ML20215K736
Letter Sequence Meeting | |
---|---|
TAC:62935, (Open) | |
Initiation
Results
Other: ML20196A234, ML20207L533, ML20209F820, ML20211B995, ML20213A567, ML20214J698, ML20214J930, ML20214J973, ML20234C463, ML20234E291, ML20235J298 | |
MONTHYEARML20138D9431985-10-17017 October 1985
[Table View]Notification of 851022 Meeting W/Util & S&W in Bethesda,Md to Discuss Fire Protection Deviation Requests Project stage: Meeting ML20206J0051986-06-23023 June 1986 Forwards Documentation of Attendees at 841130 & 1207,850117, 0820,0919 & 1022 Meetings W/Util Re Structural Engineering, Geosciences Issues,Pressure Isolation Valves,Power Sys, Computer Code Multiflex & Fire Protection,Respectively Project stage: Meeting ML20215K7361986-10-23023 October 1986 Notification of 861105 Meeting W/Util in Bethesda,Md to Discuss Issues Re Fire Protection,Including Util Deviations from Staff Technical Position Project stage: Meeting ML20214D3181986-11-18018 November 1986 Summary of 861105 Meeting W/Util,Stone & Webster & Franklin Research Inst Re Fire Protection Issues.Draft Sser 3,list of Deviations from SRP 9.5.1,agenda & List of Attendees Encl ML20207L5331987-01-0606 January 1987 Forwards Updated FSAR Fire Protection Matl in Preparation for Upcoming NRC Fire Protection Audit.Submittal Contains Info for Resolution of SER Open Item 5 & Confirmatory Item 48c.Matl Will Be Incorporated Into Amend 14 to FSAR Project stage: Other ML20207N1901987-01-0808 January 1987 Notification of 870129 Meeting W/Util in Shippingport,Pa to Conclude 4-day Site Review of Fire Protection Issues.Issues Identified as Confirmatory Issue 48 & Backfit Issue 7 in Sser 3 Project stage: Meeting ML20213A5671987-01-27027 January 1987 Requests Security Passes Be Provided to Personnel for 4-day Site Review to Begin on 870108 Re Fire Protection Issues Project stage: Other ML20209F8201987-01-30030 January 1987 Forwards Amend 14 to Fsar,Consisting of Updated FSAR Fire Protection Info Provided in Author .Info Affects Section 9.5.1 of SER Project stage: Other ML20155H2511987-02-0505 February 1987 Summary of 870130 Meeting W/Util & S&W in Bethesda, MD to Conclude NRC Fire Protection Site Review of 870127-29.List of Attendees Encl Project stage: Meeting ML20211B9951987-02-11011 February 1987 Forwards Addl Info Re Fire Protection,Including Info Re SRP Deviation on Structural Steel & Vendor Justification of Thickness Requirements for HVAC Ductwork Fire Wrap,Per NRC 870126-30 Fire Protection Site Visit Project stage: Other ML20210C3141987-04-30030 April 1987 Forwards Request for Addl Info Re Confirmatory Issue 46, Fire Protection Deviations & Confirmatory Issue 46, Control Room Isolations on High Radiation Signals. Encl Provides Background Info for Telcon.No Response Required Project stage: RAI ML20214J6981987-05-18018 May 1987 Describes Fire Detection & Suppression Sys at Facility (Ref NRC ).Present Capability of Sys Adequate & Overall Plant Safety Would Not Be Significantly Increased by Modifying Suppression Sys Alarm Circuits.W/Four Figures Project stage: Other ML20214J9301987-05-18018 May 1987 Forwards Changes Expected to Occur in Next Rev to Amend 18 of Fsar,Section 9.5 Re Fire Protection Project stage: Other ML20214J9731987-05-20020 May 1987 Provides Compensatory Measures to Deal W/Fire Zones Containing Equipment Necessary for Tech Spec Equipment Operability Where fire-rated Assemblies Incomplete.Hourly Fire Patrols Conducted When Necessary Project stage: Other IR 05000412/19870371987-05-28028 May 1987 Insp Rept 50-412/87-37 on 870420-0501.No Violations Noted. Major Areas Inspected:Preoperation & Startup Test Program, Startup Test Procedure Review,Qa Interfaces & Emergency Diesel Generator Instrumentation Vibration Project stage: Request ML20234C4631987-06-24024 June 1987 Forwards Util Comments on Low Power License for Facility, Including Discussion of Fire Protection & Plant Safety Monitoring Sys.Util Will Work W/Nrc Project Manager to Resolve Comments Project stage: Other ML20235J2981987-07-0606 July 1987 Responds to Questions Posed by D Kubicki in Telecon Re Fire Protection Supervisory Circuits & Schedule for Completion Project stage: Other ML20235Q7051987-09-30030 September 1987 Forwards Testing Status of CO2 Fire Suppression Sys. Overpressure Problems Associated w/CO2 Discharge Testing Eliminated by Installation of Back Draft Dampers.Expected Completion Date Revised to 871231 Project stage: Draft Other ML20234E2911987-12-31031 December 1987 Advises That CO2 Concentration Testing Successfully Completed for All Eight Zones,Per 870930 Commitment to Provide Schedule for Completion of Unfinished Fire Protection Items Project stage: Other ML20196A2341988-06-20020 June 1988 Concludes That Based on Licensee Annual Rept of Facility, Changes,Tests & Experiments & 880608 Site Visit, Changes,Tests & Experiments Meet Criteria in 10CFR50.59. Lists Improvements Recommended to Licensee During Visit Project stage: Other 1987-02-11 |
ML20215K736 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 10/23/1986 |
From: | Tam P Office of Nuclear Reactor Regulation |
To: | Rubenstein L Office of Nuclear Reactor Regulation |
References | |
TAC-62935, NUDOCS 8610280282 | |
Download: ML20215K736 (3) | |
Similar Documents at Beaver Valley | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212K8811999-10-0404 October 1999
[Table view]Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20199J0641998-12-30030 December 1998 Notification of 990119 Meeting with Duquesne Light Co in Rockville,Md to Discuss Status of Licensing Actions/ Activities Currently Being Reviewed by NRC & of License Amend Requests Expected to Be Submitted in Near Future ML20198G9941998-12-22022 December 1998 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor Operated Valves Program ML20196H1391998-12-0404 December 1998 Informs That Encl RAI Was Transmitted on 981204 to F Ferri of Dl.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20195G4501998-11-10010 November 1998 Rev 1 to Notification of Significant Licensee Meeting 98-87 with Util on 981116 to Discuss NRC Presentation of Osti Exit Followed by Util Presentation on Unit Restart Plant Performance ML20155K3451998-11-0505 November 1998 Notification of Significant Licensee Meeting 98-87 with Util on 981116 in Beaver Valley Power Station,Emergency Response Facility Conference Room A,For NRC Presentation of Osti Exit & Dl Presentation on Unit Restart Plan Performance ML20154M4501998-10-16016 October 1998 Informs That Encl RAI Was Transmitted by Facsimile on 981002 to F Ferri of Dlc for Use in Telcon on 981009.Memo & Attachment Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154D4481998-10-0505 October 1998 Forwards Exam Rept with as Given Written Exam for Test Administered on 980817-21 at Unit 2,for Processing Through Nudocs & Distribution to NRC Staff ML20154D5611998-10-0505 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21 ML20237B8081998-08-17017 August 1998 Forwards NRC Operator Licensing Exam Rept 50-334/98-300OL for Exam Administered on 980420-24 & 0518 ML20236X5981998-08-0404 August 1998 Notification of 980820 Meeting W/Util in Rockville,Md to Discuss Proposed Submittal of Improved Std TS ML20236K9051998-07-0101 July 1998 Notification of Significant Licensee Meeting 98-65 W/Util on 980716 to Discuss Plant Status & Preparations for Plant Restart IA-98-155, Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples1998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20236N6351998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20247D1541998-05-0505 May 1998 Notification of 980519 Meeting W/Duquesne Light Co in Shippingport,Pennsylvania to Discuss NRC SALP of Beaver Valley Power Station for Period of 960929-980321 ML20248L6081998-03-0505 March 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 971215-18 at Facility ML20248L6621998-03-0505 March 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam for Test Administered on 971215-18 at Facility ML20212G4791997-10-28028 October 1997 Forwards SER Accepting Licensee 970213 Request Re Pressurized Thermal Shock Assessment for Beaver Valley Unit 2 Reactor Vessel ML20149G3261997-07-18018 July 1997 Notification of 970805 Meeting W/Util in North Bethesda,Md to Discuss Plans & Schedules for Resolution of 10CFR50.61 Updated Info for Pressurized Thermal Shock Evaluation ML20149D2891997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317 IR 05000334/19970031997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam Repts 50-334/97-03OL & 50-412/97-03OL (Including Completed & Graded Tests) for Tests Administered on 970317-21 & 970428- 0502 ML20149D2851997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317-21 ML20148E1881997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-60 W/Util on 970623 to Discuss Surveillance Test Program Apparent Violations ML20138Q1171997-02-27027 February 1997 Rev 1 to Notification of Significant Licensee Meeting 97-20 W/Util on 970307 in King of Prussia,Pa to Discuss Plant Configuration Control Issues Related to Component Mispositionings ML20135D1271997-02-20020 February 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970304 to Discuss Plant Configuration Control Issues Re Component Mispositionings ML20133D6221997-01-0202 January 1997 Rev 3 to Notification of Significant Licensee Meeting 96-128 W/Util in King of Prussia,Pa Re Predecisional EC to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20132E7361996-12-17017 December 1996 Notification of Significant Licensee Meeting 96-462 Rev 2 W/Util on 961230 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4601996-12-0606 December 1996 Notification of Significant Licensee Meeting W/Util on 961219 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4921996-12-0404 December 1996 Notification of 961219 Significant Licensee Meeting 128 W/Util in King of Prussia,Pa to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps IA-97-166, Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review1996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20141M6491996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20129E7161996-09-30030 September 1996 Forwards Request for Addl Info Re Request to Amend 10CFR50, App H Surveillance Program & Info Provided in WCAP-14484 ML20059K7871994-01-0606 January 1994 Notification of Enforcement Conference 94-06 W/Util on 940118 to Discuss EDGs Solid State ATC Timer/Relays ML20059C3261993-12-28028 December 1993 Discusses Suggestion for More Efficient Use of NRC & Licensee Resources ML20058E4201993-11-26026 November 1993 Notification of Significant Licensee Meeting 93-157 W/Util on 931202 to Discuss AIT Exit Meeting ML20059K5501993-11-0808 November 1993 Notification of Significant Licensee Meeting 93-146 W/Util on 931115 in King of Prussia,Pa to Discuss Training Program Improvement Following Initial Exam Results from May 1993 ML20059K2711993-11-0303 November 1993 Discusses 931027 Operating Reactors Events Briefing Conducted to Inform Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 931020. List of Attendees Encl ML20059H1381993-11-0202 November 1993 Notification of 931110 Meeting W/Util in Rockville,Md to Discuss Dlc Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059J4471993-11-0202 November 1993 Notification of Cancellation of 931110 Meeting W/Util in Rockville,Md to Discuss Util Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059G1271993-11-0202 November 1993 Notification of Significant Licensee Meeting 93-139 W/Util on 931119 in King of Prussia,Pa to Discuss Enforcement Conference Re Open Containment Penetration During Refueling ML20056G8161993-08-23023 August 1993 Notification of Significant Licensee Meeting 93-111 W/Util on 930902 to Discuss Plant Operator Training Program ML20202H7351993-07-22022 July 1993 Informs That Investigation Re Potential Wrongdoing Initiated by OI on 930223,under Case 1-93-008 Being Closed.Evaluation of Facts & Circumstances Surrounding Issues Indicate That No Underlying of Regulatory Requirements Exist ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20128D2701992-11-25025 November 1992 Notification of 921210 Meeting W/Dl in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in High Pressure SIS ML20125C9761992-11-25025 November 1992 Notification of Canceled Meeting on 921210 in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in high-pressure Safety Injection Sys 1999-07-12 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20212K8811999-10-0404 October 1999
[Table view]Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20212F5401999-09-24024 September 1999 Staff Requirements Memo Re 990924 Affirmation Session Concerning SECY-99-236, Firstenergy Nuclear Operating Co, Local 29 Petition to Waive Time Limits in 10CFR2.1305 & Suppl Comments ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20199J0641998-12-30030 December 1998 Notification of 990119 Meeting with Duquesne Light Co in Rockville,Md to Discuss Status of Licensing Actions/ Activities Currently Being Reviewed by NRC & of License Amend Requests Expected to Be Submitted in Near Future ML20198G9941998-12-22022 December 1998 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor Operated Valves Program ML20196H1391998-12-0404 December 1998 Informs That Encl RAI Was Transmitted on 981204 to F Ferri of Dl.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20195G4501998-11-10010 November 1998 Rev 1 to Notification of Significant Licensee Meeting 98-87 with Util on 981116 to Discuss NRC Presentation of Osti Exit Followed by Util Presentation on Unit Restart Plant Performance ML20155K3451998-11-0505 November 1998 Notification of Significant Licensee Meeting 98-87 with Util on 981116 in Beaver Valley Power Station,Emergency Response Facility Conference Room A,For NRC Presentation of Osti Exit & Dl Presentation on Unit Restart Plan Performance ML20154M4501998-10-16016 October 1998 Informs That Encl RAI Was Transmitted by Facsimile on 981002 to F Ferri of Dlc for Use in Telcon on 981009.Memo & Attachment Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154D5611998-10-0505 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21 ML20154D4481998-10-0505 October 1998 Forwards Exam Rept with as Given Written Exam for Test Administered on 980817-21 at Unit 2,for Processing Through Nudocs & Distribution to NRC Staff ML20237B8081998-08-17017 August 1998 Forwards NRC Operator Licensing Exam Rept 50-334/98-300OL for Exam Administered on 980420-24 & 0518 ML20236X5981998-08-0404 August 1998 Notification of 980820 Meeting W/Util in Rockville,Md to Discuss Proposed Submittal of Improved Std TS ML20236K9051998-07-0101 July 1998 Notification of Significant Licensee Meeting 98-65 W/Util on 980716 to Discuss Plant Status & Preparations for Plant Restart ML20236N6351998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples IA-98-155, Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples1998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20247D1541998-05-0505 May 1998 Notification of 980519 Meeting W/Duquesne Light Co in Shippingport,Pennsylvania to Discuss NRC SALP of Beaver Valley Power Station for Period of 960929-980321 ML20248L6621998-03-0505 March 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam for Test Administered on 971215-18 at Facility ML20248L6081998-03-0505 March 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 971215-18 at Facility ML20212G4791997-10-28028 October 1997 Forwards SER Accepting Licensee 970213 Request Re Pressurized Thermal Shock Assessment for Beaver Valley Unit 2 Reactor Vessel ML20149G3261997-07-18018 July 1997 Notification of 970805 Meeting W/Util in North Bethesda,Md to Discuss Plans & Schedules for Resolution of 10CFR50.61 Updated Info for Pressurized Thermal Shock Evaluation ML20149D2851997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317-21 IR 05000334/19970031997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam Repts 50-334/97-03OL & 50-412/97-03OL (Including Completed & Graded Tests) for Tests Administered on 970317-21 & 970428- 0502 ML20149D2891997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317 ML20148E1881997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-60 W/Util on 970623 to Discuss Surveillance Test Program Apparent Violations ML20138Q1171997-02-27027 February 1997 Rev 1 to Notification of Significant Licensee Meeting 97-20 W/Util on 970307 in King of Prussia,Pa to Discuss Plant Configuration Control Issues Related to Component Mispositionings ML20135D1271997-02-20020 February 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970304 to Discuss Plant Configuration Control Issues Re Component Mispositionings ML20133D6221997-01-0202 January 1997 Rev 3 to Notification of Significant Licensee Meeting 96-128 W/Util in King of Prussia,Pa Re Predecisional EC to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20132E7361996-12-17017 December 1996 Notification of Significant Licensee Meeting 96-462 Rev 2 W/Util on 961230 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4601996-12-0606 December 1996 Notification of Significant Licensee Meeting W/Util on 961219 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4921996-12-0404 December 1996 Notification of 961219 Significant Licensee Meeting 128 W/Util in King of Prussia,Pa to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps IA-97-166, Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review1996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20141M6491996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20129E7161996-09-30030 September 1996 Forwards Request for Addl Info Re Request to Amend 10CFR50, App H Surveillance Program & Info Provided in WCAP-14484 ML20059K7871994-01-0606 January 1994 Notification of Enforcement Conference 94-06 W/Util on 940118 to Discuss EDGs Solid State ATC Timer/Relays ML20059C3261993-12-28028 December 1993 Discusses Suggestion for More Efficient Use of NRC & Licensee Resources ML20058E4201993-11-26026 November 1993 Notification of Significant Licensee Meeting 93-157 W/Util on 931202 to Discuss AIT Exit Meeting ML20059K5501993-11-0808 November 1993 Notification of Significant Licensee Meeting 93-146 W/Util on 931115 in King of Prussia,Pa to Discuss Training Program Improvement Following Initial Exam Results from May 1993 ML20059K2711993-11-0303 November 1993 Discusses 931027 Operating Reactors Events Briefing Conducted to Inform Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 931020. List of Attendees Encl ML20059G1271993-11-0202 November 1993 Notification of Significant Licensee Meeting 93-139 W/Util on 931119 in King of Prussia,Pa to Discuss Enforcement Conference Re Open Containment Penetration During Refueling ML20059J4471993-11-0202 November 1993 Notification of Cancellation of 931110 Meeting W/Util in Rockville,Md to Discuss Util Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059H1381993-11-0202 November 1993 Notification of 931110 Meeting W/Util in Rockville,Md to Discuss Dlc Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20056G8161993-08-23023 August 1993 Notification of Significant Licensee Meeting 93-111 W/Util on 930902 to Discuss Plant Operator Training Program ML20202H7351993-07-22022 July 1993 Informs That Investigation Re Potential Wrongdoing Initiated by OI on 930223,under Case 1-93-008 Being Closed.Evaluation of Facts & Circumstances Surrounding Issues Indicate That No Underlying of Regulatory Requirements Exist ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20128D2701992-11-25025 November 1992 Notification of 921210 Meeting W/Dl in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in High Pressure SIS 1999-09-24 |
Text
/
I\ October 230 1986 Docket No. 50-412 MEMORANDUM FOR: Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A FROM: Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A
SUBJECT:
FORTHCCMING MEETING WITH DUQUESliE LIGHT COMPANY REGARDING BEAVER VALLEY UNIT 2 DATE & TIME: Wednesday, November 5, 1986 10:00 a.m.
LOCATION: Maryland National Bank Building, Room 6110 7735 Old Georgetown Road Bethesda, Maryland PURPOSE: To discuss with the applicant issues related to fire protection, specifically, the applicant's deviations from the staff's technical position.
PARTICIPANTS: NRC DLC A. Singh J. O'Neal J. Shapaker G. Beatty P. Tam J. Parding NRC Consultants J. Veracek et al.
Peter S. Tam, Project Manager PWR Project Directorate #2 Division of PWR Licensing-A cc: See next page t . PM: PAD 'd C ' er PTam:he 10gj/86 10/43/86 R10280282 861023 p ADOCK 05000412 PDR
b Mr. J. J. Carey Duquesne Light Cortpany Beaver Valley 2 Power Station cc:
Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company 2300 fl Street, N.W. Beaver Valley Two Project Washington, DC 20037 P. O. Box 328 Shippingport, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurar.ce Zori Ferkin Manager Assistant Counsel Quality Assurance Departirent Guvernor Energy Council Duquesne Light Corrpany 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Managenent Agency Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Fcwer Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Managenent Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Box 4 Shippingport, Pennsylvania 15077 Mr. J. Beall U. S. f1RC John A. Lee, Esq.
P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15279 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229
r:.-
MEETING NOTICE DISTRIBUTION T[JDictiei F N 9
~
NRC PDR Local PDR-NSIC-PRC System PAD #2 Rdg D. Miller P. Tam ORAS H. Denton T. Novak C. Rossi S. Varga G. Lear B. Youngblood V. Noonan L. Rubenstein R. Ballard C. Berlinger J. Milhoan F. Rosa V. Benaroya CGC-Bethesda J. Partlow B. Grirres E. Jordan A. Singh J. Shapaker ACRS (10)
OPA Receptionist