ML20196G50723 June 1999Vynp Assessment of On-Site Disposal of Contaminated Soil by Land SpreadingGrab sample
Offsite Dose Calculation Manual
ML20205S42116 April 1999Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion
ML20205F6634 March 1999Jet Pump Riser Weld Leakage Evaluation
ML20151U03628 August 1998Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion ProjectSafe Shutdown
Time to boil
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Power Uprate
ML20205F64931 July 1998Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont YankeeSafe Shutdown
Operating Basis Earthquake
Earthquake
Flow Induced Vibration
ML20236G00130 June 1998Individual Plant Exam External EventsHot Short
Safe Shutdown
High winds
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Squib
Tornado-Generated Missile
Tornado Generated Missile
Large early release frequency
Earthquake
Fire Watch
ML20247J83431 May 1998Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998Safe Shutdown
Ultimate heat sink
ML20247E65230 April 1998Rev 0 to GE-NE-B13-01935-01, Jet Pump Riser Welds for RS-1 Indications Evaluation Rept for Vermont Yankee
ML20247E63530 April 1998Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont YankeeSafe Shutdown Earthquake
Operating Basis Earthquake
Flow Induced Vibration
ML20247E62230 April 1998Final Rept of Rev 0 to 1HQXE, Vynp Unit 1 Recirculation Inlet Riser Ultrasonic Exam
A34600, Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers13 March 1998Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers
ML20210T55510 September 1997Addl Benchmarking of BWR Using CASMO-3/SIMULATE-3
ML20210H1117 July 1997Consequence Evaluation of Vynp Class 1 Piping in Support of ASME Code Case N-560Internal Flooding
Earthquake
Fuel cladding
ML20148D8587 May 1997Advanced Offgas Follow-up Rept
ML20138H33528 April 1997Tech Specs for Offsite Power
ML20138H30828 April 1997Compliance W/Sbo Regulation
ML20107D59530 April 1996Rev 0 to Vermont Yankee Nuclear Power Station Core Shroud Repair SummarySafe Shutdown
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Abnormal operational transient
Design basis earthquake
Foreign Material Exclusion
Earthquake
Liquid penetrant
Flow Induced Vibration
ML20094D83522 September 1995Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code
ML20086S31420 July 1995Vynp 1995 Summary Rept for Repairs & Replacements 931001- 950505
ML20086K45820 June 1995Inside Surface Ultrasonic Technique Capabilities as Demonstrated for Insp of FW Nozzles Final ReptLiquid penetrant
ML20106G54517 January 1995Investigation of Certain Anonymous Allegations Re Advanced Off-Gas Sys at Vermont Yankee Nuclear Power StationMissed surveillance
ML20097A52829 May 1992Rev 1 to Decommissioning Funding Assurance Rept & Certification Submitted Per 10CFR50.33(k)(2),10CFR30.35 & 10CFR50.75,Vermont Yankee Nuclear Power Station
ML20101S12615 May 1992Application to Dispose in Place Contaminated SoilTime of Discovery
Grab sample
ML20086G4146 November 1991Emergency Response Exercise Manual 1991
ML20091B22831 January 1991Simulator Certification Rept,Vermont Yankee Training Dept Jan 1991Safe Shutdown
Reactor Vessel Water Level
Half scram
Stroke time
Squib
Scram Discharge Volume
Overtravel
Residual voltage transfer
Fuel cladding
Coast down
ML20247G99030 June 1989Rev 0 to Vermont Yankee Cycle 14 Core Operating Limits ReptFuel cladding
ML20245L18230 June 1989Method for Generation of One-Dimensional Kinetics Data for RETRAN-02
ML20247G25321 March 1989Rev 3 to Vermont Yankee Procedure Generation PackageSquib
Scram Discharge Volume
ML20151E01115 July 1988Impact of Alternate Testing on Component & Sys AvailabilityReactor Vessel Water Level
Probabilistic Risk Assessment
ML20151H95830 April 1988CASMO-3G Validation
ML20154K33529 April 1988Rept on Containment Safety at Vermont YankeeReactor Vessel Water Level
Probabilistic Risk Assessment
Hardened vent
Fuel cladding
Biofouling
ML20147G33729 February 1988Justification for Long-Term Operation for Vermont Yankee Core Spray Nozzle Weld OverlaysWeld Overlay
ML20153H04531 December 1987Shutdown Assessment of Vermont Yankee Nuclear Power Facility, Interim Rept to State of Vt General AssemblyProbabilistic Risk Assessment
Chernobyl
Coast down
ML20216J65725 June 1987Dcrdr Summary Rept Suppl for Vermont Yankee Nuclear Power PlantSafe Shutdown
Emergency Lighting
Failure to Scram
ML20234D81331 May 1987Cycle 13 Core Performance AnalysisShutdown Margin
Feedwater Controller Failure
Fuel cladding
ML20206H73331 March 1987Thermal Effects on Precoat Matl for Spent Fuel Pool Filter/ Demineralizers,Vermont Yankee Nuclear Power Station
ML20205Q54231 March 1987Evaluation of Matl Performance Suitability of New Vermont Yankee Spent Fuel Storage Rack Design
ML20207Q34612 January 1987Justification for Multi-Cycle Operation for Vermont Yankee Core Spray Nozzle Weld OverlaysWeld Overlay
ML20214K68731 August 1986Vols 1 & 2 to Dcrdr Implementation Task Team Final Rept, Supplementary NRC Matl. W/Two Oversize EnclsPost Accident Monitoring
Squib
Emergency Lighting
Scram Discharge Volume
Fuel cladding
ML20212Q27331 August 1986Containment Safety Study
ML20204F60030 July 1986Revised SAR for Vermont Yankee Spds
ML20210S23925 June 1986High Risk:Ge Mark I Pressure-Suppression Design. Public Citizen Press Release Re Natl Coalition of Citizen Groups Petitions NRC to Revoke CPs for New Nuclear Plants EnclEarthquake
Chernobyl
ML20203K81930 April 1986Spent Fuel Storage Rack Replacement ReptOperating Basis Earthquake
ML20204G73722 April 1986IHSI Weld Package for Vermont Yankee Nuclear Power StationLiquid penetrant
ML20128E4131 July 1985Dcrdr Summary Rept for Vermont Yankee Nuclear Power PlantEmergency Lighting
ML20128P08921 May 1985Rept of Investigation Carried Out by Ropes & Gray of Apparent False Documentation of Results of Receipt Insps at Vermont Yankee Nuclear Power StationCoatings
ML20117A1078 April 1985Safe Shutdown Capability AnalysisSafe Shutdown
ML20154N48131 January 1985Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Vermont Yankee Generation Station
ML20101S82931 January 1985Functional SPDS Sar
ML20094M99910 August 1984Rev 2 to Environ Qualification Master Equipment List