L January 16, 1990 Docket No. 50 219 LICENSEE: GPU Nuclear Corporation Jersey Central Power and Light Company FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUMMARY
OF PROGRESS REVIEW MEETING REGARDING STATUS OF LICENSING ACTIONS On Wednesday, January 3,1990 a meeting was held at NRC, Rockville, Maryland withGPUNuclearCorporation(GPUN,thelicensee)todiscussthestatusof Oyster Creek licensing actions. is the list of individuals participating in the discussion.
, is a marked-up copy of the staff's Regulatory Information Tracking System (RITS) dated Deceroer 6,1969 for Oyster Creek.
The marku) to update RITS resulted from the discussion on esch item or TAC number in t11s meeting.
The status of each item is given in the last column (50, TD. AD, TE) on the right. hand side of the RITS sheets.
The status in that column is the following:
"01" means the licensee, "02" means staff reviews, 03" means staff's Project Manager and "04" means coreplete.
The updating of the RITS for Oyster Creek was done during the discussion on each licensing (action in this meeting.left. hand column of RITS).
The licensing action items are listed by TAC number provides a list of open FTOL items and status of each item.
The licensee also discussed several issues which it would like the NRC staff to consider so es to facilitate the licensee's planning for the 13R refueling outage (see Enclosure 4). We advise the license that we would consider these items when they are formally submitted.
/s/
Alexander W. Dromerick, Project Manager Project Directorate 1 4 Division of Reactor Projects 1/11
Enclosures:
As stated cc w/ enclosures:
See next page 9001260012 900116 PDR ADOCK 05000219 P
PDC OFC LA:PDI 4 :PM:PDI 4,
- D:
4 7.:..c.
.....:......l.:.h.......i c k: b i d : J S tol NAME :
MA DATE101/h/9h:01/h/90:01/h90 0\\
0FFICIAL RECORD COPY Document Name: OYSTER NTG
SUMMARY
\\
lW F[\\
UNITED STATES j, '*[e';
NUCLE AR REGULATORY COMMISSION g
assmotow. p. c. robos
(. s.,
,/
Denuary 16, 1990
....+
Docket No. 50-219 LICENSEE: GPU Nuclear Corporation Jersey Central Power and Light Company FACILITY: Oyster Creek Nuclear Generating Station
SUBJECT:
SUMMARY
OF PROGRESS REVIEW HEETING REGARDMG STATUS OF LICENSING ACTIONS On Wednesday, January 3,1990 a meeting was held at NRC, Rockville, Maryland with GPU Nuclear Corporation (GPUN,.the licensee) to discuss the status of Oyster Creek licensing actions. is the list of individuals participating in the discussion. is a marked-u) copy of the staff's Regulatory Information Tracking System (RITS) dated Decem>er 6,1989 for Oyster Creek. The marku) to update RITS resulted from the discussion on each iten or TAC number in tais meeting.
f The status of each item is given in the last column (SC, TD, AD. TE) on the right-hand side of the RITS sheets. The status in that column is the following:
- C1" means the licensee, "02" means staff reviews, "03" means staff's Project Henager and "04" means complete.
The updating of the RITS for Oyster treek was done during the discussion on each licensing (action in this meeting.le.*t-hand column cf RITS).
The licensing action itets are listed by TAC number Cnclosure 3 provides a list of open FTOL items and status of each item.
The licensee also discussed several issues which it would like the NRC staff to consider so as to facilitate the licensee's planning for the 13R refueling outage (seeEnclosure4). We advise the license that we wculd consider these items when they are formally submitted.
s
$MldWI Alexander W. Dromerick, Project Manager Project Directorate 1-4 Division of Reactor Projects - 1/11
Enclosures:
As stated cc w/ enclosures:
See next page i
1
e g-
,k-Oyster Creek Nuclear Generating Station
-CC:
Ernest L. Bleke, Jr.
Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 2300 N Street, NW Post Office Box 445 Washington, D.C.
20037 Forked River, New Jersey 08731 J.B. Liberman, Esquire Comissioner Bishop, Liberman, Cook, et al.
New Jersey Department of Energy 1155 Avenue of the Anericas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Jennifer Moon, Acting Chief Regional Administrator, Region I New Jersey Department of Environmental U.S. Nuclear Regulatory Commission Protection 475 Allendale Road Bureau of Nuclear Engineering King of Prussia, Pennsylvania 19406 CN 415 Trenton, New Jersey _ 08625 BWR Licensing Manager GPU Nuclear Corporation E. E. Fitzpatrick 1 Upper Pond Road Vice President and Director Parsippany, New Jersey 07054 Oyster Creek Nuclear Generating Station
- Deputy Attorney General Fost Office Box 388 State of New Jersey Forked River, New Jersey 08731 Department of Law and Public Safety
.36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop: Site Emergency Bldg.
P. O. Box 388
-Forked River, New Jersey 08731
U;:.o
<a
^'
ENCLOSURE 1 p
ATTENDANCE LIST MEETING - JANUARY 3, 1990 OYSTER CREEK NUCLEAR GENERATING STATION t
DOCKET h0. 50-219' L
NAMES ORGANIZATION' Suren Singh N. J. State D.E.P Nicholas DiNucci N. J. State D.E.P Frank Orr-NRC/NRR/PDI-4 Edward O'Donnell GPU Nuclear Michael Laggart GPU Nuclear John Sullivan GPU Nuclear John Stolz NRC/NRR/PDI-4 L
Alexander Dromerick NRC/NRR/PDI-4 L
.)
l l
l ln k
f
(
s
=
a:
,s R
fjff //2.5 Of c' &
R-1208673-001 R E G U L~A T 0 R Y INF0RMATION
-T.R A C K I N G SYSTEM PAGE NB.*--2
'RUN-BATE: 12/06/
DIVISION OF DRP LICENSING R PROJECT MANAGER REPORT (HEAD 90ARTERS)
FACILITY: OYSTER CREEK 1 PLANT. LOCATION: 9 MI S OF TDMS RIVER, NJ FACILITY STAGE: LIC PROJECT DIRECTORATE PB14 DOCKET NUMBER: 050-00219 LICENSED P0HER: 8659 MMT PROJECT MANAGERS A. DROMERICK ARCH / ENGINEER: B8R DESIGN POWER:
1939 MNE PROJECT DIRECTOR J. STOLZ NSSS VENDOR:
GE LIC. ASSISTANT:
S NORRIS S
T MULTI Y
P RAI LICENSEE
-T TAC PLANT APPL P REVIEHED R R E'J
RESPONSE
SE INPUT LIC ACT IMPLEMENT A
NUMBER ACTION DATE E
BY I DRGH REVIEHER RAI DATE DATE DATE C0ff DAlg DATE COINENTS I
I. ACTIVE AND COMPLETED LICENSING ACTIONS IN FY MmMN ACTIVE ACTIONS munu ACTION ITEM: OYSTER CREEK - FULL TERM OPERATING LICENSE 94/30/99T N/A 9
M11268 03/06/72 A PM 3 PRPB PECERSEN 05/31/88 PD43' MICHAELS 96/07/85X PD14 ORR PD14 DRDMERICK
-(
ACTION ITEM: DYSTER CREEK 1 - PROCEDURES GENERATION PACKAGE REVIEW (NUREG 0737 SUPP/1)
M44324 F005 07/29/83 L TS 3 ESGB PICHUMANI 07/31/87 18/31/85 65/22/87X ttr59e99T~
SGNES 8& 8 4
/
E--DEfEIWWS-SODO SHERON-05/03/85X fj/g d(( (
Le tt e xc, f/4 LHFB MORISSEAU MOS/31/88u j
/c /,/f>/cy e, LHFB SMITH PBIA DELISO 05/89/86X c.,, c,,j, ACTION ITEM: OYSTER CREEK - TORNADO MISSILE DAMAGE O Mr/
G4/3 issi' IPSAR 4.6.
0 M49394 10/01/82 L TS 3 PD14 DRDMERICK 09/15/89 ESGB ASHAR
/fN 1,2,4 3f[fB /
~
PD43 MICHAELS 06/07/85X d PRPB LEVINE G8/30/86C PRAB CAMPE 08/30/86C SPLB KUDRICK 04/25/86X PARS HILSON 04/05/85X PD11 CHU 11/12/88C dh ACTION ITEM: OYSTER CREEK - SEISMIC DESIGN
.g M49598 10/01/82 L TSK 3 PTSB MCKENNA 06/24/86 10/30/89C 07/25/86X $34ộ ESGB ROTHMAN uG9/30/89m
- / /-,, /.. _ _rr
- '/ J fc /
ESGB JENG 05/27/89C PDt4 DROMERICK
-N/M 729 2 PD43 MICHAELS 86/07/85X
/
ESGB ASHAR 06/85/89C 2
ESGB REITER e
Ih
=
J A
R-1208673-001-
-R E G U L A T-0 R Y-INF0RMATION TRACKINC. S Y-S T E M
~ PAGE NO.* ~ :2 DIVISION OF DRP LICENSING R RUN BATE: 12/06/
PROJECT MANAGER REPORT (HEAD 00ARTERS)
FACILITY: OYSTER CREEK 1 S
T MULTI Y
P RAI LICENSEE T
TAC PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT. LIC ACT IMPLEMENT-A NUMBER ACTION Rale E
BY I ORGN REVIEHER RAI DATE DATE BATE COMP RATE BATE CONNENTS
.I o(CONTINUATION) nunu ACTIVE ACTIONS MMMM 97/24/87X-PD44 CHENG ESGB PICHUMANI-05/13/88X EMEB LIPINSKI ACTION ITEM: OYSTER CREEK 1 - INSTRUMENTATION TO FOLLDH THE COURSE OF AN ACCIDENT'(RG 1.97)
M51115 A017 04/04/83 L TS 3 SICB MARCUS 01/31/89 12/31/88C 66/30/99T 12/et/88L B
PD14 DROMERICK SELB ROSA 07/18/86X ACTION ITEM: OYSTER CREEK - DISCREPANCY IN DRANINGS USED IN SEP REVIEW M58004 06/13/85 L TS 3 PTSB MCKENNA 08/15/86 08/29/86X SN SeWEDett U.4
, ammansu,
PD44 CHENG 87/24/87X g
?.
.se
. ? u.
h A^-
/~ 4 ACTION ITEM: OYSTER CREEK - RESP 06SE TO STAFF POSITION ON CONTAINMENT NITROGEN PURGE / VENT SYSTEM M62980 A019 06/16/86 L TS 2 SPLB TINKLER 06/27/89 03/13/87C 81/15/98T RAI 8
PD14 DROMERICK PD14 ORR ATRP DON 0 HEN 06/09/87X ACTION ITEM: OYSTER CREEK 1 - TECH. SPECIFICATIONS COVERED BY GL 83-36 8 83-37 (TSCR 8152 - DRYWELL NIGH RAD. MONITOR)
M05/31/87TM SaW99fS11' O
M64381 B083 06/30/89 3 PD14 DROMERICK
/N
((-
PRPR MARTIN V/
'I.
ATRP DON 0 HEN 03/3f/87C
/*
e ACTION ITEM: OYSTER CREEK - INSP. OF RECIRC. 8 ISOL ATION CONDENSER PIPING IN CYCLE 12R OUTAGE
?Z, 5 b o y i e
M67183 02/16/88 L TS 3 PD14 DROMERICK 09/30/89
//[/. <JO
/g/,g EMTB K00 a 3/Jiffe 7"
~ ACTION ITEM: OYSTER CREEK - TSCR 164 - REVISE T.S. TO DELETE SAFliY LIMIT 2.1.E M67819 03/31/88 A TS 3 PD14 ORR 06,*iO/89 09/01/89 44446489F S.
a /_ _. /.__...
PD14 DROMERICK
~h r
r~
SRXB. THOMAS
%f ~ y e j" s 43por ACTION ITEM: OYSTER CREEK - HEN SEISMIC FLOOR RESPONSE SPECTRA M68217 05/18/88 L TS 3 PDJ 4 DROMERICK 05/15/89 10/11/89C 12/31449f-12751/89T' q$
~
ESGB THOMPSON
., y
?
R-1208673-001 R~E G U L-A T O R.Y INF0RMATIOO TRACKI'd0
' SYSTEM
' PAGE NO. t ~ 27 DIVISIbN OF DRP LICENSING R RUN BATE 12/06/8 FROJECT-MANAGER REPORT (HEADQUARTERS)
FACILITY: OYSTER. CREEK 1 i
~
T
. RAI LICENSEE TG SC MULTI Y
P TAC PLANT APPL P REVIEHED R
-REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT.
AE HUMBER ACTION DATE E
BY I ORGN REVIENER RAI DATE DATE BATE-COMP RATE BATE CQMMENTS IE uMMM. ACTIVE ACTIONS MMMM (CONTINUATION)
ESGB ASHAR EMEB LEE ESGB ROTHMAN iACTION ITEM: OYSTER CREEK - SEP TOPIC VII-1.B, TRIP UNCERTAINTY AND SETPOINT ANALYSIS REVIEN OF OPERATING BATA BASE l M69012 07/20/88 L 3 SICE RHON 06/30/89 09/15/89C 88/19/89P L343Se497 90 PDl4 DROMERICK 4/)l/}f,r 7^
PD14 ORR
':. f_^ T W
j ca
' ACTION ITEM: OYSTER CREEK - TSCR 167 REV.1 REORGANIATION lM75097 10/11/89' A 3 PD14 DROMERICK 12/38/89T S3 MUMM NOT SCHEDULED ACTIONS MMMMM l
$ ACTION ITEM: OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS
!MS3698 B086 11/01/84 L TS 2 SICB LASHER 04/30/88 05/15/88 09/01/87C SCHEDULE U. 95 ATRP DONOMEH 09/01/87P NKNOWN PD14 DROMERICK 04/19/89C SICB RHON 03/31/89C ACTION ITEM: DYSTER CREEK - DETAIL CONTROL ROOM DESIGN REVIEH SUPPLEMENT 01
!M61603 F071 05/19/86 L TS 3 PD14 DROMERICK 08/30/86 SCHED.TO 5 85 ATRP. DON 0 HEN 96/09/87X E DETERMND
- ACTION ITEM: OYSTER CREEK - ADDITIONAL EXEMPTIONS TO APPENDIX "R"
]M62229 08/25/86 E TR 3 ATRP STANG N/A SCHEDULE U 85 PD14 DR0t1ERICK NKNOHN ATRP DON 0HEH 06/09/87X SPLB NOTLEY-1
? ACTION ITEM: OYSTER CREEK - REV. 5 " PUMP & VALVE TESTING PRUGRAM' lM65351 03/23/87 R
.TS 4 PD14 DROMERICK SCHEDULE U 93 EMEB LEE NKNOHN EMEB SHAN 07/17/87X EMEB LI t
=
")'"'"'
T t
w a___.--%_,,eM
gg 2
~
~
39
~
. J
.l%,
+
&=59-.
- ~
z.
r,
- ~;
~ '
nSRv1208673-001
-R.E'G U'L"A'T O Q Y' I-Q F O R M A T I O N_
T.t2 A C K:I Q C' SY5 TEM
.PAGE_NB.*: 21 DIVISION OF DRP LICENSING R RUN BATE [12706/1
~
-PROJECT MANAGER REPORT fHEAD0UARTERS)
FACILITY: OYSTER CREEK.1
- y.
3 MULTI Y'
' APPL
.P REVIEHED R! REV
. RESPONSE SE INPUT LIC ACT ~
LICENSEE T1 IfrLEMENT
- Al NUMBER ACTION D.Alg g
BY
'I ORGN REVIEHER RAI DATE DATE DATE CGfr RATE BATE C0fGENTS
- 1l unum NOT SCHEDULED ACTIONS Mxmmu (CONTINUATION)'
ACTION ITEM: OYSTER CREEK - EXEMPTION FROM REQUIREMENTS OF 10CFR50, APP. R. SECT. III. J f y,T; /,s., r
~
M
.-M66055 11/24/86 E-TS 3 PD14 DROMERICK
/
/ 3-SCMEggtEU 4
'SPLB NOTLEY
~
s' NKNetes 4
ACTION ITEM: DYSTER CREEK
-IPSAR VERIFICATION' ITEMS M68142 05/16/88 L-3 PD14 ORR 91/31/89T
- SJ PD14 DROMERICK 1 ACTION ITEM: OYSTER CREEK - IMPLEMENTATION OF THE STATION BLACKOUT RULE,18CFR50.63
- M68577 A022 04/17/A9 2-PD14 DR0dERICK 94/17/89C 0;
s SELB 'T0ALSTON.
PD14 ~ TAM
[
SELB GILL
< ACTION ITEM: OYSTER CREEK - INTERGRANULAR STRESS CORROSION CRACKING (IGSCC) IN BWR PIPING (frA B-97)(GL 88-01) e M69149 B097 07/27/88 L 2 EMTB K00 12/25/88 81/31/89 Ai PD12 ' CLARK PD14 DROMERICK
/[,. 4, s
- syT YW'"7 4
ACTION ITEM: OYSTER CPEEK INSTRUMENT AIR (GENERIC LETTER 88-14) 9p
'M71692 B107 03/10/89 3 PD14 DROMERICK PD22 EDISDN
ACTION ITEM: DYSTER CREEK TECH. SPEC. CHANGE REQUEST 8160 3," g' M71975 01/26/89 A PM
' 3 PD14-DROMERICK 10/31/89
/'/ N '"i st 3
PD14' ORR-k. ACTION ITEM: OYSTER CREEK - MPA F-72: SAFETY PARAMETER DISPLAY SYSTEM RESPONSE TO GL 89-96
' M73485 F072 07/24/89 3 LHFB GOODMAN 07/24/89C J//cf Ci LHFB ' HEST-r i
you
' ACTIDN ITEM: OYSTER CREEK-INDIVIDUAL PLANT EVALUATIONS IGL 88-22)
. M74443 Bill 10/31/89 3 PD14 BOYLE h-p PD14 DROMERICK i
l
.p-
-p
<y.r.
v c
,, _ =
[r r
.c w-s- -- -
Le-M
r
'R-1208673-001 R E G U L A T O R'Y' I.M F 0 R M A.T'I O O T Q A'C K I-N 0: ' SYSTEM' PAGE'NO2:~ 2 DIVISION OF DRP LICENSING R
~
RUN BATE
- 12/06/4 PROJECT MANAGER REPORT l-(HEADQUARTERS)
~
FACILITY: OYSTER CREEK 1 T
1 S l
MULTI Y
P RAI LICENSEE T
l TAC PLANT APPL P REVIENED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT A
l' NUMBER' ACTION DATE
.E-BY 1 ORGN REVIEHER RAI DATE BATE BATE COMP RATE BATE COMMENTS
.I
(
MMxn NOT SCHEDULED ACTIONS MMMMM (CONTINUATION) l ACTION ITEM: OYSTER CREEK - INSTALLATION OF HARDENED HETWELL VENT- (GL 89-16) l M74875 B112 10/30/89 1 PD14 DROMERICK j
l PD12 THADANI ACTION ITEM: DYSTER CREEK - USI A-47
' SAFETY IMPLICATIONS OF CONTROL SYSTEMS (GL 89-19)
M74973 B113 2 PD23 JABBOUR PD14 DROMERICK ACTION ITEM: OYSTER CREEK - DRYWELL INSPECTION PROGRAM M75064 09/29/89 2 PD14 DROMERICK I
/ Y 7~
ACTION ITEM: OYSTER CREEK - TSCR-175 INDEPENDENT CONTROL ROOM HVAC M75210 10/18/89 3 PD14 DROMERICK f
SPLB NICHOLS EMTB PARCZENSKI j
MMMM COMPLETED ACTIONS MMMM ACTION ITEM: OYSTER CREEK - TSCR - 167 DELETION OF ORGANIZATIONAL CHARTS AND FACILITY STAFF SUALIFICATIONS M67593 D023 03/22/88 A
.3 PD14 DROMERICK 06/30/89 07/31/88C 18/11/89P 10/11/89C CANCELED 1 C 8/11/89 ACTION ITEM: OYSTER CREEK - CONTROL ROOM HABITABILITY RESPONSE TO REQUESTFOR ADDITIONAL INFORMATION M73235 05/16/89 3 'PD14 DROMERICK 10/18/89C 19/95/89C C
PRPB LEE 10/93/89P
' II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED ACTION ITEM: OYSTER CREEK - RPS PONER SUPPLY M07147 C011 08/07/78 1'
SICB AHMED 93/30/83P 83/30/83C 12/01/87T S:
SELB KNOX 04/03/81X DGCB MACKAY 94/98/83X ACTION ITEM: OYSTER CREEK - MARK I CONTAINMENT LONG TERM PROGRAM IMPLEMENTATION M07944, D001 10/01/79 L 1 SORI ELTANILA 91/13/84P 01/13/84C 12/91/88([r Q
I P
W v
v e y +~
-+%g m.
p
.cy,'
y
~
j
.R-1208673-001 REOULAT0RY I N F-0 R M A T.I O N
.T T A C K I N @ - SYSTEM.
PAGE NB. _'28 DIVISION OF DRP LICENSING R 1RUN BATES ~'12/96/d PROJECT MANAGER REPORT
( HEA D90 ART ERS ) -
FACILITY: OYSTER CREEK 1 St T
MULTI Y
P.
RAI LICENSEE TE TAC PLANT APPL P-REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT At NUMBER ACTION DAlf E
BY
- 1. AfLGH RJVIENER RAI DATE DATE BATE CENF RATE DATE CelW1ENTS
- .11 II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED
- (CONTINUATION)
ATRP. DON 0 HEN 81/13/84C ACTION ITEM: OYSTER CREEK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN M08100 A002 07/11/78 A 3 ATRP DONONEW '
08/13/86 10/07/86C 10/07/84C 12/91/88(('
94 PRPB MEINKE 96/26/85C ACTION ITEM: OYSTER CREEK - BHR FEEDHATER 8 CONTROL ROD DRIVE N0ZZLE CRACKING M08411 B025 08/30/78 1
ENTS HAZELTON 83/82/76 87/01/79P 83/19/82C 12/91/98L 94 ACTION ITEM: OYSTER CREEK - CONTAINMENT LEAK TESTING - APP. J (GENERIC)
M08678 A004 08/04/75 2 SPLB PULSIPMER 83/03/82P S3/93/82C 11/91/87(I 94 ACTION ITEM: OYSTER CREEK - CONTAINMENT LEAKAGE DUE TO A VALVE SEAT DETERIORATION M10287 B020 12/01/78 3 PD21-REEVES 12/81/79C S1/16/81C 12/91/877 94 ACTION ITEM: OYSTER CREEK - MASONRY HALL DESIGN. RESPONSE TO IE BULLETIN 80-11 M42914 B059 05/08/80 L 2 ATRP DON 0 HEN 08/14/85 12/25/850 12/23/85C ~ 12/01/88(L* CYCLE XI O 94 SORR CHOKSHI 11/22/85C UTAGE ACTION ITEM: DYSTER CREEK - HIND LOADS M49392 10/01/82 L 1 PTSB PERSINKD 07/05/85X 03/08/86C IPSAR 4.3.
94 PD43 MICHAELS 86/97/85X 1-7 OITEMS PTSB MCKENNA 03/14/86C ATRP DON 0HEH 93/18/86C EMEB CHEN 03/98/86P ACTION ITEM: OYSTER CREEK - EMERGENCY CONDENSER ISOLATION M49397 10/01/82 L 1 ATRP DON 0HEH 11/25/36 01/16/87C 12/24/86C 12/01/88T IPSAR 4.10. 94 q
(2)
ACTION ITEM: OYSTER CREEK - DESIGN CODES AND STANDARDS M49399 10/01/82 L 1 PD43 MICHAELS 05/30/86 06/28/84 96/07/85X 10/29/86C IPSAR 4.12 94
-PTSB PERSINKO 07/85/85X
^ TER PROB EMEB CHEN 10/29/86P
~
PTSB MCKENNA 07/25/86X t.
I-1208673-801 R'E 0 U L A T.O R.Y-I'N F 0 R M A'T I'@~N
~T R A C K.I d.C' iS Y S: TEM PAGE NS.*
2 91 DIVISION OF-DRP LICENSING R RUN BATE -12/06/81 PROJECT MANAGER REPORT
- (HEADQUARTERS )
FACILITY: OYSTER CREEK 1 SC T
MULTI Y
P RAI LICENSEE TO
-TAC PLANT APPL P PLANNED R
REV
RESPONSE
SE INPUT COMPLETION ' IMPLEMENT
^AD DRSM REVIEHER RAI DATE DATE DATE BATE BATE COPNENTS Ig JUMBER REFERENCE D_Alf g ACCOMPLSH 1 R
A (CONTINUATION)
Munu NOT SCHEDULED ACTIONS unnum LCTION ITEM: OYSTER CREEK - PROJECT MANAGEMENT ADMINISTRATION 140265 03/15/89 15211 2 PD14 DROMERICK iCTION ITEM: OYSTER CREEK - NRR VITAL AREA DEFINITION REVIEH 168420 06/20/88 1711 1 RSGB MENDELSOHN-11/21/88C PD14 DROMERICK iCTION ITEM: OYSTER CREEK - NONCONFORMING PIPING MATERIALS (BULLETIN 88-85)-
168801 X805 07/18/88 L 12121 2 EMEB KUD 89/12/88 92 PD14 DROMERICK RSIB JACKSON 87/03/89C iCTION ITEM: OYSTER CREEK - BULLETIN 88-08: THERMAL STRESSES IN PIPE CONNECTED TO RCS 92 169662 X808 08/19/88 12121 2 EMEB. HARTZMAN
. 11/12/88X PTSB PASTIS
,CTICH ITEM: OYSTER CREEK NONCONFORMING MOLDED - CASE CIRCUIT BREAKERS (BULLETIN 88 - 18)
^
/![f([
('/
171329 X810 04/03/89 12121 2 PD14 DROMERICK 04/03/89C
/
-82 PD12 STONE
)
.CTION ITEM: OYSTER CREEK LICENSEE PERFORMANCE EVALUATION 172330 1213 1 PD14 DROMERICK
.CTION ITEM: OYSTER CREEK - HEADQUARTERS FOCAL POINT FOR INFORMATION AND COMMUNICATIONS 172449 03/08/89 15211 1 PD14 DROMERICK
.CTION ITEM: OYSTER CREEK - SALP REPORT PREPARATION AND MEETING ATTENDANCE 172569 1231 1 PD14 DROMERICK
.CTION ITEM: OYSTER CREEK - POWER OSCILLATIONS IN BHR'S, BULLETIN 88-07, SUPPLEMENT 1 172792 X807 03/14/89 12121 3 PD33 LYNCH 03/14/89C
- B'e.
^
PD14 DROMERICK 6
e 0
~
~^
- .n (i t-1208673-001.
-R'E G U L A T 0 R Y.
.I'M F O.R M:A T I O O-T-Q A C K I Q O'
'S'_Y S T E M
'PAGE NO.t. 2 91
-DIVISION OF DRP LICENSING R^
RUN BATE 8'.12/964 PROJECT MANAGER REPORT
- (HEAD 9UARTERS) t
-FACILITY:LOYSTER CREEK 1 T
MULTI Y
P RAI SC
' TAC PLANT APPL P-PLANNED R
REV-.
RESPONSE
SE INPUT. -
LICENSEE TS C0fFLETION IMPLEMENT A0
- 4 UMBER REFERENCE DATE E~ ACCOMPLSH 1 ORGN REVIENER RAI DATE DATE BATE
BATE BATE C0f91ENTS
.Ig i
muun NOT SCHEDULED ACTIONS Mumww
-(CONTINUATION)
!tCTIEN ITEM: OYSTER CREEK - GENERIC LETTER 89-13 REGARDING MATER SYSTEM PROBLEMS' i174036 L913 12122 1
PD14 DROMERICK PD11-CHU
- LCTION ITEM: OYSTER CREEK - POWER REACTOR SAFEGUARDS CONTINGENCY PLANNING (GL 89-07) i174704 L907 12122 4 PD13 LEEDS PD14 DROMERICK
!f 7,(([
.gi i
RSGB MENDELSOHN
! 174782 A025 10/03/89 2 PD21 HAYES 10/03/89C 92 PD14~.DROMERICK
- tCTION ITEM: OYSTER CREEK - SEP TOPIC III-1 IPSAR SECTION 4.2
- 175092 09/29/89 1251 3 PD14 DROMERICK g
- g i
j
?
1 l
4 m
9 a
9
~ _,
~
,.. _.. ~. -
' A ~A t /r 3 W ^* f $
OPEW ff94
/7EMLS' W
. no.
IPSAR item Title /descriptian section J f#/~M 111-1 4.2 Classification of 3.2 vA'poe 57'#F Structures, Components,
<f &<#v. rd,tW/
and Systems 6p.y/ene,e pf,w III-2 Wind and Tornado Loadings-4.3.1 Reactor Building Steel 3.3
// <ts/a r c'
- U^ #-
Structure Above the Operat-pf;,,,, ye A//////
ing F1oor 3y,.,,,gy /y/c%.uyll/rj; 4.3.7 Intake Structure, Oil 3.3 fy. f.jpjy,,/. g, f -
Tanks, and Diesel Generator Building 4.3.8 Load Combinations 3.3
/ < < v//J e e 7 ## ##~ #
/x n es</ n a ' lib ib 'Iff 4.3 Control Room / Architectural 3.3 j, ff,,,,,.-,,,
f,.,j,,f, f-Components
,,,,r,,,,,
III-4.A-Tornado Missiles 4.6.1 Emergency Diesel Generators 3.5.1.1 veW4' J /<///de<a and Fuel Oil Day Tank r4#e.fr dev/ e e//
Dard FdJ.ij;ietc 4.6.2 Mechanical-Equipment Access
- 3. 5.1. 2 j,7 g,,.y g,, f,,j,,,,, y inJaist.rfirs>./*ei. 7&/11e 4.6.4 Condensate Storage Tank, 3.5.1.3 g g g,,jg.,.,j.,t,g, f Torus Water Storage Tank, and Service Water and Emergency Service Water Pumps III-5.B-Pipe Break Outside Containment 4.10.2 Emergency Condenser Isolation 3.6.2 t/<vince /lf. fs4,,f III-6 Seismic Design Considerations
/Nj///s 4.11(2)
Mechanical Equipment 3.7.1 4'^ ' (d #d O /~NC Ym'ci r cniM Mrs <t/J6f c
4.11(5)
Qualification of Cable Trays 3.7.1 Sev a, e. suo,g g,
/ M #ffet:</s, eg,,4'-
III-7.B 4.12 Design Codes, Design Criteria, 3.8.1 Load Combinations, and Reactor
/ / < e n s e e r, s. <,,,, r Cavity Design Criteria
,,v sg,,,,,y,,. g, V-10.B 4.18 Residual Heat Removal System 5.4.2 Reliability (Tornado) fed //c%, M /, /'
1 3-s
! [-
?' : 4.-
1;.-
T Cipp / Tevi
/ W M.T frew figuer/
~
i SEP topic-SER
.no.-
IPSAR item Title / description section
$7"</v5
)
i VII-1.B
- 4.28 Trip Uncertainty and Setpoint 7.1. 3
,t e cev/se c- /' c Analysis Review of Operating
- s 4sa,r a v,,,,,,4,,
1 Data Base
& t.. N, //pf VII-3 4.30 Systems Required for Safe
- 7. 3 fe'e> //es. M/, /
Shutdown (Tornado) _
NRC IE Bulletins 79-02 and 3.9.1
/ e < < /,/< e 6.reA,,i 79-14-(Seismic)
/s.s n y,<w 4,4 - <?N cic$'tig9e d rp r,. nix R t.
VI-5 Combustible Gas Control
- 6. 5 6 Gec fre w /W m.
Control Room Habitability 6.6;
- # "^'^'## /e / Vt 1/
and Generic Letter 83-36 App.
B,.
t wde/ H, y y j e,,,c,.
III. D. 3. 4 rds:si., a i, pi yg.~.
W *%rs't//1/' //$f Abnormal Transient Operator App. B, Guidelines I.C.1.3a Ch5ed
///uc.,/6 9 Detailed Control Room Design App.
B,-
0 4'. U C u.< 0' m,.: s,
Review and Summary Report I.D.1.1 Sc rff,.f,9 <x,,,
,.,t /
Safety Parameter Display System APP. B, p,ratW #4TJ 1.D.2
/w/e s. 4ce.wp c wne Additional Accident-Monitoring App. B, A g n u fe e./,.
rum t ion and Generic II.F.1 yg, M'/ ?$/'f fd i
4 i
I It '
n
+
E.E "
y, Syc. fr3 Wc' k e
y NRC/GPUN MEET 8NG JANUARY 3, 1990
/) k he'k'd////9 $V Y'*jf
'Y 9-o TSCR No. 180 Removal of cycle - Specific Parameter Limits from Technical Specifications (Generic Letter 88-16)
Submittal to be made in January 1990 L
o-ATWS Diversity Issue GPUN activities related to project design, procurement, etc are on hold pending NRC/BWROG resolution. Modification; if required, cannot be implemented-any sooner than 14R refueling outage.
Identified in. Integrated Schedule submittal dated December 22, 1989.
o IGSCC Insoection Plan j
Submittal on November 16, 1989 discussed inspection criteria for Reactor Water Cleanup system outboard of the second containment Isolation-Valve.
Heating to take place on January 10, 1989 between GPUN/NRC to discuss scope.
-l l
\\.
i Submittal will follow as identified in November 16, 1989 correspondence during January 1990.
l o
TSCR No. 181 Elimination of eight main steam safety-valves during 13R.
.i TSCR submitted on December 18,-1989.
{
o Feedwater & Control Red Drive Return Line Nozzle'Insoeetion j
i
-State of the Art UT can replace'PT examinations.
)
l i
GPUN will identify the change in NUREG 0619 commitment via correspondence to be submitted in January 1990. -Submittal will justify the use of UT in leiu of PT.
p
.i o
Installation of Hich Water-Trio Currently determining if installation is required.
Earliest possible installation date would be 14R and would be l-reflected in next Integrated Schedule submittal.
4 C320441 1
t'
(([':f~
c!
t g
4
- 3..
2
?
/ 3 2 re-f+ i /1a.1 fc f a. <1 c //iroi s g a.j,,,id _
i o-Surveillance Extension
-e j
l}
(. ~ '
Extension requests for all surveillances will be submitted end of j
January 1990.
Submittal will identify which ones are needed to continue operating until outage start date of January 11, 1991.
p L
I T
?
- l l
t C320441
g y
i Ik II hI 1208673-001~
R E O U't A T 0 R Y I N F'O R M 'A TLI O N T R A'C K I N O SYSTEM PAGE R4.8 '283 DIVISION OF DRP LICENSING R RUN DATE: 12/06/89 PROJECT MANAGER' REPORT '
CHEAD90ARTERS)
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
'P RAI LICENSEE TO
'AC PLANT APPL P REVIEWED -R
-REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT
~ IE
- AB ISER ACTION PAlf f
BY I R!LQH REVIEMER RAI DATE
-DATE DATE' COfF BATE BATE C0f91ENTS OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (CONTINUATION)
RVIB CHALINA D6/22/84X.
ATRP DONOMEM 10/29/84C PD44 CHENG-10/29/86P ION ITEM: OYSTER CREEK - LEAKAGE DETECTION 401 10/01/82 L 1 PTSB MCKENNA 06/30/85 98/23/85 04/27/84X 81/96/86C IPSAR 4.16 94 ATRP DON 0 HEN 01/86/86C PD43 MICHAELS 06/07/85X IOP ITEM: OYSTER CREEK - NATER PURITY SPECIFICATION 404 11/01/82 L 1 PD43 MICHAELS 89/18/84 96/87/85X 11/21/85C 11/01/85T IPSAR 4.29 94 PTSB MCKENNA 94/27/84X RG 1.56 jzfg..g, ATRP DONOMEN 11/21/85C ION ITEM: OYSTER CREEK TS CR NO. 148 - COOLANT ACTIVITY 412 12/01/83 L PM 3 PD43 MICHAELS 94/30/88 96/30/87C 96/97/85X 09/12/88C o
CIPSAR 4.36 94 PD14 HERNAN.
08/26/88X SUBMIT TS PD14 DROMERICK 10/14/88C ATRP DONOMEN 99/12/88P PRPB MEINKE 96/19/87X ION ITEM: OYSTER CREEK - FINAL RULE ON INTERIM REQUIREMENTS RELATED TO N2 CONTROL - REVIEW OF EXEMPTION RE9UEST 196 12/01/83 E 1 ATRP DON 0 HEN 04/22/86 04/29/85C 08/89/84C 08/09/84C 04 SPLB LICCIARDO 88/99/84X TTP0 HEARN 10/10/86X RSB HIGDOR 88/99/84P PMSB RUTH 08/89/84P DDN ITEM: OYSTER CREEK 1 - I.D.1.1 - DETAILED CONTROL ROOM DESIGN REVIEN PROGRAM PLAN F-98 85 F008 04/04/83 L LPEB RAMIREZ.
07/01/83 OS/92/86C 10/10/84C 12/01/88L 94 ATRP DONOHEN' 19/19/84P LPEB RAMEY-SMIT 92/91/84C PD41 DICK 10/10/84P DN ITEM: OYSTER CREEK - REVIEW OPERATIONAL 90ALITY ASSURANCE PLAN
'50 05/23/83 PD43 LOMBARDO-08/91/83P 87/16/85C 04 1
M R-1208673-001 R E G U L'A T O R Y INFGRMATION.TRACKINO
-S Y S T.E M PAGE NO.
2E DIVISION OF DRP LICENSING R
-- RUN BATE
- 12/06/E
~
PROJECT MANAGER REPORT
. (HEAD 9UART ERS)
FACILITY: OYSTER CREEK 1
. SC T
MULTI Y
P RAI LICENSEE TE TAC PLANT APPL P' REVIENED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AE NUMBER ACTION RALE E
BY I ORGN REVIEHER RAI DATE-DATE DATE COMP BATE BATE COMMENTS l ))
(CONTINUATION)
II. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED ACTION ITEM: OYSTER CREEK - SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA M52482 10/05/83 X RGN 3 PD14 DROMERICK 99/92/88C 88/17/88C IPSAR TIA 94 ATRP DON 0 HEN 98/17/88P REGION I PD43' MICHAELS 86/07/85X ACTION ITEM: OYSTER CREEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52863 B077 11/01/83 L TS 2 SICB RHOH
.97/95/85 94/95/85C 93/31/89C 95/27/89C 12/91/88L 92 SICB LASHER 05/27/89C PD14 DROMEPICK 94/12/89C ACTION ITEM: OYSTER CREEK 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS - RTS COMPONEN M52944 BO78 11/01/83 L RGN PD14 DROMERICK 92/28/86C 03/94/88P 95/91/88C 96/91/88T 84 ATRP DON 0 HEN 03/94/88P ACTION ITEM: OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPOWENTS M53025 5079 11/01/83 A SICS LASHER 97/05/85 94/05/85C 93/31/86P 93/31/86C 12/01/87T 94 ATRP DON 0 HEN 03/31/86C ACTION ITEM: OYSTER CREEK - REVIEW ADMINISTRATIVE TS CHANGE RE90EST FOR CLARITY 8 FORMAT ONLY-MS3411 12/08/83 A ATRP DON 0 HEN 98/30/85 97/10/85C 97/10/85C 98/01/89T UPDATE TS 94 RE9UEST ACTION ITEM: OYSTER CREEK - ISOLATION CONDENSER PIPING CRACK FAILURE ANALYSIS M54987 EMTB HAZELTON-09/19/84C 09/29/84C 12/91/88I3 04 REG 1 HAVERKAMP 11/93/84X TTPE SMITH 09/19/84C EMTB KOO 99/19/84C ATRP DON 0 HEN 99/29/84C OYSTER CREEK - REVIEN T/C CHANGE RE9. TO REVISE ACCEPTANCE CRITERIA FOR COMBINED LEAKAGE RATE OF ALL PENETRATIONS ACTION ITEM:
M55988 09/25/84 ATRP DON 0 HEN 07/31/85 98/26/85P 98/26/85C 11/91/87T WITHDRANS 94 RE90EST ACTION ITEM: OYSTER CREEK 1 - I.D.1.2 DETAILE'D CONTROL ROOM DESIGN REVIEN
SUMMARY
REPORT - F-71 M56147,F071 10/22/84 LHFB HEST-10/01/86 02/91/88P 92/91/88C 19/31/99T 19/99/85 M 94 w-re--.
o r'
.I,
- R-1208673-001 R E G UfL;A T O R Y-
.I N F O'R M A T-'I O N T R A'C K 1-C O S Y S TlE M" PAGE NO.t; 2h
^ l DIVISION OF DRP LICENSING R RUN BATE: 12/96/Si PROJECT MANAGER REPORT-2 1
- (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC:
MULTI
~ Y P
RAI LICENSEE TO l
TAC.
PLANT APPL P REVIENED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT AS l10MBER ACTION Ralg E
BY l ORGN REVIEMER RAI DATE.
DAT E BATE COMP BATE RATE' COMMENTS IE l11. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (CONTINUATION)
~
AIRP - DON 0 HEN-92/27/86C TG.
PD14 DROMERICK 11/39/86P PTSB PASTIS
'94/95/85X LPEB 'RAMEY-SMIT 95/02/86X LPEB RAMIREZ 11/30/86P hCTION ITEM: OYSTER CREEK - BWR VENT HEADER CRACKING - IE BULL. 84-91 jiS6952 02/10/84 ATRP DONOMEN 95/14/85C 95/14/85C 94 i
hCTION ITEM: OYSTER CREEK 1 - MARK 1 DRYMELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC LETTER 83-98
- 157161 D020 03/20/85 ATRP DON 0 HEW 05/30/86 94/11/85C 93/95/87C 03/95/87C 12/91/88I)-
D4 EMEB SHAN 82/12/87C PD31 LONG 98/23/85X' i
itCTION ITEM: OYSTER CREEK - REQUEST FOR SCHEDULAR EXTENSION OF SURVEILLANCE CAPSULE ANALYSES ii57333 03/21/85 EMTB ELLIOT 84/26/85C 96/12/85C 04:
ATRP DONOHEN 96/12/85C itCTION ITEM: OYSTER CREEK - GL 84 EXEMPTION REQUEST TO 50.44(C)(3)-RECOMBINER RULE i158018 07/13/84 SPLB KUDRICK 05/30/86 94/10/86C 01/10/86X 93/13/87C 12/01/87T SEE M57758 94' TTP0 HEARN-91/16/87C OTSB SCHULTEN 03/13/87P ATRP. DON 0 HEW 93/13/87C
- \\CTION ITEM: DYSTER CREEK - NEW ANALYSIS OF MAXIMUM DRYNELL TEMPERATURE PRIOR TO LOCA fiS9052 07/02/85 SPLB NOTAFRANCE 08/01/85 08/14/85C 11/22/85C REQUESTS T 94i ATRP-- DON 0 HEN 11/22/85C S
4 31CTION ITEM: OYSTER CREEK 1 - 10 CFR 50.62 OPERATING REACTOR REVIENS
- 459122 A020 06/28/84 ATRP DON 0 HEN 10/13/85 10/94/85 11/19/86C 11/19/86C 12/91/88C GENERIC DH 94!
DEAR KARSCH 11/01/85X ROG SER SICB MAUCK 99/05/86X-DEAR KENDALL 98/22/86X' SICB' LI 19/97/88 4CTION ITEM: OYSTER CREEK - REVIEH OF DELAMINATION OF COATING FROM PIPING IN EMERGENCY SERVICE HATER
{i59282 BHPS HULMAN 91/96/86P 91/96/86C 12/9./88T RE9UESTS L 94:
w a
,me
=e-,-
+-,e,-
e r
{PT
%+y g
4 =r y
w+
r4e'1 4
m#WFe
t,%..-
.~ 1208673-001
.R E G U't A T 0 R Y I N F 0 R'M"A'TLI'O M LT R ' A C K I (3 0. SYSTEM PAGE NO.8' '
28d DIVISION OF DRP LICENSING R RUN DATES - 12/96/81 i-PROJECT MANAGER REPORT.
-(HEADQUARTERS)'
I FACILITY: OYSTER CREEK 1 T
SC MULTI
. TAC PLANT
' APPL.
Y P
RAI LICENSEE-TO P -REVIEHED R.
REV
RESPONSE
SE INPUT-LIC ACT IMPLEMENT
. AD jUMBq ACTION PAJE E
BY
' IE R
I. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED (CONTINUATION)
EMIB HITT 09/29/85X ONG TERM ATRP -DONDHEN 81/96/86C PD23 KIRSLIS 12/21/85X CTION ITEM: OYSTER CREEK - DELETE DAILY CHANNEL CHECK FOR INSTRUMENTATION TO BE INSTALLED IN 10M DUTAGE
-59814 09/30/85 ATRP -DONOMEH 11/30/85C 11/30/85C 94 CTION ITEM: OYSTER CREEK - CANCELLATION OF UPGRADE OF NITROGEN VENT AND PURGE SYSTEM 59829 09/24/85 BNPS-HULMAN 06/30/86 04/10/86C 01/28/86X 95/05/86C 12/01/87T STAFF POSI 94 TTP0 HEARN 12/12/86X TION SORI ELTAMILA 12/06/85X SPLB KUDRICK 94/25/86X ATRP DON 0 HEN 85/05/86C
'CTION ITEM: OYSTER CREEK - COMPLY HITH LICENSED REACTOR OPERATORS STAFFING REGUIREMENTS IN 10CFR59.54(M)(2) j60155 11/07/85 ATRP DONOMEN 02/28/86 03/03/86 05/12/86P 85/12/86C NEN SUBMIT 84 TAL IN l
CTION ITEM: OYSTER CREEK - DEFERMENT OF FEEDWATER N0ZZLE INSPECTIONS FROM CYCLE 11R OUTAGE TO CYCLE 12R OUTAGE '
60242 11/20/85 EMTB HAZELTON 02/24/86C 92/24/86C 12/01/88T 94 EMTB TSAO 91/14/86X ATRP DON 0 HEN 02/24/86C PD12 RIVEMBARK 03/97/86X CTION ITEM: OYSTER CREEK - BHR STEADY STATE PHYSICS RELDAD REPORT TR021 61169 05/25/86 ATRP DONOHEN 02/28/87 09/22/87P 07/01/87C 12/91/88T TELECOM RA. 94 SRXB RICHINGS 09/03/87C I SENT CTION ITEM: OYSTER CREEK - IPSAR 4.1 - SEP TOPIC II.3.B. FLOODING POTENTIAL AND PROTECTIDM REGUIREMENTS 61327 04/21/86 ATRP DON 0 HEN 11/28/86C 11/28/86C 12/S I/88T 94 CTION ITEM: OYSTER CREEK - CHANGES TO PIPING INSPECTION APPROVED FOR GL84-11 (MPAlB-84) 61967 07/08/85 ATRP DON 0 HEN 99/05/86P 09/05/86C 12/01/88T 94 CTION ITEM: OYSTER CREEK - IPSAR 4.16.1 - LEAKAGE DETECTION SYSTEMS USING DRYMELL RADI0 ACTIVITY MONITORING 61968 07/08/86 L PM 3 ATRP DON 0 HEN 03/12/87C 09/99/88C 12/01/90T 94
~
s 208673-001 R E G'U.L A T 0 R Y INF'ORMATIOQ TRACKIQO-SYSTEM
.PAGE No.8 -287; DIVISION OF DRP LICENSING R RUN DATES. 12/96/89 PROJECT MANAGER REPORT
-(HEADQUARTERS)
FACILITY:.0YSTER CREEK 1 T
SC MULTI' Y
P RAI LICENSEE TO
.~ AC ' PLANT APPL P REVIEHED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT
- AD 1 Bgg ACTION RAlg g
BY 1 ORGN REVIEMER RAI DATE DATE DATE COFF DATE BATE COFW9ENTS IE 0THER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENigg (CONTINUATION)
PD14 DROMERICK 09/09/88C
" ION. ITEM: OYSTER CREEK - POSTULATED HIGH ENERGY LINE BREAK HITHIN EMERGENCY CONDENSER DRYMELL PENETRATIONS
!860 09/17/86 TTPE HERMANN-11/25/86 12/24/86P 12/24/86C 12/01/88T 94 - >
ATRP -DON 0 HEN 01/16/87C l
EMTB TSAO 12/24/86P EMTB CONRAD 12/19/86C
}
PION ITEM: DYSTER CREEK - LONG TERM CORRECTIVE ACTION FOR DELAMINATION OF ESH PIPING COATING
-!976 09/15/86 L PM 4 ATRP DONOHEN 06/09/87X 04/28/89C INSP RPT 5 94 PD14 DROMERICK 04/28/89P O219/8904 TION ITEM: OYSTER CREEK - VISUAL HELD ACCEPTANCE CRITERIA I
1311 10/14/86 1 EMTB TSAO 03/03/87P 03/03/87C 04 ATRP DON 0 HEN 03/03/87C IION ITEM: DYSTER CREEK - IE BULLETIN 86-02-SOR SWITCHES IN CORE SPRAY B00 STER PUMP AND REACTOR BUILDING TORUS VACUUM
$312 09/23/86 1 ATRP DON 0 HEN 01/16/87C 12/15/86C 12/01/87T 84 fl0N ITEM: OYSTER CREEK - CORROSION OF OUTER THICKNESS OF LOWER REGION OF THE DRYNELL SHELL 1016 12/18/86 1
EMTB HITT 12/29/86P 12/29/86C 12/Of/88T 84 EMTB LITTON ESGB TAN 12/24/86C BHEB TUROVLIN 12/24/86C 3
EMTB CONRAD 01/15/88X a
i TTPE HERMANN 12/29/86P ATRP DON 0 HEN 01/16/87C IION ITEM: OYSTER CREEK - TSCR-158 - LICENSEE RESPONSE TO GL-84-11 ITEM "B"
- 5100 03/17/87 A TS 3 SICS-LASKY 11/25/88X 05/23/89C 04 PD14 DROMERICK 05/23/89P IION ITEM
- OYSTER CREEK - RELOAD TOPICAL REPORT - 033 5138,
04/15/87 L TSK SRXB RICHINGS 10/01/87 11/01/87C 03/21/88P 03/21/88C 12/01/88T 84 PD14 DROMERICK 03/25/88C
}
i i
6
-4 x
m c a
w c
r-4et--.c-v
-aem
- un w-e
1208673-001-REGULATCRY' INFORMATIGN T.R A C K I O @
S Y S'T E M PAGE NO.s 288.
RUN BATE: 12/96/89 DIVISIDM OF DRP LICENSING R PROJECT MANAGER REPORT (HEAD 9UARTERS)
FACILITY: OYSTER CREEK 1 SC -
T MULTI Y
P RAI LICENSEI' TO IAC PLANT APPL P REVIEMED R REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT-
.AB:
4BER ACTION RAlg g-BY 1 RR9]l REVIEMER RAI DATE DATE DATE COMP BATE DATE _ C0fWEENTS IE (CONTINUATION)
OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED IION ITEM: OYSTER CREEK - RELOAD TOPICAL REPORT - 040 3139 04/15/87 L TSK' SRXB RICHINGS 10/01/87 11/01/87C 93/21/88P 93/21/88C 94 PD14 DROMERICK 93/25/88C DYSTER CREEK - RESOLUTION'0F DRYNELL SHELL POTENTIAL DEGRADATION OF MARK I DRYMELLS - GL 87-95 3448 05/12/87 o
TS 2 PD14 DROMERICK 04/30/88 91/15/87C 11/19/88C 10/26/88C 94 IION ITEM:
ESGB-TAN 19/26/88P IION ITEM: OYSTER CREEK - REVIEW RESPONSE REGARDING.10 CFR 50.62 ATHS RULE 94 5126 09/05/87.L TSK 1
SRXB MCC0Y 07/30/89 06/30/89C 08/26/88X 11/94/88C SICB LI 11/94/88P PD14 DROMERICK 11/94/88P TION ITEM: OYSTER CREEK - SAFETY LIMIT VIOLATION 5289 09/20/87 L PM SRXB THDMAS 10/14/87C 11/96/87C 94 PDl4 DRDMERICK 11/96/87F OYSTER CREEK - RVN LIC'S RE9 TO USE A VISUAL INSP. TECHNIQUE 8 ELIM THE REe TO DOCKET INSP RSLTS RE CORE SPR 5227 05/13/88 L TS 3' EMTB K00 11/97/88P 11/97/88C 11/15/88T 94 TION ITEM:
PD14 DRDMERICK 11/07/88P OYSTER CREEK - RVN REG TO CHG ENDPT OF 10 YR INTVL FOR ISI INSP'S. 8 5 CMGS TO THE EXISTING CODE REGUIREMENTS 3267 05/20/88 L TS 3 EMTB LITTON 03/96/89P 93/06/89C 12/15/88T 94 IION ITEM:
PD14 DRDMERICK 93/15/89C IION ITEM: OYSTER CREEK - TSCR - 172 MSIV TEST FREQUENTLY 1496 06/21/88 A PM 3 PD33 HALL 18/12/88P 10/12/88C 94
-PD14 DROMERICK 19/12/88P IION ITEM: OYSTER CREEK-- GL 87 SEISMIC 90ALIF. OF MECH. 8 ELEC. E901P. IN OPERATING PLANTS 7467 5105 09/29/88 L
'2 EMEB CHEN 01/31/92 19/13/88 95/19/89P 95/19/89C 12/38/92T 91 PD14 DROMERICK 05/19/89P PD13 SEARS
.05/19/89P O
e m
-m i
iII is 8
% W g
1208673-001 R E G U L'A T-0 R.Y I'N F G R M A T I O N T'RACKINo S Y - S T E" M '
PAGE NON '289 DIVISIDN OF DRP LICENSING R
_RUN HATE 1f2/06/89 PROJECT MANAGER REPORT-(HEADQUARTERS)
FACILITY: OYSTER CREEK 1 SC' T
MULTI Y
P RAI
~ LICENSEE 79-TAC PLANT APPL P-REVIEffED R ' REV
RESPONSE
SE INPUT LIC ACT IMPLEMENT A9
_DAlg E
BY 1 gggN,8 REVIEHER RAI DATE DATE DATE' Coff BATE DATE COfflENTS "IE gig ACTION
. OTHER COMPLETED LICENSING ACTIONS NOT YET IMPLEMENTED' (CONTINUATION)
IION ITEM: OYSTER CREEK - TSCR-174, ADDS ~ A REFERENCE TO NOTE LL IN STARTUP MODE FOR HIGH REACTOR PRESSURE SCRAM FUNCTION 3508 09/28/88 A PM 2 PD14-DROMERICK 12/24/88P 11/f8/88C 94-TION ITEM: OYSTER CREEK APP. G. CONFORMANCE USING REV. 2 0F R.G. 1.99 (GL-88-11) 1525 A023 07/26/89 2 PD31 DEAGAZIO 07/26/89C 05/30/89C 88/19/89C D4 PD14 DROMERICK 09/99/89C IION ITEM: OYSTER CREEK - HIGH RANGE MONITORS USED IN RAGEMS 1976 12/01/88 L TS 3 PD14 DRDMERICK 07/27/89C 98/01/89P 98/81/89C SCNEDULE U 84 PRP8 MARTIN 88/Sf/89P NKNONN TION ITEM: OYSTER CREEK DRYMELL CORROSION 2029 02/09/89-L TS 2 PD14 DROMERICK 04/28/89P' 04/28/89C e4 ESGB TAN 04/13/89 4
W 9
R'E G U L'A'T'O R-Y' I N F 0 R M~A T I'O N
-T-R A C K I N G SYSTEM
- PAGE NO2 2 -299
~
673-001 RUN DATE: 12/06/89 DIVISION OF DRP LICENSING R PROJECT MANAGER REPORT
- ( HEAD 9UART ERS )
FACILITY -DYSTER CREEK 1 SC RAI LICENSEE TO T
MULTI Y
P PLANT APPL P PLANNED
'R REY
RESPONSE
SE INPUT COMPLETION IMPLEMENT AD REFERENCE DAT.E E ACCOMPLSH I ORGN REVIEHER RAI DATE DATE DATE DATE DATE C0ff1ENTS -
IE HER ACTIVE AND COMPLETED ITEMS IN FY (OTHER THAN LICENSING ACTIONS) u ACTIVE ACTIONS NNNM OYSTER CREEK - II.3.B.-FLOODING POTENTIAL AND PROTECTION REQUIREMENTS 03/06/83X FBf3fP897 02 ITEM:
L 1S11 3 PD14 HANG PD14 DROMERICK 07/08/83C
/-
EHEB CHERY 09/30/83X ESGB STALEY HFIB FROELICH.
03/26/82X EMTB K00 OYSTER CREEK - III.S.A-EFFECTS OF PIPE BREAKS ON STRUCTURES, SYSTEMS AND COMPONENTS INSIDE CONTAINMENT 06/23/80 L 1511 3 PD14 DROMERICK 05/01/88 07/27/88 1275tr89T SEE TAC OC 01
' ITEM:
D D
7 J/
7 06/29/82X 6
8 EMER CHEN-
/0/f//fo[
EMTB K00 06/26/87X EMEB LI ITEM: OYSTER CREEK - III.5.B-PIPE BREAKS DUTSIDE CONTAINMENT 06/23/80 L 1511 3 PD14 DROMERICK 05/08/88 07/27/88 12/11/89T SEE TAC OC 01 07/02/82C 035 PTSB MCKENNA I
/~ 06/22/82C 7/
PD14 BOYLE 06/22/82X EMER CHEN EMEB LI 96/26/87X fp j g N NOT SCHEDULED ACTIONS NNNNM U /7((I' TAC 49398 R JME" i ITEM: SEP SEISMIC REVIEN - DYSTER CREEK 84/20/78 06/23/80 1511 TMIP IGNATONIS EPLACES 02/27/81
[
E9B HOFMAYER 05/21/79 I///I II/.
ESGB TAN 04/01/81 EQB ASHE-08/28/80 DE LEVIN PD41 PAULSON 05/11/81 12/03/82 TTPE HERMANN 12/01/78 SOSP FRAHM 95/21/79 MEB STEPHENS 01/21/83 PD44 CHERG p
e Il
gy p-.
4,
-..e
~;..
- c, p
Fo Dl'STRIBUTION FOR NEETING
SUMMARY
DATED:
January 16,=1990 ri L
' facility:. 0yster Creek
- X 1J. Sniezek, 12/G/18
'PDI-4 Reading H
JStolz
- ADromerick:
.SNorris OGC 0
EdordanfNNBB-3302 L'>
NRC' Participants ACRS(10)
-i
. JDyer,17/G/21 -
- Copies sent to persons on facility service list n.
b
(:
~
g M
)
^
...