MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled ML20098A4861995-09-22022 September 1995 Proposed Tech Specs,Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20086G5691995-07-0606 July 1995 Proposed Tech Specs Section 3.8.3.1,Page 3/4 8-15 Re Footnote & Bases & Expansion ML20085G7171995-06-14014 June 1995 Proposed Tech Specs,Clarifying in Revised Bases of 3/4 Chapter 8,that Alignment of Standby Auxiliary Transformer Intended to Be Temporary Alignment & Will Be Utilized When Normal Preferred Offsite Power Source,Rat Unavailable ML20083M0731995-05-12012 May 1995 Proposed Tech Specs Revising SR 4.1.6.2 to Support Exemption from 10CFR50,App J Type a Test Schedule ML20083A1391995-05-0202 May 1995 Proposed Tech Specs,Adding Automatic Load Sequencer to Plant TS ML20082D9881995-04-0404 April 1995 Proposed Tech Spec Page 6-7 Reflecting Corrected Terminology Re Composition of Plant Review Board ML20081J5031995-03-17017 March 1995 Proposed TS 3.9.4 Re Containment Airlock Doors to Be Open During Fuel Movement ML20081D1591995-03-17017 March 1995 Proposed TS Table 3.3-8, Accident Monitoring Instrumentation, Deleting Loop Numbers 551,552,553 & 554 ML20082E7731995-03-0404 March 1995 Proposed Tech Specs Re Plant Review Board Composition ML20080N2451995-02-28028 February 1995 Proposed Tech Specs Pages Re Accident Montoring Instrumentation 1999-09-22
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G6571999-10-13013 October 1999 Proposed Tech Specs Pages,Revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2 ML20217B1221999-10-0404 October 1999 Proposed Tech Specs Pages,Revising TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 Re Prestressed Concrete Containment Tendon Surveillance Program ML20212F4891999-09-22022 September 1999 Proposed Rev to TS SR 3.8.1.13,to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5511999-08-30030 August 1999 Proposed Tech Specs,Raising Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7281999-08-26026 August 1999 Proposed Tech Specs Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be in IAW with Versions of LCO 3.0.4 & SR 3.0.4 as Noted in Rev 1 to NUREG-1431 ML20211E9111999-08-24024 August 1999 Proposed Tech Specs,Relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3181999-05-18018 May 1999 Proposed Tech Specs SRs 3.8.1.3 & 3.8.1.13 Reducing Loading Requirements for DGs ML20205S3791999-04-19019 April 1999 Proposed Tech Specs Revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS Instrumentation ML20205Q7901999-04-13013 April 1999 Proposed Tech Specs,Updating Versions of LCO 3.0.4 & SR 3.0.4 to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as Appear in Rev 1 to NUREG-1431 ML20154M9961998-10-15015 October 1998 Proposed Tech Specs,Deleting & Modifing Conditions Which Were Issued with Licenses That Are Now Obsolete ML20151U2011998-09-0303 September 1998 Proposed Tech Specs Pages for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Source Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236R4661998-07-13013 July 1998 Proposed Tech Specs Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protected Channels ML20154Q8611998-06-30030 June 1998 Proposed Tech Specs Bases Since Implementation of Improved TS on 970123 Through Aug 1998 ML20206N3131998-06-30030 June 1998 Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys ML20236F1631998-06-26026 June 1998 Proposed Tech Specs Revising LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20248K5801998-05-25025 May 1998 Rev 1 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20247K5041998-05-15015 May 1998 Proposed Tech Specs Pages Revising New Program 5.5.18 to Extent That Items B,C & D. Refer to LCO Action Statement & Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9471998-05-0808 May 1998 Proposed Tech Specs Section 5.5.7, RCP Flywheel Insp Program, Specifying Alternate Flywheel Insp Once Every Ten Years ML20216J4971998-04-16016 April 1998 Proposed Tech Specs 3.3.1 & 3.3.2 Re Reactor Trip Sys & ESFAS Instrumentation ML20199E5351998-01-27027 January 1998 Complete Replacement of All Typed Pages of TS Changes Submitted in Ltr LCV-0849-E ML20199A4131998-01-22022 January 1998 Proposed Tech Specs Adding Conditions for DG for Extended DG Completion Time of Fourteen Days ML20198P6961998-01-16016 January 1998 Revised Spent Fuel Pool Boron Dilution Analysis ML20216B2621997-12-11011 December 1997 Rev 14 to ODCM, for Vogtle Electric Generating Plant ML20199G3901997-11-20020 November 1997 Proposed Tech Specs Facilitating Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6651997-11-20020 November 1997 Proposed Tech Specs Pages Changing Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Revising Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20211N2451997-10-10010 October 1997 Proposed Typed Tech Specs Pages,Revising Credit for Boron & Enrichment Increase for Fuel Storage ML20217H9051997-08-0808 August 1997 Proposed Tech Specs Pages Re Credit for Boron & Enrichment Increase for Fuel storage.W/marked-up Pages ML20141A8541997-06-13013 June 1997 Proposed Tech Specs Revising LCO 3.4.10 to Reduce Nominal Set Pressure by 1% to 2460 & Increase Tolerance to +2% ML20148E6481997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Pump IST Program ML20148E6611997-05-15015 May 1997 Rev 0 to VEGP Units 1 & 2 Second 10-Yr Interval Valve IST Program ML20133L3081997-01-10010 January 1997 Proposed Tech Specs Table 3.3.1-1 Re Amends 96 & 74 ML20140J4591996-12-13013 December 1996 Rev 11 to ODCM for Vogtle Electric Generating Plant, ML20138F1001996-12-13013 December 1996 Revs 10 & 11 to ODCM, Part 2 ML20132C4711996-12-12012 December 1996 Proposed Tech Specs Re Physical Security & Contingency Plan ML20134J9841996-10-0808 October 1996 /Unit 2 Fuel Assembly Insp Program ML20117N5851996-09-13013 September 1996 Proposed Tech Specs 3.8.1 Re AC Electrical Sources ML20129A6461996-09-11011 September 1996 Proposed Tech Specs,Providing Updated Documentation for License Amends Application for Southern Nuclear to Become Licensed Operator ML20117C4151996-08-23023 August 1996 Proposed Tech Specs to Convert Units 1 & 2 Based on NUREG 1431 ML20117N6361996-06-17017 June 1996 Proposed Tech Specs,Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20117N6471996-06-17017 June 1996 Proposed Tech Specs Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20111A5501996-05-0606 May 1996 Proposed Tech Specs,Incorporating Extended DG AOT to 14 Days from Discovery of Failure to Meet Lco,Provided Standby Auxiliary Transformer Available ML20106H2391996-03-31031 March 1996 Rev 10 to Gap Security Dept Vogtle Electric Generating Plant Nuclear Security Training & Qualification Plan ML20101D4151996-03-0505 March 1996 Proposed Tech Specs Re Conversion Based on NUREG-1431 ML20100G0371996-02-19019 February 1996 Proposed Tech Specs Based on NUREG-1431 ML20097A3171996-01-30030 January 1996 Proposed Improved TS Based on NUREG-1431 ML20096G8241996-01-22022 January 1996 Inservice Insp Program, for VEGP-2 ML20095J2501995-12-22022 December 1995 Proposed Tech Specs,Allowing Use of Option B of 10CFR50,App J for Type B & C Testing ML20094N4071995-11-20020 November 1995 Proposed Tech Specs,Converting Existing TS to Format & Content of NUREG-1431 ML20093K2281995-10-16016 October 1995 Proposed Tech Specs,Adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J & Using Guidance of RG 1.163,Rev 0 ML20098C1471995-10-0202 October 1995 Proposed Tech Specs,Allowing Next Type a Test to Be Rescheduled 1999-09-22
[Table view] |
Text
. .. .- .- . , .- = - . - . . ~ . -
t ENCLOSURE-3 !
i V0GTLE ELECTRIC GENERATING PLANT I PROPOSED CHANGES-TO TECHNICAL SPECIFICATIONS AS A RESULT OF CENERIC 87-09 INSTRUCTIONS FOR INCORPORATION The proposed changes to the Vogtle Unit I and Unit 2 Technical Specifications would be incorporated as follows: -
Bgmove Pagg Insert Page 3/4 0-1 and 3/4 0-2 3/4 0-1 and 3/4 0-2 3/4 1-17 and 3/4 1-18* 3/4 1-17 and 3/4_1-18*
3/4 2-11* and 3/4 2-12 3/4 2-11* and 3/4 2 12 3/4 3-1* and 3/4 3-2 3/4 3-1* and 3/4 3-2 3/4 3-3 and 3/4 3 4 3/4-3 3 and 3/4 3-4 3/4 3-5* and 3/4 3-6 3/4 3-5* and 3/4.3-6 3/4 3-17 and 3/4 3-18* 3/4 3-17 and 3/4 3-18* <
3/4 3 19* and.3/4 3-20 3/4 3-19* and 3/4 3-20 3/4 3-21 and 3/4 3-22 3/4 3-21 and 3/4 3-22 3/4 3-23 and 3/4 3-24 3/4 3-23 and 3/4 3 24 +
3/4 3-27 3/4 3-27 3/4 3-27a and 3/4 3-28* 3/4-3-27a and 3/4 3-28*
3/4 3 45 and 3/4 3-46* 3/4 3-45 and 3/4 3-46*
3/4 3-49 and 3/4 3-50 3/4 3-49 and 3/4 3-50 3/4 3-53 and 3/4 3-54* 3/4 3-53 and 3/4 3-54*
3/4 3-61 and 3/4 3-62* 3/4 3-61 and 3/4 3-62*-
3/4 3-65 and 3/4 3-66* 3/4.3-65-and 3/4-3-66*
3/4 3+71 and 3/4 3-72* 3/4 3-71-and 3/4 3-72*
3/4 3-79 and 3/4 3-80* _3/4 3-79 and 3/4 3-80*
3/4 4-37 and 3/4 4-38* 3/4 4-37 and 3/4 4-38*-
3/4 7-9 and 3/4 7-10* 3/4 7-9 and 3/4 7-10*
3/4 7-25 and 3/4 7-26* 3/4-7-25 and 3/4?7-26*
3/4-7-27 and 3/4 7-28* 3/4.7 27 and 3/4 7-28*
3/4 8-19_and 3/4 8-20* 3/4-8-19 and_3/4 8-20*
k 3/4 9-7 and 3/4 9-8* 3/4 9-7 and-3/4 9-8*
3/4 9-9* and 3/4 9-10 3/4 9-9* and 3/4 9-10.
3/4 9-13 and 3/4 9-14 3/4 9-13 and 3/4 9 3/4 11-1 and 3/4 11-2* 3/4 11-1 and 3/4 11-2*
i- 3/4 11-5 and 3/4 11'-6' 3/4 11-5 and 3/4 11-6
- Overleaf nage containine no chanre.
E3-1 1
9212140090 921207 4 PDR ADOCK 0500
_ P-
. . . . _ _ ._ . _ . . . _ ___ . _. __. . . . . _ _ _ - - _ . . _ . _ ..-_... , ~ . . - . . . . _.,
'-i.:
T ENCLOSURE-3 (CONTINUED).
L PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS
~AS A RESULT OF GENERIC 87-09
- 1NSTRUCTIONS FOR INCORPORATION r Remove Page Insert Pare (s)- '
3/4 11-7 and 3/4 11-8 3/4 11-7 and-3/4 11 8 3/4 11-11* and 3/4 11-12 3/4 11-11* and 3/4 11-12 3/4 11-13 and 3/4 11-14 3/4 11 13 and 3/4 11 - 3/4 11-15 and 3/4 11 16 3/4 11-15_and 3/4 11-16 3/4 11 17. and 3/4 11-18 3/4 11 17 and 3/4 11-18' 3/4 12-1* and 3/4.12-2 3/4.12 1* and.3/4-12 3/4 12-13 and 3/4 12-14 3/4:12-13 and 3/4_12-14 B 3/4 0-1 B 3/4 0-1, B_3/4 0 2, and B 3/4 0-3 B 3/4 0-ta and B 3/4 0-2 B 3/4.0-4 and B 3/4.0-5
. B 3/4 0-3 B 3/4 0-6 F
)
?
- Overleaf onge containine no chanc.e.
E3-2 4
' ' ^
u .- - _ _._,,,,._e r .g,, v.,-y.. ~ y
3/4.0 APPLICABILITY EASES comply with ACTION requirements, the plant may have entered a MODE in which a new specification becomes applicable. In this case, the time limits of the ACTION requirements would apply from the point in time that the new specification becomes applicable if the requirements of the Limiting Condition for Operation are not met.
Specification 3.0.2 establishes that noncompliance with a specification exists when the requirements of the Limiting Condition for Operation are not met and the associated ACTION requirements have not been implemented within the specified time interval. The purpose of this specification is to clarify that (1) implementation of the ACTION requirements within the specified time interval constitutes compliance with a specification and (2) completion of the remedial measures of the ACTION requirements is not required when compliance with a Limiting Condition of Operation is restored within the time interval specified in the associated ACTION requirements.
Specification 3.0.3 establishes the shutdown ACTION requirements that must be implemented when a Limiting Condition for Operation is not met and the condition is ,g not specifically addressed by the associated ACTION equirements. The purpose of 30 this specification is to delineate the time limits '.or placing the unit in a safe C) shutdown MODE when plant operation cannot be maintained within the limits for safe operation defined by the Limiting Conditions for Operation and its ACTION
g3 requirements. It is not intended to be used as an operational convenience which m permits (routine) voluntary removal of redundant systems or components from service C7 in lieu of other alternatives that would not result in redundant systems or components being inoperable. One hour is allcwed to prepare for an orderly 00
;hutdown before initiating a change in plant operation. This time permits the uperator to coordinate the reduction in electrical generation with the load
{g
- ispatcher to ensure the stability and availability of the electrical grid. The g3 4\me limits specified to reach lower MODES of operation permit the shutdown to proceed in a controlled and orderly manner that is well within the specified maximum cooldown rate and within the cooldawn capabilities of the facility assuming only the minimum required equipment is OPERABLE. This reduces thermal stresses on components of the primary coolant system and the potential for a plant upset that could challenge safety systems under conditions for which this specification applies.
If remedial measures permitting limited continued operation of the f acility under the provisions of the ACTION requirements are completed, the shutdown may be terminated. The time limits of the ACTION requirements are applicable from the point in time there was a failure to meet a Limiting Condition for Operation.
The re fo re , the shutdown may be terminated if the ACTION requirements have been met or the time limits of the ACTION requirements have not expired, thus providing an allowance for the completion of the required actions.
The time limits of Specification 3.0.3 allow 37 hours for the plant to be in the COLD SHUTDOWN MODE when a shutdown is required during the POWER MODE of V0GTLE UNITS - 1&2 B 3/4 0-2
d 3/4.0 APPLICABILITY BASES w
with the provisions of the ACTION requirements. The provisions of this specification should not, however, be interpreted as endorsing the failure to exercise good practice in restoring systems or components to OPERABLE status before plant startup.
When a shutdown is required to comply with ACTION requirements, the provisions of Specification 3.0.4 do not apply because they would delay placing the facility in a lower MODE of operation.
Specifications 4.0.1 through 4.0.5 establish the general requirements applicable to -
Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal Regulations, 10 CFR 50.36(c)(3):
" Surveillance requirements are requirements relating to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."
Snecification 4.0.1 establishes the requirement that surveillances must be performed 73 during the OPERATIONAL MODES or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual
{j Surveillance Requirement. The purpose of this specification is to ensure that -
surveillances are performed to verify the operational status of systems and ni components and that parameters are within specified limits to ensure safe operation C7' of.the facility when the plant is in a MODE or other specified condition for which the associated' Limiting Conditions for Operation are applicable. Surveillance Requirements do not have to be performed when the facility is in an OPERATIONAL MODE- hh yg for which the requirements of the associated Limiting Condition for Operation do not rn apply unless otherwise specified. The Surveillance Requirements associated with a 50 -
Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a specification.
Specification 4.0.2 establishes the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be-suitable for conducting the surveillance ; e.g., transient conditions or other ongoing surveillance or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refueling outage. It is not intended that this provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are performed during normal operation. The limitation of Specification 4.0.2 is based on engineering judgement and the recognition that the most probable result of any
-particular surveillance being performed is-the verification-of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not significantly degraded beyond that obtained frcm the specified surveillance interval.
VOGTLE UNITS - 1&2 B 3/4 0-4 l
. - _ - _ _ - - _ _ _ _ _ = _ _ _ _ _ - -
t 3/4.0 APPLICABILITY BASES S2erification 4.0.3 establishes the failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by the provisions of Specification 4.0.2, as a condition that constitutes a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Under the provisions of this specification, systems and components are assumed to be OPERABLE when Surveillance Requirements have been satisfactorily performed within the specified time interval.
However, nothing in this provision is to be construed as implying that systems or components are OPERABLE when they are found or known to be inoperable although still meeting the Surveillance Requirements. This specification also clarifies that the ACTION requirements are applicable when Surveillance Requirements have not been _
completed within the allowed surveillance interval and that the time limits of the ACTION requirements apply from the point in time it is identified that a surveillance has not been performed and not at the time that the allowed surveillance interval was exceeded. Completion of the Surveillance Requirement within the allowable outage time limits of the ACTION requirements restores compliance with the requirements of Specification 4.0.3. However, this does not negate the fact that the failure to have performed the surveillance within the allowed surveillance interval, defined by the provisions of Specification 4.0.2, was a violation of the OPERABILITY requirements of a Limiting Condition for Operation 'O that is subject to enforcement action. Further, the failure to perform a fj surveillance within the provisions of Specification 4.0.2 is a violation of a }g Technical Specification requirement and is, therefore, a reportable event under the (n requirement of 10 CFR 50.73(a)(2)(1)(B) because it is a condition prohibited by the M7 plant's Technical Specification. 57 If the allowable outage time limits of the ACTION requirements are less than 24 hours or a shutdown is required to comply with ACTION requirements, e.g.,
Specification 3.0.3, a 24-hour allowance is provided to permit a delay in implementing the ACTION requirements. This provides an adequate time limit to complete Surveillance Requirements that have not been performed. The purpose of this allowance is to permit the completion of a surveillance before a shutdown is required to comply with ACTION requirements or before other remedial measures would be required that may preclude completion of a surveillance. The basis for this allowance includes consideration for plant conditions, adequate planning, availability of personnel, the time required to performed the surveillance, and the safety significance of the delay in completing the required surveillance. This provision also provides a time limit for the completion of Surveillance Requirements that become applicable as a consequence of MODE changes imposed by ACTION requirements and for completinb Surveillance Requirements that are applicable when an exception to the requirements of Specification 4.0.4 is allowed. If a surveillance is not completed within the 24-hour allowance, the time limits of the ACTION requirements are applicable at that time. When a surveillance is performed within the 24-hour allowance and the Surveillance Requirements are not met, the time limits of the ACTION requirements are applicable at the time that the surveillance is terminated.
V0GTLE UNITS - 1&2 B 3/4 0-5