Submits Addl Info Re Hydrogen Water Chemistry Testing Under Provisions of Tech Specs Amend 125,per G Rivenbark Request. Radiological Assessment of Hydrogen Injection Test to Be Provided Following Performance of Testing
ML20211A446
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/03/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
0769C, SL-1330, TAC-60895, NUDOCS 8610150132
Download: ML20211A446 (2)


Text

.. . . .- . . _ . . - - .

i~.. A. Georgia Fbwer Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 5264526 Mailing Address:

i Tbst Office Box 4545 Atlanta, Georgia 30302 GeorgiaPower L T. Gucwa the southem ektre sgtem

, Manager Nuclear Safety SL-1330

. ano ucensin0 0769C October 3,1986

Director of Nuclear Reactor Regulation Attention
Mr. D. Muller, Project Director
BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 HYDROGEN WATER CHEMISTRY TESTING UNDER PROVISIONS OF TECHNICAL SPECIFICATIONS AMENDMENT 125 i

Gentlemen:

Georgia Power Company's (GPC) letter of March 7, 1986 requested approval of- an amendment to the Plant Hatch Unit 1 Technical Specifications which would allow performance of test injections of hydrogen into primary reactor - coolant. GPC's letter of April 22, 1986 provided additional information in regard to the test injection procedures and associated dose control measures. NRC approved the requested Technical Specification changes as Amendment 125 to Operating License DPR-57, dated May 21, 1986.

Some hydrogen injection testing was performed during July 1986.

However, results of this test indicated the need to continue the testing in order to meet test objectives. Additional testing will be performed as early as November 1986. Further changes to ' Amendment 125 or to the rest of the Unit 1 Technical Specifications are not required in order to support such testing. However, NRC (George Rivenbark) has verbally requested that GPC provide the following infomation:

Measures and procedures outlined in GPC's submittals of March 7, 1986, and April 22, 1986 for performance of hydrogen injection testing will be followed. This includes implementation of dose control measures and appropriate controls for use of hydrogen onsite. The additional testing involves essentially the same equipment and test sequence as before.

h P

g

, -7 ,,_-m - - -

, - - . _ - - - -- -m.-.-,_r -,

GeorgiaPower1 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 October 3,1986 Page Two As requested in NRC's letter of May 21 , 1986, which transmitted Amendment 125 to the Unit 1 Technical Specifications, GPC will provide NRC with a radiological assessment of the hydrogen inj ection test following performance of the testing.

Please contact this office if you desire further information.

Sincerely,

/ f" C - ,

L. T. Gucwa REB /1c c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. J. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr. Inspector - Hatch GO-NORMS l

0769C 70077$

.- --- , . , - - , - . - - - . , . - - - . - - - - - - . - . . - .