Text
,'
c esca,,'
UNITED STATES i
NUCLEAR REGULATORY COMMISSION
'!'i 2d REGION 11
~f' e,
[
101 MARIE 7TA ST.. N.W., SulTE 3100
[
ATLANT A, GE ORGI A 30303
',g January 6,1981 s,
l MEMORANDUM FOR:
Chief, Vendor Inspection Branch, Region IV FROM:
R. C. Lewis, Director, Division of Resident and Reactor Project Inspection
SUBJECT:
CONSTRUCTION DEFICIENCY REPORT - CONFIRMATION OF TELECON (AITS NO. F02700179 )
Attached is a 10'CFR 50.55(e)/10 CFR 21 report received from Mississippi JJwer and Licht Comoany This. appears to be a generic problem.
Would you please followup on the generic aspects of the problem with the AE/Verdor?
Should you have additional auestions, we will be glad to discuss them with yo..
E.c R. C.
ewis cc:
Principal Staff, RII Ac. ting Director, RPI, RI Director, RPI, RIII Acting Director, RRP&VI, RIV Director, RRP&E, RV Wayne Reinmuth, IE CONTACT:
R. Butcher (242-5584 )
8612120128 861203 PDR FOIA ELLIS96-656 PDR
o
. I ; '.
,+'.. **.
[..,,!j DAlf 1/6/81 i ' 4 I t i >'
fD l ! T I C Ai ! D'.
I :i y t.~r EVLHT ptstgygt Att ggg, Browns Ferry 2 Resident Inspector 1/5 Reportable Occurrence - Unit 2 was put on line at Followup per af e 2 re f' DN:50-260 4:00 a.m. on 1/4, but high water conductivity of the of the primary water system occurred and the reactor was shutdown at 4:30 pm. on 1/4 Conductivity reached 2
2.9 unho/cm, which exceeded the technical specification limit of 1.0 umho/cm2 Fif teen condenser tubes were found to be leaking and required plugging.
Report due 2/4.
Grand Gulf 1 & 2 Licensee 1/5 Transamerica Delaval Governor Lube Oil Coolers on DG's Followup per DNS:50-416 DSR & DSR-V series - Installation of oil cooler above MC 2512 50-417 the oil level in the governor may create a diesel Region IV generator starting problem.
Noti fied.
Assigned C-2 GENERAL:
Paul Collins of NRR operator licensing will meet today with the Duke Power Company Officials in Charlotte to discuss new operator training practices and techniques.