Letter Sequence Response to RAI |
---|
EPID:L-2020-LLA-0176, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System (Approved, Closed) |
|
MONTHYEARDCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System Project stage: Request ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G Project stage: RAI DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System Project stage: Response to RAI ML20232C6482020-08-17017 August 2020 Lochbaum Public Comment 1 on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' Project stage: Response to RAI ML20233A8592020-08-19019 August 2020 Mothers for Peace Public Comment on Exigent LAR to Modify TS 3.7.5, Auxiliary Feedwater System Project stage: Other DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' Project stage: Request ML20240A2302020-08-23023 August 2020 (External-Sender) E-mail Public Comment by D. Lochbaum Regarding Diablo Canyon Safety Issue Project stage: Request ML20239A7752020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20239A7282020-08-24024 August 2020 (External-Sender) E-mail Comments on No Significant Hazards Determination for Diablo Canyon LAR Project stage: Other ML20231A6522020-08-24024 August 2020 Summary of Teleconference with Pacific Gas & Electric Company Regarding an Exigent Amendment Request to Modify Diablo Canyon Power Plant, Units 1 & 2, Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System EPID L-2020-LLA-017 Project stage: Meeting ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 Project stage: Other ML20235R6352020-08-31031 August 2020 Issuance of Amendment Nos. 236 and 238 Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Exigent Circumstances Project stage: Approval ML20245E3952020-09-0303 September 2020 Transmittal Letter with Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other ML20245E3122020-09-0303 September 2020 Notice of Issuance, License Amendment; Issuance, Opportunity to Request a Hearing, and Petition for Leave to Intervene Project stage: Other 2020-08-19
[Table View] |
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARDCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-22-058, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2022-07-20020 July 2022 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22172A1642022-06-21021 June 2022 Response to Public Follow-up Question Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 21, 2022 DCL-22-018, Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently.2022-03-23023 March 2022 Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently. DCL-21-060, Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, 'Ac Sources - Operating,' to Support Diesel Fuel Oil Transfer System.2021-09-14014 September 2021 Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, 'Ac Sources - Operating,' to Support Diesel Fuel Oil Transfer System. DCL-21-048, Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System'2021-07-0707 July 2021 Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System' DCL-21-040, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-05-13013 May 2021 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-034, Response to Request for Additional Information on Final Supplemental Response to Generic Letter 20042021-04-15015 April 2021 Response to Request for Additional Information on Final Supplemental Response to Generic Letter 2004 DCL-20-088, Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report2020-10-16016 October 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System'2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System' DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, 'Auxiliary Feedwater System DCL-20-012, Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report2020-03-11011 March 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report DCL-19-088, Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification'2019-10-24024 October 2019 Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification' DCL-19-056, Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation.2019-07-0303 July 2019 Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation. DCL-19-039, Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation2019-05-0202 May 2019 Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation ML19074A1092019-03-14014 March 2019 Response to Letter Dated February 26, 2019, Requesting NRC Opinion on Potential Impacts Due to Pacific Gas and Electric Company'S Bankruptcy Filing DCL-17-108, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..2017-12-18018 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. ML17324B3442017-11-20020 November 2017 Response to NRC Request for Additional Information Regarding Request for Approval of Alternative for Application of Full Structural Weld Overlay, REP-RHRSWOL, Units 1 and 2 DCL-17-073, Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors.2017-08-17017 August 2017 Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors. DCL-17-060, Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U22017-06-21021 June 2017 Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 ML17179A0192017-06-21021 June 2017 PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive .. DCL-16-114, Response to Generic Letter 2016-012016-11-0303 November 2016 Response to Generic Letter 2016-01 DCL-16-101, Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term DCL-16-101, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 DCL-16-094, Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'.2016-09-28028 September 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'. DCL-16-062, Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf..2016-07-0707 July 2016 Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf.. DCL-16-044, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-04-21021 April 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-023, Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39.2016-02-25025 February 2016 Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39. DCL-16-019, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-10010 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. ML16039A3662016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 1 of 2 DCL-16-016, Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 22016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 2 DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-0101 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-013, Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U22016-01-27027 January 2016 Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U2 DCL-16-012, Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application2016-01-26026 January 2016 Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application ML16049A0112016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 DCL-16-011, Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 92016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 ML16049A0092016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-011, Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replaceme2016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-15-156, Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement2015-12-31031 December 2015 Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement ML15355A5502015-12-21021 December 2015 Transmittal of Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report DCL-15-154, Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report2015-12-21021 December 2015 Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report ML16004A3612015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03 - Updated Final Safety Analysis Report Markup, Revision 1. Part 1 of 3 ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16004A3562015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. ML16004A3572015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03 - Updated Final Safety Analysis Report Markup, Revision 1. Part 2 of 3 DCL-15-152, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03 - Updated Final Safety Analysis Report Markup, Revision 1. Part 3 of 32015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03 - Updated Final Safety Analysis Report Markup, Revision 1. Part 3 of 3 2023-04-04
[Table view] |
Text
Paula Gerfen Diablo Canyon Power Plant Site Vice President Mail code 104/6/605 P.O. Box 56 Avila Beach, CA 93424 805.545.4596 Internal: 691.4596 Fax: 805.545.4234 August 16, 2020 PG&E Letter DCL-20-068 U.S. Nuclear Regulatory Commission 10 CFR 50.91 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System
References:
- 1. PG&E Letter DCL-20-066, License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, dated August 12, 2020, ADAMS Accession No. ML20225A303
- 2. E-mail from NRC Senior Project Manager, Samson Lee, Diablo Canyon request for additional information: Exigent License Amendment Request for Application to provide a new Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G (EPID: L-2020-LLA-0176), dated August 14, 2020
Dear Commissioners and Staff:
In Reference 1, Pacific Gas and Electric Company (PG&E) submitted an exigent license amendment request to revise Technical Specification 3.7.5, Auxiliary Feedwater System. In Reference 2, the NRC Staff provided a request for additional information (RAI) via an e-mail, dated August 14, 2020. The Enclosure to this letter provides the PG&E responses to the RAI.
This letter includes two new regulatory commitments (as defined by NEI 99-04),
which are identified in Attachment 1 of the Enclosure.
If you have any questions or require additional information, please contact Mr. James Morris at (805) 545-4720.
A member of the STARS Alliance C a l l a wa y
Document Control Desk PG&E Letter DCL-20-068 August 16, 2020 Page 2 I state under penalty of perjury that the foregoing is true and correct.
Executed on August 16, 2020.
Sincerely, Paula Gerfen Site Vice President rntt/51084143-13 Enclosure cc: Diablo Distribution cc/enc: Samson S. Lee, NRR Senior Project Manager Scott A. Morris, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Gonzalo L. Perez, Branch Chief, California Department of Public Health A member of the STARS Alliance C a l l a wa y
Enclosure PG&E Letter DCL-20-068 PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System
References:
- 1. PG&E Letter DCL-20-066, License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, dated August 12, 2020 [ML20225A303]
- 2. E-mail from NRC Senior Project Manager, Samson Lee, Diablo Canyon request for additional information: Exigent License Amendment Request for Application to provide a new Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G (EPID:
L-2020-LLA-0176)," dated August 14, 2020 NRC RAI #1:
Corrosion: Please discuss:
- a. Material type of the auxiliary feedwater (AFW) piping (e.g., carbon steel)
- b. Degradation mechanism identified at Unit 2 (e.g., general corrosion)
- c. Corrosion at Unit 2 was on the internal or external surfaces?
- d. Corrosion at Unit 2 was at welds or piping?
- e. Are there any differences between the AFW piping at Units 1 and 2 in terms of material type, corrosion protection (i.e., coatings), or environment (e.g., time of wetness, potential for contaminants such as chlorides to accelerate corrosion)?
- f. Describe the locations of corrosion found in Unit 2 and plan for inspection in Unit 1.
PG&E Response:
a) The material type for the subject portions of the AFW piping is carbon steel.
Specifically, the pipe is seamless carbon steel 3-inch Schedule 80 (0.300 inch nominal wall thickness) and fittings (e.g., elbows, tees, etc.) are wrought carbon steel.
b) The degradation mechanism is determined to be external corrosion exhibited in general and/or local outside metal loss patterns.
c) Using ultrasonic testing (UT) methods, the Diablo Canyon Power Plant (DCPP) qualified Inservice Inspection team verified there were no signs of internal thinning during the Unit 2 inspections. Based on these observations and system operating conditions, these portions of the AFW system are not susceptible to flow-accelerated corrosion. Therefore, with high confidence, the degradation mechanism is concluded to be external corrosion.
1
Enclosure PG&E Letter DCL-20-068 d) The corrosion found on Unit 2 AFW piping was observed to varying degrees on all external surfaces of pipe sections and fittings, including welds.
However, areas exhibiting heavy local corrosion were found on pipe and fitting surfaces only. Welds were found to be distinct from surrounding pipe.
For example, weld crowns and toes were readily identifiable.
e) Unit 1 and Unit 2 have no differences in material type or corrosion protection.
Differences in environment are notable. Both Unit 1 and Unit 2 have two trains of AFW piping routed outdoors (supplying Steam Generators [SGs] 1 and 2 for each unit) that are exposed to the Pacific Coast marine environment. Unit 2 has a higher corrosive environment compared to Unit 1 due to localized weather patterns concentrating on the Unit 2 side. In addition, Unit 2 has historically experienced more forced outages and consequently operated its 10 percent atmospheric steam dumps more frequently. The steam dump valve exhaust, being located above the AFW piping, results in a wet environment due to falling condensation. The other two trains (supplying SGs 3 and 4 for each unit) are located indoors.
f) All locations that required weld repair on Unit 2 were found on piping downstream of Level Control Valves (LCVs)-111 and LCV-107. The plan for Unit 1 is to inspect those equivalent locations during power operations. A comprehensive extent-of-condition (EOC) inspection is planned to be performed on the remaining insulated outdoor AFW piping during the upcoming Unit 1 Twenty-Second Refueling Outage (1R22) in October 2020.
NRC RAI #2:
Please identify the AFW piping design Code and the process that will be followed for the repair consistent with the Code requirements. Is the one-to-one repair/replacement method being utilize?
PG&E Response:
The AFW piping design Code is ANSI B31.1-1967 with 1971 Addenda, with stress equations from the 1973 Summer Addenda.
The five pipe segments found on Unit 2 with below minimum wall thickness (seven locations total) were repaired with base metal weld buildup and verified with UT (for thickness), magnetic particle, and radiography to meet code requirements. Repairs were made per the Diablo Canyon Nuclear Welding Control Manual. Should repairs be required on Unit 1, the same repair method and standards will be used.
NRC RAI #3:
License amendment request (LAR), p.7 of 22, states that:
2
Enclosure PG&E Letter DCL-20-068 On July 23, 2020, with Diablo Canyon Unit 2 still in Mode 3, a 3.9 gallons per minute calculated through-wall leak was observed coming out of the elbow just downstream of Valve LCV-111 in the discharge line for Unit 2 AFW Pumps 2-1 and 2-2 to SG 2-2.
Describe the configuration of the valves and pumps, for example, which valve is downstream of Pump 2-1.
PG&E Response:
As depicted in Figure 1 provided on page 6 of the Exigent LAR (Reference 1),
the Unit 1 piping configuration is as follows: LCV-107 is downstream of turbine-driven AFW Pump 1-1, and LCV-111 is downstream of motor-driven AFW Pump 1-2. The downstream piping from Unit 1 LCV-107 and LCV-111 merge together to provide a common AFW supply for SG 1-2.
Unit 2 maintains a similar piping configuration where LCV-107 is downstream of turbine-driven AFW Pump 2-1, and LCV-111 is downstream of motor-driven AFW Pump 2-2. The downstream piping from Unit 2 LCV-107 and LCV-111 merge together to provide a common AFW supply for SG 2-2.
Table 3-1 summarizes AFW flow while in proposed Technical Specification (TS) 3.7.5 Condition G.
3
Enclosure PG&E Letter DCL-20-068 Table 3 Unit 1 AFW System Status While in Proposed TS 3.7.5 Condition G AFW Pump Flow to Flow to Flow to Flow to (pump status) SG 1-1 SG 1-2 SG 1-3 SG 1-4 Turbine-Driven Yes No Yes Yes AFW Pump 1-1 (isolated by (available to LCV-107) provide flow to SG 1-1, 1-3, and 1-4)
Motor Driven- Yes No No No AFW Pump 1-2 (isolated by (pump normally (pump normally (available to LCV-111) aligned to SG aligned to SG provide flow to 1-1 and 1-2) 1-1 and 1-2)
SG 1-1)
Motor-Driven No No Yes Yes AFW Pump 1-3 (pump normally (pump normally (OPERABLE to aligned to SG aligned to SG provide flow to 1-3 and 1-4) 1-3 and 1-4)
SG 1-3 and SG 1-4)
Number of AFW 2 0 2 2 pumps capable of providing flow (Turbine-Driven (Turbine-Driven (Turbine-Driven to SG while AFW Pump 1-1 AFW Pump 1-1 AFW Pump 1-1 Condition G and Motor- and Motor- and Motor-Required Actions Driven AFW Driven AFW Driven AFW are in effect Pump 1-2) Pump 1-3) Pump 1-3) 4
Enclosure PG&E Letter DCL-20-068 NRC RAI #4:
LAR, p.8 of 22, states that:
While in Condition G the steam generator (SG) 1-2 related technical specification (TS) required equipment will continue to remain operable.
Please explain what are the related TS required equipment.
PG&E Response:
Operability of the following SG TS-related equipment will not be impacted by the proposed TS 3.7.5 Condition G and its associated Required Actions. If any of these equipment/functions were to become inoperable, their TS Conditions and Required Actions would apply.
TS 3.3.1, Reactor Trip System (RTS) Instrumentation, Table 3.3.1-1:
- Function 14.a, SG Water LevelLow Low
- Function 14.b, SG Water Level - Low Low Trip Time Delay (TTD)
TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS)
Instrumentation, Table 3.3.2-1:
- Function 5.b, Feedwater Isolation, SG Water Level-High High
- Function 6.d.1, AFW, SG Water Level-Low Low
- Function 2, Steam Line Pressure
- Function 13.a) SG Water Level (Wide Range)
- Function 13.b) SG Water Level (Narrow Range)
TS 3.3.4, Remote Shutdown System, Table 3.3.4-1:
Enclosure PG&E Letter DCL-20-068 TS 3.4.6, RCS Loops-MODE 4 TS 3.4.17, Steam Generator (SG) Tube Integrity NRC RAI #5:
LAR, p.9 of 22, states that Conditions B and GD are modified to add new Condition G as a Condition for which an inoperable Condition is applicable. Please verify the statement.
PG&E Response:
Page 9 should have stated Conditions B and D are modified to add new Condition G as a Condition for which an inoperable Condition is applicable consistent with the TS 3.7.5 changes described on pages 3 and 4 of the submittal (Reference 1).
NRC RAI #6:
LAR p.10 states that:
Loss of Normal Feedwater Transient. The condition 2 event of loss of normal feedwater is addressed in the Final Safety Analysis Report Update (FSARU)
Section 15.2.8. This transient is modeled with an assumed single failure of the turbine-driven pump, resulting in the remaining two motor-driven pumps operable and feeding all four SGs with a total of 600 gallons per minute (gpm) flow. The proposed possible isolation of AFW flow to SG 1-2 means that the AFW system will have three available AFW pumps, which can provide well above 600 gpm, but only to the three unaffected SGs. There is an additional FSARU analysis of the loss of normal feedwater transient in Section 6.5.3.7, termed a better-estimate analysis, that is done for AFW reliability demonstration. FSARU Section 6.5.3.7 notes that the FSARU Section 15.2.8 analysis has considerable margin when 4 SGs are credited, and that the better-estimate analysis shows successful event mitigation with just two SGs receiving a total of 390 gpm. Therefore, the proposed SG 1-2 isolation case, with three available SGs, is bounded by the FSARU Section 6.5.3.7 better-estimate case which only credits AFW flow to 2 SGs.
FSARU 6.5.3.7 states that:
A better-estimate analysis is performed to address the reliability of the AFW system. This analysis is similar to that described above for the Chapter 15 analysis, but assuming that only a single motor-driven AFW system pump 6
Enclosure PG&E Letter DCL-20-068 supplies a minimum of 390 gpm to two of the four SGs. The cases considered in this additional analysis assume better-estimate conditions for several key parameters, including initial power level, decay heat, reactor coolant system (RCS) temperature, pressurizer pressure, and low-low SG level reactor trip setpoint. The results of this better-estimate analysis demonstrate that there is margin to pressurizer over-filling. While this analysis demonstrates that the AFW system remains highly reliable, the Diablo Canyon licensing basis requires that at least two AFW pumps delivering at 600 gpm to four SGs is required for this event.
The staff requests the licensee to explain the bases that a better-estimate analysis (two DGs receiving 390 gpm) can be used to cover a licensing based event (four SGs receiving 600 gpm).
PG&E Response:
The Condition II licensing basis events of loss of normal feedwater (LONF) and loss of AC power to station auxiliaries (LOAC) are analyzed in Updated Final Safety Analysis Report (UFSAR) Chapter 15.2 according to typical accident analysis methodology, crediting the worst single active failure. There is no single active failure that would result in a reduction from four SGs to just two SGs, therefore there is no licensing need to analyze that within the Chapter 15 UFSAR events. The current LAR-proposed Condition G is three SGs available with two pumps per SG available to provide flow for LONF and LOAC events (see Table 3-1 above).
Historically, it was recognized that the critical need for AFW reliability is such that it is advisable to demonstrate accident mitigation with just one of the three AFW pumps (specifically, with just one motor-driven AFW pump feeding two SGs).
Condition III and IV events are therefore analyzed with cooling to just two SGs.
In the past, the LONF and LOAC UFSAR analyses also only credited one motor-driven AFW pump feeding two SGs. The current Chapter 15 LONF/LOAC analyses were entered into the UFSAR to justify a wider replacement steam generator water level range and lower minimum AFW flow rate. At the same time, the Chapter 6 better-estimate analysis was done to continue supporting the risk-reliability concerns and demonstrate the acceptability of accident mitigation with just two SGs. This dual approach has been used at other Westinghouse sites, such as the Callaway Plant, Unit 1 - Issuance of Amendment Regarding the Steam Generator Replacement Project (TAC NO. MC4437), dated September 29, 2005 [ML052570054].
As the AFW system cooling capability for the proposed Condition G is bounded by the better-estimate analysisthere are two pumps per SG providing flow instead of just one, and there are three SGs available instead of just two SGs the better-estimate analysis is used as justification for adequate mitigation of LONF and LOAC events for the proposed, one-time-use Condition G.
7
Enclosure PG&E Letter DCL-20-068 NRC RAI #7:
The licensee proposed a completion time (CT) of 7 days for TS 3.7.5 Condition G, One or two AFW trains inoperable in MODE 1, 2, or 3 due to inoperable AFW piping affecting the AFW flow path(s) to one steam generator, for Unit 1 during repair of AFW piping. The proposed Condition is modified by a note which identifies that the condition is only applicable to Unit 1 once during Unit 1 Cycle 22 during repair of AFW piping.
In the Enclosure of the LAR on pages 12-13, the licensee provides a list of risk management actions (RMAs) the licensee will implement during the TS 3.7.5 Condition G 7-day CT. It appears that part of the justification for the proposed temporary CTs relies on the RMAs listed in the Enclosure.
Provide further justification for the proposed note language, which does not currently mention the RMAs. Alternatively, consider rewording the proposed note language to indicate that the 7 day CT is contingent on implementation of the RMAs listed in the LAR.
In addition, clarify whether the identified risk management actions will be required to be in place for the duration of the extended completion time.
PG&E Response:
The proposed TS 3.7.5 Condition G, and the associated Required Actions and Completion Times do not rely on the RMAs discussed in the LAR.
The LAR is not a risk-informed submittal, as would be submitted using the guidance of Regulatory Guides 1.174 or 1.177. However, a risk evaluation was performed in support of the proposed LAR, and based on the associated risk insights, several RMAs were identified that PG&E intends to implement in order to manage the risk in accordance with station procedures. These RMAs were included in the submittal to better inform the staff reviewers of the actions DCPP intends to take when entering the required actions of Condition G.
Accordingly, PG&E is making the following regulatory commitments as part of the proposed LAR:
A. DCPP will implement the RMAs contained in Table 9-1 in the response to NRC RAI #9 while the Required Actions for TS 3.7.5 Condition G are in effect for Unit 1.
B. Any changes to plant configuration that affect the RMAs established as part of Condition G will be evaluated and the risk will be managed in accordance with DCPP Procedures AD7.ID14, Assessment of Integrated Risk, and 8
Enclosure PG&E Letter DCL-20-068 AD7.DC6, On-Line Maintenance Risk Management, which implement the provisions of 10 CFR 50.65.
NRC RAI #8:
In the description of risk management actions, the LAR describes protecting certain equipment during the extended completion time. Clarify whether this includes preventing the protected equipment from being taken out of service for testing and maintenance activities.
PG&E Response:
No scheduled testing or planned maintenance will occur on equipment while protected. Plant administrative procedures and controls prevent employees from taking protected equipment out of service for testing or maintenance. A requirement to perform shiftly verification that no work is being performed behind posted protected equipment boundaries also exists. Emergent conditions that require work behind physical barriers to support continued plant operations result in further station risk evaluation before approval to proceed can be granted.
NRC RAI #9:
The LAR proposes risk management actions (RMAs) based on insights from the probabilistic risk assessment (PRA) to be implemented during proposed TS 3.7.5 Condition G. These RMAs support the availability of AFW, feed and bleed, and main feedwater. The NRC staff identified additional actions that could potentially support the availability of these systems/functions, which are in alignment with the proposed RMAs in the LAR. Provide a justification for not including the following actions as RMAs in the LAR. Include in this justification, a discussion of relevant risk information associated with the proposed change (e.g., change in risk contribution or importance measures) and defense-in-depth related to system redundancy, independence and diversity. Alternatively, include these actions as RMAs in the LAR.
- Protect the supporting equipment of AFW Pumps 1-1 and 1-2,
- Protect supporting equipment of AFW values (e.g., power, air/nitrogen),
- Ensure the Power-Operated Relief Valves (PORV) block valves remain open to ensure feed-and-bleed availability,
- Protect the residual heat removal (RHR) pumps and centrifugal charging/intermediate head pumps to ensure feed-and-bleed availability,
- Protect RHR sump recirculation valves (and support systems) to ensure feed-and-bleed availability,
- Protect the steam-driven main feedwater pumps and the turbine to ensure feedwater availability.
9
Enclosure PG&E Letter DCL-20-068 PG&E Response:
The following RMAs, which include the actions listed in this RAI (NRC RAI #9),
will be implemented during the proposed TS 3.7.5 Condition G 7-day Completion Time and have been accepted by Operations:
- Protect Turbine-Driven AFW Pump 1-1 and supporting equipment. This supporting equipment includes vital 4 kV and 480 V Bus G, vital DC Bus 2, Battery Charger 1-2, and Emergency Diesel Generator 1-2.
- Protect Motor-Driven AFW Pump 1-2 and supporting equipment. This supporting equipment includes vital 4 kV and 480 V Bus H, vital DC Bus 3, Battery Charger 1-32, and Emergency Diesel Generator 1-1.
- Protect the supporting equipment for the AFW LCVs, which include the vital 480 V buses F, G, and H, 125 VDC buses 1, 2, and 3, and vital AC instrument channels I, II, III, and IV.
- Protect the 10 percent atmospheric dump valves and supporting equipment, including vital AC instrument channels I, II, III, and IV, instrument air supply system, nitrogen supply system, and the 10 percent atmospheric dump valve backup air bottles.
- Protect pressure-operated relief valves (PORV) block valves to ensure they remain open to ensure feed and bleed availability.
- Protect Residual Heat Removal (RHR) Pump 1-1, RHR Pump 1-2, Charging Pump 1-1, Charging Pump 1-2, Safety Injection Pump 1-1, and Safety Injection Pump 1-2.
- Protect the RHR sump recirculation valves, which include: CCW-1-FCV-364, CCW-1-FCV-365, RHR-1-8700A, RHR-1-8700B, RHR-1-8982A, and RHR-1-8982B. Also protect the support systems for these valves, which include vital 480 V buses G and H, 125 VDC buses 2 and 3, and instrument air.
These RMAs are in addition to those documented in the Risk Insights section of the LAR submittal.
Table 9-1 documents the RMAs that will be implemented.
10
Enclosure PG&E Letter DCL-20-068 Table 9 Risk Management Actions (RMAs)
Risk Management Actions (RMAs)
Equipment-Related RMAs Protect Turbine-Driven AFW Pump 1-1 and supporting equipment. This 1 supporting equipment includes vital 4 kV and 480 V Bus G, vital DC Bus 2, Battery Charger 1-2, and Emergency Diesel Generator 1-2.
Protect Motor-Driven AFW Pump 1-2 and supporting equipment. This 2 supporting equipment includes vital 4 kV and 480 V Bus H, vital DC Bus 3, Battery Charger 1-32, and Emergency Diesel Generator 1-1.
Protect Motor-Driven AFW Pump 1-3 and supporting equipment. This 3 supporting equipment includes vital 4 kV and 480 V Bus F, vital DC Bus 1, Battery Charger 1-1, and Emergency Diesel Generator 1-3.
Protect the remaining AFW LCVs (LCV-106, LCV-108, LCV-109, LCV-110, 4
LCV-112, and LCV-113) locally.
5 Protect Pressurizer PORV PCV-455C and PCV-456.
Protect the supporting equipment for the AFW valves, which include the vital 6 480 V buses F, G, and H, 125 VDC buses 1, 2, and 3, and vital AC instrument channels I, II, III, and IV.
Protect the 10 percent atmospheric dump valves and supporting equipment, including vital AC instrument channels I, II, III, and IV, instrument air supply 7
system, nitrogen supply system, and the 10 percent atmospheric dump valve backup air bottles.
Protect PORV block valves to ensure they remain open to ensure feed and 8
bleed availability.
Protect RHR Pump 1-1, RHR Pump 1-2, Charging Pump 1-1, Charging Pump 9
1-2, Safety Injection Pump 1-1, and Safety Injection Pump 1-2.
Protect the RHR sump recirculation valves, which include: CCW-1-FCV-364, CCW-1-FCV-365, RHR-1-8700A, RHR-1-8700B, RHR-1-8982A, and RHR 10 8982B. Also protect the support systems for these valves, which include vital 480 V buses G and H, 125 VDC buses 2 and 3, and instrument air.
Protect the Main Feedwater Pumps 1-1 and 1-2 and the turbine to ensure 11 feedwater availability.
Procedure-Related RMAs Shiftly tailboard of Emergency Operating Procedure FR-H.1, Response to Loss 12 of Secondary Heat Sink, on providing Main Feedwater to the SGs on a loss of AFW.
Shiftly tailboard on feed-and-bleed cooling (including RHR sump recirculation) 13 on a loss of AFW and Main Feedwater.
11
Enclosure PG&E Letter DCL-20-068 NRC RAI #10:
The leak and degraded conditions on the Unit 2 AFW system were discovered on July 23rd. The staff is aware that the licensee has performed initial walkdown of Unit 1 AFW piping. The licensee had originally scheduled the Unit 1 AFW extent of condition inspection for the week of August 10th. The staff is aware that the current plan is to perform inspection the week of August 24 th. Please discuss, from a safety perspective, why it is acceptable to wait two additional weeks, approximately one month after the Unit 2 leak, was identified?
PG&E Response:
Operators walked down the Unit 1 AFW piping on the pipe rack, outside of Containment on the evening of July 25, 2020. The same piping was subsequently walked down the next day, on July 26, 2020, by engineers from the Engineering Fix It Now group who are trained and proficient in recognizing and evaluating degraded piping. Neither walkdown identified any leaks or areas of immediate concern.
Engineering documented the basis for the timing of the Unit 1 EOC activities for the Unit 1 AFW system piping in the corrective action program (CAP) on July 26, 2020. This basis credits the lower environmentally-induced corrosion impacts that exist on Unit 1 and the lower corrosive impact from localized wetting from 10 percent atmospheric steam dump operation, combined with the results of the above discussed walkdowns, the recognition that corrosion rates are slow (2 to 8 mils per year), and subsequent detailed analysis that demonstrates a further reduced minimum acceptable wall thickness over that applied to the Unit 2 pipe conditions. Together, these form the basis of confidence in potential Unit 1 AFW corrosion being less extensive and support continued operation of Unit 1 in the short time frame (based on corrosion rates) to develop and implement an inspection plan.
Although the basis for the timing of the Unit 1 EOC can be applied to potentially extend the detailed EOC inspection to the 1R22 outage, DCPP plans to inspect the same five pipe segments on Unit 1 that were below minimum wall thickness acceptance limits on Unit 2 to validate the basis, which is consistent with our CAP methodologies for EOC. These five pipe segments are viewed to represent the most vulnerable Unit 1 conditions (three elbows and two straight pipe segments). These inspections are planned with established contingencies, including pipe base metal repair, and will be implemented as soon as practicable after approval of this exigent LAR when plant conditions allow, and all the risk management controls can be implemented.
12
Enclosure Attachment 1 PG&E Letter DCL-20-068 Regulatory Commitments A. Diablo Canyon Power Plant (DCPP) will implement the risk management actions (RMAs) contained in Table 9-1 in the response to NRC RAI #9 while the Required Actions for TS 3.7.5 Condition G are in effect for Unit 1.
B. Any changes to plant configuration that affect the RMAs established as part of Condition G will be evaluated and the risk will be managed in accordance with DCPP procedures AD7.ID14, Assessment of Integrated Risk, and AD7.DC6, On-Line Maintenance Risk Management, which implement the provisions of 10 CFR 50.65.
Table 9 Risk Management Actions Risk Management Actions (RMAs)
Equipment-Related RMAs Protect Turbine-Driven Auxiliary Feedwater (AFW) Pump 1-1 and supporting equipment. This 1 supporting equipment includes vital 4 kV and 480 V Bus G, vital DC Bus 2, Battery Charger 1-2, and Emergency Diesel Generator 1-2.
Protect Motor-Driven AFW Pump 1-2 and supporting equipment. This supporting equipment 2 includes vital 4 kV and 480 V Bus H, vital DC Bus 3, Battery Charger 1-32, and Emergency Diesel Generator 1-1.
Protect Motor-Driven AFW Pump 1-3 and supporting equipment. This supporting equipment 3 includes vital 4 kV and 480 V Bus F, vital DC Bus 1, Battery Charger 1-1, and Emergency Diesel Generator 1-3.
Protect the remaining AFW level control valves (LCVs) (LCV-106, LCV-108, LCV-109, LCV-110, 4
LCV-112, and LCV-113) locally.
5 Protect Pressurizer Power-Operated Relief Valves (PORVs) PCV-455C and PCV-456.
Protect the supporting equipment for the AFW valves, which include the vital 480 V buses F, G, 6
and H, 125 VDC buses 1, 2, and 3, and vital AC instrument channels I, II, III, and IV.
Protect the 10 percent atmospheric dump valves and supporting equipment, including vital AC 7 instrument channels I, II, III, and IV, instrument air supply system, nitrogen supply system, and the 10 percent atmospheric dump valve backup air bottles.
8 Protect PORV block valves to ensure they remain open to ensure feed and bleed availability.
Protect Residual Heat Removal (RHR) Pump 1-1, RHR Pump 1-2, Charging Pump 1-1, Charging 9
Pump 1-2, Safety Injection Pump 1-1, and Safety Injection Pump 1-2.
Protect the RHR sump recirculation valves, which include: CCW-1-FCV-364, CCW-1-FCV-365, RHR-1-8700A, RHR-1-8700B, RHR-1-8982A, and RHR-1-8982B. Also protect the support 10 systems for these valves which include vital 480 V buses G and H, 125 VDC buses 2 and 3 and instrument air.
11 Protect the Main Feedwater Pumps 1-1 and 1-2 and the turbine to ensure feedwater availability.
Procedure-Related RMAs Shiftly tailboard of Emergency Operating Procedure FR-H.1, Response to Loss of Secondary 12 Heat Sink, on providing Main Feedwater to the steam generators on a loss of AFW.
Shiftly tailboard on feed-and-bleed cooling (including RHR sump recirculation) on a loss of AFW 13 and Main Feedwater.
1