MONTHYEARML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198F7271997-09-12012 September 1997 Notice of Violation from Investigation Completed on 970606. Violation Noted:Jw Holybee,Employee of Contractor,Submitted Inaccurate Info to NRC ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy ML20151L9151997-08-0505 August 1997 Notice of Violation from Insp on 970608-0719.Violations Noted:Licensee Failed to Establish Necessary Compensatory Actions Prior to Impairing Fire Protection Assembly by Removing Concrete Floor Plug ML20149L3271997-07-25025 July 1997 Corrected Page 2 for Notice of Violation Issued on 970611 ML20148K2761997-06-11011 June 1997 Notice of Violation from Insp on 970421-0502.Violation Noted:Ler 445/96-002-00 Failed to Include Description of Numerous Previous Occasions Where Same Valve Failed to Stroke Closed within Timeframe Specified in TSs ML20148H4421997-06-0606 June 1997 Notice of Violation from Insp on 970428-0502.Violation Noted:Nrc Identified That No Instructions or Procedures Existed at Plant to Ensure That All Licensed Operators Have Available Appropriate Lenses ML20148F8761997-06-0303 June 1997 Notice of Violation from Insp on 970317-21.Violation Noted:Failure to Perform Requalification on Listed Changes in Analog Cable Type & Length Essential Variable on Acts Sheet TBX-02-196 ML20137W3451997-04-15015 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:During Performance of Procedure MSM-CO-8802,Steps 8.6.1.3. & 8.6.1.12,maint Personnel Failed to Torque Train B motor-driven Auxiliary Feedwater Pump Discharge Valve ML20136B8981997-03-0707 March 1997 Notice of Violation from Insp on 961222-970201.Violation Noted:Corrective Actions Taken to Prevent Repetition of 1993 Unit Two Grid Synchronization Event Not Effective ML20136C0021997-03-0505 March 1997 Notice of Violation from Insp on 970210-14.Violation Noted: Licensee Had Not Corrected Weakness Involving Implementation of Site Evacuation Procedures That Was Identified During Emergency Preparedness Insp ML20135B5971996-11-27027 November 1996 Notice of Violation from Insp on 960929-1109.Violation Noted:Procedure Change to Procedure MSM-G0-0204 Rev 4 Required That Valves Be Cycled to Remove Entrapped Air Activity That Could Affect Set Pressure ML20129G1981996-10-23023 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Licensee Failure to Establish,Implement & Maintain Procedures Covering Activities Recommended in App A,Station Administrative Procedure, Clearance & Safety Tagging ML20149F2881994-08-0404 August 1994 Notice of Violation from Insp on 940529-0709.Violation Noted:Failure to Remove Field Work Request Tags from safety- Related Equipment Following Voiding of Action Requests or Work Orders ML20059C3611993-12-30030 December 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:Licensee Did Not Assure That Plant Personnel Implemented SOP-506.Contract Personnel Changed Pressurization Source W/O Authorization ML20128F6991993-02-0404 February 1993 Partially Withheld Notice of Violation from Insp on 930104-06 (Ref 10CFR73.21).Violation Noted:Failure to Search Packages Prior to Introduction to Protected Area ML20127K4891993-01-20020 January 1993 Notice of Violation from Insp on 921022-1218.Violation noted:20 Licensee & Contractor Supervisors Had Not Received Initial Behavior Observation Training & 21 Licensee & Contractor Supervisors Had Not Received Annual Training ML20126J3171992-12-31031 December 1992 Notice of Violation from Insp on 921011-1125.Violation Noted:Contract Personnel Observed to Operate Polar Crane in Vicinity of Reactor Vessel Head Contrary to Listed Procedural Requirements ML20126J3441992-12-31031 December 1992 Notice of Violation from Insp on 921025-1205.Violation Noted:Corrective Measures Implemented in Response to Westinghouse Technical Bulletin NSD-TB-89-06,inadequate ML20126F1281992-12-18018 December 1992 Notice of Violation from Insp on 921109-13.Violation Noted: Workers in Svc Insp Preparation Work in Reactor Containment Bldg Removed Insulation from Piping & Did Not Have Work Evaluated Through Analysis of Containment Surveys ML20058K3811990-12-12012 December 1990 Notice of Violation from Insp on 901113-16.Violation Noted:Technical Evaluations & Surveillance of Engineering Activities Not Being Conducted by Engineering Assurance ML20058A1041990-10-10010 October 1990 Notice of Violation on 900807-0918.Violation Noted:Logs of Steam Generator Feedwater Flow Not Maintained at 15-minute Intervals ML20059K3421990-09-17017 September 1990 Notice of Violation from Insp on 900820-24.Violation Noted: Failure to Establish Procedure Prescribing Administrative Controls Necessary to Assure That ATWS Mitigation Actuation Circuitry Operational ML20059D6561990-08-29029 August 1990 Notice of Violation from Insp on 900731-0807.Violation Noted:Water Formed from Condensed Main Steam,Backed Up to Upstream Side of Atmospheric Relief Valve & Caused Erratic Performance & Damage to Insulation & Lighting Fixtures ML20058M2481990-08-0303 August 1990 Notice of Violation from Insp on 900606-0703.Violations Noted:Procedure OPT-467A Inadequate,Work Crew Opened Unit 2 Reactor Coolant Pump Seal Water Return Filter Instead of Correct Filter & Deficiency Not Promptly Identified ML20055D4231990-06-29029 June 1990 Notice of Violation from Insp on 900503-0605.Violations Noted:Failure to Perform Isotopic Analysis for Iodine within Specified Time Interval & Inadequate Test Procedure Review Criteria ML20248A6611989-09-26026 September 1989 Notice of Violation from Insp on 890802-0905.Violation Noted:Qc Hold Point Bypassed Prior to Welding of Replacement Tray Fittings as Specified in Work Package T140EDA42-01 ML20248A5691989-09-26026 September 1989 Notice of Violation from Insp on 890802-0905.Violation Noted:Mfg Defects Requiring Repairs Erroneously Identified as Nonextensive Installation Deficiencies Which Severely Limited Review for Generic Implications ML20248B9821989-09-22022 September 1989 Notice of Violation from Insp on 890802-0905.Violation Noted:Conduits C14007913,13G01422,C1PAS11 & C13034061 Had Loose Fittings & Elbow for Conduit C13001413 & Junction Boxes JB1S-0169,JB1S-177G & JB1S-165G Had Looses Screws ML20247Q0571989-09-20020 September 1989 Notice of Violation from Insp on 890802-0905,Violation Noted:Operator Stationed at Emergency Diesel Generator B Could Not Take Action Specified by Rev Due to Inadequate Procedure & Inadequate Training ML20247B8771989-09-0808 September 1989 Notice of Violation from Insp on 890717-27.Violations Noted: Failure to Correct Deficiencies Identified in Fabrication of Containment Electrical Penetration Welds & Fuel Transfer Tube Penetration Welds ML20246H5131989-08-28028 August 1989 Notice of Violation from Insp on 890717-28.Violation Noted: Adequate Preservation,Safekeeping & Storage of Excessive Number of Completed Work Packages Awaiting Final Review for Excessive Period of Time Not Provided ML20246B3201989-06-30030 June 1989 Notice of Violation from Insp on 890503-0606.Violation Noted:Shift Test Engineer Failed to Issue Test Deficiency Rept to Document Valve Misalignment That Occurred During Testing ML20245E0731989-06-19019 June 1989 Notice of Violation from Insp on 890503-0606.Violation Noted:Neither Test Deficiency Rept Nor Test Procedure Change Processed to Document or Correct Deviation from Test Procedure Instruction ML20245D9801989-06-19019 June 1989 Notice of Violation from Insp on 890503-0606.Violation Noted:Substituted Carbon Steel Grade 5 Bolts for Silicon Bronze Bolts in Auxiliary Feedwater Pump Motor W/O Documenting,Reviewing & Approving Change to Design ML20247G6031989-05-18018 May 1989 Notice of Violation from Insp on 890405-0502.Violation Noted:Shift Test Engineer Failed to Obtain Shift Supervisor Permission to Perform Class 1E Inverter Test & Operator Failed to Perform Two Steps During Realignment of Pump ML20247C2691989-05-16016 May 1989 Notice of Violation from Insp on 890405-0502.Violation Noted:Welds on North Face of Duct Segments Lacked Required Galvanizing & Raw Edges of Structural Components on Internal Portion of One Duct Segment Still Uncoated ML20244C7781989-04-14014 April 1989 Notice of Violation from Insp on 890308-0404.Violation Noted:Qc Inspectors Not Equipped Nor Trained to Measure Listed Insp Attributes to Tolerance Required by post-const Hardware Validation Program ML20247B0701989-03-24024 March 1989 Notice of Violation from Insp on 890208-0307.Violations Noted:Snubbers Installed W/Low Strength Bolting That Could Have Been Overstressed If Subjected to Max Allowable Design Load & Inadequate Review of Design Calculations Identified ML20235U0591989-02-28028 February 1989 Notice of Violation from Discussions on 860128.Violation Noted:Applicant Failed to File Timely Request for Extension of CPPR-126,per 10CFR2.109 ML20235U7601989-02-28028 February 1989 Notice of Violation from Insp on 890111-0207.Violation Noted:Unauthorized Work or Inadequate Insp by QC Resulted in Pipe Support Deviating from Design Documentation Requirements ML20235P6871989-02-22022 February 1989 Notice of Violation from Insp on 890111-0207.Violation Noted:Wrong Procedure Followed Re Required Evaluation for Reportability of Each Deficiency Found in Design & Const of Plant.No Evidence of Such Evaluations Being Performed Found ML20195F9051988-11-18018 November 1988 Notice of Violation from Insp on 881005-1101.Violation Noted:Inspector Indicated Adequate Thread Engagement, However,No Documentation Exists as Verification 1998-07-02
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000445/19990151999-10-20020 October 1999 Insp Repts 50-445/99-15 & 50-446/99-15 on 990822-1002. Non-cited Violations.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990141999-09-14014 September 1999 Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000445/19990131999-08-18018 August 1999 Insp Repts 50-445/99-13 & 50-446/99-13 on 990720-23.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000445/19990101999-08-12012 August 1999 Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628. Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Engineering & Plant Support IR 05000445/19990121999-07-29029 July 1999 Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19993011999-07-16016 July 1999 Exam Repts 50-445/99-301 & 50-446/99-301 on 990618-24.Exam Results:Six Applicants for Senior Operator Licenses Passed Exams IR 05000445/19990111999-06-22022 June 1999 Insp Repts 50-445/99-11 & 50-446/99-11 on 990418-0529.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000445/19990081999-06-0909 June 1999 Insp Repts 50-445/99-08 & 50-446/99-08 on 990503-11.Noncited Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990091999-05-12012 May 1999 Insp Repts 50-445/99-09 & 50-446/99-09 on 990419-23.No Violations Noted.Major Areas Inspected:Reviewed Implementation of Liquid & Gaseous Radioactive Waste Effluent Mgt Program IR 05000445/19990071999-05-11011 May 1999 Insp Repts 50-445/99-07 & 50-446/99-07 on 990307-0417.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000445/19990061999-04-30030 April 1999 Insp Repts 50-445/99-06 & 50-446/99-06 on 990329-0402.No Violations Noted.Major Areas Inspected:Planning & Preparation,External Exposure Controls & Quality Assurance of Radiation Protection Activities IR 05000445/19990031999-04-0707 April 1999 Insp Repts 50-445/99-03 & 50-446/99-03 on 990124-0306.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000445/19990051999-03-19019 March 1999 Insp Repts 50-445/99-05 & 50-446/99-05 on 990222-26.One Violation Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Matls Transportation Programs IR 05000445/19990011999-03-0909 March 1999 Insp Repts 50-445/99-01 & 50-446/99-01 on 990208-12.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Program IR 05000445/19990021999-01-10010 January 1999 Insp Repts 50-445/99-02 & 50-446/99-02 on 990119-22.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000445/19980081998-12-30030 December 1998 Insp Repts 50-445/98-08 & 50-446/98-08 on 981025-1205.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Licensee Emergency Response Organization IR 05000445/19980151998-11-19019 November 1998 Insp Repts 50-445/98-15 & 50-446/98-15 on 981102-06.No Violations Noted.Major Areas Inspected:Radiation Program Activities,Including External & Internal Exposure Controls & Controls of Radioactive Matl & Contamination IR 05000445/19980071998-11-19019 November 1998 Insp Repts 50-445/98-07 & 50-446/98-07 on 980913-1024.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980161998-10-29029 October 1998 Insp Repts 50-445/98-16 & 50-446/98-16 on 981019-23.No Violations Noted.Major Areas Inspected:Testing & Maint, Protected Area Barrier & Detection Aids,Vital Area Barriers & Detection Aids & Security Sys Power Supply IR 05000445/19980141998-10-21021 October 1998 Insp Repts 50-445/98-14 & 50-446/98-14 Has Been Canceled.No Insp Rept Will Be Issued IR 05000445/19980061998-09-30030 September 1998 Insp Repts 50-445/98-06 & 50-446/98-06 on 980802-0912.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000445/19980121998-09-16016 September 1998 Insp Repts 50-445/98-12 & 50-446/98-12 Cancelled IR 05000445/19980051998-08-20020 August 1998 Insp Repts 50-445/98-05 & 50-446/98-05 on 980621-0801.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000445/19980041998-07-16016 July 1998 Insp Repts 50-445/98-04 & 50-446/98-04 on 980510-0620.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000445/19983011998-07-10010 July 1998 Insp Repts 50-445/98-301 & 50-446/98-301 on 980619-26.No Violations Noted.Major Areas Inspected:Operations.All 9 License Applicants Passed Exam ML20236G9321998-07-0202 July 1998 Notice of Violation from Insp on 980329-0509.Violation Noted:Four Examples Were Identified,Where Licensee Failed to Meet Requirement for Design of ECCS Switchover from Refueling Water Storage Tank to Containment Recirculation IR 05000445/19980031998-07-0202 July 1998 Insp Repts 50-445/98-03 & 50-446/98-03 on 980329-0509. Violations Noted.Major Areas Inspected:Operation,Maint, Engineering & Plant Support IR 05000445/19980131998-06-26026 June 1998 Insp Repts 50-445/98-13 & 50-446/98-13 on 980615-19.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program IR 05000445/19980021998-04-24024 April 1998 Insp Repts 50-445/98-02 & 50-446/98-02 on 980215-0328. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20217F6051998-04-24024 April 1998 Notice of Violation from Insp on 980215-0328.Violations Noted:Corrective Actions Were Not Sufficient to Identify That Excessive Leakage in ECC Sys Check Valves During Unit 1 Cycle 6 Required Unit 1 Safety Injection Pumps Be Started ML20216H3501998-04-16016 April 1998 Insp Repts 50-445/98-11 & 50-446/98-11 on 980323-27.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000445/19980011998-03-19019 March 1998 Insp Repts 50-445/98-01 & 50-446/98-02 on 980104-0214. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20248L8831998-03-19019 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Licensee Failed to Document Heat Related Degredation of Unit 2,Train B Solid State Safeguards Sequencer IR 05000445/19970211998-02-11011 February 1998 Errata to Insp Repts 50-445/97-21 & 50-446/97-21,correcting Errors in Insp follow-up Sys Number Associated W/Items Described in Rept IR 05000445/19970231998-01-30030 January 1998 Insp Repts 50-445/97-23 & 50-446/97-23 on 971123-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 07100012/20110221998-01-16016 January 1998 Notice of Violation from Insp on 971012-1122.Violation Noted:Procedure IPO-005B,rev 2,not Appropriate to Circumstances in That Procedure Did Not Require Pressure Be Maintained Below Rc System Pressure & Temp Limits ML20198S1891998-01-16016 January 1998 Insp Repts 50-445/97-20 & 50-446/97-20 on 971012-1122. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20198R6571998-01-16016 January 1998 Notice of Violation from Insp on 970922-25.Violation Noted: on 961029,licensee Made Changes to Emergency Plan,W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20198N2071998-01-14014 January 1998 Notice of Violation from Insp on 970608-0719 & Subsequent Inoffice Reviews Concluded on 971114.Violation Noted: Procedures OPT-102A & 102B Did Not Include Appropriate Quantitative Acceptance Criteria ML20199H0131997-11-21021 November 1997 Notice of Violation from Insp on 970831-1011.Violation Noted:Thermometer IC1473,was Used During Performance of Procedure PPT-SX-7505A on 970807 ML20199H0241997-11-21021 November 1997 Insp Repts 50-445/97-18 & 50-446/97-18 on 970831-1011. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-IV-97-067, on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee1997-11-17017 November 1997 PNO-IV-97-067:on 971117,medical Emergency Declared in Unit 1 Electrical Switchgear Room.Licensee Issued Stop Work Order for Electrical Maint While Investigation Conducted.Nrc Resident Insp Staff Will Be Following Licensee PNO-IV-97-066, on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed1997-11-17017 November 1997 PNO-IV-97-066:on 971115,new Fuel Damage Occurred.Licensee Suspended Fuel on-load & Conducting Investigation Into Why Damage Occurred.Licensee Expects Delivery of Replacement Fuel Assembly on 971123.State of Tx Informed IR 05000445/19970221997-11-17017 November 1997 Insp Repts 50-445/97-22 & 50-446/97-22 on 971103-07.No Violations Noted.Major Areas Inspected:Maint ML20199E6481997-11-13013 November 1997 Insp Repts 50-445/97-21 & 50-446/97-21 on 971027-31.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program Including Records & Repts,Test & Maint and Access control-vehicle PNO-IV-97-061, on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed1997-10-30030 October 1997 PNO-IV-97-061:on 971027,Unit 1 Experienced Main Generator Lockout,Turbine Trip & Reactor Trip from 100% Power.Afw Manually Started Shortly Following Trip,In Anticipation of Automatic Initiation of AFW Sys.State of Tx Informed IR 05000445/19970191997-10-10010 October 1997 Insp Repts 50-445/97-19 & 50-446/97-19 on 970922-25. Violations Noted.Major Areas Inspected:Rev 25 to Comanche Peak Steam Electric Emergency Plan ML20211A1051997-09-19019 September 1997 Insp Repts 50-445/97-17 & 50-446/97-17 on 970720-0830. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20211A0691997-09-19019 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:On 970507,while Performing Procedure OPT-457B,licensed Operator Failed to Close Valve 2-8812A Per Step 8.8 ML20198G1821997-09-12012 September 1997 Notice of Violation from Investigation on 970606.Violation Noted:Mn Shook Submitted Falsified Info to NRC Re Being Denied Access to Nuclear Power Plant as Result of fitness-for-duty Policy 1999-09-14
[Table view] |
Text
_ _ _ _
J APPENDIX A NOTICE OF VIOLATION Texas Utilities Electric Company Dockets: 50-445/86-07 Comanche Peak Steam Electric Station (CPSES) 50-446/86-05 .
Units 1 and 2 Permits: CPPR-126 )
CPPR-127 During an NRC inspection conducted on April 1 through May 31, 1986, six
' violations of NRC requirements were identified. The violations involved a corrective action report (CAR) that was closed before corrective action was "d -
complete, timely criteria for base metal defect inspections were not provided, }
temporary modification to cables was not properly documented, terminal blocks .*
were not identified, drawing errors were not identified during reviews and checks, and design changes were not reviewed by those responsible for the original design. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violations are listed below: [
A. Criterion V of Appendix B to 10 CFR Part 50, as implemented by
-Section 5.0, Revision 3, dated July 31, 1984, of the TUGCo Quality j_
Assurance Plan (QAP), requires that activities affecting quality shall be g prescribed by and accomplished in accordance with documented instructions, procedures, or drawings of a type appropriate to the circumstances.
Paragraph 3.2.3 of TUGCo Procedure CP-QP-17.0, Revision 6, states, in s part, " Corrective Action Reports shall remain open until all of the -
required corrective action has been completed." ".
Contrary to the above, CAR-049 was closed before corrective action was 5 completed and more importantly, ufore the corrective action was clearly i defined. CAR-049 was closed on January 16, 1986, on the basis of a memo ,
(C."DA-47,715) dated November 26, 1985, which stated that Unit 2 limit 7 switch terminations would be identified upon issuance of DCA-23,473; g however, this Design Change Authorization (OCA), issued on December 4, 2 1985,hadnorequirementtoidentifyorcorrectpreviouslyinstalledlim1S 3 switch terminations on Unit 2. _g n
This is a Severity Level IV violation (Supplement II) (445/8607-V-24).
i B. Criterion III of Appendix B to 10 CFR Part 50, as implemented by Section 3.0, Revision 4, dated November 20, 1985, of the TUGCo QAP,
{%
states, in part, " Measures shall be established to assure that applicabie K regulatory requirements and the design basis . . . are correctly ;
translated into specifications, drawings, procedures, and q instructions . . . . The design control measures shall provide for T verifying or checking the adequacy of design, such as . . . by the use of $_
alternate or simplified calculational methods . . . . The design control #
measures shall be applied to items such as . . . delineation of acceptance c criteria." ,
f k
O G
p ADO { -
h
^ ' ' -- ~ -- - * * * -
g {" g;;] '] j ' ;{ ;
~
7 . o Q u Q 'y } K; .,
? Q% mhf ' W
~
t ,-
%g j:gW1- ,
- _ig; ,
y; ~ fyg;- " -
c pyn ( , -
~
,&f f -l
~
- Contrah toLthe above, on. Sept' ember 25.1985, TUGCo_ Nuclear g N Engineeringi(TNE).-in response to Evaluation Research Corporation's 1 Technical 1Information Request:(TIR) No.-TIR-017~ dated August 26, 1985, 4 7% g a, y - niprovided design information_which delineated;the_ acceptance criteria for ~
.. s g , ; base material defects (verifyingathe' adequacy onof'the
field fabricateddesign;information tanksLwas 1TNE's by the method use of- for
- 'd : calculations. u However, as: of May ?15,1986, those-calculations:were .
- Jncomplete
- andfunapproved.:
yw ..
r m. .- . .-
, Thisiis.'a Severity Level IV violation (Supplement i II) (445-8607-V-02).
v, m-f '.. T.. .
R$ - C. Criterion ~V2of; Appendix?B to-10 CFR'Part-50,.as implemented by .
/
1 (Section'.5.0,1 Revision 3,: dated July 31,,1984 -of:the TUGCo.QAP, dated LJuly 31,41984,1 requires that- activities affecting quality _shall be '
, : prescribed by and accomplished in accordance with documented; instructions,-
y proce.dures,for drawings of a type _ appropriate 1to the_ circumstances, b'l "
' :Paragr'phf4.0.ofRevision'6to)CPSESStartup!
a iProcedure CP-SAP-13; " Temporary System Modifications," dated December 9, Administrative 11985,istates, in part. " Temporary modification tags shall?beffilled'out
- i - '
- and 'placed on all-modifications -re' quired to be' logged and tagged . . . , a
!W' f '
Log Sheet shal.1 be filledLout . .l.7,fand lifted-' leads s, hall,be suitably "
- i nsu,l a ted. " '
=
3
' ~
- JParagraphi4.2.4 of.CPSES Station Administrative Manual > Procedure STA-602,
' " Temporary Modifications," Revision 1. dated March;5,1986,' states, in
.- _ 7 'part,'"Each temporary modification will be clearly identified with 'a e
_ Temporary Modification Tag . ._. -The tag normally will be hung on the S* (lifted' lead . ... or placed.as close to the modification as possible."
l Contrary;to the_above:
II'.
LThe white conductor of: cable-EG123389 was'found lifted in Unit 1 Termination Cabinet'4 without being tagged, logged, or insulated.
1 >
, . 2. Th'e black conductor'of cable EG106004 was found lifted in Unit 1 Control' Room Relay Rack No. 2 without being tagged or logged. This
~
conductor was subsequently reconnected without documentation of the nonconforming condition.
' :This ista Severity Level IV violation (Supplement II) (445/8607-V-21).
W -D. Criterion V of Appendix B to 10 CFR Part 50, as implemented by f Section 5.0, Revision 3, of the TUGCo QAP dated July 31, 1984, requires o Jthat' activities affecting quality shall be prescribed by and accomplished lin:accordance with documented instructions, procedures, or drawings of a type appropriate to the circumstances.
- .7 ,
4- Drawing-2462-1005, sheet 1, Revision CP-1, requires that identification be E .provided' adjacent to " components."
o
, ,, , , v ,. . y__.. ., _ _ . , . _ , ~ , _ _ . , . _ . . _ , _ _ _ . , - _ _ . , ,,__,,m,,__,..m_--,m., __.m,, ._,._.,__,,,,__m._..,_ , . , _ , , .
w ,
j -
s
, . 4 .
p- '
_s
. g, ] *A
.,;a : > c 3 v ,
4 , g ?I' M^' '
^" E -
Contrary to the above, except for TB-53, -54, -55, the terminal ~ blocks in y _
Unit
- 1' Control' Room Panel .CP1-ECPRCR-01 were not identified.
J~ .
? g K.This11sia: Severity Level V violation (Supplement II) (445/8607-V-20).
c E. iCriterionVifAppendixBto:10CFRPart50,asimplementedby iSection '5.0, Revision'3 of the TUGCo" QAP dated ' July 31, 1984, requires e ;' sthatJactivities affecting quality shall be prescribed by and accomplished fin;accordance with documented instructions, procedures, or drawings of a W -
type appropr.iate-to the circumstances.
4 x
? -
~
L . Paragraph;2.1.3 of TNE Procedure TNE-DC-7, Revision 16, dated February 14,-
%~-
. 71986, " Preparation-and Review of Design Drawings,'! requires that completed drawings shall be checked for accuracy and compliance. Paragraph 2.1.4 also: requires an engineering review for technical accuracy upon completion
, ,- of-the; drafting / design check.
' Contrary to the above, drawings were-not appropriately reviewed / checked
- ifor, accuracy. 'The following drafting errors were involved with w, unsatisfactory:itemsLidentified during inspections related to ISAP I.a.4:
,y1 1. Drawing 2323-El-0172, ~ sheet 17, identified cable EG120248 as EG20248.
'2. .The white conductors of-cables EG109964, EG109975, EG109963, and EG109764 wereinot shown on Drawing 2323-El-0156, Revision CP-1.
- 3. LDrawing 2323-El-0156, Revision CP-7, shows the green conductor of cable EG118347 landed at terminal TCA-5; the conductor actually installed is white with a black stripe. This drawing also showed the
- z. orange' conductor of cable EG130012 landed at terminal TCA-7; the conductor' physically installed was black from cable EG118347A. There was no " cloud" on the drawing to indicate that this was a design change.
t
- 4. Drawing 2323-El-0172, sheet 17, Revision CP-4, did not identify the
, color'of the conductor to be landed at TB2-31.
Thi.s is a Severity Level IV violation (Supplement II) (445/8607-V-22).
~
F. ' Criterion III of Appendix B to 10 CFR Part 50, as implemented by
- ' Section 3.0, Revision 4, dated November 20, 1985, of the TUGCo QAP, states, in part, ". . . . Design changes, including field changes, shall l be subject to design control measures commensurate with those applied to 1the original design and approved by the organization that performed the original. design . . . ."
' , Contrary to the above, field design changes, pertaining to the !
installation of stainless steel shims between the reactor coolant system l
[ ~ crossover leg piping and saddle blocks, were not submitted to the i
L
, -~ ; , ~ . ,
g'i gs j 3. . .- ~ < m t - .
i 4
, , O
, 4 .
~
Q + <
f.
.. organization that performed the original design for review and approval.
9 y JIn addition,:the traveler which was used to implement the design change
- did 'not document alliof the changes that occurred.
L1 ,
- {This is a Severity Level IV violation l(Supplement II) (445/8607-V-04).
m, .
? Pursuant to th'e, provisions of 10.CFR 2.201, Texas Utilities Electric Company is T' .hereby; required to submit- to this office, within 30 days of the date of the-(letter transmitting this Notice, a written statement 'or explanation in reply, Lincluding for each violation:- (1) the reasons for the violations if admitted, T 2) the corrective steps which have been taken and the results achieved, 3)'the. corrective steps which will be taken to avoid further violations, and
- 4);the date When full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
-Dated at' Arlington,l Texas
. - -this 22nd day ~of December 1986 s