. d *"..,,'c UNITED STATES NUC ~ 'AR REGULATORY COMMISSION
)
/
l~
.[}
REGION 11 f
101 MARIE TT A ST., N W SulTE 3100
, ', _ g 8
~
- 5 ATL ANT A, GEORGI A 30303
.p
- ...e September 10, 1982 MEMORANDUM FOR:
Chief Vendor Inspection Branch, Region IV FROM:
R. C. Lewis, Director, Division of Resident and Reactor Project Inspection
SUBJECT:
CONSTRUCTION DEFICIENCY REPORT - CONFIRMATION OF TELECON (AITS N0. F02700286 )
Enclosed is a 10/CFR 50.55(e)/10 CFR 21 report received from Duke Power Company This appears to be a generic problem.
Woul d you please followup on the generic aspects of the problem with the AE/ Vendor?
Should you have additional questions, we will be glad to discuss tham with you.
f.[
R. C.
ewis Enclosure : as stated ' '
cc:
J. Clshinski, RII Director, RRPI, RI Director, RRPI, RIII Director, RRP&E, RV B. Heishman CONTACT:
A. Iginatonis (242 5588
)
8612120259 861203 h
ISS 656 PDR
--=-
4 syt. f) fj : : ' i.
-p-
. g n,,; -
, gy. ; ;
JATF _ 9f._10f,82
'f. I; ' l i
- prl : - ;:9 7: :: a;; t yg,;
REGIONAL ACT10:4 Catawba 1 & 2 Licensee 9/9 CDR - ljnsuitable Rubber Application to Diesel Followup per DNS:50-413 Gjgterator Coupling - Per the 6/23 letter from MC 2512. 414 DeLaval Co. to NRC reporting a Part 21 item, Region IV Notified.
Catawba was listed as one of the plants that Cat I received an unacceptable governor drive coupling manufactured by Koppers Co., Inc.,
Baltinore, MD.
The cancern is that Isoprene rubber material was used in the coupling.
This rubber tends to deteriorateg under oil and high temperature conditions which creates the potential of metal to metal contact between flanges in the coupler while the diesel generator is running.
Metal to metal contact can give false indication of generator frequency and trip out the running DG.
For corrective action the licensee will remove couplers having Isoprene material and replace w.n c.pty> rpan then whicr wou d have m.20prene material, liritten report due 10/ 8.
9 e
b B-6
)
Rev. 11/81 VIB
.aPECTION REPORT ROUTE SHEET
/
VEN00R/EORTRh&TORhAufM1twa'$hu:8 lAbwhsuA.l fnae J Dai V
/
DOCKET NO. 94&oo a 3 y REPORT N0./L-o z DATE OF INSPE'CTION: _4 23-24 N/2 p
REPORT DUE DATE: 9-//-#2 BY: Z u >. S 7/j a -
SUBMITTED TO PROCESSING:
VIB rf PRIORITY STATUS:* DRAFT URGENT FINAL URGENT EIB /
nh ASAP ASAP RPB dm ROUTINE ROUTINE i
(URGENT:1.e. stop other work in progres;; ASAP:. Supersedes other scheduled work; ROUTINE: normal order of work).
- 0ther than Routine must be initialed by Branch Chief GUNitNib:
Report, /66, /bbs, insoection Data bheets. ADoena1x A, Iravel Itinerary DRAFT: jeview/Conupnt/ Signature:
Date Submitted Date Comoleted 0
ED C
(S)_II I,h i,
- J D,
(S)
M9 h
)Wj zNst/0-3 'd'bfRC. r77
/ 3.c.
(S) ] I g/ d l% Q,w' F (IM/ /o4 Art A2)
T0: INSPECTOR /SECTION CHIEF:
TO: BRANCH CHIEF (S)
(3) d/g 08 /od/d2-Ml D.x (a)
T0: ENFORCEMENT COORDINATOR: (S) 6 COMMENT:
SPECIAL NOTE: RETURN DRAFT COPY TO BRANCH SECRETARY AFTER ENFORCEMENT COORDINATOR (S) Completed by Secretary (3) Completed by Branch Chief (1) Completed by Inspector /Section Chief (4) Completed by Enforcement Coordinator
, (2) Completed by extra Section Chief, if more than one section is involved l
- If Enforcement Coordinator is not present, submit to Administrator for review / concurrence I
- Branch Chief makes determination about status of report, i.e. redrafted, etc.
d Da tdSubmitted Date Comoleted g:
Review / Concurrence /Signaturg
~
& II NT2.k REPORT SUBMIT" TO PROCES :
IST (S) c, I
T'OR 10 EF:
(S)
V2.
EMY I[2h N
'y p rJ, h /9-lt lv To: ENFORCEMENT COORDINATOR:
(S)
(4)
J, 93 CLOSE0VT DATE N
\\
CATE DUE AFTER 10 DAYS DATE DUE AFTER 30 DAYS (RESPONSE DUE)
-