NRC Initial Cyber Security Inspection for Construction 05200025/2020401
ML20323A377
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/18/2020
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Yox M
Southern Nuclear Operating Co
References
IR 2020401
Download: ML20323A377 (10)


Text

November 18, 2020 Mr. Michael Yox Regulatory Affairs Director Southern Nuclear Operating Company 7825 River Road, Bldg. 302, Vogtle 3&4 Waynesboro, GA 30830

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 - NRC INITIAL CYBER SECURITY INSPECTION FOR CONSTRUCTION 05200025/2020401

Dear Mr. Yox:

On October 1, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Vogtle Electric Generating Plant, Unit 3. The enclosed inspection report documents the inspection results, which the inspectors discussed on October 1, 2020, with Mr. M. Meier, SNC Vice President of Regulatory Affairs, and other licensee and contractor staff members.

The inspection examined a sample of construction activities conducted under your Combined License (COL) as it relates to safety and compliance with the Commissions rules and regulations and with the conditions of these documents. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 5200025 License Nos: NPF-91

Enclosure:

NRC Inspection Report (IR) 05200025/2020401 w/attachment: Supplemental Information

M. Yox 2 cc w/ encls:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)

Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334

M. Yox 3 Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn)

M. Yox 4 wayne.marquino@gmail.com (Wayne Marquino)

William.Birge@hq.doe.gov (William Birge)

X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)

X2hagge@southern.com (Neil Haggerty)

X2wwill@southernco.com (Daniel Williamson)

ML20323A377 _____________________

OFFICE RII: DRS NSIR/CSB RII: DRS RII: DCO RII: DRS RII: RII: RII: RII: RII:

NAME P.Braaten M.Brown M.Singletary B. Davis S. Sheaffer DATE 11/16 /20 11/ 18 /20 11/16 /20 11/18/20 11/ 18 /20 U.S. NUCLEAR REGULATORY COMMISSION Region II Docket Numbers: 5200025 License Numbers: NPF-91 Report Numbers: 05200025/2020401 Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Unit 3 Combined License Location: Waynesboro, GA Inspection Dates: September 28, 2020 through October 1, 2020 Inspectors: P. Braaten, Reactor Inspector, DRS M. Singletary, Reactor Inspector, DRS A. Konkal, Cyber Security Specialist, NSIR Contractor A. Prada, Cyber Security Specialist, NSIR Contractor Approved by: Scott Shaeffer Branch Chief Engineering Branch 2

2

SUMMARY

OF FINDINGS Inspection Report (IR) 05200025/2020401; 09/28/2020 through 10/01/2020; Vogtle Unit 3 Combined License, cyber security construction inspection report.

This report covers a one-week partial inspection by regional inspectors. The U.S. nuclear Regulatory Commissions program for overseeing the operational programs of commercial nuclear power reactors is described in Inspection Manual Chapter (IMC) 2504, Construction Inspection Program: Inspection of Construction and Operational Programs, and in IMC 2506, Construction Reactor Oversight Process General Guidance and Basis Document.

A. NRC-Identified and Self Revealed Findings None B. Licensee-Identified Violations None

3 REPORT DETAILS

1. CONSTRUCTION REACTOR SAFETY Cornerstones: Design/Engineering, Procurement/Fabrication, Construction/Installation, Inspection/Testing IMC 2504, Construction Inspection Program - Inspection of Construction and Operational Programs 1P01 IP 81000.09 Cyber Security Inspection for Construction
  • 02.05 Access Control and Media and Portable Device Protection o Access Control for Portable and Mobile Devices (NEI (D.1.19) RG (B.1.19))
a. Inspection Scope The inspectors reviewed program documentation and procedures to assess the implementation of the cyber security program. At the time of inspection, the licensee was still in the development stage of their program. As such, many policies and procedures were not yet fully developed and ready for NRC inspection. The team was able to fully inspect one aspect of the program that has been fully implemented. The team performed a policy and procedure review of the program and conducted walk downs and interviews with site subject matter experts to determine if the policies and procedures met applicable regulatory requirements. The team also reviewed relevant corrective action program documents.
b. Findings No findings were identified.

4OA6 Meetings, Including Exit

.1 Exit Meeting.

On October 1, 2020, the inspectors presented the inspection results to Mr. M. Meier, SNC Vice President of Regulatory Affairs, and other licensee and contractor staff members. Proprietary information was reviewed during the inspection but was not included in the inspection report.

4 SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensees and Contractor Personnel E. Bean A. Campbell N. Chapman X. Chu A. DeLucia L. Eugene B. Hurst N. Kellenberger A. Lewton L. Pritchett D. Robinson G. Scott G. Sisley D. Spielman B. Westreich B. Whaley B. Yeates

5 Procedures B-GEN-CSEC-008-F04, Rev. 2 B-GEN-CSEC-008-F02, Rev. 2 B-GEN-CSEC-008, Rev. 5 B-GEN-CSEC-008-F01, Rev. 2