J APPENDIX A NOTICE OF VIOLATION Texas Utilities Electric Company Dockets: 50-445/86-07 Comanche Peak Steam Electric Station (CPSES) 50-446/86-05 .

Units 1 and 2 Permits: CPPR-126 )

CPPR-127 During an NRC inspection conducted on April 1 through May 31, 1986, six

' violations of NRC requirements were identified. The violations involved a corrective action report (CAR) that was closed before corrective action was "d -

complete, timely criteria for base metal defect inspections were not provided, }

temporary modification to cables was not properly documented, terminal blocks .*

were not identified, drawing errors were not identified during reviews and checks, and design changes were not reviewed by those responsible for the original design. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violations are listed below: [

A. Criterion V of Appendix B to 10 CFR Part 50, as implemented by

-Section 5.0, Revision 3, dated July 31, 1984, of the TUGCo Quality j_

Assurance Plan (QAP), requires that activities affecting quality shall be g prescribed by and accomplished in accordance with documented instructions, procedures, or drawings of a type appropriate to the circumstances.

Paragraph 3.2.3 of TUGCo Procedure CP-QP-17.0, Revision 6, states, in s part, " Corrective Action Reports shall remain open until all of the -

required corrective action has been completed." ".

Contrary to the above, CAR-049 was closed before corrective action was 5 completed and more importantly, ufore the corrective action was clearly i defined. CAR-049 was closed on January 16, 1986, on the basis of a memo ,

(C."DA-47,715) dated November 26, 1985, which stated that Unit 2 limit 7 switch terminations would be identified upon issuance of DCA-23,473; g however, this Design Change Authorization (OCA), issued on December 4, 2 1985,hadnorequirementtoidentifyorcorrectpreviouslyinstalledlim1S 3 switch terminations on Unit 2. _g n

This is a Severity Level IV violation (Supplement II) (445/8607-V-24).

i B. Criterion III of Appendix B to 10 CFR Part 50, as implemented by Section 3.0, Revision 4, dated November 20, 1985, of the TUGCo QAP,

{%

states, in part, " Measures shall be established to assure that applicabie K regulatory requirements and the design basis . . . are correctly  ;

translated into specifications, drawings, procedures, and q instructions . . . . The design control measures shall provide for T verifying or checking the adequacy of design, such as . . . by the use of $_

alternate or simplified calculational methods . . . . The design control #

measures shall be applied to items such as . . . delineation of acceptance c criteria." ,

f k

O G

p ADO { -

h

^ ' ' -- ~ -- - * * * -

g {" g;;] '] j ' ;{ ;

~

7 . o Q u Q 'y } K; .,

? Q% mhf ' W

~

t ,-

%g j:gW1- ,

_ig; ,

y; ~ fyg;- " -

c pyn ( , -

~

,&f f -l

  • QMW

~

Contrah toLthe above, on. Sept' ember 25.1985, TUGCo_ Nuclear g N Engineeringi(TNE).-in response to Evaluation Research Corporation's 1 Technical 1Information Request:(TIR) No.-TIR-017~ dated August 26, 1985, 4 7% g a, y - niprovided design information_which delineated;the_ acceptance criteria for ~

.. s g , ; base material defects (verifyingathe' adequacy onof'the

field fabricateddesign;information tanksLwas 1TNE's by the method use of- for

- 'd  : calculations. u However, as: of May ?15,1986, those-calculations:were .

Jncomplete
andfunapproved.:

yw ..

r m. .- . .-

, Thisiis.'a Severity Level IV violation (Supplement i II) (445-8607-V-02).

v, m-f '.. T.. .

R$ - C. Criterion ~V2of; Appendix?B to-10 CFR'Part-50,.as implemented by .

/

1 (Section'.5.0,1 Revision 3,: dated July 31,,1984 -of:the TUGCo.QAP, dated LJuly 31,41984,1 requires that- activities affecting quality _shall be '

,  : prescribed by and accomplished in accordance with documented; instructions,-

y proce.dures,for drawings of a type _ appropriate 1to the_ circumstances, b'l "

' :Paragr'phf4.0.ofRevision'6to)CPSESStartup!

a iProcedure CP-SAP-13; " Temporary System Modifications," dated December 9, Administrative 11985,istates, in part. " Temporary modification tags shall?beffilled'out

i - '
and 'placed on all-modifications -re' quired to be' logged and tagged . . . , a

!W' f '

Log Sheet shal.1 be filledLout . .l.7,fand lifted-' leads s, hall,be suitably "

i nsu,l a ted. " '

=

3

' ~

  • JParagraphi4.2.4 of.CPSES Station Administrative Manual > Procedure STA-602,

' " Temporary Modifications," Revision 1. dated March;5,1986,' states, in

.- _ 7 'part,'"Each temporary modification will be clearly identified with 'a e

_ Temporary Modification Tag . ._. -The tag normally will be hung on the S* (lifted' lead . ... or placed.as close to the modification as possible."

l Contrary;to the_above:

II'.

LThe white conductor of: cable-EG123389 was'found lifted in Unit 1 Termination Cabinet'4 without being tagged, logged, or insulated.

1 >

, . 2. Th'e black conductor'of cable EG106004 was found lifted in Unit 1 Control' Room Relay Rack No. 2 without being tagged or logged. This

~

conductor was subsequently reconnected without documentation of the nonconforming condition.

' :This ista Severity Level IV violation (Supplement II) (445/8607-V-21).

W -D. Criterion V of Appendix B to 10 CFR Part 50, as implemented by f Section 5.0, Revision 3, of the TUGCo QAP dated July 31, 1984, requires o Jthat' activities affecting quality shall be prescribed by and accomplished lin:accordance with documented instructions, procedures, or drawings of a type appropriate to the circumstances.

.7 ,

4- Drawing-2462-1005, sheet 1, Revision CP-1, requires that identification be E .provided' adjacent to " components."

o

, ,, , , v ,. . y__.. ., _ _ . , . _ , ~ , _ _ . , . _ . . _ , _ _ _ . , - _ _ . , ,,__,,m,,__,..m_--,m., __.m,, ._,._.,__,,,,__m._..,_ , . , _ , , .

w ,

j -

s

, . 4 .

p- '

_s

. g, ] *A

.,;a  : > c 3 v ,

4 , g ?I' M^' '

^" E -

Contrary to the above, except for TB-53, -54, -55, the terminal ~ blocks in y _

Unit

  • 1' Control' Room Panel .CP1-ECPRCR-01 were not identified.

J~ .

? g K.This11sia: Severity Level V violation (Supplement II) (445/8607-V-20).

c E. iCriterionVifAppendixBto:10CFRPart50,asimplementedby iSection '5.0, Revision'3 of the TUGCo" QAP dated ' July 31, 1984, requires e  ;' sthatJactivities affecting quality shall be prescribed by and accomplished fin;accordance with documented instructions, procedures, or drawings of a W -

type appropr.iate-to the circumstances.

4 x

? -

~

L . Paragraph;2.1.3 of TNE Procedure TNE-DC-7, Revision 16, dated February 14,-

%~-

. 71986, " Preparation-and Review of Design Drawings,'! requires that completed drawings shall be checked for accuracy and compliance. Paragraph 2.1.4 also: requires an engineering review for technical accuracy upon completion

, ,- of-the; drafting / design check.

' Contrary to the above, drawings were-not appropriately reviewed / checked

ifor, accuracy. 'The following drafting errors were involved with w, unsatisfactory:itemsLidentified during inspections related to ISAP I.a.4:

,y1 1. Drawing 2323-El-0172, ~ sheet 17, identified cable EG120248 as EG20248.

'2. .The white conductors of-cables EG109964, EG109975, EG109963, and EG109764 wereinot shown on Drawing 2323-El-0156, Revision CP-1.

3. LDrawing 2323-El-0156, Revision CP-7, shows the green conductor of cable EG118347 landed at terminal TCA-5; the conductor actually installed is white with a black stripe. This drawing also showed the
z. orange' conductor of cable EG130012 landed at terminal TCA-7; the conductor' physically installed was black from cable EG118347A. There was no " cloud" on the drawing to indicate that this was a design change.

t

4. Drawing 2323-El-0172, sheet 17, Revision CP-4, did not identify the

, color'of the conductor to be landed at TB2-31.

Thi.s is a Severity Level IV violation (Supplement II) (445/8607-V-22).

~

F. ' Criterion III of Appendix B to 10 CFR Part 50, as implemented by

' Section 3.0, Revision 4, dated November 20, 1985, of the TUGCo QAP, states, in part, ". . . . Design changes, including field changes, shall l be subject to design control measures commensurate with those applied to 1the original design and approved by the organization that performed the original. design . . . ."

' , Contrary to the above, field design changes, pertaining to the  !

installation of stainless steel shims between the reactor coolant system l

[ ~ crossover leg piping and saddle blocks, were not submitted to the i

L

, -~  ; , ~ . ,

g'i gs j 3. . .- ~ < m t - .

i 4

, , O

, 4 .

~

Q + <

f.

.. organization that performed the original design for review and approval.

9 y JIn addition,:the traveler which was used to implement the design change

did 'not document alliof the changes that occurred.

L1 ,

  1. {This is a Severity Level IV violation l(Supplement II) (445/8607-V-04).

m, .

? Pursuant to th'e, provisions of 10.CFR 2.201, Texas Utilities Electric Company is T' .hereby; required to submit- to this office, within 30 days of the date of the-(letter transmitting this Notice, a written statement 'or explanation in reply, Lincluding for each violation:- (1) the reasons for the violations if admitted, T 2) the corrective steps which have been taken and the results achieved, 3)'the. corrective steps which will be taken to avoid further violations, and

  1. 4);the date When full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

-Dated at' Arlington,l Texas

. - -this 22nd day ~of December 1986 s