MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl ML20214A5501987-05-14014 May 1987 Partially Deleted Memo Re Recommendation for Diablo Canyon Board Notification Concerning 831019 Allegations ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20215H9221987-05-0707 May 1987 Submits Results of Lll Exam of Facility Raceway Support Bolted Connections.Exams Conducted Due to Allegations Re Adequacy of Anchor Bolts & Feedback from Lll That Adequacy of Bolting Might Be Safety Issue 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236Y1501987-12-0707 December 1987 Staff Requirements Memo Re 871125 Affirmation/Discussion & Vote.Commission Approved Order Directing Aslab to Issue Decision by 880131 Re Installation of high-density Spent Fuel Racks & Order Vacating Stay for Low Power Operations ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl 1999-08-27
[Table view] |
Text
s l g{ o UNITE 3 STATES y; g NUCLEAR REGULATORY COMMISSION
~
j REGWN V , , . ,
0, 1450 MARIA LANE, SUITE 210 . .i.
6 WALNUT CREEK, CALIFORNI A 94596 g
FEB 2 31982 l
MEMORANDUM FOR: H. R. De , Director, Office of Nuclear Reactor Regul FROM: R. H. Engelken, Regional Administrator, RV
SUBJECT:
DIABLO CANYON SEISMIC ~ DESIGN' REVERIFICATION PROGRAM l In accordance with our discussion today, the following coments l regarding Pacific Gas & Electric's' (PG&E) Design Reverification
! Program, are provided for your consideration in responding to PG&E and the Comission. The comments address those actions proposed by i
PG&E in its letter of December 4, ~1981 in response to NRC Order i
CLI-81'-30. The coments also supplement those provided in previous memoranda to your office (memo to Frank Miraglia, NRR, from l B. H. Faulkenberry, RV, dated December 16, 1981; and memo to H. R. Denton, NRR, from R. H. Engelken, RV, dated January 16,1982).
During the conduct of the Diablo Canyon seismic design investigations, Region V had an opportunity to observe the activities of the independent seismic reverification contractor proposed by PG&E. The professional qualifications of the contractor (R. L. Cloud Associates, Inc. , RLCA),
in our opinion, are sufficient to perform the technical analyses and reviews required. RLCA has identified areas where its organization i
lacks expertise and has subcontracted experts for assistance in these areas (e.g. quality assurance, soils analysis, structural analysis,
~
i and systems engineering). The contractor also appears to be effective in identifying weaknesses in facility design. However,.we have noted a lack of formality in certain aspects of the design reverification activity and have observed a significant growth in the contractor's organization. These two factors, some lack of formality and rapid organizational growth, are of concern. It appears that neither PG&E nor the contractor fully appreciated the scope of the reverification program and the resources needed to fully implement the program at its onset. As a consequence, the contractor has had to increase his staff from approximately six people to approximately' 30 people (including subcontractors) in a short time period. The proposed i
contractor has been challenged to provide a fully developed management
! system for a project of this magnitude. Related to this, we have observed that the contractor's management procedures for the project are brief and lack the formality of larger engineering organizations (e.g. , formal reverification procedures , combined with established procedures for design reviews, professional staff training sessions, and established internal quality assurance overviews). In short, h[2lg1 860916 HOLMES 86-I51 PDR
H. R. Denton FEB 231982 we are concerned that, due to the magnitude of the currently defined program, the proposed contractor cannot conduct the reverification activities without a continuing challenge to the management systems of his organization, which could result in a less than thorough execution of the reverification program.
In reference to the proposed contractor's independence, it appears that RLCA meets the criteria established by the Commission (as identified in enclosure 3 to Chairman Palladino's letters to Congressmen Ottinger and Dingell, dated February 1,1982) with the possible exception of R. L. Cloud's previous work relating to the qualification of Westinghouse equipment. Even though no criterion has been established in the area of source of income, it should be recognized that a substantial percentage (48%) of RLCA revenues for the first 10 months of 1981 came from PG&E. A substantially greater percentage of revenues will result from RLCA's current role in the Diablo Canyon reverification program. We caution, however, against the exclusion of a small contractor solely on the basis of the source of his income, since this may unfairly preclude a small contractor from participating in reviews of this nature.
In view of the above, it is.our recommendation that the overview role of Teledyne Engineering Services be expanded and better clarified to address the folicwing items. These items should be specifically
- - defined in Teledyne's program plan and implementing procedures:
l 1. Evaluate the scope, depth, and quality of the RLCA (and subcontractors) activities.
- 2. Perform or direct additional verifications, as determined necessary by 1., above.
- 3. Examine the corrective action plans for effectiveness (considering such aspects as sample size for further verifications, depth of further reviews, and technical adequacy of proposed hardware changes).
- 4. Verify corrective action implementation.
- 5. Upon implementation of the above and completion of the Phase I review, provide a statement to PG&E and the NRC indicating:
- a. reverification status,
- b. findings and corrective actions status, and
- c. conclusions regarding the quality and thoroughness of the l
reverification effort and the implications of the findings and resultant corrective actions with respect to the safety of plant fuel load and low oower operations.
H. R. Denton FE6 4' 1 iW
- 6. In performing the above activities, Teledyne should report independently to PG&E and the NRC, in a manner which assures
- that Teledyne's independence is not compromised. Reports, proposed findings, findings, etc. should be transmitted simultaneously to the license /RLCA/NRC, and auditable records maintained on all document reviews and changes. Particular attention should be addressed as to whether the RLCA reviews adequately considered known problem areas ~ (e.g. , IEB-79-02, IEB 79-14, and 50.55(e) items related to seismic design).
The above actions may be completed by Teledyne under its cur.ent proposed role as an "overviewer". As an alternative PG&E could be required to task Teledyne with responsibility for the Phase I reverification, allowing credit for RLCA activities as supported by the evaluation discussed above. In either case, the following two independence aspects should be retained: Teledyne and RLCA should not perform verifications of any work which they originally performed; and the contractural separation between Teledyne and RLCA should be maintained, i.e. , PG&E should not consider designating RLCA as a subcontractor to Teledyne.
Should you have questions regarding the recommendations discussed, please contact this office.
/k R. H. Engelken, i Regional Adninistrator cc: W. J. Dircks, EDO R. C. DeYoung, IE