ML20151L899
ML20151L899 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 07/28/1988 |
From: | Dromerick A Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8808040173 | |
Download: ML20151L899 (15) | |
Text
_
JUL 2 81988 Occket No. 50-219 LICENSEE: GPU Nuclear Corporation Jersey Central Power and Light Company FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SLE ARY OF PROGRESS REVIEW HEETING REGARDING STATUS OF LICENSING ACTIONS On Wednesday, July 13, 1988 a meeting was held at One White Flint Ncrth, Rockville, Maryland, with GPU Nuclear Corporation (GPUN, the licensee) to discuss the status of Oyster Creek licensing actions. Attachment 1 is the list of the individuals participating in the discussion.
Attachnent 2 is a marked-up copy of the staffs's Regulatory Infonration Tracking System (RITS) dated 6-28-88 for Oyster Creek. The markup to update the RITS resulted from the discussion on each item or TAC number in this meeting. The status of each item is given in the last colunn (SC TD, AD, TE) on the right-hand side of the RITS sheets. The status in that colonin is the following: "01" neans licensee, "02" neans staff's reviews, "03" neans staff's Project Manager and "04" reans contplete.
The updating of the RITS for Oyster Creek was done during the discussion on each licensing (action in this nieeting.left-handcoluanofRITS). The licensee stated that he is The licensing action itenis are listed by TAC nurber continuing his efforts to provide implementation dates of action items at the riext status meeting.
The licensee also provided a schedule of actions to address SEP open itenis (Attachment 3) and provided connents related to Supplement 1 of the IPSAR.
The connents were editorial and did not affect the technical content of the supplenint.
WWW e808040173BB07h9 PDR ADOCK 05 w
PNU Alexander W. Dromerick, Project Panager P
Project Directorate I-4 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Attachments:
As stated cc w/attachnents:
See next page DISTRIBUTION r
h DocketTWeT.
ACrcrerick y/
NRC & Local PDRs CGC N
'\\
\\
PDI-4 Peading File EJordan
\\
JStolz EGrires 800ger ACRS(10)
SNorris HBClayton, RI LAl:06 PM9 PD:PD M SN Mris ADto ck JStoJz 07/ M 88 07/g/88 07/h/88 j
Mr. E. E. Fitzpatrick Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station cc:
Ernest L. Blake, Jr.
Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 2300 N Street, NW Post Office Box 445 Washington, D.C.
20037 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Mr. David M. Scott, Chief Regional Administrator, Region I Bureau of Nuclear Engineering U.S. Nuclear Regulatory Commission Department of Environmental Protection 475 Allendale Road CN 411
, King of Prussia, Pennsylvania 19406 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625
. Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.
P. O. Box 388 Forked River, New Jersey 08731
ATTACHMENT-1 0YSTER CREEK DOCKET N0. 50-219' MEETING-JULY 13, 1988 LIST OF ATTENDEES RNAME ORGANIZATION XTUromerick HRR-PDI-4 M.Laggart GPUN-Licensing
- Y.Nagai GPUN-Licensing F.Orr '.
NRR-PDI-4 M.Jacobs' N.J. State D.E.P.
J.L.Sullivan Jr.
GPUN-Licensing 0
e
-...-.y,
,,c
,m-
hffk[YY$Y? k
.-..a.
R-1208673-001
/g T' REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGd NO.s i
DIVISION OF DRP LICENSING R PROJECT MANAGER REPORT RUN DATE: 06/28s CHEADQUARTERS)
FACILITY: OYSTER CREEK 1
- PLANT LOCATION
- 9 MI S OF TOMS RIVER, HJ FACILITY STAGE: LIC DOCKET NUMBER:
050-00219 PROJECT DIRECTORATE: PD14
- ARCH / ENGINEERS B&R LICENSED POWER
- 1930 MHT PROJECT MANAGER:
A. DROMERICK IE INSPECTORS H. BATEMAN DESIGN POWERS 0650 ps4E PROJECT DIRECTOR:
J. STOLZ NSSS VEND 0R' GE LIC. ASSISTANTS S NORRIS T
MULTI Y
P TAC PLANT APPL P REVIEHED R REV LICENSEE RAI SC NUMBER ACTION R&If f
BY i DRGH REVIEHER RAI DATE DATE DATE COMP DATE DATE C0f91ENTS TP
RESPONSE
SE INPUT LIC ACT IMPLEMENT 4
I. ACTIVE AND COMPLETED LICENSING ACTIONS IN FY CPLANNED ACCOMPLISHMENT /111) 1:MED ACTIVE ACTIONS MMMM ILCTION ITF.Ms OYSTER CREEK - FULL TERM OPERATING LICENSE 111268 05/06/72 A PM 3 PD43 MICHAELS 45e 5 vaa 06/07/85X 08/00/89T N/A t:
PD14 DROMERICK PD14 ORR
%CTION ITEM OYSTER CREEK 1 - PROCEDURES GENERATION PACKAGE REVIEN (NUREO 0737 SUPP/1)
M4324 F-05 L
TS 3 SODO SHERON 10/31/85C 05/03/85X 09/30/88T 10/00/85C SCHED.TO 3 02 PBIA DELISO ESGB PICHUMANI 05/09/86X E DETERMND LHFB MORISSEAU 05/22/87X 08/31/58 LCTION ITEM: OYSTER CREEK - TORNADO MISSILE DAMAGE 149594 10/01/82 L TS 3 PD43 MICHAELS 07/03/85C 06/07/85X 08/00/89T
,1.
I?sAR 4.6.
OS PARS HILSON SPLB.CHU 04/05/85X t,2,4 i ESGB ROMNEY
\\
SPLB KUDRICK PRPB LEVINE 0G/25/86X
~
PRAB CAMPE 08/30/86C PD14 DROMERICK 08/30/86C
\\
.CTION ITEMS OYSTER CREEK - SEISMIC DESIGN 149598 10/01/82 L TSK 3 PD44 CHENG 04/24/86C 06/24/86C 07/24/87X 08/00/89T PD43 MICHAELS LPEB MCKENNA 06/07/85X 02 ESGB ASHAR 07/25/86X PD14 DROMERICK ESGB ROTHMAN 09/30/88 ESGB PICHUMANI ESGB REITER OS/13/88X O
g 5
-1208673-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s 224 DIVISION OF DRP LICENSING R PROJECT MANAGER REPORT RUN DATE: 06/28/88 (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
MULTI Y
P SC RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AD UMBER ACTION DAlf f
BY 1 DROH REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS If un=n ACTIVE ACTIONS MMMM (CONTINUATION)
CTION ITEMS OYSTER CREEK - NEUTRON MONIl0 RING ISOLATION 49408 12/01/85 L TS 3 OEAR SCHOLL 11/10/87 06/15/88 11/06/85X 09/15/48T 12/00/86C IPSAR 4.27 01 PD43 MICHAELS 06/07/85X (1), MTG.
SICS STENARI
@ TION ITEMS OYSTER CREEK TS CR NO. 148 - COOLANT ACTIVITY 39412 12/01/83 L PM 3 PD43 MICHAELS 06/30/87 04/05/88C 06/07/85X 27/ine??T IPSAR 4.36 83 h
OflTDff[
'*I ETION ITEMS OYSTER CREEK 1 - INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG 1.97) 91115 A-17 04/04/83 L TS 3 SELB RCTA 09/04/ 7C 04/05/88C 07/18/86X -99ettetSTT 12/08/48L SCHED UNKN 02 N
ICK ETION ITEM 8 D2482 OYSTER CREEK - SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA 10/05/83 X RCN 5 PD43 MICHAELS 06/07/85X 0f ?.'22 7 -
IPSAR TIA 03 PD14 DROMERICK g
g g7 REGION I (2863 TION ITEM 8 OYSTER CREEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS v
8-77 11/01/83 L TS 2 SICB LASHER 04/05/85 10/23/85C 09/30/88 12/08/88T 12/08/88L 02 j CTION ITEM 8 OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS 33598 B-86 j
11/01/84 L TS 2 SICB LASHER 01/22/88C 05/15/88C 09/00/87C 12/00/88T N / /
M 02 PD14 DROMERICK (4005 TION ITEM 8 OYSTER CREEK 1 - ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TES) INTERVALS B-93 11/01/84 L TS 2 SICS LASHER 04/05/85C 10/23/85C 09/30/88 10/30/58T 86/08/45C BNR00 SE 02 ION ITEMS OYSTER CREEK - DISCREPANCY IN DRAHINGS USED IN SEP REVIEN 004 06/13/85 L TS 3 PD44 CHENG 08/15/86 07/24/87X 08/00/49T SCNEDULE U 02 LPES MCKENNA 08/29/86X NKN0HN s
~.
3-1208673-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s 22 DIVISION OF DRP LICENSING R RUN DATE: 06/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC HULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPL EMENT AD 20511g ACTION R&lg f
SY 1 RREN REVIEHER RAI DATE DATE DATE COMP DATE DATE _ COMMENTS IE 0000 ACTIVE ACTIONS MMMM (CONTINUATION)
TION ITEM: OYSTER CREEK - SUPPLEMENT 1 TO INTEGRATED PLANT SAFETY ASSESSPENT REPORT DATED JANUARY 1983 2077 08/06/86 A PM 3 PD14 DROMERICK 4Hb94eeef 04/00/88 SE CMP DT 03 47lJolpyf-2 S DETD TCTION ITEM: OYSTER CREEK-TSCRs126-REVISE CONTAINMENT LEAKAGE TESTING, AS OUTLINED IN 10CFR50 APPENDIX "J" 32078 07/25/86 A TS 2 SPLB KUDRICK 02/19/88C N04/01/87M CL'!S/EST' 02 SPI B GOEL g7-gy hCTION ITEM: OYSTER CREEK - LONG TERM CORRECTIVE ACTION FOR DELAMINATION OF ESH PIPING C0ATING 3 2976 09/15/86 L PM 4 PD14 DROMERICK 12/31/88T 12/00/88 03 "TION ITEM OYSTER CREEK - RESPONSE TO STAFF POSITION ON CONTAINMENT HITROGEN PURGE / VENT SYSTEM mc2980 A-19 06/16/86 L TS 2 PD14 DROMERILK 03/13/87 05/31/88(2 09/00/88T M12/00/87 N RAI 0)(
CTION ITEM OYSTER CREEK - REVIEH RESPONSE REGARDING 10 CFR 50.62 ATHS RULE 2331 26 09/05/87 i TSK 1
PD14 DROMERICK 04/29/88C 97'30'!!T-02 SRX8 MCC0Y p
7-1CTION ITEM: OYSTER CR FK - REVIEH GPU TOPICAL REPORT TR-045 BNR-2 TRANSIENT ANALYSIS h36358 09/29/8/ L TSK 2 PD14 DROMERICK 07/15/ooi 02 SRXS SUN o *y,'fggyj-CTION ITEM: OYSTER CREEK - SEP TOPIC II-3B FLOODING POTENTIAL AND PROTECTION REQUIREMENTS OST 3660S 11/06/87 L TS 3 PD14 DROMERICK 03/30/88C 05/30/86 x12/31/87M -44,5viosi
<*DF ESGB STALEY MOS,1S/88M gy-g f OYSTER CREEK - INSP. OF RECIRC. 8 ISOLATION CONDENSER PIPING IN CYCLE IIR DUTAGE C8/'
$]CTION ITEM:
37183 02/16/83 L TS 3 PD14 DROMERICK 04/ 5/88C BJ446764E-+
EMTS K00 y 73p g
g pj gg
$'CTION ITEM: OYSTER CREEK - TSCR 166 - TECHNICAL SPECIFICATION CHANGES TO SU.* PORT CYCLE 12 RELOAD 67743
'03/30/88 2 PD14 DROMERICK 10/15/88T 02 SRXB SUN
R-1202673-001 QEOULAT0CY INF0RMATI9N TRACKINO 5YSTEM PAGE NO.*
23 DIVISION OF DRP LICENSING R RUN DATES 06/28/I PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITYs OYSTER CREEK 1 T
Sr MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AE 1 UMBER ACTION MIE E
BY I EQN REVIEHER RAI DATE DATE
__DATE COMP DATE DATE C0tt1ENTS 11 cnna ACTIVE ACTIONS umux (CONTINUATION)
LCTION ITEM: OYSTER CREEK - TSCR 164 - REVISE T.S. TO DELETE SAFETY LIMIT 2.1.E 467819 05/31/88 3 PDi4 DROMERICK 08/15/88T 09/15/88 0.
iLCTION ITEM: OYSTER CFEEK - TSCR-173 - REVISE REQ'S. FOR OPERABILITY OF POSITION INDICATORS FOR 16 ASME CODE SAFETY VALVES 167964 04/29/d5 2 PD14 DROMERICK Eh, wie 66T t? '07/66-4$
ROWS N
f M 6-
%CTICH ITEMS OYSTER CREEK - NEW SEISMIC FLOOR RESPONSE SPECTRA 168217 05/18/88 3 ESGB ROTHMAN 10/01/88T 11/01/88 OS ESGB THOMPSON PD14 DROMERICK
%CTION ITEMS OYSTER CREEK - RVH LIC'S REQ TO USE A VISUAL INSP. TECHNIQUES ELIM THE REQ TO DOCKET INSP RSLTS RE CORE SPRAY SPARG 468227 05/13/88 L TS 3 PD14 DRGMERICK 08/19/88T 09/10/88 02 1CTION ITEM: OYSTER CREEK - RVH REQ TO CHO ENDPT OF t o YR INTVL FOR ISI INSP'S. & 5 CHGS TO THE EXISTING CODE REQUIREMEHTS 168267 05/20/88 L TS 3 PD14 DROMERICK 08/10/88T 09/30(88 0?
CC 3 NOT SCHEDULED ACTIONS MMMNK
- ICTION ITEMS UPORADE TABLE 3.1.1 0F TECHNICAL SPECIFICATIONS LEVEL INSTRUMENTATION FOR REACTOR VESSEL ISOLATION 159955 10/11/85 3 SRXB HDDGES 07/30/88 07/30/88 03/20/87X 12/09/87 NEW SCHED C'
UNKNOHN
- LCTION ITEM: OYSTER CREEK - DETAIL CONTROL ROOM DESIGN REVIEW SUPPLEMENT 81 161603 F-71 05/19/86 L TS 3 PD14 DROMERICK 08/30/86 12/00/88 SCHED.TO B 02 LHFB RAMIREZ E DETERMND
- LCTION ITEM 8 OYSTER CREEK - ADDITIONAL EXEMPTIONS TO APPENDIX "R"
162229 04/25/86 E TR 3 PD14 DROMERICK N/A SCHEDULE U 02 ECEB NOTLEY NKN0HN
=
=
.-1208673-001 REGULAT0RY INF0RMATION TRACKINO SYS1EM PAGE N0.8 22 DIVISION OF DRP LICENSING R RUN DATE: 06/28/t PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
MULTI 7
P RAI LICENSEE TC SC TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AI JMBER ACTION Ralf f
BY I DRM REi!IEHER RAI DATE DATE__
DATE COMP DATE DATE COMMENTS If tunX NOT SCHEDULED ACTICHS xxxxx (CONTINUATION)
- TION ITEMS OYSTER CREEK - TSCR-158 - LICENSEE RESPONSE TO GL-84-11 ITEM "B" L5100 03/17/87 A TS 3 PD14 DROMEJICK SPLB LICCIARDO SCHED.TO 3 02 E DETERMND SICB LASKY 03/15/88 lTIEN ITEMS 0) STER CREEK - REV. 5 "PUMP & VALVE TESTING PROGRAM" iS351 03/23/87 R 4 PD14 DROMERICK EME3 SHAN SCHEDULE U 02 07/17/87X NKNOHN EMEB LEE EME8 LI
- TICH ITEM: OYSTER CREEK - RESOLUTION OF DRYMELL SHELL PDTENTIAL DEGRADATION OF MARK I DRYNELLS - OL 87-05 5148 05/12/87 L TS 2 PD14 DROMEPICK 01/15/87 C4/30/88 OJ ESGB TAN j
-44 7/2,0.67 df p ggy OYSTER CREEK - EXEMPTIDW FROM REQUIREMENTS OF 10CFR50, APP. R. SECT. III. Jf J #pC TION ITEM:
5055 11/24/86 E TS 3 PDt4 DROMERICK ECEB NOTLEY SCHEDULE U 02 3
NKNOHN
,1.
T70N ITEM: OYSTER CREEK - REVISE BASES FOR TECH. SPEC. 3.5 6701 01/30/87 A R/W 3 PD14 DROMERICK SCHEDULE U S1 NKNOWN TION ITEM: OYSTER CREEK - TSCR - 167 DELETION OF ORGANIZATIONAL CHARTS AND FACILITY STAFF QUALIFICATIONS 7593 03/22/88 3 PD14 DPOMERICK 96 *23766 SCHEDULE U 01 67/3/957~
IION ITEM: OYSTER CREEK - IPSAR VERIFICATION ITEMS 5142 05/16/88 3 PD14 DROMERICK 08/01/89 02 PD14 ORR FION ITEM: OYSTER CREEK - TSCR NO. 162 - MODIFY STAND 5Y LIQUID CONTROL SYSTEM (SLCS) TO REF
>198 05/10/88 1
PD14 DROMERICK SRXS MCC0Y' G7/iS/66 D3 6
/> M -
-et Mb8
R-1208673-001 REGULAT0RY INF0RMATION TRACKINO
$YSTEM PAGE NO.
2 DIVISION OF DRP LICENSING R RUN DATE: 06/28/.
PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITYs OYSTER CREEK 1 T
58 i
MULTI Y
P RAI LICENSEE Ti i TAC PLANT APPL P REVIEWED R REV
RESPONSE
IMPLEMENT A:
NUMBER ACTION DAII E
BY I ARGH REVIEMER RAI DATE DATE DATE COMP DATE DATE C0fetENTS 11 unnu NOT SCHEDULED ACTIONS nummu (CONTINUATION) 1
' ACTION ITEM OYSTER CREEK - TSCR 168 - TECHNICAL AND SAFETY REVIEN OF PROCEDURES 41 di JI gg[
M64372 05/26/88 3 PD14 DRDMERICK j
unun COMPLETED ACTIONS munu i
' ACTION ITEM OYSTER CREEK 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR REC 009tENDATIONS - RTS C0ff0NENTS M52944 E-78 11/01/83 L RGN PD14 DROMERICK 02/28/86 12/25/87C 05/04/88P 05/08/88C 06/08/88 S-AF ACTION ITEM: OYSTER CREEK 1-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL *R COMPONENTS M53741 3-87 11/01/84 L RGN PD14 DROMERICK 02/28/86 12/23/87C 05/04/88P 03/08/88C 18/00/85C 8'
o4 OCTION ITEM: OYSTER CREEK 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES 250091 3-92 11/01/84 L RGN PD14 DRDMERICK 12/23/87C 05/04/88P 05/08/88C 08/08/85C REG I. SE es SEE M52944 8+
TION ITEMS OYSTER CREEK 1 - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN
SUMMARY
REPORT - F-71 147 F-71 10/22/84 PD23 PASTIS 10/01/86 04/05/85X 02/01/88C 12/Ot/88L 10/09/85 M 4H LPEB RAMEY-SMITH 05/02/86X l
LHFB RAMIREZ 11/!0/86P TG.
8+
l PD14 DROMERICK 11/30/86F 4
ACTION ITEM: OYSTER CREEK - INTEGRATED LIVING SCHEDULE (GL-85-07)
M64687 01/27/87 A PM PD14 DROMERICK 05/15/88C 05/27/88P 05/27/88C 02/09/88 1H
- 4h
'CTION ITEM 8 OYSTER CREEK - RELOAD TOPICAL REPORT - 033 A
M65138 04/15/87 L TSK SRXB RICHINGS 11/01/87 10/01/87 05/21/88P 05/21/88C 12/08/87 4H PD14 DROMERICK 05/25/88C of ACTION ITEMS OYSTER CREEK - RELOAD TOPICAL REPORT - 040 465139 04/15/87 L TSK PD14 DROMERICK 11/01/87 10/01/87 03/25/88C 05/21/88C ed SRXS RICHINGS 03/21/88P e4L LCTION ITEM: OYSTER CREEK -TSCR 146 REV SECT 4.3.0 CONCERNING ADDTIONAL CONDITION WHICN NOULD REG PERFORMING EXISTING LEAK TESTS 965640 06/19/87 L TS PD14 DROMERICK 11/38/87P 11/38/87C 11/08/87C 04 e
. r
?F1208673-005 REOULAT0RY INF0RMATION 7 RACKINO SYSTEM PAGE No.s 23-DIVISION OF DRP LICENSING R RUM DATES 06/28/8 PROJECT MANAGER REPORT CHEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
MULTI Y
P RAI LICENSEE TO.
SC TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AD MUMBER ACTION DAlg g
BY I ARGH REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS If 1
II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111) (CONTINUATION) l ACTION ITEM: OYSTER CREEK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN M08100 A-02 07/11/78 A 3 PRPB MEINKE 08/13/86 06/26/85C 10/07/86C 12/00/88 04 I
LCTION ITEM: OYSTER CREEK - BHR FEEDH3TER 8 CONTROL ROD DRIVE N0ZZLE CRACKING p08411 3-25 08/30/78 1
EMTB HAZELTON 03/02/76C 07/01/79P 03/19/82C 12/09/90L 04 1CTION ITEM: OYSTER CREEK - CONTAINMENT LEAK TESTING - APP. J (GENERIC) 08678 A-04 08/04/75 2 SPLB PULSIPHER 03/05/82P 03/03/82C M11/00/87 N 04 ION ITEM: OYSTER CREEK - CONTAINMENT LEAKAGE DUE TO A VALVE SEAT DETERIORATION g 0287 B-20 12/01/78 3 PD21 REEVES 12/00/79C 01/16/81C M12/00/87 M 04
[CTIONITEMs OYSTER CREEK TMI FOLLON UP HORK
- 11755 B-42 1
02/15/80C 05/08/80C N09/00/a7LM 04 lCTION ITEM: OYSTER CREEK - LESSONS LEARNED IMPLEMENTATION J12422 B-44 10/13/79 1
04/01/81X 03/27/81C M09/00/87LM 04 p2914 ION ITEM: OYSTER CREEK - MASONRY HALL DESION. RESPONSE TO IE BULLETIN 80-11 B-59 05/08/80 L 2 SORR CHOKSHI 08/14/85C 11/22/85C 12/23/85C 12/00/88 CYCLE XI O 04
~
UTAGE RTION ITEM: OYSTER CREEK - HUREG-0737 III.D.3.4, CONTROL ROOM HABITAPILITY M466 F-70 L
1 SORI READ 08/16/85C 04/05/85X 07/15/86C 12/00/83L 04 EMES DEMPSEY 07/15/86P PD31 QUAY 12/13/85X PRAB CAMPE 04/04/86C l'
$TICH ITEMS OYSTER CREEK 1 - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN F-08 51185 F-06 04/04/83 L PD41 DICK 07/01/83 10/10/84P 10/10/84C 12/00/88L 04 LPEB RAMEY-SMITH 02/01/84C LHFB RAMIREZ 05/02/86C e
e
! -1208673-001 R
REOULAT0RY INF0XMATION TRACKI>J SYSTEM PAGE NO.
2, DIVISIDH OF DRP LICENSING R RUN BATE: 06/28/l PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: CYSTER CREEK 1 T
MULTI Y
P RAI LICENSEE Ti S4 TAC PLANT APPL P REVIEWED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT s
NUMBER ACI19.H RAIE E
BY I QREH REVIEHER RAI DATE DATE DATE COMP DATE DATE CDMMENTS CEUU COMPLETED ACTIONS MMMM (CONTINUATION)
REG 1 CAPHTON 11/30/87P ACTION ITEM: OYSTER CREEK - SAFETY LIMIT VIOLATION M66289 09/20/87 L PM PD14 DROMERICK 11/06/87P 11/06/8?C 4k SRXB Th0 MAS 10/14/87C of ACTION ITEM: OYSTER CREEK GENERATING STATION - T.S.C.R.16S - CHANGE ALLONABLE OUT OF 3ERVICE TIllE - 12S V.D.C. MOTOR M66884 12/18/87 A TS PD14 DROMERICK 03/25/88C 03/00/88C 19 SELB TOALSTON 02/12/88X
- 4 iACTION ITEM: OYSTER CREEK - T.S. CHANGE NO. 154 - P-T OPERATING CURVES
,M67019 01/19/88 A TS PDI4 DROMERICK 03/21/88P 03/21/88C 0
! ACTION ITEM: OYSTER CREEK - TECH SPEC CHANGE REQUEST NO. 163 - FUEL H. HIGHER ENRICH jM67080 01/29/88 A TS PC14 DROMERICK 04J22/88C 04/11/88C 04 SRXB BROOKS 03/12/88X l ACTION ITEM: OYSTER CREEK NUCLEAR GENERATING STATION EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50, APPENDIX J, SECTION III.A.3
- M67356 02/19/88 PD14 DROMERICK 04/22/88C 04/18/88C
.1.
?
00
- ACTION ITEM: OYSTER CREEK - BULLETIN 88-01: DEFECTS IN HESTINGHOUSE DS SERIES CIRCUIT BREAKERS
.M67698 B100 R*234#88 PD14 DROMERICK 06/01/88P 06/01/88C 00
,gg,,,
PD23 HOOD 06/01/88P
- II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111)
_ ACTION ITEM: JYSTER CREEK - RPS POWER SIJPPLY TH07147 C-11 08/07/78 1
SELB KNOX 04/03/81X 03/30/83C N12/00/87 u 04 l
SEL S AHMED 03/30/83P l
OGC8 MACKAY 04/08/83X ACTION ITEM: OYSTER CREEK - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION
!M07944 D-01 10/01/79 L 1 SORI ELTAHILA 01/13/84P 01/13/84C 12/08/88L 04
_W M
a
l R-1208673-001 REOULAT0Rv IhFGRMATION TRACKINO SYSTEM PAGE N0.8 DIVISION OF DRP LICENSING R RUN RATE: 06/28e PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
MULTI Y
P RAI LICENSEE TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC /L'.
IMPLEMENT-NUMBER ACTION Dalg f
BY 1 DEQH REVIEHER RAI DATE DATE DATE _ COMP DATE DATE CDMMENTS II.
OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111)
(CONTINUATION)
ACTICN ITEM: OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS M53025 8-79 11/01/85 A SICL LASHER 04/05/85 10/25/35C 05/31/86P 05/31/86C M12/00/87 m 4
og ACTION ITEMS OYSTER CREEK 1 - MARK 1 DRYNELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC LETTER 83-08 M57161 D-23 03/20/85 PD41 LONG 04/11/85 05/23/86C 08/23/85X 05/05/87C 12/00/89L EMEB SH/W 02/12/87C of.
ACTION ITEM: OYSTER CREEK 1 - 10 CFR 50.62 OPERATING REACTOR REVIENS M59122 A-20 06/28/S4 OICB KENDALL 10/04/85C 08/22/86X 11/19/86C 12/00/88L GENERIC.BW 44 0 FAB KARSCH 11/01/85X ROG SER og SICB MAUCK 09/05/86X SICB LI l
r.
1 i
b 9
9
t-1208673-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.s 2
DIVISION OF DRP LICENSING R RUN DATE: 86/28/
PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITYs OYSTER CREEK 1 T
St MULTI Y
P RAI LICENSEE TI TAC PLANT APPL P PLANNED R
REV
RESPONSE
SE INPUT COMPLETION IMPLEMENT Al (UMBER REFERENCE EAlf f ACCOMPLSH I DREN REVIEHER RAI DATE DATE__
DATE DATE DATE CDMMENTS
))
IV. 01eTR ACTIVE AND COMPLETED ITEMS IN FY (EXCLUDES PLANNED ACCOMPLISHMENT /111)
En~3 ACTIVE ACTIONS MMMM tCTION ITEM: OYSTER CREEK - II.3.B.-FLOODING POTENTIAL AND PROTECTION REQUIREMENTS 141352 1511 HFIB FROELICH 03/26/82X 08/09/89T 44 -
EHEB CHERY 07/08/83C dA ESGB STALEY 09/30/83X PD14 HANG 03/06/83X PD14 DROMERICK LCTION ITEM: OYSTER CREEK - III.5. A-EFFECTS OF PIPE BREAKS ON STRUCTURES, SYSTEMS AND COMPONENTS INSIDE CONTAINMENT 141437 06/23/80 1511 EMEB CHEN 05/01/88 06/29/82X 08/00/89T SEE TAC OC 4F EMER LI 06/26/87X 035 di LPEB MCKENNA 07/09/82C PD14 BOYLE 06/29/82C
'LCTION ITEM: OYSTER CREEK - III.5.B-PIPE BREAKS OUTSIDE CONTAINMENT 141475 06/23/80 1511 EMEB CHEN 05/01/88 06/22/82X 08/00/89T SEE TAC DC 41, EMER LI 06/26/87X 935 of*
LPEB MCKENNA 07/02/82C PD14 BOYLE 06/22/42C 3, '.
C 53 NOT SCHEDULED ACTIONS MMMMM
- tCTION ITEMS SEP SEISMIC REVIEN - OYSTER CREEK 107345 06/23/80 1511 TMIP IGNATONIS 04/20/78 TAC 49398 R 4K PD41 PAULSON 05/11/81 EPLACE3 sq EQB
!10FMAYER 02/27/Si i
ESGB TAN 05/21/79 EQB ASHE 04/91/81 DE LEVIN 08/28/80 l
SOSP FRAHM 12/00/78 MEB STEPHENS 05/21/79 PD44 CHENG 01/21/83 I
liCTION ITEMS OYST R CREEK - REVIEW OF THE DESIGN 8 OPERATION OF VENTILATION SYSTEM 3 l 147070 10/28/81 1511 PMSB BAJNA 03/29/85 04/30/82X UNKNONN 44.
ej l
~
-1208673-801 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.8 23' DIVISION OF DRP LICENSING R RUN DATE: 06/24/8; PROJECT MANAGER REPURT CHEADOUARTERS)
FACILITYs OYSTER CREEK 1 T
SC MULTI Y
P RAI LICfhSEE TO TAC FLANT APPL P PLANNED R
REV
RESPONSE
SE INPUT COMPLETION IMPLEMENT AD DMBER REFERENCE RAIE E ACCOMPLSH 1 DRGH REVIEHER RAI DATE DATE DATE F-_? T E DATE COMMENTS IE E333 HDT SCHEDULED ACTIONS Mmmum (CONTINUATION)
CTION ITEM OYSTER CREEK IPSAR SUPPLEMENT 49809 02/28/83 1511 PMAS CHALINA 06/22/84X TAC 62077 R 03 LPES MCKENNA 11/23/84X EPLACES CTICN ITEMS OYSTER CREEK - SECURITY PLAN
,55199 12/02/86 L 1711 PD14 DROMERICK CTION ITEM: OYSTER CREEK - PROOF AND REVIEW OF IPSAR SUPPLEMENT 57776 04/05/88 1511 ECEB HING PD14 DROMERICK EMTB TSAO PD14 ORR LHFB ECKENRODE PRAB KELLY 05/13/88X EMER LI SPLB ANAND PRPS MEINKE CTION ITEM OYSTER CREEK - NRR VITAL AREA DEFINITION REVIEN
-I-
?
58420 06/20/88 1711 1 PD14 DROMERICK RSGB MENDELSOHN CTION ITEM: OYSTER CREEK - NRR REGULATORY EFFECT. REVIEN 68421 06/20/88 1713 1 PD14 DROMERICK RSGB MENDELSOHN RSGB ORRIK RSGB NARREN 6
0 9
s
ATTACHMENT 3 SEP TOPlc 5bbMITTACSCHEDUI.E IPSAR SEC110N ISSUES SUBMITTAL _DATE IPSAR4.1(3)
Water Level Monitoring 7/31/88 in the Intake Canal IPSAR 4.2 Design of Specified 9/30/88 Components (seismic and qualify)
IPSAR 4.3 Control Room Wall Under 9/30/88 Combined Wind and Missile Impact Loading IPSAR 4.3.1 Reactor Building Upper 9/30/88 Steel Structure Under Tornado Wind Loads IPSAR 4.6.4 Protection to ensure 8/15/88 Safe Shutdown for Tornado Missile IPSAR 4.12 Evaluation, on a Sampling 9/30/88 basis, of Specific Structural Elements Per Current Codes and Loading Conditions
.IPSAR 4.16.1 Primary System Leakage July 1, 1988 Rate and Leakage Detection System Sensitivity IPSAR 4.28 RPS Monitors with July 31, 1988 Inappropriate Scalt Trip Settings l
IPSAR 4.36 Primary Coolant Activity SUBMITTEL (TSCR 148, Rev. 1)
IPSAR 4.27 Isolation of RPS from 8/15/88 non-safety systems IPSAR4.34(1)
Adequacy of diesel To be determined generato,r load capacity i