Issue date | Title | Topic | |
---|---|---|---|
ML20211L331 | 3 September 1999 | Notification of 990927 Meeting with Util in Rockville,Md to Allow Licensee to Present Modified Program to Reverify Design Code Compliance of Large Bore Safety Related Piping at Plant,Unit 3 | |
ML20207F845 | 2 March 1999 | Forwards NRC Operator Licensing Exam Rept 50-302/98-301 (Including Completed & Graded Tests) for Tests Administered on 980629-0701 | Boric Acid Shutdown Margin High Radiation Area Grab sample Job Performance Measure |
ML20207L777 | 18 February 1999 | Notification of 990312 Meeting with Util in Rockville,Md to Discuss Deficiencies in License Amend Request to Change Standby Position of LPI & Bldg Spray Sys Suction Valves from Open to Closed.Meeting Has Been Cancelled | |
ML20203J085 | 18 February 1999 | Notification of 990312 Meeting with Util in Rockville,Md to Discuss Licensee Deficiencies Identified in Their License Amend Request to Change Standby Position of Low Pressure Injection & Building Spray Sys Suction Valves | |
ML20151X031 | 27 August 1998 | Notification of 980921 Meeting W/Fpc in Rockville,Md to Discuss Present Plans & Schedules for Proposed Design Mods to Emergency Feedwater & High Pressure Injection Systems at Crystal River Unit 3.Meeting Agenda Attached | |
ML20237E313 | 26 August 1998 | Forwards for Public Release,Info Re NRC SMM Held on 980714-15.Summary of January 1998 NRC SMM & Watch List Removal Evaluation Factors Also Encl | Safe Shutdown Hydrostatic Missed surveillance Maintenance Rule Program |
ML20236Y576 | 6 August 1998 | Notification of 980724 Meeting W/Util in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project | |
ML20236S145 | 17 July 1998 | Responds to 980206 Memo from W Rogers Which Documented Errors Identified in Staff SE for Amend 163 to Crystal River Unit 3 FOL | |
ML20236U564 | 10 July 1998 | Notification of 980724 Meeting W/Florida Power Corp in Rockville,Md to Describe Crystal River Unit 3 Large Bore Piping Project | Operability Determination |
ML20249A792 | 12 June 1998 | Submits TIA 98-003 Requesting That NRR Respond to Questions Re Unit 3 Low Pressure Injection ECCS Valve Configurations | |
ML20248M083 | 11 June 1998 | Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis | |
ML20248L742 | 5 June 1998 | Notification of 980617 Meeting W/Util in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis | |
ML20217Q527 | 4 May 1998 | Notification of 980513 Meeting W/Util in Crystal River,Fl to Discuss Issues Related to Increased Number of Sea Turtles Entering Crystal River Intake Canal,Requirements of Endangered Species Act | |
ML20217Q555 | 1 May 1998 | Discusses Opening of Task Authorization Control Number for Effort Associated W/Sea Turtle Issues at Crystal River Unit 3 | |
ML20216J524 | 15 April 1998 | Notification of 980429 Meeting W/Florida Power Corp in Rockville,Md to Discuss Issues Related to Revised Control Complex Habitability Analysis,Including Assumptions Used in Analysis | |
ML20203A365 | 12 February 1998 | Notification of Meeting W/Fpc on 980225 in Rockville,Md Re Technical Discussions Concerning IPE Submittal | |
ML20199F921 | 27 January 1998 | Informs That on 971215 FPC Submitted Jco Re Control Complex Habitabiltiy Envelope | |
ML20199A485 | 7 January 1998 | Notification of 980112 Meeting W/Util in Rockville,Md to Present Status of Resolution Issues Addressed in NRC CAL, | |
ML20199A481 | 5 January 1998 | Notification of 980108 Meeting W/Util in Rockville,Md to Discuss Control Complex Habitability Envelope Including NRC Staff Assessment of FPC Justification for Continued Operation (NRC Ltr ) | |
ML20203C476 | 5 December 1997 | Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Util Response to Staff 971126 Request for Addl Info Re SBLOCA License Amend Submittal | |
ML20202E658 | 26 November 1997 | Notification of 971202 Meeting W/Util in Rockville,Md to Discuss Seismic Qualification of Mechanical & Electrical Equipment (A46 Issue) & Large Bore Piping & Pipe Support Calculations | |
ML20198Q275 | 4 November 1997 | Notification of 971106 Meeting W/Util in Rockville,Md to Discuss Crystal River 3 Restart Schedule Issues | |
ML20198Q423 | 4 November 1997 | Notification of Meeting W/Fpc on 971120 in Rockville,Md Re Plant Mgt Corrective Action Plan & Mc 0350 Restart Panel Meeting | |
ML20198Q492 | 4 November 1997 | Notification of Meeting W/Fpc on 971114 in Rockville,Md Re Control Complex Habitability envelope-working Level Technical Discussions | |
ML20199B979 | 4 November 1997 | Notification of Change in Time & Room Number of 971120 Meeting W/Util in Rockville,Md Re Plant,Unit 3 Mgt Corrective Action Plan & Manual Chapter 0350 Restart Panel Meeting | |
ML20199C482 | 4 November 1997 | Notification of Change in Room Number & Purpose for 971114 Meeting W/Fpc Re Control Complex Habitability Envelope - Working Level Techincal Discussions & Request for Addl Info Re SBLOCA | |
ML20217K813 | 17 October 1997 | Notification of 971028 Meeting W/Util Re Working Level Discussions Re EDG Mods,Testing & Qualification | |
ML20198R800 | 16 October 1997 | Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20.Meeting Cancelled & to Be Rescheduled | |
ML20212F236 | 16 October 1997 | Notification of 971105 Meeting W/Util in Rockville,Md to Discuss FPC IPE Submittal in Response to GL 88-20 | |
ML20198K045 | 15 October 1997 | Revised Notification of 971022 Meeting W/Util in Rockville, MD to Discuss Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes.Listed Attendees Encl | |
ML20211P438 | 9 October 1997 | Notification of 971022 Meeting W/Util in Rockville,Md to Discuss Working Level Technical Discussions Relating to FPC Proposed License Amend for Mitigating Small Break LOCA & Associated Design Basis Changes | |
ML20216J436 | 10 September 1997 | Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes | |
ML20217Q961 | 28 August 1997 | Notification of 970905 Meeting W/Util in Rockville,Md to Discuss Licensee Schedule & Status of Licensing Submittals Required for Restart | |
ML20217D334 | 30 July 1997 | Transmits Attachment D to Memo of 970729,which Forwarded Minutes of Crystal River 3 Restart Panel Meeting Held 970722.Memo Did Not Include Attachment D as Result of Inadvertent Error | Hot Short Mission time Emergency Lighting Exemption Request |
ML20141C576 | 23 June 1997 | Notification of 970722 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Progress Toward Readiness for Restart & Addressing Issues Specified in Confirmatory Action Ltr 2-97-01 | |
ML20148J734 | 13 June 1997 | Notifies of 970624 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed License Amend for Addressing Emergency Diesel Upgrade,Emergency Feedwater,High Pressure Injection Sys & Small Break LOCA Design Basis Issues | |
ML20141H469 | 21 May 1997 | Notification of 970611 Meeting W/Florida Power Corp in Rockville,Md to Discuss Licensee Findings Related to 10CFR50,App R Design Basis Issues | |
ML20148C085 | 7 May 1997 | Provides NRR Concurrence to Extend SALP Evaluation Period for Plant Facility Until Six Months After Restart of Unit from Current Extended Shutdown | |
ML20148C093 | 17 April 1997 | Requests Concurrence in Adjusting SALP Period for Plant Facility Until Six Months After Restart of Unit | |
ML20137V278 | 15 April 1997 | Notification of 970423 Meeting W/Florida Power Corp in Rockville,Md to Discuss Status of Licensing Activities & Actions | |
ML20137D574 | 25 March 1997 | Forwards Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr.W/O Encl | |
ML20137A139 | 13 March 1997 | Requests That Pp Number 73 Be Removed,Destroyed & Replaced W/Encl Corrected Pp Number 73 to Physical Security Plan.Page Withheld | |
ML20136C103 | 6 March 1997 | Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR | |
ML20135E199 | 4 March 1997 | Notification of Meeting on 970318 W/Util in Rockville,Md to Discuss Licensing & Design Basis Issues Re High Pressure Injection & Small Break Loss of Coolant Accidents | |
ML20134H521 | 7 February 1997 | Notification of Meeting W/Fpc on 970218 in Rockville,Md to Discuss & Review Status of Licensing Activities & Actions | |
ML20147C335 | 27 January 1997 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 960322-29 | Boric Acid Shutdown Margin Loop seal Packing leak High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Power Operated Valves Power change Siren Overspeed trip Loss of condenser vacuum |
ML20133K987 | 16 January 1997 | Discusses Util Which Submitted 30 Day Special Rept 96-03 & Informed NRC of Plan to Abandon Two Peak Seismic Monitoring Instruments.Subj Plan Found to Be Acceptable | |
ML20210L347 | 14 January 1997 | Responds to 960926 Memo to Ew Merschoff Re Proposed Enforcement Actions Resulting from Crystal River Integrated Performance Assessment Process for Insp Rept 50-302/96-07. Planned Disposition of Potential Enforcement Actions Listed | |
ML20203B391 | 24 December 1996 | Forwards Rept of Investigation Re Alleged Discrimination Against Senior Licensed Operations Supervisors DA Fields & RP Weiss (Case 2-95-020 & 2-95-021) | Fitness for Duty |
ML20203B528 | 4 December 1996 | Expresses Appreciation for Prompt Review of Six Transcripts Provided in 961003 Memo |