December 29, 1994 LICENSEE: GPU Nuclear Corporation FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUMARY OF DECEMBER 19, 1994, MEETING REGARDING STATUS OF LICENSING ACTIONS On Monday, December 19, 1994, a meeting was held at Oyster Creek Nuclear Generating Station with GPU Nuclear Corporation (GPUN, the licensee) and the NRC staff to discuss the status of Oyster Creek licensing actions. is the list of individuals participating in the discussion.
! is a marked-up copy of GPU Nuclear Corporation's Licensing Activities list for Oyster Creek dated December 19, 1994. The markup to update GPUN's list resulted from the discussion on each item or TAC number in i
this meeting. The action / status of ear.h item is given in the fifth column on 1
the right side of GPUN Licensing Activities List.
l The updating of GPUN's Licensing Activities List for Oyster Creek was done during the discussion on each licensing action in this meeting.
Original signed by Ronald W. Hernan for:
Alexander W. Dromerick, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-219 Attachments: As stated cc w/atts:
See next page Distribution:
cc w/ enclosures 1 & 2 cc w/ enclosure 1 only l
Docket File-WRussell/FMiraglia PUBLIC RZimmerman PD I-4 Memo SVarga JFRogge, RI JZwolinski ADromerick PMcKee SNorris OGC EJordan,D/AE0D ACRS (4)
WDean, EDO, RI 9501050412 941229 PDR ADOCK 05000219 rm n l.,..._'^~'"?
P PDR f ;,,' :
DOCUMENT NAME: G:\\DROMERIC\\l2-19. SUM 0FFICE LA:PDI-4 /.l.
PM:PDI-4 l4 D:PDI-4 i / I4 l
l NAME SNorris bHNA ADromerick:b/hiPMcKee M/// /A DATE 12/'/7/94~ 'V' 12/9/94 JA 12/A/ /94
F' 0FFICIAL RECORD COPY
December 29, 1994
-<f l
f LICENSEE: GPU Nuclear Corporation FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUPMARY OF DECEMBER 19, 1994, MEETING REGARDING STATUS OF LICENSING ACTIONS On Monday, December 19, 1994, a meeting was held at Oyster Creek Nuclear Generating Station with GPU Nuclear Corporation (GPUN, the licensee) and the NRC staff to discuss the status of Oyster Creek licensing actions. is the list of individuals participating in the discussion. is a marked-up copy of GPU Nuclear Corporation's Licensing Activities list for Oyster Creek dated December 19, 1994. The markup to update GPUN's list resulted from the discussion on each item or TAC number in i
this meeting. The action / status of each item is given in the fifth column on l
the right side of GPUN Licensing Activities List.
j The updating of GPUN's Licensing Activities List for Oyster Creek was done during the discussion on each licensing action in this meeting.
Original signed by Ronald W. Hernan for:
Alexander W. Dromerick, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-219 Attachments: As stated cc w/atts: See next page Distribution:
cc w/ enclosures 1 & 2 cc w/ enclosure 1 only Docket File WRussell/FMiraglia PUBLIC RZimmerman PD I-4 Memo SVarga JFRogge, RI JZwolinski ADromerick PMcKee l
SNorris OGC EJordan, D/AE00 ACRS (4)
WDean, EDO, RI 1
l DOCUMENT NAME: G:\\DROMERIC\\l2-19. SUM 0FFICE LA:PDI-4'
.l PM:PDI-4 l
_D:PDI-4 l,
l l
NAME SNorrish ;/ /_,,
ADromerick:b/htPMcKee
&{f/ 9, DATE 12/7//94~ 'L~'
12/.V/94 yh 12fA//94
l' OfflCIAL RECORD COPY l
>SRfOgg
/
f UNITED STATES 2
E NUCLEAR REGULATORY C,OMMISSION If WASHINGTON, D.C. 20555 0001 s
/
Deceraber 29, 1994 LICENSEE: GPU Nuclear Corporation 1
FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUMARY OF DECEMBER 19, 1994, MEETING REGARDING STATUS OF LICENSING ACTIONS l
On Monday, December 19, 1994, a meeting was held at Oyster Creek Nuclear Generating Station with GPU Nuclear Corporation (GPUN, the licensee) and the NRC staff to discuss the status of Oyster Creek licensing actions. is the list of individuals participating in the discussion. is a marked-up copy of GPU Nuclear Corporation's Licensing Activities list for Oyster Creek dated December 19, 1994. The markup to update GPUN's list resulted from the discussion on each item or TAC number in this meeting. The action / status of each item is given in the fifth columo on the right side of GPUN Licensing Activities List.
The updating of GPUN's Licensing Activities List for Oyster Creek was done during the discussion on each licensing action in this meeting.
f)g l
'y % L fx lexander W. Dromerick, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-219 Attachments: As stated cc w/atts: See next page m
2 Oyster Creek Nuclear Generati$g Station cc:
Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission l
2300 N Street, NW.
Post Office Box 445 Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Mr. John J. Barton Parsippany, New Jersey 07054 Vice President and Director GPU Nuclear Corporation Mayor Dyster Creek Nuclear Generating Station Lacey Township Post Office Box 388 818 West Lacey Road Forked River, New Jersey 08731 Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:
Site Emergency Bldg.
Post Office Box 388 Forked River, New Jersey 08731 l
t I
~9 0YSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219 NEETING - DECEMBER 19. 1914 ATTElGANCE LIST M8llE ORGANIZATION Alexander Dromerick NRC/NRR/P01-4 George Busch GPU Nuclear Michael Laggart GPU Nuclear - Licensing Ron Zak GPU Nuclear - Licensing l
J i
ATTACHMENT 1 1
ATTACHMENT 2-12/19/94 GPUN/NRC LICENSING ACTIVITIES LIST PAGE 1-Next TAC to.
CATEGORY ITEM ENGR GPUN ACTION / STATUS WRC ACil0N / STATUS Action by PRIOR 51115 GFNERIC INSTRUMENTAi!ON YN ON 9/19/91 GPUN TRANS4tiiED ADDITIONAL INFORMAfl0N BY LETTER DATED 12/11/91 COMPLETE MUtil-PLANT TO FOLLOW THE REQUESTED SY THE NRC 2/19/91 LETTER CONCERNING NRC TRANSMITTED TMEIR R.G. 1.97 COURSE OF AN CONTAINMENT ISOLAil0N VALVE POSITION INDICATORS SAFETY EVALUAft04 (SE).
ACCIDENT (REDUNDANT CLASS 1E POWER SUPPLIES). THE REDUNDANT THE SE CONCLUDED iMAT POWER SUPPLIES WERE IMPLEMENTED DURING iME ISR CUTAGE.
GPUN EITNER CONFORMS TO, TMIS COMPLETES ALL ACil0NS SPECIFIED IN THE 2/19/91 OR MAS ADEQUATELY AND 9/19/91 LETTERS.
JUSTIFIED DEVIATIONS FROM THE GUIDANCE OF R.G.
1.97.
GPUN 15 ALSO REQUIRED TO INFORM THE COMMISSION, IN WRITING, OF ANY CHANGES IN THE ESTA8LISMED COMPLETION SCHEDULE FOR MODIFICAtl0N AND WHEN iME ACTION MAS BEEN COMPLETED.
68142 PLANT IPSAR YN ALL SEP ITEMS MAVE BEEN RESOLVED WiiH NRC.
VERIFY ALL ACTIONS NRC C
SPECIFIC VERIFICATION COMPLETE THROUGH ITEMS INSPECTION.
69467 GENERIC SEISMIC YN SY LEffER DATED 11/25/91 TO NRC, GPUN STATED THAT SQUG NRC TO ISSUE SER ON FRS.
NRC/GPUN 82 Mutit-PLANT QUALIFICAil0N OF WALKDOWN AND IPEEE WALKDOWNS WILL BE CONDUCTED IN 15R METHODOLOGY SY W/31/P4'.
GL 87-02 ELECTRICAL &
AND WILL UTILIZE A NEW FLOOR RESPONSE SPECTRA FOR THE
/((g**
MECHAM. EQUIP.
SQUG EVALUATION. GPUN RECEIVED NRC SSER ON SEISMIC
/I USI A-46 (500G)
QUALIFICAITON METHODOLOGY ON 5/22/92. NRC RESPONDED AND ACCEPTED RESPONSE AND SCHEDULE ON 11/19/92.
PROCEDURE AND CRiiERIA DOCUMENT FOR FRS DEVELOPED BY EQE WLRE SUOMITTED TO NRC ON 12/23/93 AND FOLLOWED UP WITH A LETTER ON 1/1S/94 STATING THAT THE EQE REPORT IS NO LONGER A PROPRIETRY INFORMATION. NRC REQUESTED ADDITIONAL INFORMAfl0N ON 3/17/94 REGARDING THE FRS METHODOLOGY, GPUN RESPONDED ON 8/22/94. SQUG WALKDOWN WAS CONDUCTED DURING 15R AND iME FINAL REPORT,15 DUE IN MAY OF 1995.
O
12/19/94 GPUN/NRC LICE %$1PG ACTIVITIES LIST PAGE 2 L Next TAC Ko.
CATEGORY ITEM ENGR CPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR T4443 GENERIC IPE DJD OC IPE SUBMITTED ON 8/14/92 (C321-92-2201). LETTER NRC APPROVED IPE SY COMPLETE MULTI-PLANT SUBMITTED TO NRC TO DELETE DC PORTABLE GENERATOR LETTER DATED 8/2/94. NRC GL 88-20 COMMITMENT IN ISR ON 7/2/93 (C321-93-2174). MRC RAI CLARIFIED SER BY LETTER ISSUED 7/30/93. RESPONSE TO RAI SUBMITTED ON 10/1/93 DATED 12/7/94.
(C321-93-2259). NRC APPROVED IPE BY LETTER DATED 8/2/94 HOWEVER GPUN NOTED DISCREPANCIES REGARDING COMMITMENTS. GPUN CONTERENCE CALL WITH NRC HELD ON 9/19/94 A LETTER DOCUMENTING THE DISCREPANCIES WAS SU8MITTED ON 11/8/94 74973 GENERIC GL 89-19 REACTOR GMG IN ACCORDANCE WITH THE INTEGRATED SCHEDULE, THE REACTOR COMPLETE LETTER OVERFILL OVERFILL PROTECTION SYSTEM WAS INSTALLED DURING THE 15R PROTECTION OUTAGE.
SYSTEM (ROPS) 80655 (LANT CONTROL ROOM XDJ BY LETTER 5000-91-2052 (6/20/91), GPUN PROVIDED AN NRC TO RESOLVE GIC 8 NRC 83 SPECIFIC HABITABILITY ASSESSMENT OF THE THYROID DOSE. THIS LETTER WAS IN SY TBD RESPONSE TO AN htC STAFF REQUEST DATED 2/27/90. 8Y A SUBSEQUENT LETTER (5000-91-2080, DATED 11/18/91), GPUN AGREED TO PROVIDE A MORE DETAILED EVALUATION OF THE THRYO!D DOSE UPON THE STAFF RESOLUTION OF GIC-8.
I 1
4 e
i i
6 e
_g.
.,,..,s_...
,,~#r
92/99/94 GPE]/NRC LICENSIDG OCTIVI?!ES LIST
,PAGE 3
-Next TOC Co.
CATEGORY ITEM ENGR GPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR 81944 TSCR 191 STABILITY PFC TSCR 191 SUBMITTED TO NRC ON 10/9/91. TSCR RESTRICTS NRC TO REVIEW AND APPROVE haC B2 ALLOWED NUMBER OF OUT-OF-SERVICE LPRM/APRM DETECTORS ON AMENDMENT BY /*3/*(('
THE A AND B LEVELS, AND REVISES MCPR LIMIT. SINCE BWROG ANALYSIS TAKES CREDIT FOR FLOW-BI ASED SCRAM, 7/93 NRC SER REQUIRES A CERTAIN DEGREE OF RELIABILITY FOR RECIRCULATION FLOW INSTRUMENTATION. PLANNED 15R UPGRADE WAS DESCRIBED TO NRC REVIEWERS ON 2/1/94 VIA TELECON. A FOLLOW-UP SUBMITTAL WITH SY O M DETAILS WAS SUBMITTED IN EARLY MARCH 1994. A CONFERENCE CALL WAS HELD ON APRIL 12, 1994 TO DISCUSS REV! EWER QUESTIONS ON THE EMI/RFI OUALIFICATION OF THE NEW RECIRCULATION FLOW INSTRUMENTATION. THE NRC REVIEWCR REDUESTED A LETTER FROM GPUN CONFIRMING THE FOXBORO SPEC 200 INSTRUMENT'S 4
RESISTANCE TO EMI/RFl. THIS LETTER WAS SUBMITTED. A RESPONSE TO GENERIC LETTER 94-02 ADDRESSSING THE CHOSEN g
LONG TERM SOLUTION AND VERIFICAT10N OF APPROPRIATE INTERIM CORRECTIVE ACTIONS WAS SUBMITTED ON SEPTEMBER 9, 1994 TSCR 191 PROVIDES GPUN'S LONG TERM SOLUTION FOR OYSTER CREEK.
A FOLLOWUP LETTER COMMITTING TO USE OF STABLE FUEL ASSEM8 LIES WAS SUBMITTED ON DECEMBER 16, 1994 83210 PLANT INSERVICE JJR GPUN IS INTERFACING WITN THE REVIEWER TO ANSWER NRC ISSUED SER APPROVING' COMPLETE SPECIFIC INSPECTION QUESTION COMING FROM THE NRC CONSULTANT WITH REGARD TO ISI PROGRAM.
PROGRAM UPDATED STEAM PIPING DOWNSTREAM OF MSIV'S. REVIEWER NEEDS FOR THE THIRD 10 REFERENCE TO DOCUMENTS REVIEWED IN SEP ACCEPTANCE OF TR INTERVAL THIS PIPING kOT MEETING ASME CODE 2.
THIS HAS BEEN PROVIDED.
83652 GENERIC IPEFE DJD IPEEE PROGRAM DESCRIPil0N SUBMITTED ON 12/17/91 NRC APPROVED PLAN ON GPUN -
82 l
MUtil-PLANT (C321 91-2323). EVALUATION OF EXTERNAL HAZARDS AGAINST 6/30/92. NRC APPROVED Gt 88-20 SRP CRITERIA WILL BE PERFORMED BY LICENSING FOR USE BY REVISED SCHEDULE ON RISK ANALYSIS BY 5/92. IPEEE SUBMITTAL SCHEDULE 9/8/92.
REASSESSMENT SUBMITTED 8/31/92. IPEEE SCHEDULE COMMITMENT IS 6/30/95 BUT NO LATER THAN 12/20/95.
4 O
+a..,
. - - ~ -
12/19/94 GPUN/NRC LICE % SING ACTIVITIES LIST PAGE 4
~
Next TLC Co.
CATEGORY ITEM ENGR GPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR 85531 GENERIC THERMOLAG ISSUE DJD OC RESPONSE TO 10CFR50.54 E RAI SUBMITTED ON 2/10/94.
GPUN B1 MULil-PLANT UPDATED THERMOLAG QUANTITIES & FINAL RESOLUTION ON RB GL 92-08 STAIRWELL INSTALLATION SUBMITTED TO NRC ON 9/16/94. BY LETTER DATED 9/15/94, NRC REQUESTED ADDITIONAL INFORMAi!ON IN AREAS WHICH OUR RESPONSE WAS INCOMPLETE OR WHERE WE RELIED ON THE RESULTS OF THE NEI PROGRAM.
SUBMITTAL 15 TARGETED FOR 12/20/94.
85751 PLANT NUREG 0619 ADK DELETE REQUIREMENT TO INSPECT FEEDWATER N0ZZLE AND N9C ISSUED SER ON OCTOBER COMPLETE SPECIFIC FEEDWATER EXTEND INSPECTION INTERVAL. GPUN RESPONDED TO NRC SER 4, 1994 INSPECTIONS ON 1/25/93. NRC STAFF RESPONDED ON 5/16/93 WITH A REQUEST FOR ADDITIONAL INFORMATION. RAI WAS RESPONDED TO ON 6/16/93. A MEETING WITH THE NRC WAS HELD ON MAY 11, 1994 TO RESPONO TO QUESTIONS ABOUT THE METHODOLOGY AND THE CORRESPONDENCE. AS PART OF THE NRC REVIEW, THE 4
NRC REQUESTED INFORMATION ON THE 1977 INSPECTION.
G5931 PLANT TSCR #208 CHANGE BDE RESET ONE SAFETY VALVE TO THE NEW SETPOINT. SETPOINT AMENDMENT #164 ISSUED 41PtM
$PECIFIC SAFETY VALVE RESET AT TESf!NG FACIlliY AND INSTALLED DURING 15R.
6/7/93 AUTHORIZING CHANGE 6d&d(([
SETPOINT 86904 GENERIC NRC BULLETIN BDE INSTALL WATER LEVEL INSTRUMENT MODIFICATION DURING 15R. NRC CONCURRENCE BY LETTER GRWW-MULT1-PLANT 93-03/ GEN LTR PROJECT COMPLETED DURING 15R.
DATED 9/29/93 4 SAMLET 8"'
BU 93-03/GL 92-04 92-04 87769 PLANT ADEQUACY OF GWB DEVELOPED A METHODOLOGY TO CONTROL REACTOR POWER TO THE RESIDENT INSPECTORS NRC C
SPECIFIC METHODOLOGY LICENSED LIMIT AS EFFICIENTLY AS POSSIBLE.
REQUESTED NRR REVIEW OF REGARDING CORE THIS POSITION. NRR TO THERMAL POWER REVIEW BY _ iBD.
LIMIT 88170 PLANT SEA TURTLE BD A WRITTEN C019tITMENT ON PROCEDURES IS NEEDED.
REVIEW REPORT.
NRC SPECIFIC
!MPINGMENTS COMMITMENT WAS MADE TO NRC ON 8/31/94. GPUN TO SUBMIT gg gjrggrg (ENDANGERED FINAL ASSESSMENT REPORT BY OCTOBER 31, 1994. FINAL gg SPECIES)
ASSESSMENT REPORT SUBMIifED ON 10/28/94.
3 J/-fr
'9
12/19/94 GPUN/NRC LICE:: SING ACTIVITIES LIST PAGE 5 Wext TAC to.
CATEGORY ITEM ENGR GPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR 8887D PLANT RX BUILDING MWL MEETING WITH NRC ON 11/19/93 TO DISCUSS DRY STORAGE NRC WILL AUDIT SAFETY GPUN 82 SPECIFIC CRANE TO FACILITY AND THE USE OF THE REACTOR Bu!LDING CRANE TO EVALUATION.
TRANSFER SPENT TRANSFER SPENT FUEL TO DRY STROAGE FACILITY. A 6 ///M 4////.,f/#[//f.
FUEL CASK FOLLOW-UP MEETING WAS CONDUCTED ON 7/18/94 TO DISCUSS pg ggggy IN MORE DETAIL THE 50.59 EVALUAil0N GPUN WAS PREPARING.
CPUN WILL NOTIFY NRC IN JANUART 1995 REGARDING COMPLETION DATE OF THE SAFETY EVALUATION. NRC WILL AUDIT THE GPUN EVALUATION PRIOR TO FUEL TRANSFER.
89?67 GENERIC RX VESSEL YN NRC !$ SUED GL 92 01 RE: UPPER SHELF ENERGY (USE) ON NRC TO REVIEW M NRC B2 MUtil-PLANT STRUCTURAL 2/28/92. A MEETING WAS HELD ON 5/11/92 WITN NRC STAFF MfM/94. &*fN((M Gt 92-01 INTEGRITY ON ENERGIES OF BELTLINE VESSEL PLATE MATERIAL WHICH pggp DOES NOT MEET 10 CFR 50 APPENDIX G CRITERIA. GPUN RESPONSE TO THE GL WAS SUBMITTED 04 6/30/92. A REPORT M
[
DESCRIBING THE RESULTS OF ANALYSES CONCFENING USE ON 4
BELT LINE VESSEL MATERIAL WAS SUBMITTED ON 9/22/92.
SUBSEQUENTLY ON 11/9/92, 5/23/93, 8/23/93 AND 3/30/94 NRC REQUESTED ADDITIONAL INFORMATION. GPUN RESPONDED 10 NRC 04 1/26/93, 9/7/93, 4/19/94 AND 6/6/94.
l 89301 GENERIC DEBRIS PLUGGING JJR RESPONDED TO THE BULLETIN, SUPP 1 WITH PLANS TO ADDRESS NRC ACCEPTED GPUN ACTIONS GPUN C
MULTI-PLANT OF ECCS SUCTION REQUIRED ACTIONS. NRC LETTER DATED 7/27/94 ACCEPTED BY LETTER DATED 7/27/94.
BU 93-02, STRAINERS GPUN RESPONSE AND ACTIONS. GPUN WILL SUBMIT A SUPP 1 COMPLETION REPORT WITHIN 30 DAYS FOLLOWING THE COMPLETION OF ALL ACTIONS REQUIRED IN THE BULLETIN.
OPERATOR TRAIN!PdG YET To BE COMPLETED. SUBMITTAL IS TARGETED FOR 1/31/95.
69348 TSCR 213 EMRV BTPASS RTZ CLARIFYS TS PARAGRAPN TO REMOVE 10 YEAR REACTOR NRC ISSUED AMENDMENT ON COMPLETE MYDROTESTING AND REPLACE " REACTOR VESSEL PRESSURE 9/27/94.
TESTING *. SUBMITTAL MADE ON 4/14/94.
NRC SER AND AMENDMENT 170 RECV'D 9/27/94 AMENDMENT HAS BEEN INCORPORATED INTO TS.
4 S
4 12/19/94 GPUN/NRC LICENSING ACTIVITIES LIST PABE 4 '
Next
. TAC No.
CATEGORY ITEM ENGR GPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR 89351 TSCR 215 DELETE 04 AUDIT ADE THE TS CONTAIN AN INFLEXIBLE AUDIT SCHEDULE WHICH DOES NRC TO REVIEW AND APPROVE GPUN 82 FREQUENCIES FROM NOT RECOGNIZE DIFFERENCES IN PERFORMANCE AMONG AUDITED AMENDMENT BY _ T80.
TECHNICAL AREAS OR THE INFLUENCE OF PLANT CONDITIONS ON THE SPECIFICAfl0NS APPROPRIATENESS OF THE AUDIT SCHEDULE. THIS TSCR REMOVED THE SCHEDULAR PART FROM THE TS. CONCURREN!LY, iME 00A PLAN WAS MODIFIED TO REFLECT AN AUDIT SCHEDULE BASED ON PERFORMANCE WITM LONGER MAXIMUM INTERVALS BETWEEN AUDITS. TSCR SUBMITTED ON APRIL 15, 1994. v!A CONFERENCE CALL, NRC MAS INFORMED GPUN THAT 36 MONiMS MAXIMUM FREQUENCY AND PLUE OR MINUS 25% IS UNACCEPTABLE. IT MAS BEEn DECIDED THAT GPUN WILL REVISE ITS SU6MITTAL TO CopFORM TO TME "ACCEPTA8tE"'
LEVEL. ?ME REVISION TO THE 00A PLAN IS IN THE REVIEW CYCLE. ONCE THAT REVISION It SIGNED OFF THE TSCR WILL BE RESUBMIffED. TARGET DATE '/31/95.
r D
89480 TSCR 218 INSTRUMENT PFC TMIS PROJECT WILL RESULT IN CHAkGES TO INSTRUMENT NRC TO REVIEW AND APPROVE NRC 81 SURVEILLANCE FUNCTIONAL TEST INTERVALS FROM WE MLY OR MONiMLY TO AMENDMENT 8Y 14/4tf94 FREQUENCf CHANGE QUARTERLY. ALSO, OUT-OF-SERVICE TIME FOR TESTING WILL fp /
p BE 6 NOURS VICE 2 N0URS AND INOPERA8tE INSTRUMENTS WILL MAVE UP TO 24 HOURS TO BE REPAIRED OR REPLACED WITMOUT PLACING THE INSTRUMENT IN THE TRIP CONDITION. TSCR 218 WAS SUOMITTED 04 MAY 12, 1994. A WORK 500K WAS SENT TO THE OC PROJECT MANAGER ON JUNC 14, 1994 TO NELP FACILITATE NRC REVIEW. A CONFERENCE CALL WAS HELD ON AUGUST 3, 1994 WITH THE TECHNICAL REVIEWER (SANG RMOW)
AND AL DROMERICK At WHICH ADDlil0NAL INFORMATION CONCERNING SETPOINT DRIFT FOR APRM SCRAM INSTRUMENTATION WAS REQUESTED. THE RESPONSE WAS SUBMITTED 04 SEPTEMBER 2, 1994.
4 T
,,c.-
.......,,,,,..,m,
.m-
. _,,m_,.,.,.,._..._
12/19/94 GPUM/NRC LICECSING QCTIVlilES LIST PAGE 7 Next TAC Co.
CATEGORY liEM ENGR GPUN ACTION / STATUS NRC ACTION / STATUS Action by PRIOR 89684 TSCR 216 RX HIGH PRESSURE GMG TSCR 216 WHICH REVISES THE SETPOINTS OF THE RX 'llGH NRC TO REVIEW AND APPROVE NRC A
RELIEF VALVE PRESSURE RELIEF VALVE INITIATION, WAS SUBMliTED 04 AMENDMENT BY 1@ 4tf9R.
(EMRV) 6/15/94. A REQUEST FOR ADDITIONAL INFORMATION fRAI) 04[2hj7 INITIATION -
FROM THE NRC TECHNICAL REVIEWER, HANS ASHAR, DATED ACTUAil0N 8/22/94 WAS RECEIVED 8/26/94 AND A RESPONSE TO NRC IS SETPo!NTS DUE IN 30 DAYS (9/25/94).
THE FINAL DRAFT IS 001 FOR DEPARTMENTAL REVIEW AND APPROVAL. SUBMITTAL MADE ON 9/23/94 Ar4)lil0NAL QUESTIONS MAVE BEEN RAISED BY THE NRC TECHNICAL Zwl"_2, AND A CONFERENCE CALL WAS HELD 10/11/94 THC ROUND TWO QUESTIONS MAVE BEEN ANSWERED, BY LETTER SIGNED BY R. KEATEN ON 11/3/94.
STATUS AS OF 12/6/94: CALL RECEIVED FROM ALEX D. HE COULD NOT FIND 11/3/94 LETTER AND MANS ASHER DID NOT SEE IT AS OF THAT DATE, BUT HE FOUND IT LATER.
09F41 (StR 217 SHUTDOWN MARGIN XDJ TSCR 217 WHICH CLARIFIED THE REQUIREMENTS FOR NRC TO REVIEW AND APPROVE WRC B1 DEMONSTRATING SHUTDOWN MARGIN (SDM), WAS SUBMiffED ON AMENDMENT BY 'A'M,%.
/)]/[p[
5/6/94. REVISION 1 WAS SUBMITTED TO NRC BY LETTER C321-94-2076 04 6/22/94.
89792 TSCR 221 HIGH RECIRC FLOW TS TSCR SUBMITTED ON 6/24/94. A VERBAL RAI WAS RECEIVED ON TSCR APPROVED AS NRC B1 SCRAM 9/20/94 TO BE ANSWERED BY TELCON. A TELECON MAS BEEN AMENDMENT #175.
ARRANGED WITH A. DROMERICK FOR 9/29/94. RAI ANSWERED BY LETTER DATED 9/30/94. TECH SPEC AMENDMENT #175 ISSUED.
09B45 iSCR 219 REVISE DJD TSCR SUBMITTED ON 7/8/94 BASED ON COMPLETED 5.E. &
NRC ISSUED AMENDMENT ON COMPLETE UNDERVOLTAGE CALCULAi!ONS TO SUPPORT CHANGE TO THE 2ND LEVEL 11/30/94.
PROTECTION UNDERVOLTAGE PROTECTION SETPOINT. GPUN SUBftITTED SETP0lNT RESPONSE TO VERG*L RAI AS DISCUSSED 04 9/14/94 DN 10/3/94.
Q9970 PLANT OPERAil0NAL ADK GPUN INTENDS TO MERGE THE CURRENT QA ORGANIZAi!ON INTO NRe2'!R MV:CU Md4TA) COMPLETE SPECIFIC QUALITY THE INDEPEDENT SAFETY REVIEW FUNCTION. THIS REQUIRES A DETE4W614AT C' T j CC.
ASSURANCE PLAN SIGNIFICANT REVISION TO THE 00A PLAN. A MEETING WAS KidDNA-HrltESPONirTO CHANGE HELD WITH THE NRC 04 FEB. 24, 1994 Ai KING OF PRUS$1A IMPft TOPU e tfS7 PA. TO BRIEF THEM ON THE PROPOSED CHANGES AND THE GPUN g g /gygp 50.54(A) DETERMINAll0N THAT THE CHANGES DID NOT REDUCE g
COMMITMENTS AS CONTAINED IN THE PLAN. GPUN SUBMITTED A Y((((
LETTER ON 4/6/94 DESCRIBING THE CHANGES AND IMPLEMENTED THE PROPOSED CHANGES ON APRIL 30, 1994.
O
-..,- _..,... _ _ ~
12/19/94 GPtTJ/NRC LICE % SING ACTIVITIES LIST PAGE 8 heat TAC to.
CATEGORT liEM ENGR GPUN ACil0N / STATUS NRC ACTION / STATUS Action by PRIOR 901D4 A GENERIC CORE $NROUD ADK NRC ISSUED GL 94 03 ON 7/25/94 CONCERNING CORE SHROUD 6
NRC B1 MULTI-PLANT INSPECTION CRACKING. A RESPONSE WAS SUBMITTED ON 8/24/94.
SW8MtitAt-9Y-il/M/94, C#T/ '
GL 94-03 INSPECTIONS WERE CONDUCTED DURING 15R. A REPORT ON THE A/86 /SM88 88 #d/ #jd((9[
INSPECil0N WAS SUBMITTED 11/04/94.
90104 8 CORE SMROUD RTZ GPUN SUBMITTALS OF 9/28, 11/1, 3, 9, AND 16, 1994 NRC ISSUED SER ON GPUN REPAIR PROVIDED DESIGN REPORTS AND SAFETY EVALUATION. NRC SER 11/25/94 SER REQUESTED 69 REQUESTED A CONFIRMATORY DYNAMIC SEISMIC ANALYSIS 8E 3 FOLLOWUP ACTIONS
[48J2* 8'/// W.
SUBMITTED BY 12/31/94 AND MATERIAL CORROSION TESTS AND GPUN'S ISI PROGRAM FOR THE REPAIR SY 6/14/95.
MS A./N N 90248 PLANT IGSCC WATER RTZ GPUN INCORPORATED NRC SUGGESil0NS FOR SUBAlfiAL GPUN
- St*
SPECIFIC BACKED WELDING JUSTIFYING 15R CONTINGENCY PLAN TO PERFORM WELD DVERLAY kN DNM REPAIRS ON REACTOR N0Z2LE SAFE ErDS WITHOUT DRAIN DOWN g Q gd$$ [*p//
OF VEEEL. SUBMITTAL MADE ON 8/26/94. GPUN TO PROVIDE CONFIRMATION REGARDING GE PROPRIF?ARY ! C ORMATION. AS 0F 10/13/94, PER D. HOLLAND, A "SANii! ZED" GE REPORT 13 BEING PREPARED FOR SUBMIffAL. THE PREVIOUSLY SUBMIffED REPORT WILL BE WITMDRAWN. TMIS REPAIR WILL NOT NOW BE NEEDED FOR ISR.
90372 PLANT ASME RELIEF JJR REQUEST FOR APPROVAL OF ASME CODE CASE ON ELIMINATING NRC REVIEW AND APPROVED COMPLETE A SPECIFIC REQUEST FOR MSIV REQUIREMENT FOR MYROS ON CLASS 1/2 SYSTEM MODS MAS BEEN PRIOR TO ISR RESTART.
AND CORE SPRAY MADE GENERICALLY FOR THE INDUSTRY. A SPECIFIC RELEIF MODS (NO HYDRO)
REQUEST WAS SUBMiiTED 04 9/14/94 FOR OYSTER CREEK OUTAGE WORK ON THE CORE SPRAY AND MSIV BYPASS LINE MODIFICATIONS.
90602 PLANT CORE SPRAY RTZ CORE SPRAY SPARGER INSPECil04 SCHEDULED TO BEGIN NRC ISSUED SER ON COMPLETE
-SPECIFIC SPARGER 9/25/94. THE INSPECTION WILL PROCEED SIMULTANEOUSLY 11/18/94 INSPECTION /
WITM THE CORE SMROUD INSPECTION. REPORT ON SPARGER REPORT INSPECil0N RESULTS (OL REQUIREMENT, PARA. 2.C.(5)) IS I
SCHEDULED FOR SU8MITTAL SY 10/21/94 INSPECTIONS COMPLETED, REPORT IN PROGRESS AND SUBMliiAL LETTER TO BE PREPARED. SUOMIfiAL OF TOPICAL REPORT TR-098 TO NRC WAS MADE ON 11/3/94 I
99995 TSCR 222 INCREASE SPENT PFC A LICENSE AMENDMENT TO USE APPROXIMATELY 45 ADDITIONAL GPUN HAS REQUESTED THAT 81 FUEL POOL EXISilNG SPENT FUEL STORAGE LOCAil0NS IN TME OC SPENT NRC REVIEW AND APPROVE M b STORAGE FUEL POOL IS REQUIRED TO ENSURE FULL CORE OFFLOAD AMENDMENT BY l
CAPA81LITY UNill 16R. TSCR WAS SUBMITTED ON 11/25/94.
[S/ [
l O
mi.
_.._.,_.~_-_-._~.--__._m-.-_
,.m.
-~-.. - -. m.
.,.. - -. -........, ~, _ _ - -., _ -.
12/19/94 GPUN/NRC LICE 1 SING ACTIVITIES LIST PAGE O Next TAC Co.
CATEGORT ITEM ENGR GPUN ACil04 / STATUS NRC ACTION / STATUS Action by PRIOR 2......
99998 GENERIC MOV PROGRAM DJD LETTER WOTIFYING NRC OF BASIS FOR NOT TESTING CORE GPUN 82 MULTI-PLANT SPRAY MOV'S SUBMIT'D 12/1/93 (C321-93-2316) & VERBAL GL 89-10 ACCEPTANCE PROVIDED BY NRC ON 2/15/94 NRC LTR. DTD.
1/27/94 ACCEPTS ICS COND. RETURN LINE ISOL. VALVE 35 SEC. DELAY BASl$ FOR INTERIM ONLY & REQUIRES 15R $10D.
TO ALLOW VALVE TO CLOSE a 1020 PSI DELTA P.
GPUN SUBMITTED LETTER TO NRC PROVIDING JUS?lFICAil04 0F DESIGN BASIS CONDITIONS ON 4/20/94 (C321-94-2035) &
NOTIFYING NRC TMAT GPUN IS "NOT" PLANNING TO MODIFY THE ICS CONDENSATE RETURN LINE VALVE IN 15R TO CLOSE AGAINST A HIGMER DELTA-P.
NRC MOV INSPECTION WAS HELD THE WEEK OF 6/27/94.
GPUN/NRC MGT. MEETING SCHEDULED FOR 10/20/94. RESPONSE TO NOV SUBMITTED 9/19/94 REVISED SUPPL. 3 LTR.
SUBMITTED ON 11/7/94 WHICH RESOLVES ICS & RWCU ISSUES.
g SUPPL. 6 RESPONSE TO BE SUBMITTED IF ANY OUTLIERS ARE IDENTIFIED AS A RESULT OF VALVE FACTOR EVALUAil0N TO BE COMPLETED BY 1/1/95 (PER 10/20/94 NRC MTG.).
99999 TSCR 224 10 CFR 20 YN TWENTY SEVEN(27) LAls MAVE BEEN ISSUED TO RESPONSIBLE GPUN 82 GROUPS. ON 1/17/92 GPUN REQUESTED THAT WRC REVISE THE IMPLEMENTATION DATE FOR THE RULE TO 1/1/94 BASED ON NRC BEING SENIND SCHEDULE FOR ISSUING NECESSARY REG GUIDES.
ON 2/12/92 NRC STATED VIA INTERNAL MEMO THAT THEY DECIDED TO DELAY IMPLEMENTATION TO 1/1/94. DEADLINE FOR LAIS HAS BEEN EXTENDED TO 12/15/93.
WORK REQUIRED BY THE END OF 1993 NAS 8EEN COMPLETED SUCCESSFULLY. LICENSING IS NOW PREPARING A TSCR TO INCORPORATE NEW 10CFR 20 REQUIREMENTS. NRC HAS ALSO ISSUED A DRAFT MODEL TECM SPEC. TSCR IS EXPECTED TO BE SUBMITTED BY 2/28/95.
G t