ML20154C651

From kanterella
Jump to navigation Jump to search
Summary of 880414 Progress Review Meeting W/Util & State of Nj Re Status of Facility Licensing Actions.List of Attendees Encl
ML20154C651
Person / Time
Site: Oyster Creek
Issue date: 05/09/1988
From: Dromerick A
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8805180261
Download: ML20154C651 (12)


Text

- _-__-___ _ _ .

Docket No. 50-219 DISTRIBUTION:

Docket TiH- EJordan NRC &~ Local"PDRs JPartlow PDI-4 R/F ACRS (10)

JStolz ADromerick LICENSEE: GPU Nuclear Corporation 0GC-WF Jersey Central Power and Light Company NRC Participants HBClayton(RegionI)

I FACILITY: Oyster Creek Nuclear Generating Station

SUBJECT:

SUMMARY

OF PROGRESS REVIEW MEETING REGARDING STATUS

(' 0F LICENSIhG ACTIONS On Thursday, April 14, 1988 a treeting was held at Energy Spectrum, Oyster Creek Nuclear Generating Station, Forked River, New Jersey, with GPU Nuclear Corporation (GPUN, the licensee) to discuss the status of Oyster Creek licensing actions. Attachtrent 1 is the list of the individuals participating in the discussion.

Attachnnt 2 is a marked-up copy of the staff's Regulatory Infomation Tracking Systern (RITS) dated March 28, 1988 for Oyster Creek. The inarkup to update the RITS resulted from the discussion on each itern or TAC number in this meeting. The status of each item is given in the last colunn (SC, TD, AD, TE) on the right-hand side of the RITS sheets. The statuc in that column is the following: "01" neans licensee, "02" means staff's reviews, and "03" means staff's Project Manager and "04" ans complete.

The updating of the RITS for Oyster Creek was done during the discussion on The licensing action items are listed each by TAClicensing number (action in this meeting.left-hand Thecolumn licenseeofstated RITS).that GPUN will aarkup the "Other Completed Licensing Actions Not Yet Irtplemented" and will provide implementation dates at the next status treetirig. A discussion related to future actions was also held.

"0ELS1 MLB EW' Alexander W. Dromerick, Project Manager Project Directorate I-4 Division of Reactor Projects I/II Attachnents: As stated cc w/attachnents:

See next page 8805100261 e00509 PDR ADOCK 05000219 p PDR

~

DTFilTi)DT~4~~~~lW:)b ~~ ~  : Di)DTT~~7~ ' '~ l ' ' ' ~ " ~ ' ' ': ~ ~ ' -~ ~ ~:

.....:.. g s :. 4 .....:.. . .....:............:............:... ........:...........

NAME :SNorris/bm :AMomerick :JSt  :  :  :  :

DATE:5/ff/88 :5//,,f88,,_,j5f,_f88 8  :  :  :  :

)

0FFICIAL RECORD COPY

r o .

q Pr. E. E. Fitzpatrick Oyster Creek Nuclear Oyster Creek Nuclear Generating Station Generating Station CC:

Ernest L. Blake, Jr. Resident Inspector Shaw, Pittnan, Potts and Trowbridge c/o U.S. NRC 2300 N Street, NW Post Office Box /45 Washington, D.C. 20037 Forked River, New Jersey 00731 J.B. Liberman, Esquire Commissioner Fishop, Libernen, Cook, et al. New Jersey Cepartment of Energy 1155 Avenue of the Anericas 101 Converce Street New York, New York 20036 Newark, New Jersey 07107 Mr. David P. Scott, Chief Regional Adn.inistrator, Region I Bureau of Nuclear Engineering U.S. Nuclear Regulatory Commission Departnent of Envirer, mental Protection 475 Allendale Road CN 411 King of Prussia, Pennsylvania 19406 Trenton, New Jersey 086?S BWR Licensing Manager GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.

P. O. Box 388 Forked River, New Jersey 08731

Attachrrent 1 OYSTER CREEK Docket No. 50-2,1,9 I'eeting:

e Ap,ril 14, 1988 List of Attendees Name Organization A. Dromerick NRC-Division of Projects I/II M. Laggart GPUN J. KowalsM GPUN E. Fitzpatrick GPUN(part-time)

J. Sullivan GP'UN (part-time)

, - M. Jacobs N.J. State D.E.P./BNE S. Singh N.J. State D.E.P./BNE l

l

..-- -- =.- ,_-_ _ _-_. ._.-.-.--_. .-. . --- .-- ..-. .-- .-_.-._.-. - . . . . . . - -

h f[a ckM Ul .

7 S 1208473-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 219 DIVISION OF DRP LICENSING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 ANT LOCATION: 9 MI S OF TOMS RIVER, NJ FACILITY STAGE: LIC PROJECT DIRECTORATE: PD14 ICKET NUMBER: 050-00219 LICENSED P0HER: 1930 MHT PROJECT MANAGER: A. DROMERICK lCH/ ENGINEER: B&R DESIGN POHER: 0650 MHE PROJECT DIRECTOR: J. STOLZ INSPECTOR: 44.-SMOtAN),Wh#'J84 EEIGEg NSSS VENDOR: GE LIC. ASSISTANT: S NORRIS T SC MULTI Y P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT  !IC ACT IMPLEMENT AD ltitLE ACTION palf E BY I DEEN REVIEHER RAI DATE DATE DATE f&MP_.DATE DATE COMMENTS IE ACTIVE AND COMPLETED LICENSING ACTIONS IN FY (PL ANNED ACCOMPLISHNENT/111) muun ACTIVE ACTIONS MMMM KTICN ITEM: DYSTER CREEK - FULL TERM OPERATING LICENSE 1248 03/06/72 A PM 1 PD14 ORR 99PStrWW- 08/00/89T 03 PD43 MICHAELS f2 06/07/85X PD14 DROMERICK 3 TION ITEM: OYSTER CREEK 1 - PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1) 4324 F-05 L TS 1 SODO SHERON 10/31/85C 05/03/85X 09/30/88T 10/00/85C SCHED.TO 3 02 PBIA DELISO 05/09/86X E DETERMND ESGB PICHUMANI 05/22/87X LHFB MORISSEAU 08/31/88 TION ITEM: OYSTER CREEK - TORNADO MISSILE DAMAGE (9394

10/01/82 L TS 1 PRPB LEVINE 07/03/85C 08/30/86C 08/00/89T IPSAR 4.6. 02 PRAB CAMPE 08/30/86C 1,2,4 PD14 DROMERICK SPLB CHU ESGB ROMNEY PD45 MICHAELS 06/07/85X PARS HILSON 04/05/85X SPLB KUDRICK 04/25/86X l TION ITEM
OYSTER CREEK - SEISMIC DESIGN ,

>9398 10/01/82 L TSK 1 PD44 CHENG 04/24/86 06/24/86. 07/24/87X

' 08/00/89T/ 02 PD43 MICHAELS 06/07/85X .

LPEB MCKENNA 07/25/86X ESGB ASHAR PD14 DROMERICK ESGB ROTHMAN

  1. 4/s / fff ESGB PICHUMANI

$$U8 CYS$

W

. 'v

1208673-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.: 220 DIVISION OF DRP LICENSING R RUN DATE: 05/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: DYSTER CREEK 1 T

SC Y P RAI LICENSEE TO MULTI AD BAC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPLEMENT DATE DATE COMP DATE DATE COMMENTS If MILE ACTION Dalf E BY 1 RREN REVIEHER RAI DATE unun ACTIVE ACTIONS MMMM (CONTINUATION)

UION ITEM OYSTER CREEK - NEUTRON MONITORING ISOLATION OJR 3408 12/01/83 L TS 1 OEAR SCHOLL 11/10/87 S1/51/00 11/06/85X 04/15/88T IPSAR 4.27 d>P-H o Y UION ITEM 2 OYSTER CREEK TS CR NO. 148 - COOLANT ACTIVITY D412 12/01/83 L PM 1 PD43 MICHAELS 06/30/87 Of 06/07/85X 04/15/88T IPSAR 4.36 01 PRPB MEINKE 06/19/87X pg g g7 SUBMIT TS PD14 HERNAN 05[~ fff*

DION ITEM: OYSTER CREEK 1 - INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97) 0115 A-17 04/04/85 L TS SELB ROSA 09/04/87C 44 559r88- 07/18/86X -e'Wi 5e c o s 12/00/88L DRAFT TER OR,

/ g/) gCO SENT GPUN SICB MARCUS PD14 DROMERICK o g/ O S)LS $f[ s qrgp gyggy.my UION ITEM OYSTER CREEK - SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA 06/07/85X 94p+97987- IPSAR TIA 03 3482 10/05/83 X RGN PD43 MICHAELS PD14 DROMERICK pg g a g/g /

y REGION I ..

BION ITEM: OYSTER CREEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VEND 0P INTERFACE - RTS COMPONENTS 02

@853 B-77 11/01/85 L TS SICB LASHER 04/05/85 10/23/85C 09/30/88 12/00/88T 12/00/88L BION ITEM: OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS 3698 B-86 11/01/84 L TS SICB LASHER 01/22/88C Aeea&MHHb 09/00/87C 12/00/88T M// M 01 PD14 DROMERICK pff g'gy lUION ITEM: OYSTER CREEK 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNAflVES & TEST INTERVALS 02 4008 B-93 11/01/84 L TS SICB LASHER 04/05/85C 10/23/85C 09/30/88 10/30/88T 06/00/85C BHROG SE

.T'a0N ITEM OYSTER CREEK 1 - I.D.1.2 DETAILED CONTROL ROOM DESIGN REVIEN

SUMMARY

REPORT - F-71 6147 F-71 10/22/84 PD23 PASTIS 10/01/86 04/05/85X #11/30/86Td 12/00/88L 10/09/85 M 04 LPEB RAMEY-SMITH ,

05/02/86X jy j,j,g TG. .

LHFB RAMIREZ 11/30/86P PD14 DROMERICK 11/30/86P .

e O

-1208673-001 R.E G U L A T 0 R Y INF0RMATION TRACKING SYSTEM PAGE NO. 221 DIVISION OF DRP LICENSING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T SC MULTI Y P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPLEMENT AD 11DIR ACTION PAIE E BY l DRfdi REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS lE ucun ACTIVE ACTIONS MMMM (CONTINUATION)

TION ITEM: OYSTER CREEK - DISCREPANCY IN DRAHINGS USED IN SEP REVIEH

>8004 06/13/85 L TS PD44 CHENG 08/15/86 07/24/87X 08/00/89T SCHEDULE U 02 LPEB MCKENNA 08/29/86X NKN0HN OSlNl[f7~ -

TION ITEM: OYSTER CREEK - SUPPLEMENT 1 TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT DATED JANUARY 1983 2077 08/06/86 A PM PD14 DROMERICK S4M5781T SE CMP DT 03

$ fpl$f/*

TION ITEM: OYSTER CREEK- TSCRt126-REVISE CONTAINMENT LEAKAGE TESTING, AS OUTLINED IN 10CFR50 APPENDIX "J" -

2078 07/25/86 A TS SPLB KUDRICK 02/19/88C M 0 '; ' 9 ? '" ? = 06/30/88T SCHED. UNK %(

SPLB GOEL NDHN g

TION ITEM: OYSTER CREEK - ADDITIONAL EXEMPTIONS TO APPENDIX "R" _e_ _- f2 f 2229 08/25/86 E TR PD14 DROMERICK s--=f 05/30/8CT ECEB NOTLEY gcjfgpfjg 02 TION ITEM: OYSTER CREEK - LONG TERM CORRECTIVE ACTION FOR DELAMINATION OF ESH PIPING C0'ATING 2976 09/15/86 L PM PD14 DROMERICK 12/31/88T 03 TION ITEM: OYSTER CREEK - RESPONSE TO STAFF POSITION ON CONTAINMENT HITROGEN PURGE / VENT SYSTEM * -

2980 06/16/86 L TS PD14 DROMERICK 93'I'/SS 04/30/88T RAI 01 05/.7//88

  • TION ITEM: OYSTER CREEK - INTEGRATED LIVING SCHEDJLE (GL-85-07) / .30 4&87 01/27/87 A PM 1 PD14 DROMERICK O /W@ ' f[f 'j/' 04/)h188T f

0[

/ r TION ITEM: OYSTER CREEK - RESOLUTION OF DRYHELL SHELL POTENTIAL DEGRADATION OF MARK I DRYHELLS - GL 87-05 5448 05/12/87 L TS 3 PD14 DROMERICK 01/15/87 N 4S/i6/56? 01 ESGB TAN pgo gg 0 2 P / Jo g[

TION ITEM: OYSTER 6055 CREEKE- EXEMPTION FROM REQUIREMENTS OF 10CFR50, APP. R. S(ECT. III. J 11/24/86 TS 1 PD14 DROMERICK ,fc//fp 02 ECEB NOTLEY a 4/em/- - 05/31/88T

'T y j--- ()Ll/C002//l

1208575-001 REGULA e' ORY INF0RMATION TRACKING SYSTEM PAGE NJ.: 222 DIVISION OF DRP LICENSING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: DYSTER CREEK 1 T SC MULTI Y P RAI LICENSEE 10 F AC PLANT APPL P REVItMCG R REV RESPONSE SE INPUT LIC ACT IMPLEMENT AD 111R ACTION IMIE E BY 1 OEfdf REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS If nuum ACTIVE ACTIONS MMMM (CONTINUATION) rION ITEM: OYSTER CREEK - REVIEN RESPONSE REGARDING 10 CFR 50.62 ATHS RULE L125 09/05/87 L TSK PD14 DROMERICK SP-M766 05/31/88T 0/-

"f0* Ofl3flff' "ION ITEM: DYSTER CREEK - REVIEH GPU TOPICAL REPORT TR-045 BHR-2 TRANSIENT ANALYSIS

>358 09/29/87 L TSK PD14 DROMERICK 96791f88T- 02 SRXb SUN dh J.rf p/lj3pyy rION ITEM: OYSTER CREEK - SEP TOPIC II-3B FLOODING POTENTI AL AND PROTECTION REQt'IREMENTS L&O6 11/06/87 L TS 2 ESGB STALEY G4ri5,66T 02 PD14 DROMERICK g Of/Ja[88[ M  ?

//./go/gf[

j FION ITEM: OYSTER CREEK - TECH SPEC CHANGE REQUEST NO. 163 - FUEL H. HIGHER ENRICHMENTS STORED IN HIGH DENSITY POISON RACKS Ga3 e

080 01/29/88 A TS PD14 DROMERICK SRXB BROOKS g/gyg f/ 04/4-574&P o g { g ION ITEM: OYSTER CREEK - INSP. OF RECIRC. & ISOLATION CONDENSER PIPING IN CYCLE IIR DUTAGE

/183 02/16/88 L 15 2 PD14 DR6MERICK > /- / , 06/30/88T O2 ENTB K00 " F7M /

  • N/rR3c ION ITEM: OYSTER CREEK NUCLEAR GENERATING STATION EXEMPTION FROM THE REQUIREMENTS OF 10 CFR 50, APPENDIX J, SECTION III. A.3 356 02/19/88 2 PD14 DROMERICK j g 04/15/88T unun NOT SCHEDULED ACTIONS MMMMM UP M&f^ 14aw 3 L / 'P&c/wa}Ssw5'<&

ION ITEM: OYSTER CREEK - Rrvrq npg,qgii;77 g; ig;.; -ip;; ypcyno uATE_R_--tEVEt-TM3TRUMEttTAT1GN l 0" REACTOR-VESSEL 60N'

{J935 10/11/85 SRXB HDDGES -0 3 5 e o a-- 11/In'?? 03/2;;/072- NEW SCHED 01 D 30 ION ITEM: OYSTER CREEK - DETAIL CONTROL ROOM DESIGN REVIEH SUPPLEMENT 81 (603 J F-71 05/19/86 L TS PD14 DROMERICK 08/30/86 12/00/88 SCHED.TO B 02 LMFB RAMIREZ E DETERMND e  %

1208673-001 REGULAT0RY INF0RMAT ION TRACKIHG SYSTEM PAGE NJ.: 223 DIVISION OF DRP LICEN3ING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T SC MULTI Y P RAI LICENSEE TO TAC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPLEMENT AD 11LE ACTION DATE E BY I ORGN REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS lE unun NOT SCHEDULED ACTIONS un*wu (CONTINUATION)

TION ITEM 4 OYSTER CREEK - TSCR-158 - LICENSEE RESPON*sE TO GL-84-11 ITEM *B" 3100 05/17/87 A TS 2 PD14 DROMERICK SCHED.To B 02 SPLB LICCIARDO . E DETERMND SICB LASKY 63/i5,68- -

IION ITEM: OYSTER CREEK - REV. 5 "PUMP & VALVE TESTING PROGRAM" 5351 05/23/87 R 1 PD14 DROHERICK SCHEDULE U C2 EMEB SHAH 07/17/87X NKN0HN EMEB LEE EMEB LI TION ITEM: OYSTER CREEK - REVISE BASES FOR TECH. SPEC. 3.5 i

6701 01/30/87 A R/H PD14 DROMERICK 44/ i v oo__ ,f Cd e t 8 01 nunn COMPLETED ACTIONS NMMM # "

TION ITEM: OYSTER CREEK 1 - ITEMS 3.1.1 a 3.1.2 - FOSi MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONENTS 2944 B-70 11/01/85 L RGN PD14 DROMERICK 02/28/86 12/23/87C 03/04/88P 03/04/88C M / / M 04 TION ITEM: OYSTER CREEK 1- ITEMS 3.2.1 & 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS - ALL SR COMPONENTS 3781 B-87 11/01/34 L RGN PD14 DROMERICK 02/28/86 12/23/87C 03/04/88P 03/04/88C 10/31/85C 04 TION ITEM: OYSTER CREEK 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES 4091 B-92 11'01/84 L RGN PD14 DROMERICK 12/23/87C 03/04/88P 03/04/88C 08/00/85C REG I, SE 04 SEE M52944 UION ITEM: OYSTER CREEK - RELOAD TOPICAL REPORT - 033 5138 04/15/87 L TSK 1 PD14 DROMERICK 11/01/87 10/01/87 05/21/88P 03/21/88C SpC SRXB RICHINGS 03/21/88P TION ITEM OYSTER CREEK - RELOAD TOPICAL REPORT - 040 5139 04/15/87 L TSK 1 PD14 DROMERICK 11/01/87 10/01/87 03/21/88P 03/21/88C 0 SRXB RICHINGS G3/21/88P

228575-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PAGE NO.* 224 DIVISION CF DRP LICENSING R RUN DATE: 03/28/E8 PROJECT MANAGER REPGRT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T SC HULTI Y P RAI LICENSEE TO OC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPLEMENT AD ALE ACTION RAIE E BY I RRGH REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS IE caug COMPLElED ACTIONS MMMM (CONTINUATION)

ION ITEM: GYSTER CREEK -TSCR 146 REV SECT 4.3.G CONCERNING ADDTIONAL CONDITION HHICH HOULD REQ PERFORMING EXISTING LEAK TESTS

,640 0'./19/87 L TS 2 PD14 DROMERICK 11/30/87P 11/30/87C 04

  • REG 1 CAPHTON . 11/30/87P ION ITEM: OYSTER CREEK - SAFETY LIMIT VIOLATION 289 09/20/87 L PM 1 PD14 DROMERICK 11/06/87P 11/06/87C 04 SRXB THOMAS 10/14/87C ION ITEM: OYSTER CREEK GENERATING STATION - T.S.C.R. 165 - CHANGE ALL0HABLE OUT OF SERVICE TIME - 125 V.D.C. MOTOR 824 12/18/87 A TS 1 PD14 DROMERICK 03/07/88P 05/07/88C Odf SELB T0ALSTON 02/12/88X ION ITEM: OYSTER CREEK - T.S. CHANGE No. 154 - P-T OPERATING CURVES 019 01/19/88 A TS PD14 DROMERICK 03/21/88P 05/21/88C O(

OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111)

ION ITEM: OYSTER CREEK - RPS POWER SUPPLY

'174 C-11 08/07/78 1 SELB KNOX 04/05/81X 03/30/83C M12/00/87 M 04 SELB AHMED 03/30/83P OGCB MACKAY 04/08/83X ION ITEM: OYSTER CREEK - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION 944 D-01 10/01/79 L 1 SORI ELTAHILA 01/13/84P 01/13/84C 12/00/88L 04 ION ITEM OYSTER CREEK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEH .

5100 A-02 07/11/78 A 3 PRPB MEINKE 08/13/86 06/26/85C 10/07/86C 12/00/88 04

' ION ITEM: OYSTER CREEK - BHR FEEDWATER 8 CONTROL ROD DRIVE N0ZZLE CRACKING i411 B-25 08/30/78 1 EMTB HAZELTON 03/02/76C 07/01/79P 03/19/82C 12/00/90L 04 "ICN IItM: OYSTER CREEK - CONTAINMENT LEAK TESTING - APP. J (GENERIC) 4578 A-04 08/04/75 2 SPLB PULSIPHER 03/03/82P 03/05/82C M11/00/87 N 04 O .

208673-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.* 225 DIVISION OF DRP LICENSING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T SC MULTI Y P RAI LICENSEE Tri OC PLANT APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPLEMENT AD JUR ACTION R&LE E BY l QRGH REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS IE OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PLANNED ACCOMPLISHMENT /111) (CONTINUATION)

ION ITEM: OYSTER CREEK - CONTAINMENT LEAKAGE DUE TO A VALVE SEAT DETERIORATION 187 B-20 12/01/78 3 PD21 REEVES 12/00/79C 01/16/81C M12/00/87 m 04

  • ION ITEM: OYSTER CREEK TMI FOLLOH UP HORK 955 B-42 1 02/15/80C 05/08/80C N09/00/87tu 04 ION ITEM: OYSTER CREEK - LESSONS LEARNED IMPLEMENTATION 422 B-44 10/13/79 1 04/01/81X 03/27/81C N09/00/87LM 04 ION ITEM: OYSTER CREEK - MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11 014 B-59 05/08/80 L 2 SORR CHOKSHI 08/14/85C 11/22/85C 12/23/85C 12/00/88 CYCLE XI O 04 UTAGE ICN ITEM: OYSTER CREEK - HUREG-0737 III.D.3.4, CONTROL ROOM HABITABILITY 456 F-70 L 1 SORI READ 08/16/85C 04/05/85X 07/15/86C 12/00/88L 04 EMEB DEMPSEY 07/15/86P PD31 QUAY 12/13/85X PRAB CAMPE 04/04/86C ION ITEM: OYSTER CREEK 1 - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEH PROGRAM PLAN F-08 185 F-08 04/04/85 L PD41 DICK 07/01/83 10/10/84P 10/10/84C 12/06/88L 04 LPEB RAMEY-SMITH 02/01/84C LHFB RAMIREZ 05/02/86C ICH ITEM OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS LO25 B-79 11/01/83 A SICS LASHER 04/05/85 10/23/85C 03/31/86P 03/31/86C M12/00/87 m 04 ION ITEM: OYSTER CREEK 1 - MARK 1 DRYHELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC LETTER 83-08

'161 D-20 03/20/85 PD41 LONG 04/11/85 05/23/86C 08/23/85X 03/03/87C 12/00/89L 04 EMEB SHAH 02/12/87C ION ITEM: OYSTER CREEK 1 - 10 CFR 50.62 OPERATING REACTOR REVIEHS 3122 A-20 06/28/84 SICB KENDALL 10/04/85C 08/22/86X 11/19/86C 12/00/88L GENERIC BH 04

5203575-001 REGULAT0RY INFCRMATION TRACKINO SYSTEM PAGE NO.8- 226 DIVISION OF DRP LICENSING R RUN DATE: 03/28/83 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T SC MULTI Y P RAI LICENSEE TO IAC P L t.N T APPL P REVIEHED R REV RESPONSE SE INPUT LIC ACT IMPiEMENT AD SUUt ACTION DAlf E BY I QREN REVIEHER RAI DATE DATE DATE COMP DATE DATE COMMENTS IE OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (PL ANNED ACCOMPLISHMENT /111) (CONTINUATION)

OEAB KARSCN 11/01/85X ROG SER SICB MAUCK 09/05/86X SICS LI OTHER ACTIVE AND COMPLETED ITEMS IN FY (EXCLUDES PLANNED ACCOMPLISHMENT /111) cunn ACTIVE ACTIONS MMMM IION ITEM: OYSTER CREEK - III.S.A-EFFECTS OF PIPE BREAKS ON STRUCTURES, SYSTEMS AND COMPONENTS INSIDE CONTAINMENT 8437 06/23/80 1511 EMEB CHEN 05/01/88 06/29/82X 08/00/89T SEE TAC OC Of EMER LI 06/26/87X 835 LPEB MCKENNA 07/09/82C PD14 BOYLE 06/29/82C ION ITEM 2 OYSTER CREEK - III.S.B-PIPE BREAKS OUTSIDE CONTAINMENT

]475 J 06/23/80 1511 EMEB CHEN 05/01/88 06/22/82X 08/00/89T SEE TAC OC 01 EMES LI 06/26/87X 835 LPEB MCKENNA 07/02/82C PD14 BOYLE 06/22/82C Ennu NOT SCHEDULED ACTIONS MMMMM 3 ION ITEM: SEP SEISMIC REVIEH - OYSTER CREEK 7345 06/23/80 1511 DE LEVIN 08/28/80 TAC 49398 R 02 SOSP FRAHM 12/00/78 EPLACES MEB STEPHENS 05/21/79 PD44 CHENG 01/21/83 PD41 PAULSON 05/11/81 TMIP IGNATONIS 04/20/78 EQB HOFMAYER 02/27/81 ESGB TAN 05/21/79 EQB ASHE 04/01/81 TION ITEM: OYSTER CREEK - II.3.B.-FLOODING POTENTIAL AND PROTECTION REQUIREMENTS 1552 1511 HFIB FROELICH 03/26/82X 02 EHEB CHERY 07/08/83C ESGB STALEY 09/30/83X

~

PD14 HANG 03/06/83X PD14 DROMERICK

208573-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PA!E NO. 227 DIVISION OF DRP LICENSING R RUN DATE: 03/28/88 PROJECT MANAGER REPORT (HEADQUARTERS)

FACILITY: OYSTER CREEK 1 T

SC MULTI Y P RAI LICENSEE OC PLANT TO APPL P PLANNED R REV RESPONSE SE INPUT COMPLETION IMPLEMENT AD ALE REFERENCE Ralf f ACCOMPLSH I REGH REVIEHER RAI DATE DATE DATE DATE DATE COMMENTS IE 3093 HQJ SCHEDULED ACTIONS MMMMM (CONTINUATION)

ION 27 0 ITEM: OYSTER CRLEK - REVIEH OF THE DESIGN & OPERATION OF VENTILAJION SYSTEMS 1511 10/28/81 PMSB BAJNA 03/29/85 04/30/82X UNKNDHN 03

  • 303 ITEM: OYSTER CREEK IPSAE SUPPLEMENT 109 02/28/83 1511 PMAS CHALINA 06/22/84X TAC 62077 R 4 LPEB MCKENNA 11/23/84X EPLACES I BON ITEM: OYSTER CREEK - SECURITY PLAN 197 12/02/86 L 1711 PD14 DROMERICK 9

6 m

h