 90
- 12. 96 2.89E-02 3.35E-01 810.45
- 0. 32
-3.39E+OO l.49E+01 867.37
- 4. 26
-l.51E-01 l.04E+00 919.33
- 0. 43 2.18E+OO 1.12E+Ol 964.08 14.65 l.65E-01 3.78E-01 1085.87 10.24
-5.30E-02 5.46E-01 1089.74
- 1. 73
-1. 09E+00 3.09E+00 1112. 07 13.69 -1. 76E-02 4.27E-01 1212.95
- 1. 43
-2. 34E+OO 4.68E+OO 1249.94
- 0. 19 6.75E+00 3.34E+Ol 1299.14
- 1. 63
-1.92E-02 3.75E+OO 1408.01
- 21. 07
- 1. 07E-01 2.29E-01 1457.64 0.50
- 1. 68E+02 4.42E+Ol 1528.10 0.28 2.55E+OO 9.51E+00 Eu-154 123.07 40.40 8.35E-02 9.05E-02 9.05E-02 24 7. 93 6.89 2.lSE-01 5. 16E-01 591.76 4.95 3.0lE-01 8.25E-01 692. 42
- 1. 78
-8.67E-01 2.23E+OO 723.30 20.06 3.35E-02 2.41E-Dl 756.80 4.52 -7. 34E-01 8.83E-D1 ?~ d.s.{3 5 873.18 12.08 - 6.42E-02 3.88E-01
1/8/2020 4:24:59PM Page 7 of7 Analysis Report for 08-Jan-20-10003 L 1-12203D-VJGS-004SS Nuclide Energy Yield(%) Activity NuclideMDA LineMDA Name (keV) (pCi/grams) (pCilgrams) (pCilgrams) Eu-154 996.29 10.48 -9.09E-02
- 9. 05E-02
- 4. 42E-01 1004.76 18.01 8.0lE-02 2. 68E-01 1274. 43 34.80 9.19E-02 1.70E-01 1596.48
- 1. 80
- 1. 52E+OO 2.59E+OO Eu-155 45.30
- 1. 31 2.66E+00 1.94E-01
- 1. 21E+Ol
- 60. 01
- 1. 22
-4.38E+OO 1.29E+Ol 86.55 30.70
- 1. 20E-01
- 2. llE-01 105.31 21.10
- 8. llE-02 l.94E-01 Ra-226 186. 21 3.64 4.76E-01 l.03E+OO l.03E+OO Pa-231 27.36
- 10. 30
- 1. 63E+00 1.36E+00 l. 46E+00 283.69
- 1. 70
-1. 71E+OO l.97E+00 300.07 2.47 -2.16E+OO l.36E+00 302.65 2.20
- 7. llE-01 1.70E+OO 330.06
- 1. 40 7.43E-01 2.61E+OO U-235 143.76 10.96 l.45E-Ol 6.52E-02 3.30E-01 163.33 5.08
-1.58E-01 6.57E-01 185.71 57.20 4.37E-03 6.52E-02 202.11 1.08 -2.97E+00 2.82E+OO 205.31 5.01 -4.53E-01 6.13E-01 Am-241 59.54 35.90 -1.59E-01 4, 42E-01 4.42E-01 + = Nuclide identified during the nuclide identification = Energy line found in the spectrum > = MDA value not calculated @ = Half-life too short to be able to perform the decay correction ? = CAUTION: MDA value is inconsistent with Currie MDA at 95% confidence level
60 55 so. ~ t ~ I 45 40 35 VI ~ C: 8 30 J 20 15 10 ~ ~ ~ ~ I ~ 00 = ~ r:. ~ 7 ~ 0000082379.CNF Live Tilt! :900.000 sec Real Time :900.260 sec start: 1: -0.0(kev) Stop : 8192:2047.B(kev) Acq. start :wed )an 08 16:09:30 2020 I n11mmrno,, \\ Wll\\l) u /INHll)!!IJM ) I ~IJ~ I I\\ M 11\\l()Am 5 ,.,...... *-* 'f. I I I I "OY" ""' "" *ir** I I ~ I """. I.
- f I
I 'V "' I I I e 1 1 1 1 1 1 ~ 0 ti I I I I I ~ ~ u.> U'! ~ ROI Type: 1 1000 2000 3000 4000 channel 5000 6000 7000 /i\\lil I AA\\I) IIM\\M 1mn IU 8000
1/8/2020 4:24:51PM Analysis Report for 08-Jan-20-10004 L 1-122D3D-VJGS-005SS GAMMA SPECTRUM ANALYSIS Sample Identification Sample Description Sample Type Unit Sample Point Sample Size Facility Sample Taken On Acquisition Started Procedure Operator Detector Name Geometry Live Time Real Time Dead Time Peak Locate Threshold Peak Locate Range (in channels) Peak Area Range (in channels) Identification Energy Tolerance Energy Calibration Used Done On Efficiency Calibration Used Done On Efficiency Calibration Description Sample Number Fill Height Certificate Name Certificate Date Jan-20-1 0004
- L 1-12203D-VJGS-005SS
- Soil
- 1. 756E+03 grams
- Default
- 1/7/2020 8:23:00AM
- 1/8/2020 4:09:37PM
- 130G_SOIL_1
- Administrator
- 352
- 130G_SOIL_1
- 900.0 seconds
- 900.3 seconds
- 0.03%
- 3.00
- 120- 8192
- 120-8192
- 1.000 keV
- 11/4/2019
- 1/8/2020
- 82380
- 1755.71 gram
- Eu155-Na22
- 1/7/2013 12:00:00PM PEAK ANALYSIS REPORT Peak Analysis Performed on
- 1/8/2020 4:24:42PM Peak Analysis From Channel Peak Analysis To Channel
- 120
- 8192 Page 1 of?
Analysis Report for 08-Jan-20-10004 L 1-12203D-VJGS-005SS Peak Energy ROI ROI No. (keV) start end 1 238.62 948 - 961 2 295.11 1174 - 1187 3 338.47 1349 - 1360 4 351. 89 1401 - 1415 5 4 77. 60 1903 - 1917 6 583.24 2323 - 2339 7 609.21 2428 - 2445 8 911.26 3637 - 3651 9 968.95 3869 - 3880 10 1460.64 5832 - 5854 M = First peak in a multiplet region m = Other peak in a multiplet region F :a Fitted singlet Errors quoted at 1.000sigma Peak Centroid 954.95 1180. 66 1353. 92 1407. 56 1909.96 2332.29 2436.09 3644.06 3874.85 5842. 92 No background subtract performed on this spectrum. 1/8/2020 4:24:51PM Page 2 of7 Net Peak Net Area Continuum FWHM Area Uncertainty Counts (keV) l.47E+02 19.92 8.82E+Ol 0.87 3.98E+Ol 12.30 4.02E+ 01 0.87 3.07E+01 9.72 2.53E+ 01 1.06 9.32E+Ol
- 12. 94 2.58E+Ol
- 1. 35 4.37E+Ol 9.44
- 1. 53E+01 1.27 6.02E+Ol
- 10. 02
- 1. 28E+01 1.15
- 9. 71E+01 10.96
- 6. 93E+OO 0.84 3.50E+Ol 8.50 l. 30E+Ol
- 1. 61 2.43E+01 6.64 7.70E+OO
- 0. 5 9 2.49E+02 16.48
- 5. 75:E+OO
- 2. 24 NUCLIDE /DENT/FICA TION REPORT Nuclide Library Used
- C:\\Canberra\\Apex\\Root\\Default\\Library\\ZION LIB-BNL.NLB IDENTIFIED NUCLIDES Nuclide Id Energy Yield('1/4)
Activity Activity Name Confidence (keV) (pCilgrams) Uncertainty BE-7 1.00 477.60 10.44 4.44E-01 1.0lE-01 K-40 0.99 1460.82 10.66 5.04E+OO 3. 99E-01 Tl-208 0.99 583.19 85.00 8.39E-02 1.48E-02 Pb-212 1.00 115. 18 0.60 238.63
- 43.60 2. 2 5E- 01 3. 5 6E-02 300.09 3.30
~~ d.l\\~35" Bi-214 0.99 609.32
- 45.49 2.60E-01
- 3. 32E- 02
Analysis Report for 08-Jan-20-10004 L 1-12203D-VJGS-00SSS Nuclide Id Energy Name Confidence (keV) Bi-214
- 0. 99 768.36 806.18 934. 06 1120. 29 1155. 21 1238.12 1280.98 1377.67 1385. 31 1401.52 1407.99 1509.21 1661.27 1729.59 1764.49 1847. 43 2118. 51 Pb-214 0.99 241.99 295.22 351. 93 785.96 Ac-228 0.99 129.07 209.25 270. 24 328.00 338.32 409.46 463.00 794.95 911. 20 964.7 7 968.97 1588.20
- = Energy line found in the spectrum.
- = Manually added nuclide. ? = Manually edited nuclide. @ = Energy line not used for Weighted Mean Activity Energy Tolerance : 1.000 keV Nuclide confidence index threshold = 0.30 Errors quoted at 1.000sigma 1/8/2020 4:24:51PM Page 3 of7 Yield(%) Activity Activity (pCJ/grams) Uncertainty 4.89 1.26 3.11 14. 92
- 1. 63 5.83 1.43 3.99 0.79
- 1. 33
- 2. 39 2. 13 1.05 2.88 15.30 2. 03
- 1. 16 7.25 18.42
- 1. 62E-01 5.17E-02 35.60 2.22E-01 3.55E-02
- 1. 06 2.42 3. 89 3.46 2. 95 11.27
- 2. 25E-01 7.34E-02
- 1. 92 4.40 4.25 25.80 2. 15E-01 5. 30E-02 4.99
- 15. 80 2.53E-01 7.0lE-02 3.22
- INTERFERENCE CORRECTED REPORT
Analysis Report for 08-Jan-20-10004 X ? = X = L 1-12203D-VJGS-005$S Nuclide Nuclide Name Id Confidence BE-7
- 1. 000 K-40
- 0. 995 Tl-208 0. 999 Bi-211 0.898 Pb-212
- 1. 000 Bi-214 0.999 Pb-214 0.999 Ac-228 0.999 nuclide is part of an undetermined solution nuclide rejected by the interference analysis 1/8/2020 Wt mean Activity (pCilgrams) 4.44E-01 5.04E+00 8.39E-02 2.25E-01 2.60E-01 2.03E-01 2.28E-01
@ = nuclide contains energy lines not used in Weighted Mean Activity Errors quoted at 1.000sigma 4:24:51PM Page 4 of7 Wt mean Comments Activity Uncertainty
- 1. OlE-01 3.99E-01 l.48E-02 3.56E-02
- 3. 32E-02 2.93E-02 3.66E-02
1/8/2020 4:24:51PM Analysis Report for 08 an-20-1 0004 + + L 1-12203D-VJGS-O0SSS Peak Locate Performed on Peak Locate From Channel Peak Locate To Channel Peak No. Energy (ke V) All peaks were identified. M = First peak in a multiplet region m = Other peak in a multiplet region F = Fitted singlet Errors quoted at 1.000sigma UNIDENTIFIED PEAKS
- 1/8/2020 4:24:42PM
- 120
- 8192 Peak CPS (3/4)
Peak Size (CPS) Uncertainty Peak Type NUCLIDE MDA REPORT Nuclide Library Used
- C:\\Canberra\\Apex\\Root\\Default\\Library\\ZION LIB-BNL.NLB Nuclide Energy Yield(%)
Activity NuclideMDA LineMDA Name (keV) (pCilgrams) (pCilgrams) (pCi/grams) An Pk 511. 00 100.00 3.26E-02 4.91E-02 4.91E-02 BE-7 477.60 10.44 4.44E-01 2.61E-01 2.61E-01 K-40 1460.82 10.66 5.04E+OO 3.82E-01 3.82E-01 Mn-54 834.85 99.98 3.03E-02 4.49E-02 4.49E-02 Co-60 1173.23 99.85
- 1. 24E-02 4.57E-02 5.59E-02 1332.49 99.98 3.43E-02 4.57E-02 Nb-94 702.65 99.81 3.48E-02 4.59E-02
- 4. 59E- 02 871. 09 99.89
- 1. 58E-02 4.67E-02 Ag-108m 79.13 6.60 9.66E-01 3.54E-02 1.61E+DO 433.94 90.50
- 1. 71E-02 3.54E-02 614.28
- 89. 80
-1.99E-02 7.16E-02 722. 94 90.80 4.45E-02 5.66E-02 Sb-125 176.31 6.84 2.97E-01 l.18E-01 5.23E-01 380.45
- 1. 52 1.22E+OO 2.48E+OO 427.87 29.60 5.0lE-02 1.18E-01 463.36 10.49 l.17E-01 3.77E-01 600.60 17.65 1.67E-01 2.3 0E-01 606.71 4.98 2.04E+OO 1.3 6E+OO 635.95
- 11. 22
-3.60E-01 2.95E-01 Page 5 of7 Tolerance Nuclide '\\'~ ~~ '-\\--35
1/8/2020 4:24:51PM Page 6 of7 Analysis Report for 08-Jan-20-10004 L 1-12203D-VJGS-00SSS Nuclide Energy Yield(%) Activity NuclideMDA LineMDA Name (keV) (pCUgrams) (pCilgrams) (pCUgrams) Sb-125 671. 44 1.79 -1.65E+OO 1.18E-01 2.44E+OO Ba-133 79.61 2.65 3.35E+OO 7.44E-02 3.95E+OO
- 81. 00
- 32. 90
-2. 97E-01 2. 72E-01 276.40 7.16 2. 56E-01 5. 36E-01 302.85 18.34 9.52E-02 2.00E-01 356.01 62.05 -2.16E-02 7.44E-02 383.85 8.94 -9.42E-02 3.99E-Ol Cs-134 475.36
- 1. 48 2.19E+OO 5.43E-02 3.18E+OO.
563.25 8.34 -7.28E-02 4.67E-01 569.33 15.37 -5.31E-02 2.34E-01 604. 72 97.62 -3.79E-03 6.41E-02 795. 86 85.46 4.23E-02 5.43E-02 801.95 8.69 -1.66E-01 5.37E-01 1038.61
- 0. 99
-3.32E+OO 3.94E+OO 1167.97
- 1. 79
-1. 26E+OO 2.93E+O O 1365.19 3.02 -8.04E-01 1.50E+OO Cs-137 661.66 85.10 2.lSE-02 5.45E-02 5.45E-02 Eu-152 121. 78 28.67 5.64E-02 1.33E-01 l.39E-01 244.70 7.61 3.86E-01 5.56E-01 295. 94 0.45 l.52E+OO 9.87E+OO 344.28 26.60 4.02E-02 1.33E-01 367.79
- 0. 86
-1.24E+OO 3.96E+OO 411.12 2.24 -7.22E-01 1.67E+OO 443.96 2.83 -l.89E-01 l.12E+OO 488.68
- 0. 42
-3.98E+OO 9.43E+OO 563.99 0.4 9 - 3.54E-01 7.93E+00 586.26 0.46 -2.70E+OO 1.29E+Ol 678.62 0.47 9.05E-01 9.09E+OO 688.67 0.86
- 1. 22E+OO 4.54E+OO 719.35 0.28
-2.33E+OO
- 1. 40E+Ol 778. 90 12. 96
-2.89E-01 2.85E-01 810.45 0.32 -7.14E+OO 1.29E+Ol 867.37 4.2 6 -1. 63E-01
- 1. llE+OO 919.33 0.43
-l.47E+OO 9.25E+OO 964.08 14.65 -l.57E-Ol 4.34E-01 1085.87 10.24 1.05E-01 4.64E-01 1089. 74
- 1. 73
-2.21E+OO 2.49E+ OO 1112. 07 13.69 -1. 68E-01 3.59E-01 1212.95
- 1. 43
-2.65E-01 3.99E+OO 1249.94 0.1 9 2.18E+Ol 2.89E+Ol 1299.14
- 1. 63 8.31E-01 3.39E+OO 1408. 01 21.07
-6.07E-02 2.20E-01 1457.64 0.50 1.07E+02 3.44E+Ol 1528.10 0.28 4.74E+OO
- 1. 16E+01 Eu-154 123.07 40.40
-1.02E-01 9. 42E-02 9.42E-02 247.93 6.89
- 1. 82E-02
- 4. 72E-01 591.76
- 4. 95
-4.72E- 01 7.84E-01 692.42
- 1. 78
-6.30E-0 1
- 2. 04E+OO 723. 30 20.06
- 9. 57E-02 2.54E-01 756.80 4.52
-1. 83E-01 8.33E'-01 873.18 12.08 l.30E-01 3.76E-01 'f~~~~;s-
1/8/2020 4:24:51PM Page 7 of7 Analysis Report for 08-Jan-20-10004 L 1-12203D-VJGS-005SS Nuclide Energy Yield("/4) Activity NuclideMDA LineMDA Name (keV) (pC//grams) (pC//grams) (pCl/grams) Eu-154 996.29 10.48 1.74E-01 9.42E-02 4.59E-01 1004.76 18.01 1.99E-01 2.89E-01 1274.43 34.80 4.49E-02 1.49E-01 1596.48
- 1. 80
-9.16E-01 2.00E+OO Eu-155
- 45. 30
- 1. 31 7.44E+OO 2.18E-01 2. 21E+Ol
- 60. 01
- 1. 22
-1.45E+Ol 2.25E+Ol
- 86. 55
- 30. 70
-7. 85E-02 2.38E-01 105.31 21.10 -6. 26E-02 2.18E-01 Ra-226 186.21 3.64 l.54E+OO
- l. 15E+OO 1.15E+OO Pa-231 27.36 10.30
- 2. 56E+OO 1.55E+OO 2.57E+OO 283.69
- 1. 70 5.79E-01
- 2. llE+OO 300. 07 2.47 4.57E-01 1.55E+OO 302.65 2.20 4.35E-01
- 1. 66E+OO 330.06
- 1. 40
-l. 14E+OO 2.49E+OO U-235 143.76
- 10. 96
- 2. 97E-02 7.28E-02 3.49E-01 163.33 5.08 4.55E-01 7. 68E-01 185. 71 57.20
- 9. 61E-02 7.28E-02 202. 11 1.08
- 1. 55E-01 3.36E+OO 205. 31 5.01
-8.36E-01 7.28E-01 Am-241 59.54 35.90 -2.16E-01 8.23E-01 8.23E-01 + = Nuclide identified during the nuclide identification = Energy line found in the spectrum MDA value not calculated = Half-life too short to be able to perform the decay correction ? = CAUTION: MDA value is inconsistent with Currie MDA at 95% confidence level
60 55 50 45 40 35 V) ' C: 8 30 25 20 15 10 ~ ~ a,.. ~ ~ 00 ~ ~ ~ w m co
- a:
I- ~ 0000082380.CNF Live Tillll! :900.000 sec Real Time :900. 310 sec start: l: -0.2(kev) Stop : 8192: 2046. 9 (kev) Acq. Start :wed Jan 08 16:09: 37 2020 0.... I I I I I I 5 lJ~~!~~~~J!~~~f~I ::::11~ 1L1U1J_Jl~I;~: ,() I Ill I I e 11 I n!' I 11 "II -f Q I I I I uJ c.rt ~ 1000 2000 3000 4000 Channel I l I IJ. -* 1 TI/J III\\IY 1u11 Jim!MY/1\\ANNIIII\\A All\\ !UM.llnlYU IUI 1111\\IPJDI JUll!NII\\I\\UI W\\ ll\\!11 ~I 5000 6000 7000 8000 OJ l/l ~ ROI Type: 1 FSS AREA ACCESS REQUEST, AUTHORIZATION AND SIGN-IN SHEET REQUEST FOR ACCESS: ZS-LT-300-001-003 Revision 7 Information Use Survey Area No.: 10200/12100/10300* Survey Unit No.: 10208B/C - 10221 A - 10220G - 10214A-10220C - 10301 Survey Unit Type: Open Land~ Structure D System D Work Group
Contact:
Description of Planned Activities: FSS technician performing Semi-annual and Special Surveillance surveys for this survey unit. Duration: Start 08-24-2020 / 0700 Stop 09-25-2020 I I soo Access Controls Required: I. FSS technician will brief/sign on the Attachment 2 this procedure ZS-L T-300-001-003.
- 2. The personnel that enter the survey unit will perform a hand and foot frisk and survey any equipment that will be going in for surveying.
- 3. Posting will be verified when job is complete.
Survey Name Unit# (Print/Sign) 12-2-m j) t. {3t2-4-c;A-,Do I ~~d-0 /J..W;'3/. p, 91}~#\\ /~~ GL Digitally signed by GL Wood ON: cn::GL Wood, o=ZSRP, ou=ZSRP LRE, email=glwood-ext@ene-rgysolutions.com, W d c=US 0 0 Date, 2020.08.21 14,4~34 Approved by: _____ -()4_* 00_* ___ Reason for Entry Date Time In s UR-Vtl l,,~,J C-<£ 9-30-2,() 003D "1 ( ! i
- (*) - This access will suffice for all activities in I 0200, 12100 and I 0300 survey units for the work activities specified on this attachment.
Time Out ~ti 4-:S' t, Page 1 of 2 FSS l&C Surveillance Summary Survey Area No.: La100 Survey Unit No.:
== Description:== suvvei llaHce Survey Unit Open Land~ Structure D Type: Oassification: Class 3 D Class2 0 Reason for Surveillance: Semi-Annual ~ Surveillance Due Date: 09-;).0c).0 Reason: I- ~ ~ ZS-LT-300-001-003 . Revision 7 Information Use /iA~03D SystemO Class 1 ~ Special 0 11 "~ f,.',*,_t~r,:,,,,,,.~* * \\.-~ *\\,:;:;-!-}, _,:;,.... ~r..!,,,* ~,.
- ,-;_*~
- :-~ *-f' ~
~
- 1) Review ZS-LT-300-001-003 Attachment 2, PSS Area Access Request, Authorization and Sign-In Sheet for authorized entries into the FSS Survey Unit-******************************************************************* ~ -
- 2) Perform a walk down of the FSS Survey Unit and identify decommissioning activities adjacent survey units that could have a reasonable potential to spread radioactive material to the FSS Survey Unit.********************************************************************************************************************************************* ~
- Surveillance Un-Satisfactory q--3V**2-o /9D (Print Namo'S. (Date) (Time) (Print Name.'Signature) Radiological Engineer (Date) (Time) (Plint Nam~'Signature) C/LT Manager (Date) (Time) Page21 of22 Page 2 of 2}}