ML20247H380

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to ISI Rept,Unit 2 Catawba 1997 Refueling Outage 8, Replacing Affected Pages of Original Rept W/Pages Included in Attachment IAW Encl Rev Instructions
ML20247H380
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/11/1998
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247H384 List:
References
NUDOCS 9805210149
Download: ML20247H380 (7)


Text

_ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ - _ . _ _ - . _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - - _ . _ . _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ - _ _ _ . _ . _ - _. _

' Duke Power Catawba Nudrar Station a s- pr 4800 Concord Road York, SC 29745 Gary R. Peterwn (803) B31-42Sl omCE Vice President (803) S313426ux May 11, 1998 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 {

Subject:

Duke Energy Corporation Catawba Nuclear Station, Unit 2 Docket Number 50-414 Revision to Inservicc. Inspection Summary Report for End of Cycle 8 Refueling Outage Pursuant to 10 CFR 50.4, please find attached the subject report revision. This report revision pertains to the inservice inspection of Catawba Unit 2 during the End of Cycle 8 Refueling Outage. Please replace the affected pages of the original report with those included in the attachment in accordance with the enclosed revision instructions.

If you have any questions concerning this report revision, please call L.J. Rudy at (803) 831-3084.

Very truly y rs,

/

,Ay T Gary R. Peterson LJR/s Attachment 1

\\

4 mul .

e-9905210149 990511 i PDR ADOCK 05000414:

G PDR r.

{

j U.S. Nuclear Regulatory Commission Page 2 May 11, 1998 xc (with attachment):

L.A. Reyes Regional Administrator, Region II U.S. Nuclear Regulatory Commission l Atlanta Federal Center j 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 D.J. Roberts j Senior Rcsident Inspector Catawba Nuclear Station P.S. Tam Senior Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-14 H25 Washington, D.C. 20555 l

l l

t l

I l

I I I

(

O O

April 28,1998 Duke Energy Corporation Quality Assurance Technical Services I

- Catawba Work Control NRC Document Control

Subject:

Catawba Nuclear Station Inservice Inspection Report Unit 2 1997 Refueling Outage 8, Revision 1 Attached for your information and use is Revision I to the above Inspection Report. Please revise your copy of the Inspection Report per the instructions below:

Delete Add 1

NIS-1,2 Pages Dated 7/24/97 NIS-1,2 Pages Dated 4/28/98 i Title Page, Rev. O Title Page, Rev.1 i Table of Contents Table of Contents Section 2.0 i Pages 1-20, Rev. O, Dated 7/16/97 Pages 1-20, Rev.1, Dated 4/15/98 Section 3.0 Pages 1-4, Rev. O, Dated 7/16/97 Pages 1-4, Rev.1. Dated 4/15/98 Section 6.0 Page 1 of 1, Rev.1, Dated 7/16/97 Page 1 of 1, Rev. O, Dated 4/15/98 O

I

l l-1 i- April 28,1998 Section 8.0 Page 1 of 1, Rev.1, Dated 7/16/97 Page lof 1, Rev. O, Dated 4/15/98

- Section 9.0 -

. Page 1 of 1, Rev.1, Dated 7/16/97 - Page 1 of 1, Rev. I Dated 4/15/98 -

l' PIP Serial No. 2-C97-2098 PIP Serial No. 2-C97-2098 Originated 6/26/97,7 Pages . Originated 6/26/97, Final and Overall PIP Approval

! 11/19/97, 8 Pages Section 10.0 Page 1 of 1, Rev.1, Dated 7/16/97 Page 1 of 1, Rev. O, Dated 4/15/98

All Inspection Report holders receiving this transmittal are asked to sign and date the attached " Receipt of Documents" letter, and return it to the following address l within thirty (30) days of the date of the transmittal

Duke Power Company P O Box 1006 QA Technical Services /EC07J Charlotte, N C 28201-1006 l

Attention : V. E. Keller U W V. E.'Keller QA Technical Services Enclosures O

2 L_---_____--__-_-__-__--______----_.

April 28,1998 V. E. Keller QA Technical Services j

- P O Box 1006 - EC07J l Charlotte NC 28201-1006 l

l l

I l l

Subject:

Receipt of the Catawba Nuclear Station Inservice Inspection Report, Rev.1 Unit 2 Refueling Outage 8 i

Please be' advised that the above referenced Documents forwarded by V. E. Keller's letter of April 28,1998 has been received and is in my possession as of the date below. . My copy of the ISI Inspection Report has been revised in accordance with the instructions indicated and the old pages have l been destroyed or marked superseded.

I Copy No.: 2 Assigned to: NRC Document Control i

By:

Date:

O  !

V '

l l

238 Pages FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner: Duke Enerev Corporation. 526 S Church St.. Charlotte. NC 28201-1006 (Name and Address of Owner)
2. Plant: Catawba Nuclear Station. 4800 Concord Road. York. SC 29745 (Name and Address of Plant)
3. Plant Unit: 2 4. Owner Certificate of Authorization (if required) N!/A
5. Commercial Service Date:8/19/86 6. National Board Number for Unit 171 7.. Components inspected:

Component or Manufacturer Manufacturer State or National Appurtenance Installer Installer Serial Province No. 130ard No.

No.

Section 1.1 in the attached report lists the Manufacturer / Installer Serial Number; State or Providence Number; and National Board Number for

__ . the systems and the NSSS Components. Detailed listings of the components inspected are contained in Sections 4 and 11.

Note: Supplemental sheets in form of lists sketches. or drawmps may be used provided (1) site is 81/2 in. x 1 I in.. (2)information in items I through 6 on this data report is included on each sheet. and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

l Tliis NIS-1 Form supersedes the previous NIS-1 Form submitted with Revision 0 of this report.

o__ _ ____________ _ _ _ _ _ _ _ _ _ _ ____ _ _ . . _ _ _ _ . _ _ _ _ _ _ _ _ _ _

FORM NIS-1 (llack)

8. Examination Dates November 30.1995 to May 2.1997
9. Inspection Period identification: First Period of the Second Interval
10. Inspection Interval identification: Second Inservice Inspection Interval
11. Applicable Edition of Section XI 1989 Addenda None
12. Date/ Revision of Inspection Plan: February 13,1996 / Revision 1
13. Abstract of Examinations and Test. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. See Sections 3.0,4.0 and i1.0
14. Abstract of Results of Examination and Tests. See Sections 5.0 and i1.0
15. Abstract of Conective Measures. See Section 8.0 We certify that a) the statements made in this report are correct b) the examir:ations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date h/Tb 19 N Signd Duke Energy Corp. By n

/ Owner Q' CERTil ICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of NC employed by

  • The HSBl&l Co.

of have inspectcd the components described in this Owners' Report during the period 11/30/95 to 05/02/97 . and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owners' Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, test, and corrective measures described in this Owners' Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury a r is ons 97 Ins'pector's Signature National Board, State, Province, and Endorsements

! Date N 19 C)@

  • The liartford Steam Boiler Inspection & Insurance Co.

200 Ashford Center North Suite 300 l Atlanta, GA. 30338 l l

l This N15-1 Form supersedes the previous NIS-1 Form submitted with Revision 0 of this report.

__-_. _ _ - . _ _ _ _ _