ML20210E460

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request.Documents Listed in App B Encl.Documents Also Available in PDR
ML20210E460
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/16/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20209C222 List:
References
FOIA-86-151, RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8609250012
Download: ML20210E460 (3)


Text

&--D(h e

y Sa mao UNITED STATES

/ o NUCLEAR REGULATORY COMMISSION g o W ASHIN GTON. D. C. 20555

. 1

.,...... SEP 161996 Mr. Gregory A. Holmes Associate Consultant MHB Technical Associates 1723 Hamilton Avenue, Suite K IN RESPONSE REFER San Jose, CA 95125 TO FOIA-86-151

Dear Mr. Holmes:

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

_X__ This is a partiel response to your request. We will notify you upon completion of search for and review of any additional records subject to your request.

_ _ _ _ The staff has completed the search for and review of records subject to your request, and this is the final response to your request.

The NRC has no records subject to your request.

Records subject to your request are available for public inspection and copying at the NRC.Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s). The PDR accession number is identified beside each record description.

_X__ Records subject to your request are being made available for public insrection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PPR file folder under the above number and your name. These records are listed on the enclosure (s).

We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.

Sincerely, 8609250012 860516 PDR FOIA g HOLMESB6-151 PDR Donnie H. Grimsley, Director Division of Rules and Records Office of Administration Enclosure (s): As stated P

.G'd Re: FOIA-86-151 APPENDIX B

1. 12/16/81 Memo for FMiraglia from BHFaulkenberry re: Region V Comments on PG&E's Design Verification Program Plan and Qualifications oY '

Companies Proposed to Conduct Independent Reviews (3 pages)

2. 1/15/82 Memo for RHEngelken thru JLCrews from PJMorrill, KSHerring, JRFair re: Preliminary Assessment of R. L. Cloud and PG&E Reverification Program (3 pages)
3. 1/16/82 Memo for HDenton from RHEngelken re: Reverification Programfby R. L. Cloud Associates for Diablo Canyon (4 pages)
4. 2/23/82 Memo for HRDenton from RHEngelken re: Diablo Canyon Seismic Design Reverification Program (3 pages)
5. 2/24/82 Memo for RCDaYoung from RHEngelken re: Apparent Violations of Regulatory Requirements identified at Diablo Canyon Nuclear Power Plant Related to Seismic Design Errors Discovered on September 22, 1981; the Material False Statement Made on November 2, 1981; and other Potential Violations Identified .

by the Licensee or NRC During the Design Reverification Program (2 pages)

6. 7/30/82 Memo for DGEisenhut from RHEngelken re: Diablo Can Verification Program - Scope of Phase 1 (2 pages) yon Design
7. 8/20/82 Memo for DGEisenhut from RHEngelken re: Diablo Can Verification Program - Scope of Phase II (4 pages) yon
8. 3/29/82 Memo for HRDenton from RHEngelken re: Diablo Canyon Design Verification Program (1 page)
9. 9/17/82 Memo items for(DGEisenhut 14 pages) from PHEngelken re: Diablo Canyon Action
10. 9/24/82 Memo for DGEisenhut from TWBishop re- Summary Status of Region V Diablo Canyon Action Items (13 pages)
11. 10/6/82 Memo for DGEisenhut from RHEngelken re: Diablo Canyon Phase 11 Commission Paper (5 pages) i 12. 6/30/83 Memo for TBishop, DKirsch from PMorrill re: Non-destructive l

Examination (NDE) Activities to be Performed at Diablo Canyon Related to Reactor Coolant System (RCS) piping Minimum Wall l

i Problem (5 pages) e

13. 7/21/83 Memo for HSchierling Diablo Canyon from PMorrill SER Supplement (9 pagesre:) Region V Input for
14. 8/23/83 Memo for GWKnighton from TWEishop re: Radiation Safety Items Related to Diablo Canyon (8 pages)

7,. ., .

+ ,

\;

i. >

,w.

Re: FOIA-86-151

?

, L _

APPENDIX B (cont'd) s .

1

~l 15. 9/22/83 Memo for HSchierling from PHMorrill re: Diablo Canyon i

Response to Gsvernor Deukemejian's Third Set of Interogatories(5 pages)

16. 10/14/83 Memo for JBMartin from TWBishop re: Result of the Diablo Canyon Unit I License Reinstatement Review Panel Considerations (12 pages) 0 17.'

' 10/20/83 Memo for DGEisenhut from TWBishop re: Recommendation for w Diablo Canyon Board Notification Regarding Allegations Received October 19,1983 (w/o Confidential enclosure) (2 pages) 18.

10/26/83 Memo for DGEisenhut from TWBishop re: Allegations Concerning c

the Residual Heat Removal System, Diablo Canyon Units 1 and 2 Docket Nos. 50-275 and 50-323, Allegation No. RV-83-A-0047 (10 pages)

C *' 19. 11/15/83 Memo for HDentor, from JBMartin re: Fuel Loading - Diablo Cr.nyon Unit 1 Pacific Gas and Electric Company (3 pages) 20.

12/12/83 Memo for GWKnighton, HSchierling, PTKuo thru DFKirsch from PJMorrill re: Diablo Canyon - Allegations Concerning Errors in Design and / Documentation Components (7 pages of) Safety Related Systems, Structures, f

l l

l

__