ML20117Q032
Text
1
_. Docket Hos.:
50-317/318 MAY 14M MEMORANDUM FOR:
Robert A. Capra, Project Director Project Directorate I-1 Division of Reactor Projects I/!!
FROM:
Faust Rosa, Chief Electrical Systems Branch Division of Systems Technology
SUBJECT:
CALVERT CLIFFS 1 AND 2 -
TECHNICAL SPECIFICATION REVISIONS Plant Name:
Calvert Cliffs 1 and 2 Utility:
BG&E Docket Hos.:
50 317/318 TAC Nos.:
71592/71593/71594/71595 Licensing Stage:
OR Resp. Directorate: PD I-1/DRP Project Manager:
S. McNeill Review Branch:
SELB/ DST Review Status:
Complete 14, 1988, Baltimore Gas and Electric requested approval By letter dated December of four Technical Specification changes, each extending the usual 18 month sur.
veillance interval to a refueling interval, nominally 24 months, but often more, depending on the gross heat production, or approximately, on the net Maximum The staff finds the Technical Specification Dependable Capacity (net MDC).
The changes acceptable, although not for the reasons offered by the licensee.71592/71593/71594/
enclosed Safety Evaluatior. Report completes SELB action on TACs 71595.
Enclosed is the SALP input for the staff review.
01nkvt Faust Rosa, Chief Electrical Systems Bran h
Division of Systems Tec1nology Distribution;
Enclosures:
Docket File Nos. 50 317/318 1.
SER 2.
SALP SELB Rdg.
C. Morris (PF)(2)
D. Tondi
Contact:
C. Morris, SELB/ DST F. Rosa Calvert Cliffs S/F X23284 M &!4 6
[0051700F6)T M,'
DFn
- =p.
- s. _ _ _ =
I{
g
- C
- 5ELB/ DST
- 5C/SELB/ DST :BC/5ELB/ DST :.:.......____:____........:..___......:.........I VIE :Citorris:rn :DTondi FRosa
....:.....CAQ...:.......f ATE:4/(f/90
- f/ /0 /90
- f/jy/90 OttlCIAL RECORD COPY Document Name: CM
-