Updates 970815 Response to NOV Re Violations Noted in Insp Repts 50-282/97-08 & 50-306/97-08.Completion Date for Listed Commitment Will Be Changed from 980331 to 980930
ML20217M105
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/30/1998
From: Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-282-97-08, 50-282-97-8, 50-306-97-08, 50-306-97-8, NUDOCS 9804080008
Download: ML20217M105 (2)


Text

. .

, .~

  • Northern States Power Company i Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 I i

March 30,1998 10 CFR Part 2 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Update to a Reply to Notice of Violation (Inspection Report 97008),

Deficiencies in the Corrective Action and Calculation Verification Programs Your letter of July 16,1997, which transmitted Inspection Report No. 97008, required a response to a Notice of Violation. Our response to the notice was submitted by letter dated August 15,1997. In that letter and attached response we made several new Nuclear Regulatory Commission commitments. All of the commitments required to be completed by r'ow have been completed, with the exception of one, which was intended to be competed by March 31,1998.

The commitment not completed yet has to do with the violation on discrepancies found in engineering calculations. Several short-term and long-term corrective actions were specified to ensure adequate calculations are performed. The one commitment that won't be completed in the time specified is:

A sample of calculations will be reviewed to determine the extent of the potential problem with inaccuracies in design calculations by March 31,1998.

Our Quality Services Department has performed an audit of the Prairie Island Design Bases Control functions, including evaluations of several engineering calculations.

However, we have not completed the sampling which the engineering department is \.

responsible to perform. The results of the audit findings will be factored into the y\

sampling 1:y the engineering department and the sampling and its conclusions will be completed by September 30,1998. , c\

fY 9804080008 980330 DR ADOCKOSOOg2

,.6

USNRC NORTHERN STATES POWER COMPANY March 30,1998 '

Pag 42 In this letter we have made no new Nuclear Regulatory Commission commitments but have changed the commitment completion date for a previous commitment.

Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.

Joel P Sorensen Plant Manager Prairie Island Nuclear Generating Plant c: Regional Administrator - Region Ill, NRC Senior Resident inspector, NRC

. NRR Project Manager, NRC J E Silberg 9700 6(. '.a 3C