SURVEII. LANCE REQUIREMENTS auto-start signal; the steady-state generator voltage and frequency shall be maintained within these limits during this test;

6) Simulating a loss-of-offsite power in conjunction with an ESF Actuation test-signal, and: ,

a) Verifying deenergitation of the emergene busses and load i shedding from the emergency busses; I b) Verifying the diesel starts on auto-start signal energizes the emergency buss with permanently conne,cted loads within IT.5 seconds,* energizes the auto-connected emergency (accident) loads through the load sequencer and operates for greater than or equal to 5 minutes while ite generator is loaded with the emergency lohds. After energization, the steady-state voltage and frequency of i the emergency busses shall be maintained at 4160 +170, j 410 volts and 60 + 1.2 Hz during this test; and c) Verifying that all automatic diesel generator trips, except .

engineoverspeed,lowlubeoilpressure,highjacketwater '

temperatures"# and generator differential, are automatically l bypassed upon loss of voltage on the emer -

with a Safety Injection Actuacion signal.gency bus concurrent ,

7) Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. >

During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generatGr shall be loaded tn an indicated 7600 to 7700 kW,** and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be

?,<

6 >

loaded to an indicated 6800-7000 kW.** The generator voltage 4

  • and frequency shall be 4160 + 170. - 135 volts and 60 1 1.2 Hz 'c within 11.4 seconos after the star + signal; the steady-state 9 generator voltage and frequency : hall- u 4160 + 170, -410 volts 7 >

and 60

  • 1.2 Hz during this test.' 4tthir4-*4mte; after cm

$?: ting thi; 2'-h;r test r-perf-. r. . . .... .... ,,6c M .2h. Z ,g Q y

8) Verifying that the auto-connected loads to each diesel t, generator do not exceed the continuous rating of 7000 kW; Verifying the diesel generator's capability to:

j i

~

9)

Q.

t43

  • All engines starts for the purpose of surveillance testing as required by [f Spacification 4.8.1.1.2 may t.e preceded by an engine prelube period as  ;

@ (C recommended by the manufacturer to minimize mechanical stress and wear on L u/

the diesel engine D'

    • This band is meant as guidance to avoid-routine overloading of the engine, Loads in excess of this band or momentary veristions due to changing bus d

qt loads chall not invalidate the test. 9&

  1. Failure to maintain voltage and frequency requirements due to grid
disturbances does not render a 24-hour test as a failure. -

"M N!!5E551.N,

_ . . _ , ..c

.. $59MEE'db!N!?IN!i.;,N.. ._E

. ... 7. . ,.. ... , m . . . . -

.,I the die'sel generatop sho//'aey be operated at the load required by Surveillance Requirement 4.8.1.1.2.a5 te

%f JNYhe'g high'jNke#

b # ""flQ pjn I hour)t waker $emh@uEe #~ Ngerahn bypasiedMAas naped

-V0GTLE UNITS - 1 '^ 1 3/4 8-7 1p maY5h h@cQ[WM T[47 Amendment No. 31 (Unit 1) l 92o90 PDR - $ $ 920$

oso aj4 D Amendment No. 11 (Unit 2)

E