ML20258A027

From kanterella
Jump to navigation Jump to search

Acceptance Review - Hatch TSTF-582 LAR (EPID L-2020-LLA-0194) (e-mail)
ML20258A027
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/11/2020
From: John Lamb
Plant Licensing Branch II
To: Enfinger T
Southern Nuclear Operating Co
Lamb J
References
EPID L-2020-LLA-0194
Download: ML20258A027 (2)


Text

From: Lamb, John To: Enfinger, Timothy Lee

Subject:

Acceptance Review - Hatch TSTF-582 LAR Date: Friday, September 11, 2020 5:49:00 PM Importance: High

Tim, By [[letter::NL-20-0785, Southern Nuclear Operating Co - Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements|letter dated August 28, 2020]] Agencywide Documents Access and Management System Accession No. ML20241A240), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (Hatch),

Units 1 and 2.

SNC requests adoption of Technical Specification Task Force (TSTF)-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements. The Technical Specifications (TS) related to RPV WIC are revised to incorporate operating experience and to correct errors and omissions in TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the TS) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 6 months, which is March 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine

interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information (RAI),

unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation