ML20117P934

From kanterella
Jump to navigation Jump to search

Requests Designation of Region I Personnel for Membership on Calvert Cliffs Assessment Panel to Coordinate Review of Performance Improvement Plan
ML20117P934
Person / Time
Site: Calvert Cliffs  
Issue date: 04/28/1989
From: Murley T
Office of Nuclear Reactor Regulation
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20116D885 List: ... further results
References
FOIA-96-237 TAC-72931, TAC-72932, NUDOCS 8905050327
Download: ML20117P934 (4)


Text

1

(#

UNITED STATES f

g NUCLEAR REGULATORY COMMISSION

'r, j

WASHING TON, D. C. 20555

\\*****/

APR 2 81980 Docket Nos. 50-317 and 50-318 1

1 MEMORANDUM FOR: William T. Russell, Regional Administrator Region i l

FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

ESTABLISHMENT OF CALVERT CLIFFS ASSESSMENT PANEL TO COORDINATE REVIEW OF THE CALVERT CLIFFS PERFORMANCE t

IMPROVEMENTPLAN(TACNOS.72931AND72932)

On April 7,1989, the Baltimore Gas and Electric Company (BG&E) submitted a Performance Iraprovement Plan (PIP) in response to NRC's actions resulting from the December 1988 Senior Management Meeting during which Calvert Cliffs was categorized as a plant that required closer monitoring. Facilitation of an expeditious yet comprenensive review of this PIP, particularly as weighed against current plant performance, can best be accomplished, I believe, through the use of an assessment panel approach. This panel would be comprised of HRC Region I (RI) and Headquarters (HQ) staff members with wide ranges of expertise to review the licensee's actions associated with the problems currently existing at Calvert Cliffs.

This would permit better coordination of inspection and licensing activities. The effective and successful use of this approach has been demonstrated during the NRC reviews of the Nine Mile Point 1. Peach Bottom 2/3 and Pilgrim Restart Plans.

In order to implement this concept in consideration of the present high level of staff activities in Region I, I have. designated Bruce Boger, Assistant Director for Region I Reactors, NRR, as the Chairman of the Calvert Cliffs Assessment Panel (CCAP) and as the NRC point of contact for all public matters directly related to the PIP.

To properly staff the CCAP, beyond the NRR Projects personnel being provided, it is requested that you designate RI resources to bring a balanced approach to this panel.

In addition to the need for RI DRP resources, including a

)

senior manager to act as Vice-Chairman, an engineering expert from DRS and a representative of DRSS are considered vital to the proper functioning of the CCAP. The proposed CCAP membership is as fellows:

Contact:

Scott McNeil (FTS 492-1438) xn 2l&l96 yY 1

45'uiORyy{

g

~

'APR 2 81999 4

William T. Russell 2-l Chairman: Bruce Boger, Assistant Director for Region I Reactors, NRR Vice_ Chairman: SES Representative, DRP, RI Members: Robert Capra, Project Director, PDI 1, NRR Maureen Hunemuller, Performance Evaluation Branch, NRR Scott McNeil, Project Manager, PDI-1, NRR Representatives, DRP, RI Representative, DRS, RI Representative, DRSS, RI To facilitate an expeditious review of the PIP, I request that you inform either me or Bruce Boger of the Region I personnel you designate for CCAP membership no later than May 4, 1989.

Upon completion 'f review of'the Performance Improvement Plan and acceptance o

of the PIP by the NRC staff, the Chairman of the Calvert Cliffs Assessment Panel will inform me by memorandum recomending the dissolution of the CCAP.

l OrrgTnal signed by pomas z. EudeEf Thomas E. Murley, Director Office of Nuclear Reactor Regulation DISTRIBUTION Docket file SVarga PDI_1 Rdg BBoger TMurley RCapra JSniezek SMcNeil JPartlow CVogan

  • SEE PREVIOUS CONCURRENCE CALVERT CLFS. PIP TASHIrl6 NEM0]

FC :PDI-1

PDI-l
ADRI
DRP
ADRP
DDONRR R

AME :SMcNei bah:vr:RCapra

BBoger
SVarga
JPartlow
JSniezek
urley

)

ATE :4/47/89

4/21/89*
4/21/89*
4/21/89*
4/24/89*
4/24/89*
4 89 l

0FFICIAL RECORD COPY

William T. Russell hairman: Bruce Boger, Assistant Director for Region I Reactors, NRR ce. Chairman: SES Representative, DRP, RI M

ers: Robert Capra, Project Director, PDI-1, NRR Maureen Hunemuller, Performance Evaluation Branch, NRR Scott McNeil, Project Manager, PDI-1, NRR Representatives, DRP, RI Representative, DRS, RI epresentative, DRSS, RI To facflitate an peditious review of the PIP, I request that you inform either me or Bruce ger of the Region I personnel you designate for CCAP membership no later an April 28, 1989.

Upon completion of revi of the Performance Improvenent Plan and acceptance of the PIP by the NRC sta

, the Chairman of the Calvert Cliffs Assessment Panel will inform me by me randum recommending the dissolution of the CCAP.

Origina1 signed by l

D20 mas E.1:urley i

homas E. Murley, Director fice of Nuclear Reactor Regulation DISTRIBUTION Docket file SYarga PDI_1 Rdg BBoger TMurley RCapra JSniezek SMcNeil JPartlow CVogan

  • SEE PREVIOUS CONCURRENCE i:ALVERTCLFS.PIPTASHINGMEM0]

';C

PDI-l
PDI-l
ADRI
DRP
ADRP
D 1RR
....:__....g"__:.... ______ :............:__________..:... ___....z d
\\ME
SMcNe 1: bah:vr:RCapra
BBo
SVarga
JPartlow

/ : SW1

urle
...
...._...____:............:_..ger.__.... _:_.... ______:._____....

k:-______....., _____y

!\\TE:4/A6/89

4/21/89*
4/21/89*
4/21/89*
4/24/89*
4/ipp89

/89 0FFICIAL RECORD COPY

William T. Russell hairman: Bruce Boger, Assistant Director for Region I Reactors, NRR ce. Chairman: SES Representative, DRP, RI Me ers: Robert Capra, Project Director, PDI-1, NRR Maureen Hunemuller, Performance Evaluation Branch, NRR Scott McNeil, Project Manager, PDI-1, NRR Representatives, DRP, RI Representative, DRS, RI j

epresentative, DRSS, RI To facilitate an e seditious review of the PIP, I request that you inform either v self or Br e Boger of the Region I personnel you designate for CCAP membership no later an April 28, 1989.

Upon completion of revie of the Performance Improvement Plan and acceptance of the PIP by the NRC sta

, the Chairman of the Calvert Cifffs Assessment Panel shall inform me by randum recommending the dissolution of the CCAP.

homas E. Murley, Director 0 fice of Nuclear Reactor Regulation DISTRIBUTION Docket file SVarga PDI-1 Rdg BBoger TMurley RCapra i

JSniezek SMcNeil JPartlow CVogan

ALVERT CLFS. PIP TASHING MEM0]

9 A

l :C :PDI-l

PDI
ADR[
DRP
ADRP
DDONRR
NRR
....
....__ g.: __-l

... :...;ge r..

......:.. 7..____:....___..___:._

,\\ME :SMcNe11: bah:vr:RCapra

BBo a
JPar w
JSnfezek
TMu ey 4.__.:_______.....:_._______.:_______..___:_. ___..___:___..... __.:.__.........:_____.....

l\\TE:4/g(/89

4/2l/89
4/l\\. /89
4 g/89
4/g /89
4/ /89
4/ /8 l

t 0FFICIAL RECORD COPY

- -