MONTHYEARML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247E6521998-04-30030 April 1998 Rev 0 to GE-NE-B13-01935-01, Jet Pump Riser Welds for RS-1 Indications Evaluation Rept for Vermont Yankee ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee ML20247E6221998-04-30030 April 1998 Final Rept of Rev 0 to 1HQXE, Vynp Unit 1 Recirculation Inlet Riser Ultrasonic Exam A34600, Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers1998-03-13013 March 1998 Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers ML20210T5551997-09-10010 September 1997 Addl Benchmarking of BWR Using CASMO-3/SIMULATE-3 ML20210H1111997-07-0707 July 1997 Consequence Evaluation of Vynp Class 1 Piping in Support of ASME Code Case N-560 ML20148D8581997-05-0707 May 1997 Advanced Offgas Follow-up Rept ML20138H3351997-04-28028 April 1997 Tech Specs for Offsite Power ML20138H3081997-04-28028 April 1997 Compliance W/Sbo Regulation ML20107D5951996-04-30030 April 1996 Rev 0 to Vermont Yankee Nuclear Power Station Core Shroud Repair Summary ML20094D8351995-09-22022 September 1995 Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code ML20086S3141995-07-20020 July 1995 Vynp 1995 Summary Rept for Repairs & Replacements 931001- 950505 ML20086K4581995-06-20020 June 1995 Inside Surface Ultrasonic Technique Capabilities as Demonstrated for Insp of FW Nozzles Final Rept ML20106G5451995-01-17017 January 1995 Investigation of Certain Anonymous Allegations Re Advanced Off-Gas Sys at Vermont Yankee Nuclear Power Station ML20097A5281992-05-29029 May 1992 Rev 1 to Decommissioning Funding Assurance Rept & Certification Submitted Per 10CFR50.33(k)(2),10CFR30.35 & 10CFR50.75,Vermont Yankee Nuclear Power Station ML20101S1261992-05-15015 May 1992 Application to Dispose in Place Contaminated Soil ML20086G4141991-11-0606 November 1991 Emergency Response Exercise Manual 1991 ML20091B2281991-01-31031 January 1991 Simulator Certification Rept,Vermont Yankee Training Dept Jan 1991 ML20247G9901989-06-30030 June 1989 Rev 0 to Vermont Yankee Cycle 14 Core Operating Limits Rept ML20245L1821989-06-30030 June 1989 Method for Generation of One-Dimensional Kinetics Data for RETRAN-02 ML20247G2531989-03-21021 March 1989 Rev 3 to Vermont Yankee Procedure Generation Package ML20151E0111988-07-15015 July 1988 Impact of Alternate Testing on Component & Sys Availability ML20151H9581988-04-30030 April 1988 CASMO-3G Validation ML20154K3351988-04-29029 April 1988 Rept on Containment Safety at Vermont Yankee ML20147G3371988-02-29029 February 1988 Justification for Long-Term Operation for Vermont Yankee Core Spray Nozzle Weld Overlays ML20153H0451987-12-31031 December 1987 Shutdown Assessment of Vermont Yankee Nuclear Power Facility, Interim Rept to State of Vt General Assembly ML20216J6571987-06-25025 June 1987 Dcrdr Summary Rept Suppl for Vermont Yankee Nuclear Power Plant ML20234D8131987-05-31031 May 1987 Cycle 13 Core Performance Analysis ML20206H7331987-03-31031 March 1987 Thermal Effects on Precoat Matl for Spent Fuel Pool Filter/ Demineralizers,Vermont Yankee Nuclear Power Station ML20205Q5421987-03-31031 March 1987 Evaluation of Matl Performance Suitability of New Vermont Yankee Spent Fuel Storage Rack Design ML20207Q3461987-01-12012 January 1987 Justification for Multi-Cycle Operation for Vermont Yankee Core Spray Nozzle Weld Overlays ML20214K6871986-08-31031 August 1986 Vols 1 & 2 to Dcrdr Implementation Task Team Final Rept, Supplementary NRC Matl. W/Two Oversize Encls ML20212Q2731986-08-31031 August 1986 Containment Safety Study ML20204F6001986-07-30030 July 1986 Revised SAR for Vermont Yankee Spds ML20210S2391986-06-25025 June 1986 High Risk:Ge Mark I Pressure-Suppression Design. Public Citizen Press Release Re Natl Coalition of Citizen Groups Petitions NRC to Revoke CPs for New Nuclear Plants Encl ML20203K8191986-04-30030 April 1986 Spent Fuel Storage Rack Replacement Rept ML20204G7371986-04-22022 April 1986 IHSI Weld Package for Vermont Yankee Nuclear Power Station ML20128E4131985-07-0101 July 1985 Dcrdr Summary Rept for Vermont Yankee Nuclear Power Plant ML20128P0891985-05-21021 May 1985 Rept of Investigation Carried Out by Ropes & Gray of Apparent False Documentation of Results of Receipt Insps at Vermont Yankee Nuclear Power Station ML20117A1071985-04-0808 April 1985 Safe Shutdown Capability Analysis ML20154N4811985-01-31031 January 1985 Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Vermont Yankee Generation Station ML20101S8291985-01-31031 January 1985 Functional SPDS Sar ML20094M9991984-08-10010 August 1984 Rev 2 to Environ Qualification Master Equipment List 1999-06-23
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
. _ - - -= - _ . . - _ . . _ - = - _ - - - - _ . . - . ~ . - . .
t DECOhihilSSIONING FUNDING ASSURANCE REPORT AND CERTIFICATION SUBhillTED PURSUANT TO 10 CFR i 50.33(k)(2),10 CFR 30.35 AND 10 CFR I 50.75 VERhtONT YANKEE NUCLEAR POWER STATION VERNON, VERhf 0NT VEP.htONT YANKEE NUCLEAR POWER CORPORATION REVISION 1, hfAY 29,1992 l-I WDATA_DECOMM_D052992 l
l l
9206030013-920S29-PDR- ADOCK 05000271 I PDR
1 INIRODUCTlON This report is being submitted by the Vermont Yankee Nuclear Power Corporation
(" Vermont Yankee"), holder of Facility Operating License No. DPR-28 and hiaterials License No. 44-13669-04, pursuant ta 10 CFR E $0.33(k)(2) and 10 CFR 30.35(c)(2) for the purpose of " indicating how reasonable assurance will be provided that funds will be available to decommission the f acility". The irformation contained in this report addresses Vermont Yankee's compliance with 10 CFR 50.75 and 10 CFR 30.35 and the implementing requirements of the Regulatory Guide 1.159, "Asturing tbc Availability of Funds for Decommissioning Nuclear Rcactors, prepared by the Staff in conjunction therewith (cited herein as " Reg.
Position").
COhiPl.IANCE WITil 10 CFR 50.75 AND 10 CFR 3025 Vermont Yankee
- 1. On hiarch 11,1988, Vermont Yankee and Chittenden Trust Company, as Trustee, enterol into the Vermont Yankee Decommissioning Trust Agreement (the " Trust"). On hiarch 10,1989, The lloward Bant; of Barlington, Vermont, was appointed as successor Trustee of the Trust (the " Trustee"). On hiay 9,1990, the Trust was amended to further define the Investment Guidelines. The Trust is an independent, irrevocable trust whose assets are held and administered by the Trustee for tbc purpose of paying the decommissioning costs of the Vermont Yankee plant. As such, the Trust is completely segregated from Vermont Yankee's assets and outside its administrative control. The "Irust constitutes an external sinking fund within the meardng of 10 CFR 30.35 (f)(iii) and 10 CFR Q 50.75(c)(ii). A composite copy of the Trust is submitted herewith in compliance with the requirements of 10 CFR Q 30.35(c) and 10 CFR Q 50.75(b) (see Exhibit I hereto). (Reg. Position 2.1.4.)
- 2. The Trust has been duly executed by officers of the parties thereto, thereunto duly authorized. (Reg. Position 2.1.3.)
- 3. The Trustee is a Vermont corporation whose trust operations are regulated and examined by the State of Vermont. (Reg. Position. 2.2.3.)
- 4. As of December 31,1991, the market value of the Trust was $69.9 million. All funds held by the Trust are available to meet costs of decommissioning the Vermont Yankee plant (see Sections 1.03 and 3.05 of the Trust, Exhibit I hereto). The market value of the Trust exceeds the $759,000 required by 10 CFR 30.35(d).
- 5. All material that Vermont Yankee is authorized to possess and use by hiaterials 2
, l.icense No. 44-13669-04 is part of the facility as licensed by Facility Operating 1.icense DPR-
- 28. ' No new byproduct, source or special nu: lear material is authorized by the Materials Operating License. The Materials License only oathorizes Vermont Yankee to transport material to off-site vendor facilities for special inspections, repairs or testing and requires it to be returned to Vermont Yankee. Removal of this material is therefore included in the T1.G Engineering, Inc. cost estimate for decommissioning Vermont Yankee referred to below.
- 6. In connection with its most necent rate proceeding before the Federal Energy Regulatory Commission ("FERC") in 1989, Vermont Yankee commissioned the preparatio.. of a site specine cost estimate (the " Study") for the decommissioning of the Vermont Yankee plant by TI.G Engineering, liased upcn the Study and other evidence, the FERC approved an Offer _
of Settlement which accepted $190 million in 1990 dollars (the " Allowed Cost") as the estimated cost of decommissioning of the Vermont Yankee plant which is ir.cludeable in rates and l authorized the collection of annual amounts which, together with the existing funds in the Trust and anticipated carnings thereon (based upon an assumed 6% annual in0ation rate and a real 3 carnings rate 0.94% per year) and appropriate tax loss carry backs, by 2012 would generate about $769 million. The year 2012 is the expiration date of Vermont Yankee's operating license. ,
- 7. liased upon the minimum requirements of 10 C1 at Q 50.75(c) and the adjustment factors specified therein, the applicable formula amount for decommissioning the Vermont Yankee plant, escalated as thereiri provided, would be $175.3 million in January 1991 dollar; (see Exhibit 2), using the applicable United States Bureau of 12bor Statistics publication rd -
NUREG 1307, Revision 2, " Report on Waste Ihrial Charges", July,1991.' This calculated minimum fund amount, escalated to March 2012 (the expiration date of Vermont Yankee's license), at 6% annually per the FERC Rate Settlement, becomes $595.9 million.
- 8. Since the Allowed Cost which is currently being collected and deposited in the Trust exceeds the minimam amount required by 10 CFR Q 50.75(c), daails of the Study are not i required to be submitted at this time (Reg. Posiiion 1.1,1.). Nevertheiess, the Study will be provided if the Commission or Staff so requests.
- 9. Vermont Yankee has Power Contracts, dated as of February 1.,19M, as heretofor amended by eight amendments, and Additional Power Contracts, dated as of February 1,1984,
' Note that the Burial Cost Index contained in NUREG 1397 is complete through January 1991 whereas the other escalation factors are complete through December 1990.
3
, with carh of its sponsoring utilities which obligate said sponsoring utilities in the aggregate to purchase the output and capacity of the Vermont Yankee plant and to pay therefor 100% of Vermont Yankee's operating costs, including decommissioning, whether or not its plant is operating. These contracts are valid and enforceable obligations of the parties thereto and have been approved as rates by the FERC. Composite conformed copics of the Power Contracts and Additional Power Contracts are Gled herewith as Exhibit 3 and Exhibit 4 hereto, respectively. '
Pursuant to these contracts the obligation of each spnnsoring utility to pay its pro rata share of decommissioning cost is irrevocable and remains in effect until the decommissioning of the Vermont Yankee plant has been completed.
Based upon the foregoing, Vermont Yankee hereby certines that Snancial assurance for decommissioning of the Vermont Yankee plant will be provided in an aggregate amount not less than the inflation adjusted minimum amount required by 10 CPR 50.75(c). Vermont Yankee further certifies that this financial assurance is inclusive of that required to decommission all materials authorized to be possessed by Vermont Yankee by Material License Number 44 13669-04 in accordance with the requirements of 10 CFR 30.35.
Respectfully submitted, VERMONT YANKEE NUCLEAR POWER CORPORATION 7
%)dGWM(U M M 4 May 29,1992 Ily: Thomas Wm11ennet h.. Assistant Treasurer .
List of Exhibits
- 1. Copy of Trust (previously Gled)
- 2. i 50.75 (c) calculation l