SER Supporting Employee Concern Element Rept OP 40201-SQN, Instruments,Matl,Equipment as Relates to Purchasing & Requisitions
ML20206G337
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/04/1988
From:
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20206G037 List: ... further results
References
NUDOCS 8811220241
Download: ML20206G337 (2)


Text

. .

[e. as s 's UNITED STATES

! NUCLEAR REGULATORY COMMISSION 2 c%~J ,. ,fl

- 1i WASHING TON, D. C. 20555 SAFETY EVALUATION REPORT BY THE OFFICE OF SPECIAL PROJE' CTS EMPLCYEE CONCERN ELEMENT REPORT !!C 40201-SQN, "INSTFUMENTS, MATERIAL. EQUIPMENT AS IT RELATES TO FURCHASihG AhD RECUISITIONS" TENNESSEE VALLEY AUTHORITY SEOUOYAh NUCLEAk FUWER PLANT UNITS 1 & 2 DOCKET NOS. 50-327 AND 50-328 ,

I. Subject Category: Material Control (40000)

Subcategory: Purchasing and Requisitions (40200)

Element:

Instruments. Material, Equipment As It Relates to Purchasing and Requisitions (40201)

Empicyee Concerns: IN-86-463-007. IN-85-463-008 and IN-85-964-003 11, 1987 is The basis for Element Report MC-40201-SON, Rev. 4, dated March Watts Bar Employee Concerns IN-85 t63-007, IN-85-463-008, and IN-85-964-C02, which state (respectively):

"Instruments dedicated for a particular unit or system are frequently l sent to another unit, system or even plant, i.e., Watts Bdr to Sequoyan. The drawings and other applicable documentation are not revised for months, if ever." ,

2-PDT-42, 2-PDT-30-43, e "Unit 2, System 30. TVA ',-;entifiers: '

2-POT-30-44, 2-PDT-30-45. These instruments transmitters (Westinghouse) were sent to Sequoydh and documentation generated to

, reflect this (including drawings) have not been done."

"Material / equipment is ordered dedicated to a specific system, unit, etc., but is frequently installed /used elsewhere, and it is unknown C1 has

(

if cccurtnistion is revised to reflect this cannibalizhtion.

ne further infornation."

ev?Iutted t ~VA to be potentially nuclear ~

    • J* ::<:t" .e%

"t ' e te; e r; ;;;er;*, ally a;;lica:le to StcuCych (generic).

5:* s *c 8911220241 PDR GG1104ADOCK PDC 05000327  !

P ,

I.

Surrarycf[ssue The problem as defined by TVA is the adequacy of drawing revisions to reflect changes for the substituted / replaced equipment or material transferred, and the acequacy Jf documentation and drawing genarction/

revisicn for the transfer of Unit 2 pressure differential trant.mitters 2-FDT-30-42, 2-F07-30-43, 2-PDT-30-44 and 2-P07-30-45 to Sequoyah fron Watts Ear.

11!. Evaluatien TVA reviewed applicable quality control, inspection, maintenance, and administrative instruction and procedures, contract documents, purchase requiritions, shipping orders, receipt inspection reports, surveillance reports, and interviewed knowledgeable personnel from maintenance, design support, power stores, and quality assurance.

The TVA procedures, instruction, and various other documents reviewed address all espects covering the prucessing of documents and the revisico of drawings to reflect transfers of material and equipment from the original cestinatiun to another locaticn, unit or plant.

TVA concluded that the perceived problem of inadequate documentation to reflect changes for substituted / replaced equipment or material transferred is not valid. TVA also concludeo that the perceived problem of inadequate documentation and drawing revisions for the transfer of 2-POT-30-42, 2 PDT-30-43, 2-FOT-30-44 and 2-PDT-30-45 to SQN from WBN is not valid.

During the original Generic Concern Task Force (GCTF) investigation of the subject concerns associated cases of missing documentation for material transferred to Sequoayh were discovered. TVA has initiated Coriective Actiun Tracking Document (CATO) No. 4C201-SQN-01 to correct documentation ciscrepancies.

IV. Conclusions The NRC inspectors reviewed the Element Report and its associated ECTG file, and discussed the issues with the ECTG evaluator and Sequoyah personnel.

The NRC staff agrees with the TVA fincings and conclusions regarding the adequacy of the existing procedures, and instructions, covering the handling of documents, and updating of drawings affected by material and equipment transfers, addressed in Element Report C0 40201-SCN, Rev. 4

      • ho further action by the NRC is required,