Other: ML20038A958, ML20039B843, ML20049J329, ML20054E507, ML20079P712, ML20082J783, ML20091B733, ML20093E411, ML20096F812, ML20096F838, ML20106D353, ML20114B418, ML20203J883, ML20203L369, ML20205Q246, ML20206S023, ML20213G680, ML20213G684, ML20214D723, ML20214K479, ML20215F737, ML20262H555, ML20262H558, ML20262H561, ML20262H563, ML20262H567, ML20262H569, ML20262H571, ML20263B925, ML20263B927, ML20263B930, ML20263B932, ML20265A774, ML20265A780, ML20265A791, ML20265A796, ML20265A801, ML20265A806, ML20265A810, ML20265A816, ML20265A821, ML20265A826, ML20265A832, ML20265A837
|
MONTHYEARML20262H5551973-12-14014 December 1973 Watertight Door Assy. Sheet 1 of 3 Project stage: Other ML20262H5611973-12-14014 December 1973 Details:3,13,19,24,28,35 & 36. Sheet 3 of 3 Project stage: Other ML20262H5581973-12-14014 December 1973 Details:1,2,17 & 21 Thru 27,32,33 & 34. Sheet 2 of 3 Project stage: Other ML20262H5671975-06-18018 June 1975 4 Ft X 8 Ft Opening Lhrb Door & Frame Assembly. Sheet 1 of 3 Project stage: Other ML20262H5711975-06-18018 June 1975 Details 2,3,4 & 5. Sheet 3 of 3 Project stage: Other ML20262H5691975-06-18018 June 1975 Details 1 & 6. Sheet 2 of 3 Project stage: Other ML20038A9581981-11-12012 November 1981 Requests Extension of Schedule for Emergency Lighting Installation Until 811204.Class II Fee Encl Project stage: Other ML20039B8431981-12-0707 December 1981 Exemption Granting Extension of Completion Date of Emergency Lighting Installation from 811117 to 1204 Project stage: Other ML20049J3291982-03-0303 March 1982 Requests Extension to 820701 for Submitting Design Info Re Implementation Schedule of 10CFR50.48 & Encl 2 of NRC Project stage: Other ML20052F4801982-05-0303 May 1982 Exemption from Fire Protection Rule Schedular Requirements of 10CFR50.48(c).Exemption Subj to Listed Conditions. Clarification of Generic Ltr 81-12 & Criteria for Evaluating Exemption Requests Encl Project stage: Approval ML20054E5071982-06-0202 June 1982 Requests Verification of Exemption of Station Battery Room water-tight Doors from Having 3-h Fire Rating Project stage: Other ML20054L8131982-07-0101 July 1982 Forwards Supplemental Responses to 10CFR50.48 & App R to 10CFR50 & Engineering Planning & Mgt,Inc Rept, DC Essential Cabinet Analysis, Per NRC 810220 Request (Generic Ltr 81-12) Project stage: Supplement ML20262H5631982-08-20020 August 1982 Installation of PR2905-4 3 Ft 9 & 1/2 Inches X 7 Ft 1/2 Inch Door & Frame Assy. Sheet 1 of 1.No Revision Date Project stage: Other ML20265A8161982-09-22022 September 1982 Edwin I Hatch Nuclear Plant - 1 & 2 Fire Protection Piping River Intake Structure Project stage: Other ML20070V7991983-02-14014 February 1983 Requests Meeting on or After 830329 W/Nrr to Appeal for Reconsideration of NRC Proposed Denial of App R Exemption Request.Addl Info Forthcoming to Clarify 820701 Submittal Project stage: Meeting ML20073S1721983-04-28028 April 1983 Clarifies Requests for Exemptions from 10CFR50.48 & App R Requirements in Response to NRC Request at 830330 Meeting. Rev to 820701 Response to Be Submitted by 830530 Project stage: Meeting ML20023D7611983-05-27027 May 1983 Forwards Revised Response to 820701 Requests for Exemption from 10CFR50.48 & App R Requirements,Per 830330 Request.Rev Reflects Compliance w/10CFR50.48 & App R Requirements & Responds to 830120 Draft SER Concerns Project stage: Draft Other ML20024A3861983-06-14014 June 1983 Forwards Addl Info to Justify 820701 10CFR50.48 & App R Schedule Exemption Requests Discussed at 830330 Meeting. Plan Being Developed to Complete Maint & Design Changes. W/Two Oversize Drawings.Aperture Cards Available in PDR Project stage: Meeting ML20263B9301983-08-18018 August 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 2 of 5 Project stage: Other ML20263B9251983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 4 of 5 Project stage: Other ML20263B9271983-11-0707 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 3 of 5 Project stage: Other ML20263B9321983-11-14014 November 1983 Appendix R Fire Protection Modifications - CPM Schedule. Sheet 1 of 5 Project stage: Other ML20082D3421983-11-16016 November 1983 Forwards Addl Info Justifying Three Requests for Exemption from 10CFR50.48 & App R as Discussed in 830330 Meeting.Rev to 820701 Response Will Be Submitted by 831130 Project stage: Meeting ML20082J7831983-11-30030 November 1983 Forwards Replacement Pages to Re Clarification of App R Exemption Requests,Reflecting Revised Sections of 820701 Response to 10CFR50.48 Project stage: Other ML20083D7541983-12-20020 December 1983 Forwards Revised Pages for Insertion Into 830701 Request for Exemption from 10CFR50.48 & 10CFR50,App R Requirements Re Sprinkler Head/Nozzle & Detector Placement Project stage: Request ML20083D7721983-12-21021 December 1983 Forwards Payment of Fee Required for Review of 810319 Submittal on Safe Alternate Shutdown & Request for Schedular Exemption from Installation of Emergency Lighting Project stage: Request ML17255A6241984-01-16016 January 1984 Forwards App R Alternative Shutdown Sys. New Shutdown Approach Provides Fewer Mods & Allows Phased Implementation as Opposed to Installation of Required Dedicated Shutdown Sys Project stage: Request ML20079P7121984-01-24024 January 1984 Submits Info Documenting Addl Considerations of Projected Phased Improvement in Fire Protection & Mitigating Factors for Areas Unmodified During Extended Implementation Period. Tentative Completion Dates for App R Mods Encl Project stage: Other ML17255A6941984-02-29029 February 1984 Summary of 840222 Meeting W/Util & Bechtel Re Proposed App R Exemption Requests & Alternative Shutdown Sys.Meeting Agenda & List of Attendees Encl Project stage: Meeting ML20084L4301984-04-18018 April 1984 Exemption from Requirements of App R to 10CFR50 Re Licensee Alternate Fire Protection Configuration for East Corridor, Control & Turbine Bldgs & Condensate Pump Area Project stage: Approval ML20084L4461984-04-18018 April 1984 Safety Evaluation Supporting Util 820701 Requests for Exemption from Requirements of App R to 10CFR50 & Approval of Deviations from Several NFPA Codes Per Installation & Maint of Fire Protection Sys Project stage: Approval ML17254A7601984-05-10010 May 1984 Exemption from Schedular Requirements of 10CFR50.48(c)(4) to Extend Implementation of Alternative Shutdown Sys Until Startup from 1986 Refueling Outage Project stage: Approval ML20091B7331984-05-25025 May 1984 Notifies of Commitment to Meet on fire-area-by-fire-area Basis,Either Item 1 or 2 & 3 for Period of Time from Expiration of 10CFR50.48 Schedule Allowance Until Area Complies W/Paragraphs III.G.2 & III.G.3 of 10CFR50,App R Project stage: Other ML20197G5581984-06-0808 June 1984 Requests Addl Info on App R Implementation,Needed to Respond to 840525 Request for Schedular Exemption.Proposed Schedules Appear Acceptable Project stage: Approval ML20096F8381984-09-0404 September 1984 Forwards Proposed Specific Compensatory Measures to Support 840525 Requested 10CFR50.48 Schedular Exemptions for nonoutage-related App R Mods,Per 840608 Request Project stage: Other ML20096F8121984-09-0404 September 1984 Requests Notification of Determination Re Acceptability of Kaowool as Fire Barrier Project stage: Other ML20093E4111984-10-0202 October 1984 Proposes Establishment of Roving Fire Watch to Pass Through Listed Sections of Control & Reactor Bldgs as Compensatory Measures to Support Schedular Extension of App R Mods Project stage: Other ML20265A8211984-10-0404 October 1984 Intake Structure Pumps Project stage: Other ML20265A8261984-10-0404 October 1984 As Built Isometrics for Intake Structure Pumps Project stage: Other ML20106D3531984-10-19019 October 1984 Requests Exemption from 10CFR50.48(c) to Allow Extension Until 861130 of Implementation Schedule for Listed App R Related Mods Which Can Be Implemented During Nonoutage Period Project stage: Other ML20101E3731984-12-20020 December 1984 Submits Specific Info Re Compensatory Measures for nonoutage-related App R Mods Not Completed within 10CFR50.48 Time Frame,In Support of 841002 Request for Extension of Schedule to Complete Listed Mods Project stage: Request ML20215F7371984-12-26026 December 1984 Rev 1 to Administrative Control Procedure 40AC-FPX01-0, Fire Protection Program. Portions of Procedures 34AB-OPS-056-1S & 34AB-OPS-056-2S Encl Project stage: Other ML20114C0021985-01-10010 January 1985 Environ Assessment & Finding of No Significant Impact Re Util 840904 Request for Schedular Deferment from 10CFR50, App R,Section Iii.G for Fire Protection Equipment Used for Safe Shutdown to 861130.EIS Unwarranted Project stage: Approval ML20114B8481985-01-16016 January 1985 Exemption from Requirements of 10CFR50.48(c) to Extend Deadline for Completion of Fire Protection Mods Not Requiring Plant Shutdown Until 861130 Project stage: Approval ML20114B4181985-01-17017 January 1985 Responds to 850116 Order & Provides Rev to Interim Mitigation Factors for Nonoutage Related App R Mods,Per 850117 Telcon Project stage: Other ML20117L4581985-05-0707 May 1985 Notice of Issuance of Environ Assessment & Finding of No Significant Impact Re 850416 Request for Schedular Exemption from 10CFR50.48 Requirements Project stage: Approval ML20128B9601985-05-10010 May 1985 Safety Evaluation Supporting Relief for 16 MSIVs from 1980 Edition of ASME Section XI Code Requiring Increased Frequency of Leak Rate Testing Based on Leak Rate Trending of 6-inch & Larger Valves Project stage: Approval ML20128H9751985-05-14014 May 1985 Exemption to Schedular Requirements of 10CFR50.48,extending Deadline Until 861130 for Installation of Mods to Fire Protection Sys Project stage: Approval ML20265A7741985-09-30030 September 1985 Edwin I Hatch Nuclear Plant - Unit 1 Appendix R Path 1 & Path 2 Raceways Diesel Generator Building (Dsl 1A), as-built Project stage: Other ML20265A7801985-09-30030 September 1985 Edwin I Hatch Nuclear Plant - Unit 1 Appendix R Path 1 & Path 2 Raceways Diesel Generator Building (Dsl 1B), as-built Project stage: Other 1983-08-18
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
(6 SEP 9 1986 Georgia Power Company ATTN: Mr. J. H. Miller, Jr.
President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R, SECTIONS III.G.,
III.J, III.L. AND III.0 AND ASSOCIATED FIRE PROTECTION FEATURES -
HATCH NUCLEAR PLANT, DOCKET NOS. 50-321 AND 50-366 This letter is to confirm the dates of December 15-19, 1986, for the special inspection of Hatch, which were established during the telephone conversation of August 25, 1986, between W. E. Burns, of your staff, and T. E. Conlon of this office.
The purpose of this inspection is to evaluate Hatch Units 1 and 2 for compliance with Sections III.G, III.J, III.L and III.0 of Appendix R to 10 CFR 50.
This will be a team type inspection composed of personnel from the NRC Region II Office.
In order for us to properly prepare and perform this type of comprehensive and complex inspection, we request that you provide this Office with the latest revision to the following additional information by November 14, 1986:
1.
Piping and instrumentation (flow) diagrams for hot shutdown and cold shutdown systems, alternative or dedicated shutdown and the reactor coolant pump oil collection system.
2.
Plant layout and equipment location drawings which identify the physical plant locations of hot shutdown and cold shutdown equipment.
3.
Color coded marked-up electrical raceway drawings which identify the cable routing of power and control circuits for those plant systems necessary to achieve and maintain hot shutdown.
4.
Single line AC and DC power and control electrical distribution diagrams.
5.
Plant layout drawings which identify fire area delineation and fire protec-tion equipment locations.
6.
Marked-up plant layout drawings which identify the locations of e:nergency lighting units.
7.
Associated circuit analysis.
[ No G
pk
SEP 9 586 Georgia Power Company 2
1 8.
Plant Operating Procedures which describe normal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.
9.
Fire damage control and repair procedures for cold shutdown systems.
In addition to the information requested above, copies of any other analysis and/or evaluation which demonstrate compliance to Sections III.G, III.J, and III.0 of Appendix R should be available on site for review during this inspec-tion.
Appropriate personnel, knowledgeable with respect to those plant systems required for safe shutdown and their capabilities, should be available at the site during this inspection. Also, we request that your staff make the necessary arrangements to permit team members ready access to the radiologically controlled areas of the plant if necessary.
Your cooperation with us during this inspection will be appreciated. Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
\\T
( l rg' < { -
Com g T
h/ Roger D. Walker, Director Division of Reactor Projects cc:gJ.P.O'Reilly,SeniorVicePresident Nuclear Operations J. T. Beckham, Vice President and s
General Manager-Nuclear Operation yH. C. Nix, Site General Manager A. Fraser, Acting Site QA Supervisor s
L. Gucwa, Manager, Nuclear Safety y
and Licensing bec: E. Rivenbark, NRR Project Manager
- 4. R. Herdt V. Brownlee
. Conlon
. Cantrell lP. Madden Miller
' G. Wiseman RC Resident Inspector fugh S. Jordan, Executive Secretary
$* Se0k BOON k
RII.
RII RI R
RII VBr niee v5h6 WMiller TEConlon ARHerdt FGib on 09/ /86 09/ /86 09/q/86 1
9/ /86 09/g/86
.