Text
-
.0STe6 loss Docket No. 50-219 LICENSEE: GPU Nuclear Corporation Jersey Central Power and Light Company FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUMMARY
OF PROGRESS REVIEW NEETING REGARDING STATUS OF LICENSING ACTIONS.
Or. Wednesday, September 28, 1988, a meeting was held at Oyster Creek Nuclear Generating Station,) Forked River, New Jersey, with GPU lluclear Corporation (GPUN, the licensee to discuss the status of Oyster Creek licensing actions. is the list of the individuals participating in the discussion. is a marked-up copy of the staff's Regulatory Information Tracking System (RITS) dated September 7,1988 for Oyster Creek.
The markup to update the RITS resulted from the discussion on each item or TAC number in this meeting. The status of each item is given in the last column (SC, TD, AD, TE) on the right-hand side of the RITS sheets.
The status in that column is the following:
"01" means licensee, "02" means staff's reviews, and "03
means staff's Project Manager and "04" means complete.
The updating of the RITS for Oyster Creek was done during the discussion on each licensing (action in this meeting.left-handcolumnofRITS).
The licensee stated that GPUN will The licensing action items are listed by TAC number markup the "Other Completed Licensing Actions Not Yet Implemented" and will provide implementation dates at the next status meeting.
A discussion related to future actions was also held.
Alexander W.) romerick, Project Manager Project Di ectorate I-4 r
Division of Reactor Projects I/II Attachments:
As stated cc w/ attachments:
See next page DISTRIBUTION i
2 Decast J ue: 4 EJordan, 3302 MNBB Of0l NRC & Local PDRs B6 rimes, 9/A/2 PDI-4 Rdg.
NRC Participants JStolz ACRS(10) l l I
ADromerick HBClayton, M M p-t'j OGC h-4 D:PD)
LA PDI O P
St 71s A
rick:bd JStol 10/ 6 /88 10/6 /88 10/6/8 8810130276 891006 PDR ADOCK 05000219 f9 fPJE
Mr. E. E. Fitzpatrick Oyster Creek Nuclear Oyster C eek Nuclear Generating Station Generating Station cc:
Ernest L. Blake, Jr.
Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 2300 N Street, NW Post Office Box 445 Washington, D.C.
20037 Forked River, New Jersey 08731 J.8. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Mr. David M. Scott, Chief Regional Administretur, Region I Bureau of Nuclear Engineering U.S. Nuclear Aegulatory Commission Department of Environmental Protection 475 Aller. dale Road CH 411 King of Prussie, Pennsylvania 19406 Trenton, New Jersey 08625 BWR Licensing Manager GPU Nuclear Corporation i Upper Pond Road Persippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Low arid Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.
P. O. Box 388 Forked River, New Jersey 08731 O
F e
e Attachment _1 ATTENDANCE LIST OYSTER CREEK NUCLEAR GENERATING STATION September 28, 1988 Meeting NAMES ORGANIZATION A. W. Dromerick NRC-NRR-PDI-4 M. W. Laggart GPU NUCLEAR Mark Jacobs State of N.J. DEP/BNE Suren Singh State of N.J. DEP/BNE s
4 4
)7rrsas/EWr o?
- C-1208673-C01 REOULATOQY INF0CMATIOO TRACKIOO
$YSTEM PAGE NO.:
2a DIVISION OF DRP LICENSING R RUN BATE: 09/07/8 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 PLANT LOCATION' 9 MI 5 0F TDMS RIVER, NJ FACILITY STAGE LIC PA0 JECT DIRECTORATE: PD14 DOCKET NUMBER: 050-00219 LICENSED POWER: 1930 MWT PROJECT MANAGER:
A.
DROMERICK ARCH / ENGINEERS 58R DESIGN POWER:
0650 MHE PROJECT DIRECTOR J. STOLZ IE INSPECTOR H. BATEMAN NSSS VENDOR GE LIC. ASSISTANT:
$ NORRIS T
SC MULTI Y
P RAI LICENSEE Tt TAC PLANT APPL P REVIEWED R NEV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AI NUMBER ACTION Dale E
BY 1 ORON REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS IJ I. ACTIVE AND COMPLETED LICENSING ACTIONS IN FY (PL ANNED ACCOMPLISHMENT /111) cnra ACTIVE ACTIONS MMMM ACTION ITEM: OYSTER CREE 4 - FULL TERM OPERATING LICENSE M11238 03/06/72 A PM 3 PD43 MICHAELS 05/31/88 06/07/85X 08/00/89T N/A Of P314 DROMERICK PD14 ORR ACTinN ITEM: OYSTER CREEK 1 - PRGCEDURES GENERATION PACKAGE REVIEH (NUREG 0737 SUPP/1)
M44324 F-05 L
TS 3 SODO SHERON 10/31/85C 05/05/85X.;L 5meenF 10/00/85C SCHED.70 B 09 f
f E DETERMND l
PBIA DELISO 35/09/86X j,/ y,/gy7-ESGB PICHUMANI 05/22/87X LHFB MORISSEAU 08/31/88 ACTION ITEMS OYSTER CREEK - TORNADO MISSILE DAMAGE Ot M40394 10/01/82 L TS 3 SPLB CHU 07/05/85C 08/00/S9T IPSAR 4.6.
4M ESGB ROMNEY 1,2,4 PD43 MICHAELS 06/07/85X l
PARS HILSON 04/05/85X l
SPLB KUDRICK 04/25/86X PRPS LEVINE 08/30/86C PRAB CAMPE 08/30/86C PD14 DROMERICK 11 ACTION ITEM: OYSTER CREEK - SEISMIC DESIGN l9M403!8 10/01/82 L TSK 3 PD44 CHENG PS/24/86C 06/24/86C 07/24/87X 08/00/89T Of l
PD43 MICHAELS 06/07/85X LPER MCKENNA 07/25/86X ESGB ASHAR PD14 DROMERICK I
ESGB ROTHMAN 09/30/88 ESGB PICHUMANI 05/13/88X ESGB REITER g
C-1208673-001 REOULAT0RY INF0RMATION TCACKICO SYSTEM PAGE NO.
2:
DIVISION OF DRP LICENSING R RUN DATE 09/07/1 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
S MULTI Y
P RAI LICENSEE T
TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT A
NUMBER ACTION Dalf f
BY 1 QEqH REVIEHER RAl_QAlf DATE DATE COMP DATE DATE CRBMENTS CCC3 ACTIVE ACTIONS MMum (CONTINUATION)
ACTION ITEM: OYSTER CREEK - NEUTRON MONITORING ISOLATION
/(7 jP M49408 12/01/83 L TS 3 OEAB SCHOLL 11/10/87 08/15/88 C3 11/0Je.cfX 88T 12/00/86C IPSAR 4.27 Od PD43 MICHAELS n6/07/r X (1), MTG.
SICS STEWART ACTION ITEM: OYSTER CREEK TS CR NO. 148 - COOLANT ACTIVITY o
M49412 12/01/83 L PM 3 PD43 MICHAELS 06/30/87 04/05/88C 06/07/85X 09759/8&F-IPSAR 4.36 -Ah PD14 DROMERICK
/
SU5MIT TS p ppp/gg(;
PRPB MEINKE 06/19/87X PD14 HEO.AN 08/26/88X.
ewerc ACTION ITEM: OYSTER CREEK 1 - INSTRUMENTATION TO FOLLOH THE COURSE OF AN ACCIDENT (RG 1.97)
/) J/
M51115 A-17 04/04/83 L TS 3 SELS ROSA 09/30/88 04/08/88C 07/18/86X 44v 88T 12/00/88L SCHED UNKN 0; SICB MARCUS j
OWN PD14 DROMERICK ACTION ITEM: OYSTER CRLEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M12853 B-77 11/01/85 L TS 2 SICB LASHER 04/05/85 10/23/85C 09/30/88 12/00/88T 12/00/88L 0;
ACTION ITEM: OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53698 B-86 11/01/84 L TS 2 SICB LASHER 01/22/880 05/15/88C 09/00/87C 12/00/88T M
/ /
u 0;
PD14 DROMERICK ACTION ITEM: OYSTER CREEK 1 - ITEMS 4.5.2 & 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES & TEST INTERVALS M54008 B-93 11/01/84 L TS 2 SICB LASHER 04/05/85C 10/23/85C 09'20/88 19'50'8*f 06/00/85C BHROG SE 0;
P/30/f,f
///316/$W "ACTION ITEM: OYSTER CREIK - DISCREPANCY IN DRAHINGS USED IN SEP REVIEH M58004 06/13/85 L TS 3 PD44 CHENG 08/15/86 07/24/87X 08/00/89T SCHEDULE P 0; LPEB MCKENNA 08/29/86X NKNOHN ACTION ITEM OYSTER CREEK-TSCR8126-REVISE CONTAINMENT LEAKAGE TESTING, AS OUTLINED IN 10CFR50 APPENDIX "J" o
M62078 07/25/86 A TS 2 SPLB KUDRICK 02/19/88C N04/01/87M -et/40/88T 4H fgg//3ff' SPLB GOEL 3f I
i2p/SVT
?///sl61r
C-1208673-001 REOOLAT0RY INF0RMATICN T R A C K,1 11 0 SY$ TEM PAGE NO.
22 DIVISION OF DRP LICENSING R RUN DATE 09/07/4 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
St MULTI Y
P RAI LICENSEE Ti TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE IhPUT LIC ACT IMPLEMENT Al NUMBER ACTION Ralf f
BY l DEQH REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS
))
ECC3 ACTIVE ACTIONS mamm (CONTINUATION)
ACTION ITEM: OYSTER CREEK - LONG TERM CORRECTIVE ACTION FOR DELAMINATION OF ESH PIPING COATING M62970 09/15/86 L PM 4 PD14 DROMERICK 12/31/88T 12/00/88 0;
ACTION IIEM: OY3TER CREEK - RESPONSE TO STAFF POSITION ON CONTAINMENT NITROGEN PURGE / VENT SYSTEM M62980 A-19 06/16/86 L TS 2 PD14 DROMERICK 03/13/87 05/31/88(;
,pf'00/00T M12490/87 M RAI 0;
SPLB TINKLER
/.2./Z.f857 ACTION ITEM: OYSTER CREEK - RESOLUTION AF DRYHELL SMELL PCTE*!TIAL DEGRADATION OF MARK I DRYHELLS - GL 87-05 M65448 05/f2/87 L TS 2 PD14 DROME.41CK 01/15/87C 997377T86
. 54*9WtHW J
ESGB TAN N07/29/87M j /,,
jr o;
upHCf ACTION ITEM: OYSTER CREEK - REVIEW RESPONSE REGARDING 10 CFR 50.62 ATHS RULE e
M66123 09/05/87 L TSK 1 5RAL H6Gef--
04/29/88C 08/26/88X 01'30'00f 41 f0l/fllSf
/0/3//8$T WEi~
ACTION ITEM: OYSTER CREEK - REVIEW GPU TOPICAL REPORT TR-045 BHR-2 TRANSIENT ANALYSIS M66358 09/29/87 L TSK 2 PD14 DROMERICK f
10/15/88T 0;
7/e xjyjgg SRXS SUN
/
PD14 ORR ACTION ITEM: OYSTER CREEK - SEP TOPIC II-35 FLOODING POTENTIAL AND PROTECTION REQUIREMENTS J43 K "606 11/06/87 L TS 3 PD14 DROMERICK 03/30/88C 05/30/88 M12/31/87M 10/,15/88T 0;
ESGS STALEY 15/88 f/SST I
ACTION ITEM: OYSTER CREEK - INSP. OF RECIRC. 8 ISOLATION CONDENSER PIPING IN CYCLE OUTAGE M67103 02/16/88 L TS 3 PD14 DROMERICK 08/31/88 08/01/88C 10/15/88T 0;
3 EMTB K00 o
ACTION ITEM: OYSTER CREEK - TSCR 166 - TECHNICAL SPECIFICATION CHANGES TO SUPPORT CYCLE 12 RELOAD
~6 M67743 03/30/88 A TS 2 PD14 DROMERICK 10/15/88T JN SRXB SUN I,#
.[
PD14 ORR 3
m
C-1208673-801 QEOGLATQRY IQF0QMATION TQACKICO SYSTEM PAGE NO.
25 3
DIVISION OF DRP LICENSING R RUN DATE: 09/07/8<
PR0!ECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC FlANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AD NUMBER ACTION Ralf E
BY I RRCH REYJEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS 11 00:3 ACTIVE ACTIONS mamn (CONTINUATION)
/l/' /T)' dI/'
l>J ACTION ITEM: OYSTER CREEK - NEW SEISMIC FLOOR RESPONSE SPECTRA be44t#99T Wht M60217 05/18/88 L TS 3 PD14 DROMERICK ESGB ROTHMAN 7
PMSB THOMPSON ACTION ITEM: OYSTER CREEK - RVH LIC'S REQ TO USE A VISUAL INSP. TECHNIQUES ELIM THE REQ TO DOCKET INSP RSLTS RE CORE SPFAY SPARGER M68227 05/15/88 L TS 3 PD14 DROMERICK
- G~^^
si iii i u'J8.
02
' ? /! h fff~
ACTION ITEM: OYSTER CREEK - RVH REQ TO C3G ENDPT OF 10 YR INTVL FOR ISI INSP'S. & 5 CHGS TO THE. EXISTING CODE REQUIREMENTS 568267 05/20/84 L TS 3 PD14 DROMERICK f
ESA+476tt 99750/88 02 fb f; ff" f
I EII ACTION ITEM: OYSTER CREEK - TSCR - 172 MSIV TEST FREQUENTLY
//j //
0E M63096 06/21/88 3 PD14 DROMERICK DS453eos
- / II CCC3 MOT SCHEDULED ACTIONS mammu ACTION ITEM: UPGREDE TABLE 3.1.1 0F TECHNICAL SPECIFICATIONS LEVEL INSTRUMENTATION FOR REACTOR VESSEL ISOLATION M59935 10/11/85 3 SRXB HODGES 07/30/88 67ettrEF 05/20/87X 12/00/87 NEW SCHED 01 UNKNOWN fo/J/[jT[
ACTION ITEM: OYSTER CREEK - DETAIL CONTROL ROOM DESIGN REVIEW SUPPLEMENT 81 M61CO3 F-71 05/19/86 L TS 3 PD14 DROMERICK 08/30/86 12/00/88 SCHED.TO B 08 LQAB RAMIREZ E DETERMND ACTION ITEM: OYSTER CREEK - IPSAR 4.16.1 - LEAKAGE DETECTION SYSTEMS USING DRYHELL RADI0 ACTIVITY MONITORING f
M61968 07/05/86 PD14 DROMERICK 12/00/90 04 l
ACTION ITEM: OYSTE2 CREEK - ADDITILMAL EXEMPTIONS TO APPENDIX "R"
Oh M62223 08/25/86 E TP 3 PD14 DROMERICK N/A SCHEDULE U ECEB NOIL EY NKNOWN l
l ACTION ITEM: OYSTER CREEK - T';E 45d - LICENSEE RESPONSE TO GL-84-11 ITEM "B" 3 PD14 DROMERICK SCHED.TO B 0 lM65100 05/17/37 A l
C-1208673-001 QEOGLAT00Y ICF0RMATIOO TQACKICO SYSTEM PAGE NO.*
25 DIVISION OF DRP LICENSING R RUN DATE: 09/07/4 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEWED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AB NUMBER ACTION DAIE E
BY I RREM REVIEHER RAI DATF DATE DATE COMP DATE DATE CDMMENTS 11 CCC3 NOT SCHEDULED ACTIOM1 mumma (CONTINUATION)
SPLB LICCIARD' E bETERMND SICS LASKY N
n/f//rW~
ACTION ITEM: OYSTER CREEK - REV. 5 "PUMP 4 VALVE TES11NG PP.0 GRAM' j
M65351 05/23/87 R TS 4 PD14 DROMERICK SCHEDULE U Oe EMER SHAH 07/17/87X NKNOWN j
EMEB LEE EME5 LI ACTION ITEM: OYSTER CREEK - EXEMPT 1' ri /4 REG'JIREMENTS OF 10CFR50, APP. R. SECT. III. J Sh
,M66055 11/24/86 E TS 5 F D14 DROMERICK SCHEDULE U l
ECEB NOTLEY NKNDHN l
/v[bfjd'6'[~
ACTION ITEM: OYSTER CREEK - REVISE BASES FOR TECH. SPEC. 3.5 SCHEDULE L' 00l M66701 01/30/87 A R/W 3 PD14 DRCHERICK NKNOWN ACTION ITEMS OYSTER CREEK - TSCR - 167 DELETION OF ORGANIZATIONAL CHARTS AND FACILITY STAFF QUALIFICATIONS SCHEDULE U 00:
4'el'/^^ff[~
NKNOHN M67593 05/22/88 3 PD14 DROMERICK fjp l ACTION ITEM OYSTER CREEK - TSCR 164 - REVISE T.S. TO DELETE SAFETY LIMIT 2.1.E j
jr-j7
/-
02 M67019 05/31/88 A TS 3 PD14 DROMERICK SRXB THOMAS ACTION ITEM: OYSTER CREEK - IPSAR VERIFICATION ITEMS M68142 05/16/88 3 PD14 DROMERICK 08/01/89 02 PD14 ORR 9
ACTION ITEM: OYSTER CREEK - IMPLEMENIATION 07 THE STATION BLACKOUT RULE,100:R50.63 M68577 A-22 06/21/88 1 PD14 DROMERICK M / /
M SELB GILL PD14 TAM ACTION ITEM: OYSTER CREEK - NONODNFORMING PIPING MATERIALS (BULLETIN 88-05) gj}
M68801 3104 07/18/88 2 PD14 DROMERICK py jg f((
h WM1 l
~
j a-1208573-001 EGULAT0RY INF0RHATION TRACE ING SYSTEM PAGE NO.*
26 DIVISION OF DRP LICENSING R RUN DATE: 09/07 PROJECT P.ANAGER REPORT (HEADQUARTEP3)
FACILITY: OYSTER CREEK 1 SC MUti' P
RAI LICENSEE TE TAC PLANT J "f.
P REVIEhED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT Am NUMBER ACTION mali E
B Y __ 1 ORON REVIEHER RAI DATE DATE DATE COMP DATE DAYE COMMENTS nuun NOT SCHEDULED ACTIONS MMMMM (CONTINUATION)
PD32 JACKSON EMEB KUD ACTION ITEM: DYSTER CREEK - SEP TOPIC VII-1.B. TRIP UNCERTAINTY AND SETPOINT ANALYSIS REVIEH OF OPERATING DATA BASE
/
M69012 07/20/88 3 PD14 DROMERICK fyf7 gf7" l
l ACTION ITEM: OYSTEk CREEK - INTERGRANdLAR STRESS CORROSION CRACKING (IGSCC) IN BHR PIPING (MPA B-97)(GL 88-01)
- f(/4GP, pg{
M / /
M gggvie v
,M69149 B-97 07/27/88 2
D1 ROM RICK pj /j gyg, nuun COMPLETED ACTIONS MMMM
%CTICN ITEM: OYSTER LIEEK - SEP ACTION ITEMS - IPSA2 SUPPLEHENT TIA M52482 10/05/83 X RGN 3 PD43 MI :HAELS 06/07/85X 08/17/88C IPSAR TIA 00 PD14 DROMERICK 08/26/88C REGION 7 ACTIC ITEM: OYSTER CREEK 1 - ITEMS 3.1.1 3 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS CDNPONENTS H52944 B-78
- 1. '01/83 L RGN PD14 DROMER?CK 02/28/86 12/23/87C 03/04/88P 03/00/880 M06/00/88 M 00 ACTION ITEM: OYSTER CREEK 1-ITEMS 3.7..*
& 5.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONENTS M53771 B-87 11/01/84 L RGH PD14 DROMERICK 02/28/86 12/23/87C 03/04/88P 03/00/850 10/00/85C 00 ACTION ITEM: OYSTER CREEK 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIbNA! TESTING - DIVERSE TRIP FEATURES M54091 B-92 11/01/84 L RGN PD14 DROMERICK 12/23/87C 03/04/88P 03/00/88C 08/00/85C REG I, SE 00 SEE M52944 ACTION ITEM: OYSTER CREEK 1 - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEH
SUMMARY
REPORT - F-71 "M56147 F-71 10/22/64 PD23 PASTIS 10/01/86 04/05/85X 02/01/88C 12/00/88L 10/09/85 M 00 LPEB RAMEY-SMITH 05/02/86X TG.
LQAB RAMIREZ 11/30/86P PD14 DPOMERICK 11/30/86P LHFB HEST ACTION ITEM: OYSTER CREEF SUPPLEMENT 1 TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT DATED JANUARY 1983 lM62077 08/06/86.
PM 3 PD14 DRCHERICK 08/2&/88C 08/47/88C SE CMP DT 00
/7 24G
]H1204673-801 QEOCLAT0RY IOF0RMATION TCACKIOO SYSTEM PAGE NO,.
26 DIVISION OF DRP LICENSING R RUN DATE: 89/07 PROJECT MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEWED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT mD MUMSER ACTIOH D&IE E
BY I DRGH REVIEHER BAI DATE DATE DATE COPF DATE DATE COPWTENTS If' Jr=u COMPLETED ACTIONS NNNN (CONTIkUATIOM)
PD14 ORR 88/26/ASC 2 B DFTD ACTION ITEM OYSTER CCEEK - INTEGRATED LIVING SCdEDULE (GL-85-07)
M64687 01'27/87 A PM PD14 DROMERICK 05/15/SSC 05/27/ SSP 05/27/SSC 02/06/48 D4 i
1 ACTION ITEM: DYSTER CREEK - RELOAD TOPICAL REPORT - 033 M65158 04/15/87 L TSK PD14 DR3MERICK 11/01/87 10/01/87 03/25/SSC S3/21/SSC 12/09/87 94l SRX5 RICHINGS 03/21/ SSP ACTION ITEM: OYSTER CREEK - RELOAD TOPICAL REPORT - 040 M65139 04/15/87 L TSE PD14 CROMERICK 11/01/87 10/01/87 03/25/84C 85/21/88C S4.
SRXS RICHINGS 03/21/ SSP ACTION ITEM: OYSTER CREEK -TSCR 146 REV SECT 4.3.G CCNCERNING ADDTIONAL CONDITION WHICH WOULD RES PERFORMING EXISTING LEAK TESTS M65640 06/19/87 L TS PD14 DROMERICK 11/30/4?P 11/30/37C 11/08/87C 04 REG 1 CAPHTON 11/30/87P l
ACTIGd ITEM: OYSTER CREEK - SAFETY LIMIT VIOLATION M60289 09/20/87 L PM PD14 DROMERICK 11/06/87P 11/86/87C 04' SRXS THOMAS 10/14/87C ACTION ITEM: OYSTER CREEK GENERATING STATION - T.S.C.R.105 - CHANGE ALLOHABLE OUr OF SERVICE TIME - 125 V.D.C. MOTOR M60444 12/18/87 A TS PD14 DRDMERICK 03/25/SSC 03/08/SSC 04 SELS TOALSTON 02/12/44X ACTION ITEMS OYSTER CREEK - T.S. CHANGt' NO. 154 - P-T OPERATING JURVES
,M67C19 01/19/88 A TS PD14 DROMERICK 03/21/&SP 03/21/SSC 04 GCTION ITEM: OYSTER CREEK - TECH SPEC CHANGE REQUEST NO.163 - FUEL H. HIGHER ENRICHMENTS STORED IN HIGH DENSITY POISON RACKS M67030 01/29/45 A TS PP1' DROMERICK G4/22/SSC 04/11/SSC 04 SRXS SR00KS 03/12/SSX ACTION ITEM: OYSTER CREEK NUCLEAR GENERATING STATION EXEMPTION FROF THE REQUIREMENTS OF 18 CFR 50, APPP_NDIX J, SECTION III. A.3 M67356 02/19/88 PD14 DROMERICK 04/22/SSC 04/14/SSC e4
R-1208673-001 CEOULATORY IOFORMATIOO TRACKIOO SYSTEM PAGE NO,.*
262 DIVISION OF DRP LICENSING R RUN DATE: 09/07/8d PROJECT MANAGER REPORT
( H EADQ"ART ERS )
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AD NUMDfR ACTION Haig E
BY I QRGH REVIEHER RAI D&lE DATE
..DATE__
COMP DATE DATE COMMENTS If C2:3 COMPLETED ACTIONS MMmm (CONTINUATION)
ACTION ITEM: SYSTER CREEK - BULLETIN 88-01: DEFECTS IN HESTINGHOUSE DS SERIES CIRCUIT BREAKERS M67693 B100 03/31/88 PD14 DROMERICK 06/01/88P C6/01/88C 04 PD23 HOOD
)
ACTION ITEM OYSTER CRTEK - TSCR-173 - REVISE REQ'S. FOR OPERABILITY OF POSITION INDICATORS FOR 16 A!ME CODE SAFETY VALVES M67960 04/29/85 2 PD14 DROMERICK 06/28/88P 06/28/88C 06/28/88C 04' l
PD14 ORR 06/28/88P l
SIC 8 BURR 0HS 06/28/88P ACTION ITEM 8 075TER CREEK - TSCR NO. 162 - MODIFY STANDBY LIQUID CONTROL SYSTEM (SLCS) TO REFLECT USE OF AN ENRICHED SCDION PENT.
M63198 05/10/88 A TS 1 PD14 DR0MERICK 08/05/88C 07/15/88C 04:
l SRXB MCC0Y 07/15/88P l
1 ACTION ITEM 8 OYSTEK CREEK - TSCR 168 - TECHNICAL AND SAFETY REVIEH OF PROCEDURES M68s72 05/26/88 A PM 3 PD14 DROMERICK 08/10/88P 08/10/88C 04 3CT:0N ITEM: OYSTER CREEK - NRR REGULATORY EFFECT. REVIEH M6:421 06/20/88 1 PD14 DROMERICK 08/19/88P 08/19/88C 04 RSGB MENDELSOHN 08/22/88C RSGB ORRIK 08/19/88P RSGB HARREN 08/15/88C II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111)
ACTION ITEM: OYSTER CREEK - RPS POWER SUPPLY M071C7 C-11 08/07/78 1 SELB KNOX 04/05/81X 03/30/83C m12/00/87 M 04 SELB AHMED 05/30/83P DGCB MACKAY 04/08/83X ACTION ITEM: OYSTER CREEK - HARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION D-01 10/01/79 L 1 SORI ELTtHILA 01/13/84P 01/13/84C 12/00/88L 04 M07944 ACTION ITEM: OYSTER CREEK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEH M08100 A-02 07/11/78 A 3 PRPB MEINKE 08/13/86 06/26/85C 10/07/86C 12/00/88 04
R-1208673-001 CEOOLAT0CY ICF0CMATIOO TRACKIOO 5YSTEM PAGE NO.*
26 UIVISION OF DRP LICENSING R RUN DATE: 09/07/8 PROJECT MANAGER REPORT j
(HEADQUARTERS)
FACILITY 2 OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AU H9M5ER ACTION palf f
BY I DEHH REVIEHER RAI DATE DATE DATE f0MP DATE DATE COMMENTS lj II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111) ~90FfINUATION)
ACTION ITEM: OYSTER CREEK - BWR FEEDHATER & CONTROL ROD DRIVE N0ZZLE CRACKING M08:11 B-25 08/30/78 1
03/02/76C 07/01/79P 03/19/82C 12/00/90L 04 ACTION ITEM OYSTER CREEK - CONTAINMENT LEAK TESTING - APP. J (GENERIC)
M08678 A-04 08/04/75 2 SPLB PULSIPHER 03/05/82P 03/05/82C M11/00/87 M 04 ACTION ITEM OYSTER CREEK - CONTAINMENT LEAKAGE DUE TO A VALVE SEAT DETERIORATION
.110287 B-20 12/01/78 3 PD21 REEVES 12/00/79C 01/16/81C m12/00/87 m 04 ACTION ITEM 8 OYSTER CREEK TMI FOLLOH UP HORK M11755 B-42 1
02/15/80C 05/08/80C N09/00/87tu 04 ACTION ITEM: DYSTER CREEK - LESSONS LEARNED IMPLEMENTATION M12422 B-44 10/13/79 1
04/01/81X 03/27/81C N09/00/87LK 04 ACTION ITEM: OYSTER CREEK - MASONRY HALI DESIGN. RESPONSE TO IE BULLETIN 80-11 M42;14 B-59 05/08/80 L 2
SOF' CHOKSHI 08/14/85C 11/22/85C 12/23/85C 12/00/88 CYCLE XI O 04 UTAGE ACTION ITEMS OYSTER CREEK - NUREG-0737 III.D.3.4, CONTROL ROOM HABITABILITY M46465 F-70 L
1 SORI READ 08/16/85C 04/05/85X 07/15/86C 12/00/88L 04 PRAB CAMPE 04/04/86C EMEB DEMPSEY 07/15/86P PD31 QUAY 12/13/85X 9 ACTION ITEM: OYSTER CREEK 1 - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN F-08 M51185 F-08 04/04/83 L LQAB RAMIREZ 07/01/83 05/02/86C 10/10/84C 12/00/88L 04 P341 DICK 10/10/84P LPEB RAMEY-SMITH 02/01/84C ACTION ITEM OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS M53025 B-79 11/01/83 A SICB LASHER 04/05/85 10/23/85C 03/31/8(P 03/31/86C M12/00/87 u 04 b
C-1264673-801 OEOOLAT4RY IOF0QMATIOO TGACKIOO
$YSTEO PAGE NO.
26 DIVISION OF DRP LICENSING R RUN DATE: 09/07/8 PROJECT MANAGER REPORT 1
(HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TC TAC PLANT APPL P REVIEWED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AS NUMBER ACTION Balf f
BY I DRQW REVIENER RAI DATE DATE DATE C0fF DATE DATE C0f91ENTS If II. OTNER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOPFLISNME4T/111) (CONTIWATION)
ACTIDM ITEM: OYSTER CREEK 1 - MARK 1 DRYMELL VACUUM BREAKERS. LICENSEE RESPONSE TO GENERIC LETTER 83-08 M57151 D-20 O!/20/85 EMER $NAW 04/11/85 05/23/86C 02/12/47C 05/03/87C 12/08/89L S4 FD43 LONG 88/23/85X ACTIDW ITEM: OYSTER CREEK 1 - 18 CFR 50.62 OPERATING REACTOR REVIENS M59122 A-20 06/28/84 OEAR KENDALL 10/04/85C 08/22/86X 11/19/86C 12/09/88L LENERIC BH 84 DEAR KARSCH 11/01/45X R)G SER SICS MAUCK Ev/85/86X SICS LI 4
h1288673-001 REOOLATOOY IOF0QRaTIOD TCACKIOO 5YSTEO PAGE No.,s 265 DIVISION OF DRP LICENSIPG R RtIN 9 ATE: 09/07/84 PROJECT MANAGER REPORT (HEADQUART EMS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI LICENSEE TO TAC PLANT APPL P PLANNED R
REV
RESPONSE
SE INPUT COMPLETION IMPLEMENT AD BUMBER REFERENCE RAIE E ACCOMPLSH 1 9Erdi REVIE3ER RAI DATE DATE DATE
_ DATE DATE C0f91ENTS 3
V. OTHER ACTIVE AND COMPLETED ITEMS IN FY (EXCLUDES PL ANNED ACCOMPLISHMENT /111) l CCO3 ACTIVE ACTIONS NNNW l
ION ITEM: OYSTER CREEK - II.3.3.-FLOODING PDTENTIAL AND PROTECTION REQUIREMENTS 1352 1511 HFIB FROELICH 03/26/82X 08/08/89T 02 '
EHES CHERY 07/08/830 ESGB STALEY 09/30/83X PD14 NANG 03/06/83X PDi4 DROMERICK H
~
IDN ITEM: DYSTER CREEK - III.5. A-EFFECTS OF PIPE BREAKS ON STRUCTURL1, SYSTEMS AND COMPONENTS INSIDE CONTAINMENT 1037 06/23/80 1511 EMER CHEN 07/27/88C 06/29/82X 08/00/89T SEE TAC DC 01 EMEB LI 06/26/87X 035 l
LPEB McKENNA 07/09/82C PD14 BOYLE 06/29/82C t
EMTB K00 l
ION ITEM 8 OYSTER CREEK - III.S.5-PIPE BREAKS OUTSIDE CONTAINMENT 1C75 06/23/80 1511 EMER CHEN 07/27/88C 06/22/82X 08/08/89T SEE TAC OC 01
/ /
06/26/87X 035 EMEB LI 8/ [8 T 7/02/82C
/
LPEB MCKENNA
/
/
0 PD14 BOYLE 06/22/82C ION ITEM: LYSTER CREEK - SECURITY PLAN 5199 12/02/66 L 1711 PD14 DROMERICK es,5ses T 03
/ # I'/#dI
/
CCC3 NOT SCHEDULED ACTIONS NNNuu
$ TION ITEM: SEP SEISMIC REVIEW - OYSTER CREEK D7345 06/23/80 1511 PD41 PAULSON 0 5/11."$1 TAC 49598 R 82 TMIP IGNATONIS 04/20/78 EPLACES EQB HOFMAYER 02/27/81 ESGS TAN 05/21/79 EGB ASHE 04/01/81 DE LEVIN 08/28/80 SOSP FRAHM 12/00/78 MEB STEPHENS 05/21/79
-1208673-001 REOCLATCRY ICF0RMATIOO TRACKICO SYSTEC PAGE NO.
266 DIVISION OF DRP LICENSING R RUN DATE: 09/07/88 PROJECT MANAGER REPORT (HEADQ.ARTERS)
FACILITY: CYSTER CREEK 1 T
SC MULTI Y
P RAI LICE:iSEE To TAC PLANT APPL P PLANNED R
REV
RESPONSE
SE INPUT COMPLETION IMP 12 MENT AD IUMBER REFERENCE DAlf E ACCOMPLSH i REQH REVIEHER RAI DATE DATE DATE__
DATE
_,T4TE COMMENTS IE CICJ NOT SCHEDULED ACTIONS Namum (CONTINUATION)
P344 CHENG 01/21/83 CTION ITEM: OYSTER CREEK - REVIEH OF THE DESIGN & CPERATION OF VENTILATION SYSTEMS 47070 10/28/81 1511 PMSB BAJKA 05/29/85 04/30/82X UNKNORN 03 CTION ITEM: DYSTFR CREEK IPSAR SUPPLEMENT Of*
149809 02/28/85 1511 PMAS CHALINA 06/22/84X of er///4*
TAC 62077 R -6&
LPEB MCKENNA 11/25/84X
/
EPLACES 0
CTION ITEM: OYSTER CREEK - PROOF AND REVIEH OF IPSAR SUPPLEMENT 47770 04/05/88 1511 PD14 DROMERICK 08/17/88C 04 SPLB ANAND PRPB MEINKE EMTB TSAO ECEB HING PD14 ORR 08/26/88C LHFB ECKENR0bE 08/26/88X PRAB KELLY 05/15/88X EMEB LI
>CTION ITEM: OYSTER CREEK - NRR VITAL AREA DEFINITION REVIEH 16':420 06/20/85 1711 1 PD14 DROMERICK RSGB MENDELSOHN
.